Holcim Cement
Pre-Engineered Office Building

                Presented by:
       Wes Villhard – Kozeny-Wagner
            VP Commercial Construction


             Tom Way – WGA
            Senior Engineering Manager
Success Thru Best Practices
 Front End Planning
 Materials Management
 Team Building
 Partnering
Front End Planning
 Pre-Engineered Building
 Architecture & Engineering
 Mechanical / Electrical
 Interior Finish
 Project Team
Pre-Engineered Building
 Pre-Ordered American Metal Building
 Released without Door & Window Trim
 “In-Stock” Center Support Building
 Early Delivery in order to Build Frames During Slab Pour
Architecture & Engineering
 Completed Foundation Design from Pre-Engineered
  Building Loads
 Ordered Rebar for Foundations before Slab Design was
  Complete
 Pre-Approved Concrete Mix Design
 Allowed Two Weeks for Architectural Design
Mechanical / Electrical
 Ordered “In-Stock” Ground Mounted Split Systems
 Saved Engineering Time for Roof Frames
 Electrical Rough-in of Slab vs. Overhead
 Saved Two Weeks on Schedule
Mechanical / Electrical
 HighBay Lighting for Open Office Areas
    Reusable for Future Warehouse
 Duct Socks Reduced Field Labor
 Prefabed All Ductwork
 Installed Ductwork Prior to Roofing
Interior Finish
 Panelized Office Walls During Floor Slab Pours
 Install Studs Prior to Roofing
 Ordered only “In-Stock” Material
    Windows, Doors, Hardware, Toilet Partitions, Accessories, etc.
 Allowed Sealed Concrete Floors Rather than VCT or Other
  Flooring
 Coordinated all Interior Work with Roof Installation
    One Side then the Other
Project Team
 Selected Only Subs with Available Manpower
 Past Performance “Can-do” Attitude
    Subcontractors- Foreman & Project Manager
    Kozeny-Wagner - Foreman & Project Manager
 Teamwork, Find Solutions
 Overcome Obstacles
 Go the Extra Mile
Week 1 – Prefab Foundation Rebar
During Building Layout
Week 1 – Bad Soils & Rock
Encountered
Week 1 – Rock Encountered
Week 1 – Foundations Started
Week 1 – PreFabed Rebar in Perimeter
Foundations
Week 2 – Foundation Complete and
Backfilled
Week 2 – Slab Rough-in, Electrical &
Plumbing
Week 2 – Rebar For Heavy Duty Slab,
Delivered & Installed
Week 3 – Slab Pour, Steel Material Deck
Delivered in the Background
Week 3 – Rain Pushed First Slab Pour
Late Into the Night
Week 3 – Second Slab Pour
Week 4 – Plumbing Rough-in Started
Immediately with Wall Layout
Week 4 – Steel Erection in Progress
Using Pre-Assembled Frames
Week 4 – Center Support vs Clear-Span
Steel Used for Early Delivery
Week 4 – Building Frame Complete
Week 5 – Roof Perlins Complete and
Duct Hangers In Progress
Week 5 – Ductwork Delivered
Week 5 – Plumbing Rough-In
In Progress
Week 5 – Ductwork & West End &   Side
Wall
Week 5 – Exterior HVAC Units Set, Roof
Insulation & Roof Panels In Progress
Week 5 – Roof Insulation, Roof Panels,
Widows & Exterior Framing In Progress
Week 5 – Exterior View of Roof Insulation,
Window Framing & Ductwork / AC Units
Week 6 – Close-up of Roof Panels
In Progress
Week 6 – Ceiling Grid-Continuous,
Prior to Perimeter Offices
Week 6 – First Panelized Office
Week 6 – Exterior Office Framing,
Acoustical Grid, Prior to Roof Panels
Week 6 – Roof Insulation & Roof Panels
Continue to the Far End of the Building
Week 6 – One Side of Roof Complete,
Framing / MEP Rough-in In Progress
Week 7 – High Bay Lights Above Open
Office Areas
Week 7 – Roof Deck Delayed by High
Winds 1- 2 Weeks, Nearly Complete
Week 7 – Exterior Panes / Windows
Nearly Complete
Week 7 – Exterior Wall Panels Complete
Week 7 – Exterior Duct Work Complete,
Power On! Test & Balanced Started.
Week 7 – Duct Socks Installed to
Reduce Field Labor
Week 7 – Sheetrock and Restrooms
In Progress
Week 7 – Drywall / Doors / Hardware In
Progress, Preparing for Work Stations
Week 8 – Work Stations In Progress, Flex
Duct / Diffusers Installed, Lights / HVAC On
Week 8 – Painting Nearly Complete
Week 9 – Project Complete
COMPLETED IN
  9 WEEKS!
Project Summary
 Design-Build Delivery
 Half the Time of a Typical Schedule
 32 Private Offices, 5 Conference Rooms and
  90 Workstations
 Critical Path – “Fast-Track” Mode
    10-12 Hour Days
    7 Days / Week
Project Summary
 $240,000 in Change Orders
 $79 / Square Foot Total
 45 Normal Working Days (9 Weeks M-F)
 Less 16 Weather Days
Safety Award
 “On the Spot” WGA Safety
  Award Given to Dan Fox of
  Kozeny-Wagner.
 MSHA Award – Recognized by
  the South Central Region of the
  Federal Mine Safety & Health
  Administration for Outstanding
  Safety Compliance &
  Accomplishment.
Success Thru Best Practices
 Front End Planning
 Materials Management
 Team Building
 Partnering
Thank You Project Team!
 Aschinger Electric              Zumwalt Corporation
 Bieg Plumbing Company           Wedemeyer/Cernik/Corrubia, Inc.
 Fenix Construction Company      Zahner Surveying
 Frontenac Painting, Inc.        A.F. Becker
 Grau Contracting, Inc.          CKC Woodworks, Inc.
 Jarrell Contracting             H&G Sales
 Paul Abt Flooring               St. Louis Steel Buildings
 Rednour Steel Erectors, Inc.
A Special Thanks to

