2. Welcome and Introductions Steering Group Community Members Public Space Rangers Pomegranate Center Other?
3. Agenda Review of process - timeline Present design concepts Assemble task force Next steps
4.
5. Design development June 11 community meeting June 12 – July 12 internal design workshops Site visits Initial budgeting and materials selection Meetings with property owners and selected community members June 28 Steering Group meeting
15. opportunity for fundraiser: carving names of local donors on pavers
16.
17.
18. existing metal pole: stainless steel birds perch on pole from largest to smallest
19. all poles painted in a repeating color palette
20. adopt-a-pole project to decorate new and existing polesnew poles existing metal pole
21. Pole Art Bird pole and Adopt-a-poles Bird pole Stainless steel local birds perch on pole in descending order of size Adopt-a-poles New and existing wooden poles are painted and decorated with found materials such as cd’s, coffee cards, etc
45. Hedge can be coppiced (pruned to the ground) to harvest red twigs for weaving wreaths.
46.
47. Assemble Task Force Sign Up on Volunteer Sheets for: Plants Benches and Stage Poles Pavers In-kind donations of equipment Local source for native meadow-mix seeds Leader for paver fundraiser? Adopt-a-pole neighbors (pole enhancement ideas) Prime pole Paint pole per color scheme Fibonacci spiral Attach materials to pole
48. Next Steps Fine-tune design and budget Bench and Pole prototype workshop, July 19 Steering Group, July 26 Construction, August 18-21