SlideShare una empresa de Scribd logo
1 de 1
Descargar para leer sin conexión
0 10.000m 20.000m 30.000m 40.000m 50.000m
Hong Kong-Zhuhai-Macao Bridge 50,000m
Penang Second Bridge 23,370m
Padma Bridge 6,150m
Minpu Bridge 3,610m
Nhat Tan Bridge 3,080m
Vidin Calafat Bridge 1,971m
Hardanger Bridge 1,380m
Hong Kong-Zhuhai-Macao Bridge (HZMB)
Total length: 50,000m
Project Cost (est.): $10.7 billion
Expected Date of Completion: End 2016
Design: Will include three cable-stayed spans
Penang Second Bridge
Total length: 23,370m
Project Cost (est.): not available
Expected Date of Completion: January 2014
Design: Cable-stayed bridge
Carries: Motor vehicles
2Padma Bridge
Total length: 6,150m
Project Cost (est.): $2.9 billion
Expected Date of Completion: 2016
Design: Truss bridge
Carries: Motor vehicles, Railway
Minpu Bridge
Total length: 3,610m
Project Cost (est.): not available
Expected Date of Completion: not available
Design: Cable-stayed bridge (double-decker)
Carries: S32 Shenjiahuhu Expressway (Upper deck); road and pedestrian traffic
Nhat Tan Bridge
Total Length: 3,080m
Project Cost (est.): not available
Expected Date of Completion: Sept 2014
Design: 6 span continuous cable-stay bridge
Vidin Calafat Bridge
Total Length: 1,971 m
Project Cost (est.): $160 million
Expected Date of Completion: End of 2012
Design: Cable-stayed bridge
Carries: Four lanes of roadway, one railway track, two walkways
Hardanger Bridge
Total Length: 1,380m
Project Cost (est.): 200 million euro
Expected Date of Completion: 2013
Design: Suspension bridge
Carries: Two lanes of roadway and a bike/walkpath
Disclaimer:
Please note that we do all we can to ensure accuracy and timeliness of the information presented herein but errors may
still understandably occur in some cases. If you believe that a serious inaccuracy has been made please let us know. This
infograph is provided for information purposes only. IQPC accepts no responsibility whatsoever for any direct or indirect
losses arising from the use of this report or its contents.
References:
http://en.wikipedia.org/wiki/Hong_Kong%E2%80%93Zhuhai%E2%80%93Macau_Bridge
http://en.wikipedia.org/wiki/Padma_Bridge
http://en.wikipedia.org/wiki/Penang_Second_Bridge
http://en.wikipedia.org/wiki/Hardanger_Bridge
http://en.wikipedia.org/wiki/Minpu_Bridge
http://en.wikipedia.org/wiki/Danube_Bridge_2
http://www.nssmc.com/en/product/use/case/bridge/nyattan_bridge.html/
http://www.intellasia.net/construction-on-nhat-tan-bridge-to-be-completed-by-sep-2014-189144
http://talkvietnam.com/tag/nhat-tan-bridge-project/
Battle of Mega Bridges
The 7 Highly Notable Mega Bridge Projects
Notable Fact: With its length, HZMB
would become one of the landmarks
within the Pearl River Delta in East Asia.
Notable Fact: Penang Second Bridge
is considered a High Impact Project,
which is seen as a key catalyst in the
socio-economic development of the
Northern Corridor Economic Region
(NCER) of Malaysia.
Notable Fact: When completed,
Padma Bridge will be the largest
bridge in Bangladesh and the first
fixed river crossing for road traffic.
Notable Fact: The Minpu Bridge
carries two levels of roadway to
accommodate more cars and has
a stiffening truss to prevent
swinging in the city's harsh winds.
Notable Fact: Nhat Tan Bridge is
expected to be the longest
cable-stayed bridge in Vietnam
Notable Fact: The Vidin
Calafat Bridge will be the
second bridge on the
shared section of the
Danube between Romania
and Bulgaria
Notable Fact: The Hardanger Bridge
is world’s no. 7 longest span
Bridges Asia 2013 tackles Efficient Design, Construction and Maintenance of Long Span Bridge
Projects. Attend the conference and get access to visits, exclusive presentations and case
studies on the mega bridge projects in Asia, including:
• Hong Kong-Zhuhai-Macao Bridge
• Minpu Bridge
• Nhat Tan Bridge
• Vidin Calafat Bridge
• and more…
To find out more, visit www.bridges-asia.com. To attend the conference, email enquiry@iqpc.com.sg or call +65 6722 9388.