  Holcim Cement
        &
       WGA
We Build A Better Quality of Life

More Related Content

What's hot

Allen Robert CV
Allen Robert  CVAllen Robert  CV
Allen Robert CV
Rob Allen
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018
Crosstown TO
 
PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14
Jim Benge
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - June 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - June 2018Cedarvale & Forest Hill Construction Liaison Committee Meeting - June 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - June 2018
Crosstown TO
 

What's hot (20)

Allen Robert CV
Allen Robert  CVAllen Robert  CV
Allen Robert CV
 
Avenue & Chaplin CLC - Construction Update: November 3, 2021
Avenue & Chaplin CLC - Construction Update: November 3, 2021Avenue & Chaplin CLC - Construction Update: November 3, 2021
Avenue & Chaplin CLC - Construction Update: November 3, 2021
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
 
Fairbank-Oakwood Construction Update - January 2021
Fairbank-Oakwood Construction Update - January 2021Fairbank-Oakwood Construction Update - January 2021
Fairbank-Oakwood Construction Update - January 2021
 
Cedarvale & Forest Hill Construction Update (November 24, 2021)
Cedarvale & Forest Hill Construction Update (November 24, 2021)Cedarvale & Forest Hill Construction Update (November 24, 2021)
Cedarvale & Forest Hill Construction Update (November 24, 2021)
 
ITS Building Project - progress update 6
ITS Building Project - progress update 6ITS Building Project - progress update 6
ITS Building Project - progress update 6
 
Fairbank-Oakwood Construction Update - January 2022
Fairbank-Oakwood Construction Update - January 2022Fairbank-Oakwood Construction Update - January 2022
Fairbank-Oakwood Construction Update - January 2022
 
Fairbank-Oakwood Construction Update - November 2021
Fairbank-Oakwood Construction Update - November 2021Fairbank-Oakwood Construction Update - November 2021
Fairbank-Oakwood Construction Update - November 2021
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - Oct 2018
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - June 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - June 2018Cedarvale & Forest Hill Construction Liaison Committee Meeting - June 2018
Cedarvale & Forest Hill Construction Liaison Committee Meeting - June 2018
 
Brentcliffe-Victoria Park CLC Meeting
Brentcliffe-Victoria Park CLC MeetingBrentcliffe-Victoria Park CLC Meeting
Brentcliffe-Victoria Park CLC Meeting
 
Pharmacy to Kennedy CLC meeting
Pharmacy to Kennedy  CLC meetingPharmacy to Kennedy  CLC meeting
Pharmacy to Kennedy CLC meeting
 
progress of work till date
progress of work till dateprogress of work till date
progress of work till date
 
BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012
 
Chaplin & Avenue Construction Liaison Committee Meeting
Chaplin & Avenue Construction Liaison Committee MeetingChaplin & Avenue Construction Liaison Committee Meeting
Chaplin & Avenue Construction Liaison Committee Meeting
 
Brentcliffe to Victoria Park CLC Meeting - Presentation - November 4, 2021
Brentcliffe to Victoria Park CLC Meeting -  Presentation - November 4, 2021 Brentcliffe to Victoria Park CLC Meeting -  Presentation - November 4, 2021
Brentcliffe to Victoria Park CLC Meeting - Presentation - November 4, 2021
 
Balinese residences at adora de goa
Balinese residences at adora de goaBalinese residences at adora de goa
Balinese residences at adora de goa
 
Plots for sale in electronic city
Plots for sale in electronic cityPlots for sale in electronic city
Plots for sale in electronic city
 

Viewers also liked

101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building
hlksd
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildings
hlksd
 
88254718 pre-–engineered-steel-buildings
88254718 pre-–engineered-steel-buildings88254718 pre-–engineered-steel-buildings
88254718 pre-–engineered-steel-buildings
hlksd
 
Peb structures
Peb structuresPeb structures
Peb structures
hlksd
 
Bajaj corporate Office Architect and interiors India
Bajaj corporate Office Architect and interiors India Bajaj corporate Office Architect and interiors India
Bajaj corporate Office Architect and interiors India
COLLABORATIVE ARCHITECTURE
 
Project Punjab Energy Development Agency, Office Building, Chandigarh
Project Punjab Energy Development Agency, Office Building, ChandigarhProject Punjab Energy Development Agency, Office Building, Chandigarh
Project Punjab Energy Development Agency, Office Building, Chandigarh
arvindkrishan
 
Portfolio office design
Portfolio office designPortfolio office design
Portfolio office design
guest516d293
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
hlksd
 

Viewers also liked (20)

Richa industries is the main Pre Engineered building and Construction firm in...
Richa industries is the main Pre Engineered building and Construction firm in...Richa industries is the main Pre Engineered building and Construction firm in...
Richa industries is the main Pre Engineered building and Construction firm in...
 
Ace Builders and Engineers
Ace Builders and EngineersAce Builders and Engineers
Ace Builders and Engineers
 
Civil pre engennerd structure
Civil pre engennerd structureCivil pre engennerd structure
Civil pre engennerd structure
 
101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building
 
Pre engg buildings
Pre engg buildingsPre engg buildings
Pre engg buildings
 
88254718 pre-–engineered-steel-buildings
88254718 pre-–engineered-steel-buildings88254718 pre-–engineered-steel-buildings
88254718 pre-–engineered-steel-buildings
 
Peb structures
Peb structuresPeb structures
Peb structures
 
Commercial Office Building Acquisition
Commercial Office Building AcquisitionCommercial Office Building Acquisition
Commercial Office Building Acquisition
 
P.e.b. mini project report
P.e.b. mini project reportP.e.b. mini project report
P.e.b. mini project report
 
Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building System
 
Office building design
Office building designOffice building design
Office building design
 
Bajaj corporate Office Architect and interiors India
Bajaj corporate Office Architect and interiors India Bajaj corporate Office Architect and interiors India
Bajaj corporate Office Architect and interiors India
 
Pre engineering building design sample
Pre engineering building design samplePre engineering building design sample
Pre engineering building design sample
 
Project Punjab Energy Development Agency, Office Building, Chandigarh
Project Punjab Energy Development Agency, Office Building, ChandigarhProject Punjab Energy Development Agency, Office Building, Chandigarh
Project Punjab Energy Development Agency, Office Building, Chandigarh
 
Design with Sun, for an office building in Aurangabad, India
Design with Sun, for an office building in Aurangabad, IndiaDesign with Sun, for an office building in Aurangabad, India
Design with Sun, for an office building in Aurangabad, India
 
PEB construction-Mukesh Bhavsar
PEB construction-Mukesh BhavsarPEB construction-Mukesh Bhavsar
PEB construction-Mukesh Bhavsar
 
Portfolio office design
Portfolio office designPortfolio office design
Portfolio office design
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
Office Building in Järnbrott
Office Building in JärnbrottOffice Building in Järnbrott
Office Building in Järnbrott
 
IT parks in india
IT parks in indiaIT parks in india
IT parks in india
 

Similar to Office Building Constructed in Nine Weeks !

Intern operations project
Intern operations projectIntern operations project
Intern operations project
Kidd Khazini
 
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelOldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Blake Johnson
 
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Sustainable Performance Institute
 
Scs – A World Of Possibilities R New
Scs – A World Of Possibilities R NewScs – A World Of Possibilities R New
Scs – A World Of Possibilities R New
neerajtri
 
Thermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete BrochureThermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete Brochure
Doug Olson
 

Similar to Office Building Constructed in Nine Weeks ! (20)

Intern operations project
Intern operations projectIntern operations project
Intern operations project
 
Factory built substation case study
Factory built substation case studyFactory built substation case study
Factory built substation case study
 
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand HotelOldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
Oldcastle Precast Spokane - Urban Modular Construction - The Grand Hotel
 
Building act 2006 presentation english version
Building act 2006 presentation english versionBuilding act 2006 presentation english version
Building act 2006 presentation english version
 
Assume the Worst: Dealing with Contingency Items Before and After Renovation...
Assume the Worst: Dealing with Contingency Items Before and After Renovation...Assume the Worst: Dealing with Contingency Items Before and After Renovation...
Assume the Worst: Dealing with Contingency Items Before and After Renovation...
 