Más contenido relacionado

Similar a Battle of Mega Bridges - The 7 Highly Notable Mega Bridge Projects

Widening of existing Ghataprabha Bridge from 2 to 3 lane(oneway).pptx
Widening of existing Ghataprabha Bridge from 2 to 3 lane(oneway).pptxWidening of existing Ghataprabha Bridge from 2 to 3 lane(oneway).pptx
Widening of existing Ghataprabha Bridge from 2 to 3 lane(oneway).pptxSantoshMajagi
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET Journal
 
Presentation about Padma Bridge.pptx
Presentation about Padma Bridge.pptxPresentation about Padma Bridge.pptx
Presentation about Padma Bridge.pptxMdAbiAbdullah1
 
Uemc apr 19_2011
Uemc apr 19_2011Uemc apr 19_2011
Uemc apr 19_2011Harith
 
Padma bridge
Padma bridgePadma bridge
Padma bridgemsnsela
 
Sky bus an emerging technology
Sky bus an emerging technologySky bus an emerging technology
Sky bus an emerging technologyAmiya Kumar Samal
 
2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure Submissions2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure SubmissionsAutodesk AEC
 
Southeast Asia Construction - Qianximen Bridge, Chongqing, China
Southeast Asia Construction - Qianximen Bridge, Chongqing, ChinaSoutheast Asia Construction - Qianximen Bridge, Chongqing, China
Southeast Asia Construction - Qianximen Bridge, Chongqing, ChinaT.Y. Lin International
 
Structural analysis of a road bridge using ansys
Structural analysis of a road bridge  using ansysStructural analysis of a road bridge  using ansys
Structural analysis of a road bridge using ansysSubham kumar
 
2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-enTeresa Elliott
 
China Pakistan Economic Corridor (C-PEC)
China Pakistan Economic Corridor (C-PEC)China Pakistan Economic Corridor (C-PEC)
China Pakistan Economic Corridor (C-PEC)Annie1199
 
Mainland china to Taiwan bridge and artificial island progress.pptx
Mainland china to Taiwan bridge and artificial island progress.pptxMainland china to Taiwan bridge and artificial island progress.pptx
Mainland china to Taiwan bridge and artificial island progress.pptxdillarizky1
 
Seminar report on Vactrain
Seminar report on VactrainSeminar report on Vactrain
Seminar report on VactrainPunit Chainwal
 
Padma Brige Project 2017
Padma Brige Project 2017Padma Brige Project 2017
Padma Brige Project 2017RJ Sajeeb
 
15 of the Largest Megaprojects Still Under Construction
15 of the Largest Megaprojects Still Under Construction15 of the Largest Megaprojects Still Under Construction
15 of the Largest Megaprojects Still Under ConstructionPlanGrid
 

Similar a Battle of Mega Bridges - The 7 Highly Notable Mega Bridge Projects (20)

Widening of existing Ghataprabha Bridge from 2 to 3 lane(oneway).pptx
Widening of existing Ghataprabha Bridge from 2 to 3 lane(oneway).pptxWidening of existing Ghataprabha Bridge from 2 to 3 lane(oneway).pptx
Widening of existing Ghataprabha Bridge from 2 to 3 lane(oneway).pptx
 
Kattwykbridge
KattwykbridgeKattwykbridge
Kattwykbridge
 
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...IRJET-  	  Comparative Study of Effect of Varying Span Length on Major Elemen...
IRJET- Comparative Study of Effect of Varying Span Length on Major Elemen...
 