North Dakota Precast Concrete
North Dakota Precast ConcreteNorth Dakota Precast Concrete
North Dakota Precast Concrete
 
Leaside and Laird CLC - 10 May 2021
Leaside and Laird CLC - 10 May 2021 Leaside and Laird CLC - 10 May 2021
Leaside and Laird CLC - 10 May 2021
 
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
Case Study: Challenges of Insulating Existing Masonry Buildings in the Common...
 
Leaside and Laird CLC 8Mar2021
Leaside and Laird CLC 8Mar2021Leaside and Laird CLC 8Mar2021
Leaside and Laird CLC 8Mar2021
 
ITS Building Project - progress update 5
ITS Building Project - progress update 5ITS Building Project - progress update 5
ITS Building Project - progress update 5
 
A Net-Zero World and The Greening of Aiken
A Net-Zero World and The Greening of AikenA Net-Zero World and The Greening of Aiken
A Net-Zero World and The Greening of Aiken
 
ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...
ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...
ARCIS Ultra-Thin, Lightweight Prestressed Architectural Precast Panels – Prop...
 
Scs – A World Of Possibilities R New
Scs – A World Of Possibilities R NewScs – A World Of Possibilities R New
Scs – A World Of Possibilities R New
 
We have your piece of heaven
We have your piece of heavenWe have your piece of heaven
We have your piece of heaven
 
We Have Your Piece of Heaven
We Have Your Piece of HeavenWe Have Your Piece of Heaven
We Have Your Piece of Heaven
 
Thermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete BrochureThermo Bond Pre-Cast Concrete Brochure
Thermo Bond Pre-Cast Concrete Brochure
 
Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01Guidetosolarprojectimplementation 140323073210-phpapp01
Guidetosolarprojectimplementation 140323073210-phpapp01
 
Guide to Solar Project Implementation
Guide to Solar Project ImplementationGuide to Solar Project Implementation
Guide to Solar Project Implementation
 
ITS Building Project - progress update 1
ITS Building Project - progress update 1ITS Building Project - progress update 1
ITS Building Project - progress update 1
 
advanced constructiion technologies
advanced constructiion technologiesadvanced constructiion technologies
advanced constructiion technologies
 

Recently uploaded

Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 

Recently uploaded (20)

Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 

Office Building Constructed in Nine Weeks !

  • 1. Holcim Cement Pre-Engineered Office Building Presented by: Wes Villhard – Kozeny-Wagner VP Commercial Construction Tom Way – WGA Senior Engineering Manager
  • 2. Success Thru Best Practices  Front End Planning  Materials Management  Team Building  Partnering
  • 3. Front End Planning  Pre-Engineered Building  Architecture & Engineering  Mechanical / Electrical  Interior Finish  Project Team
  • 4. Pre-Engineered Building  Pre-Ordered American Metal Building  Released without Door & Window Trim  “In-Stock” Center Support Building  Early Delivery in order to Build Frames During Slab Pour
  • 5. Architecture & Engineering  Completed Foundation Design from Pre-Engineered Building Loads  Ordered Rebar for Foundations before Slab Design was Complete  Pre-Approved Concrete Mix Design  Allowed Two Weeks for Architectural Design
  • 6. Mechanical / Electrical  Ordered “In-Stock” Ground Mounted Split Systems  Saved Engineering Time for Roof Frames  Electrical Rough-in of Slab vs. Overhead  Saved Two Weeks on Schedule
  • 7. Mechanical / Electrical  HighBay Lighting for Open Office Areas  Reusable for Future Warehouse  Duct Socks Reduced Field Labor  Prefabed All Ductwork  Installed Ductwork Prior to Roofing
  • 8. Interior Finish  Panelized Office Walls During Floor Slab Pours  Install Studs Prior to Roofing  Ordered only “In-Stock” Material  Windows, Doors, Hardware, Toilet Partitions, Accessories, etc.  Allowed Sealed Concrete Floors Rather than VCT or Other Flooring  Coordinated all Interior Work with Roof Installation  One Side then the Other
  • 9. Project Team  Selected Only Subs with Available Manpower  Past Performance “Can-do” Attitude  Subcontractors- Foreman & Project Manager  Kozeny-Wagner - Foreman & Project Manager  Teamwork, Find Solutions  Overcome Obstacles  Go the Extra Mile
  • 10. Week 1 – Prefab Foundation Rebar During Building Layout
  • 11. Week 1 – Bad Soils & Rock Encountered
  • 12. Week 1 – Rock Encountered
  • 13. Week 1 – Foundations Started
  • 14. Week 1 – PreFabed Rebar in Perimeter Foundations
  • 15. Week 2 – Foundation Complete and Backfilled
  • 16. Week 2 – Slab Rough-in, Electrical & Plumbing
  • 17. Week 2 – Rebar For Heavy Duty Slab, Delivered & Installed
  • 18. Week 3 – Slab Pour, Steel Material Deck Delivered in the Background
  • 19. Week 3 – Rain Pushed First Slab Pour Late Into the Night
  • 20. Week 3 – Second Slab Pour
  • 21. Week 4 – Plumbing Rough-in Started Immediately with Wall Layout
  • 22. Week 4 – Steel Erection in Progress Using Pre-Assembled Frames
  • 23. Week 4 – Center Support vs Clear-Span Steel Used for Early Delivery
  • 24. Week 4 – Building Frame Complete
  • 25. Week 5 – Roof Perlins Complete and Duct Hangers In Progress
  • 26. Week 5 – Ductwork Delivered
  • 27. Week 5 – Plumbing Rough-In In Progress
  • 28. Week 5 – Ductwork & West End & Side Wall
  • 29. Week 5 – Exterior HVAC Units Set, Roof Insulation & Roof Panels In Progress
  • 30. Week 5 – Roof Insulation, Roof Panels, Widows & Exterior Framing In Progress
  • 31. Week 5 – Exterior View of Roof Insulation, Window Framing & Ductwork / AC Units
  • 32. Week 6 – Close-up of Roof Panels In Progress
  • 33. Week 6 – Ceiling Grid-Continuous, Prior to Perimeter Offices
  • 34. Week 6 – First Panelized Office
  • 35. Week 6 – Exterior Office Framing, Acoustical Grid, Prior to Roof Panels
  • 36. Week 6 – Roof Insulation & Roof Panels Continue to the Far End of the Building
  • 37. Week 6 – One Side of Roof Complete, Framing / MEP Rough-in In Progress
  • 38. Week 7 – High Bay Lights Above Open Office Areas
  • 39. Week 7 – Roof Deck Delayed by High Winds 1- 2 Weeks, Nearly Complete
  • 40. Week 7 – Exterior Panes / Windows Nearly Complete
  • 41. Week 7 – Exterior Wall Panels Complete
  • 42. Week 7 – Exterior Duct Work Complete, Power On! Test & Balanced Started.
  • 43. Week 7 – Duct Socks Installed to Reduce Field Labor
  • 44. Week 7 – Sheetrock and Restrooms In Progress
  • 45. Week 7 – Drywall / Doors / Hardware In Progress, Preparing for Work Stations
  • 46. Week 8 – Work Stations In Progress, Flex Duct / Diffusers Installed, Lights / HVAC On
  • 47. Week 8 – Painting Nearly Complete
  • 48. Week 9 – Project Complete
  • 49. COMPLETED IN 9 WEEKS!
  • 50. Project Summary  Design-Build Delivery  Half the Time of a Typical Schedule  32 Private Offices, 5 Conference Rooms and 90 Workstations  Critical Path – “Fast-Track” Mode  10-12 Hour Days  7 Days / Week
  • 51. Project Summary  $240,000 in Change Orders  $79 / Square Foot Total  45 Normal Working Days (9 Weeks M-F)  Less 16 Weather Days
  • 52. Safety Award  “On the Spot” WGA Safety Award Given to Dan Fox of Kozeny-Wagner.  MSHA Award – Recognized by the South Central Region of the Federal Mine Safety & Health Administration for Outstanding Safety Compliance & Accomplishment.
  • 53. Success Thru Best Practices  Front End Planning  Materials Management  Team Building  Partnering
  • 54. Thank You Project Team!  Aschinger Electric  Zumwalt Corporation  Bieg Plumbing Company  Wedemeyer/Cernik/Corrubia, Inc.  Fenix Construction Company  Zahner Surveying  Frontenac Painting, Inc.  A.F. Becker  Grau Contracting, Inc.  CKC Woodworks, Inc.  Jarrell Contracting  H&G Sales  Paul Abt Flooring  St. Louis Steel Buildings  Rednour Steel Erectors, Inc.
  • 55. A Special Thanks to Holcim Cement & WGA
  • 56. We Build A Better Quality of Life