Presentation about Padma Bridge.pptx
Presentation about Padma Bridge.pptxPresentation about Padma Bridge.pptx
Presentation about Padma Bridge.pptx
 
Uemc apr 19_2011
Uemc apr 19_2011Uemc apr 19_2011
Uemc apr 19_2011
 
Padma bridge
Padma bridgePadma bridge
Padma bridge
 
Bridge report
Bridge reportBridge report
Bridge report
 
Sky bus an emerging technology
Sky bus an emerging technologySky bus an emerging technology
Sky bus an emerging technology
 
sky bus
sky bussky bus
sky bus
 
2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure Submissions2015 Excellence in Infrastructure Submissions
2015 Excellence in Infrastructure Submissions
 
Southeast Asia Construction - Qianximen Bridge, Chongqing, China
Southeast Asia Construction - Qianximen Bridge, Chongqing, ChinaSoutheast Asia Construction - Qianximen Bridge, Chongqing, China
Southeast Asia Construction - Qianximen Bridge, Chongqing, China
 
Structural analysis of a road bridge using ansys
Structural analysis of a road bridge  using ansysStructural analysis of a road bridge  using ansys
Structural analysis of a road bridge using ansys
 
2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en2015 excellence-infrastructure-summary-slides-en
2015 excellence-infrastructure-summary-slides-en
 
China Pakistan Economic Corridor (C-PEC)
China Pakistan Economic Corridor (C-PEC)China Pakistan Economic Corridor (C-PEC)
China Pakistan Economic Corridor (C-PEC)
 
Mainland china to Taiwan bridge and artificial island progress.pptx
Mainland china to Taiwan bridge and artificial island progress.pptxMainland china to Taiwan bridge and artificial island progress.pptx
Mainland china to Taiwan bridge and artificial island progress.pptx
 
MIG CV (Mar 2016)
MIG CV (Mar 2016)MIG CV (Mar 2016)
MIG CV (Mar 2016)
 
Seminar report on Vactrain
Seminar report on VactrainSeminar report on Vactrain
Seminar report on Vactrain
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
Padma Brige Project 2017
Padma Brige Project 2017Padma Brige Project 2017
Padma Brige Project 2017
 
15 of the Largest Megaprojects Still Under Construction
15 of the Largest Megaprojects Still Under Construction15 of the Largest Megaprojects Still Under Construction
15 of the Largest Megaprojects Still Under Construction
 

Más de Darwin Jayson Mariano

Contact Centre China: The Winning Strategy [eBook]
Contact Centre China: The Winning Strategy [eBook]Contact Centre China: The Winning Strategy [eBook]
Contact Centre China: The Winning Strategy [eBook]Darwin Jayson Mariano
 
Inside Shanghai Tower - Exclusive interview with Chief Architect, Marshall St...
Inside Shanghai Tower - Exclusive interview with Chief Architect, Marshall St...Inside Shanghai Tower - Exclusive interview with Chief Architect, Marshall St...
Inside Shanghai Tower - Exclusive interview with Chief Architect, Marshall St...Darwin Jayson Mariano
 
The Best Strategy for Asset Integrity
The Best Strategy for Asset Integrity The Best Strategy for Asset Integrity
The Best Strategy for Asset Integrity Darwin Jayson Mariano
 
Aiming for Alpha - Opportunities and Challenges for ETF Investors in Asia
Aiming for Alpha - Opportunities and Challenges for ETF Investors in AsiaAiming for Alpha - Opportunities and Challenges for ETF Investors in Asia
Aiming for Alpha - Opportunities and Challenges for ETF Investors in AsiaDarwin Jayson Mariano
 
6 Game-Changing Tips to Deal with Risk Management and Drug Safety Audit
6 Game-Changing Tips to Deal with Risk Management and Drug Safety Audit6 Game-Changing Tips to Deal with Risk Management and Drug Safety Audit
6 Game-Changing Tips to Deal with Risk Management and Drug Safety AuditDarwin Jayson Mariano
 
How effective is double skin façade in preventing building heat loss
How effective is double skin façade in preventing building heat lossHow effective is double skin façade in preventing building heat loss
How effective is double skin façade in preventing building heat lossDarwin Jayson Mariano
 
Nagging Dilemmas in Airport Expansion (and how to deal with them)
Nagging Dilemmas in Airport Expansion (and how to deal with them)Nagging Dilemmas in Airport Expansion (and how to deal with them)
Nagging Dilemmas in Airport Expansion (and how to deal with them)Darwin Jayson Mariano
 
The 3-Tier Process to Keep Pavements and Runways in Top Form
The 3-Tier Process to Keep Pavements and Runways in Top Form The 3-Tier Process to Keep Pavements and Runways in Top Form
The 3-Tier Process to Keep Pavements and Runways in Top Form Darwin Jayson Mariano
 
Latin America vs Southeast Asia: The Race for Private Equity Supremacy
Latin America vs Southeast Asia: The Race for Private Equity SupremacyLatin America vs Southeast Asia: The Race for Private Equity Supremacy
Latin America vs Southeast Asia: The Race for Private Equity SupremacyDarwin Jayson Mariano
 
The Best Private Equity Exit Strategy
The Best Private Equity Exit StrategyThe Best Private Equity Exit Strategy
The Best Private Equity Exit StrategyDarwin Jayson Mariano
 
What you don’t know about Membrane Solutions
What you don’t know about Membrane SolutionsWhat you don’t know about Membrane Solutions
What you don’t know about Membrane SolutionsDarwin Jayson Mariano
 
7 Most Significant Underground Projects in Asia Today [Infograph]
7 Most Significant Underground Projects in Asia Today [Infograph]7 Most Significant Underground Projects in Asia Today [Infograph]
7 Most Significant Underground Projects in Asia Today [Infograph]Darwin Jayson Mariano
 
Process Safety Blind Spots: EXPOSED [Infographic]
Process Safety Blind Spots: EXPOSED [Infographic]Process Safety Blind Spots: EXPOSED [Infographic]
Process Safety Blind Spots: EXPOSED [Infographic]Darwin Jayson Mariano
 
SKY HIGH - The 7 Most Remarkable Tall Building Projects in the World
SKY HIGH - The 7 Most Remarkable Tall Building Projects in the WorldSKY HIGH - The 7 Most Remarkable Tall Building Projects in the World
SKY HIGH - The 7 Most Remarkable Tall Building Projects in the WorldDarwin Jayson Mariano
 
The Changing Face of Asia's Geospatial Intelligence
The Changing Face of Asia's Geospatial Intelligence The Changing Face of Asia's Geospatial Intelligence
The Changing Face of Asia's Geospatial Intelligence Darwin Jayson Mariano
 
TRAILBLAZING: Shared Services and Outsourcing Trends in Asia 2013
TRAILBLAZING: Shared Services and Outsourcing Trends in Asia 2013 TRAILBLAZING: Shared Services and Outsourcing Trends in Asia 2013
TRAILBLAZING: Shared Services and Outsourcing Trends in Asia 2013 Darwin Jayson Mariano
 

Más de Darwin Jayson Mariano (20)

The Best Measure of SCADA Success
The Best Measure of SCADA SuccessThe Best Measure of SCADA Success
The Best Measure of SCADA Success
 
Contact Centre China: The Winning Strategy [eBook]
Contact Centre China: The Winning Strategy [eBook]Contact Centre China: The Winning Strategy [eBook]
Contact Centre China: The Winning Strategy [eBook]
 
Cash Forecasting Trends in Asia
Cash Forecasting Trends in Asia Cash Forecasting Trends in Asia
Cash Forecasting Trends in Asia
 
The India BPO Industry Report 2013
The India BPO Industry Report 2013The India BPO Industry Report 2013
The India BPO Industry Report 2013
 
Inside Shanghai Tower - Exclusive interview with Chief Architect, Marshall St...
Inside Shanghai Tower - Exclusive interview with Chief Architect, Marshall St...Inside Shanghai Tower - Exclusive interview with Chief Architect, Marshall St...
Inside Shanghai Tower - Exclusive interview with Chief Architect, Marshall St...
 
The Best Strategy for Asset Integrity
The Best Strategy for Asset Integrity The Best Strategy for Asset Integrity
The Best Strategy for Asset Integrity
 
Aiming for Alpha - Opportunities and Challenges for ETF Investors in Asia
Aiming for Alpha - Opportunities and Challenges for ETF Investors in AsiaAiming for Alpha - Opportunities and Challenges for ETF Investors in Asia
Aiming for Alpha - Opportunities and Challenges for ETF Investors in Asia
 
6 Game-Changing Tips to Deal with Risk Management and Drug Safety Audit
6 Game-Changing Tips to Deal with Risk Management and Drug Safety Audit6 Game-Changing Tips to Deal with Risk Management and Drug Safety Audit
6 Game-Changing Tips to Deal with Risk Management and Drug Safety Audit
 
Designing a Super Tall Skyscraper
Designing a Super Tall Skyscraper Designing a Super Tall Skyscraper
Designing a Super Tall Skyscraper
 
How effective is double skin façade in preventing building heat loss
How effective is double skin façade in preventing building heat lossHow effective is double skin façade in preventing building heat loss
How effective is double skin façade in preventing building heat loss
 
Nagging Dilemmas in Airport Expansion (and how to deal with them)
Nagging Dilemmas in Airport Expansion (and how to deal with them)Nagging Dilemmas in Airport Expansion (and how to deal with them)
Nagging Dilemmas in Airport Expansion (and how to deal with them)
 
The 3-Tier Process to Keep Pavements and Runways in Top Form
The 3-Tier Process to Keep Pavements and Runways in Top Form The 3-Tier Process to Keep Pavements and Runways in Top Form
The 3-Tier Process to Keep Pavements and Runways in Top Form
 
Latin America vs Southeast Asia: The Race for Private Equity Supremacy
Latin America vs Southeast Asia: The Race for Private Equity SupremacyLatin America vs Southeast Asia: The Race for Private Equity Supremacy
Latin America vs Southeast Asia: The Race for Private Equity Supremacy
 
The Best Private Equity Exit Strategy
The Best Private Equity Exit StrategyThe Best Private Equity Exit Strategy
The Best Private Equity Exit Strategy
 
What you don’t know about Membrane Solutions
What you don’t know about Membrane SolutionsWhat you don’t know about Membrane Solutions
What you don’t know about Membrane Solutions
 
7 Most Significant Underground Projects in Asia Today [Infograph]
7 Most Significant Underground Projects in Asia Today [Infograph]7 Most Significant Underground Projects in Asia Today [Infograph]
7 Most Significant Underground Projects in Asia Today [Infograph]
 
Process Safety Blind Spots: EXPOSED [Infographic]
Process Safety Blind Spots: EXPOSED [Infographic]Process Safety Blind Spots: EXPOSED [Infographic]
Process Safety Blind Spots: EXPOSED [Infographic]
 
SKY HIGH - The 7 Most Remarkable Tall Building Projects in the World
SKY HIGH - The 7 Most Remarkable Tall Building Projects in the WorldSKY HIGH - The 7 Most Remarkable Tall Building Projects in the World
SKY HIGH - The 7 Most Remarkable Tall Building Projects in the World
 
The Changing Face of Asia's Geospatial Intelligence
The Changing Face of Asia's Geospatial Intelligence The Changing Face of Asia's Geospatial Intelligence
The Changing Face of Asia's Geospatial Intelligence
 
TRAILBLAZING: Shared Services and Outsourcing Trends in Asia 2013
TRAILBLAZING: Shared Services and Outsourcing Trends in Asia 2013 TRAILBLAZING: Shared Services and Outsourcing Trends in Asia 2013
TRAILBLAZING: Shared Services and Outsourcing Trends in Asia 2013
 

Último

4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfErwinPantujan2
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
EMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxEMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxElton John Embodo
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 

Último (20)

4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdfVirtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
Virtual-Orientation-on-the-Administration-of-NATG12-NATG6-and-ELLNA.pdf
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
EMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxEMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docx
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 

Battle of Mega Bridges - The 7 Highly Notable Mega Bridge Projects

  • 1. 0 10.000m 20.000m 30.000m 40.000m 50.000m Hong Kong-Zhuhai-Macao Bridge 50,000m Penang Second Bridge 23,370m Padma Bridge 6,150m Minpu Bridge 3,610m Nhat Tan Bridge 3,080m Vidin Calafat Bridge 1,971m Hardanger Bridge 1,380m Hong Kong-Zhuhai-Macao Bridge (HZMB) Total length: 50,000m Project Cost (est.): $10.7 billion Expected Date of Completion: End 2016 Design: Will include three cable-stayed spans Penang Second Bridge Total length: 23,370m Project Cost (est.): not available Expected Date of Completion: January 2014 Design: Cable-stayed bridge Carries: Motor vehicles 2Padma Bridge Total length: 6,150m Project Cost (est.): $2.9 billion Expected Date of Completion: 2016 Design: Truss bridge Carries: Motor vehicles, Railway Minpu Bridge Total length: 3,610m Project Cost (est.): not available Expected Date of Completion: not available Design: Cable-stayed bridge (double-decker) Carries: S32 Shenjiahuhu Expressway (Upper deck); road and pedestrian traffic Nhat Tan Bridge Total Length: 3,080m Project Cost (est.): not available Expected Date of Completion: Sept 2014 Design: 6 span continuous cable-stay bridge Vidin Calafat Bridge Total Length: 1,971 m Project Cost (est.): $160 million Expected Date of Completion: End of 2012 Design: Cable-stayed bridge Carries: Four lanes of roadway, one railway track, two walkways Hardanger Bridge Total Length: 1,380m Project Cost (est.): 200 million euro Expected Date of Completion: 2013 Design: Suspension bridge Carries: Two lanes of roadway and a bike/walkpath Disclaimer: Please note that we do all we can to ensure accuracy and timeliness of the information presented herein but errors may still understandably occur in some cases. If you believe that a serious inaccuracy has been made please let us know. This infograph is provided for information purposes only. IQPC accepts no responsibility whatsoever for any direct or indirect losses arising from the use of this report or its contents. References: http://en.wikipedia.org/wiki/Hong_Kong%E2%80%93Zhuhai%E2%80%93Macau_Bridge http://en.wikipedia.org/wiki/Padma_Bridge http://en.wikipedia.org/wiki/Penang_Second_Bridge http://en.wikipedia.org/wiki/Hardanger_Bridge http://en.wikipedia.org/wiki/Minpu_Bridge http://en.wikipedia.org/wiki/Danube_Bridge_2 http://www.nssmc.com/en/product/use/case/bridge/nyattan_bridge.html/ http://www.intellasia.net/construction-on-nhat-tan-bridge-to-be-completed-by-sep-2014-189144 http://talkvietnam.com/tag/nhat-tan-bridge-project/ Battle of Mega Bridges The 7 Highly Notable Mega Bridge Projects Notable Fact: With its length, HZMB would become one of the landmarks within the Pearl River Delta in East Asia. Notable Fact: Penang Second Bridge is considered a High Impact Project, which is seen as a key catalyst in the socio-economic development of the Northern Corridor Economic Region (NCER) of Malaysia. Notable Fact: When completed, Padma Bridge will be the largest bridge in Bangladesh and the first fixed river crossing for road traffic. Notable Fact: The Minpu Bridge carries two levels of roadway to accommodate more cars and has a stiffening truss to prevent swinging in the city's harsh winds. Notable Fact: Nhat Tan Bridge is expected to be the longest cable-stayed bridge in Vietnam Notable Fact: The Vidin Calafat Bridge will be the second bridge on the shared section of the Danube between Romania and Bulgaria Notable Fact: The Hardanger Bridge is world’s no. 7 longest span Bridges Asia 2013 tackles Efficient Design, Construction and Maintenance of Long Span Bridge Projects. Attend the conference and get access to visits, exclusive presentations and case studies on the mega bridge projects in Asia, including: • Hong Kong-Zhuhai-Macao Bridge • Minpu Bridge • Nhat Tan Bridge • Vidin Calafat Bridge • and more… To find out more, visit www.bridges-asia.com. To attend the conference, email enquiry@iqpc.com.sg or call +65 6722 9388.