Summary:
Advanced Notice of Proposed Rulemaking
Released August 2011
By John Beets
Principal GIS Technologist, Willbros Engineering


An Advanced Notice of Proposed Rulemaking (ANPRM) was released by the Pipeline and Hazardous Materials Safety
Administration (PHMSA) in August 2011. High profile incidents, such as the PG&E failure in San Bruno, CA, have
instigated a push by Federal regulatory agencies for additional safety measures for gas transmission pipelines. This
ANPRM is requesting public comment on 14 specific topics in two broad categories. At some point following the review
period, PHMSA will release a Notice of Proposed Rulemaking (NPRM) that will incorporate comments/questions they
receive as a result of this ANPRM. This will allow another round of public comment/questions before a final rule is
released. It is difficult to predict the time frame for release of a final rule – past experience might indicate this could
occur very late in 2012, but more likely sometime in 2013.

The purpose of this document is to provide a brief summary of the content of the ANPRM in order to present a snapshot
of issues that may be under consideration for a revised final rule. An analysis of the information contained in the
ANPRM is not included.

Category 1: Should integrity management requirements be revised and strengthened to bring more pipeline mileage
under integrity management requirements and to better assure safety of pipeline segments in high-consequence
areas (HCAs)?

Topics:
1. Modify HCA definition to expand pipeline mileage in HCAs? This could be done by:
   a. Revising (decreasing) the count for buildings intended for human occupancy
   b. Expanding the definition of identified sites
   c. Making all Class 3 and 4 locations HCA – also increase the width for determining class location on pipelines
      over 24” outside diameter (OD) operating above 1,000 pounds per square inch gauge (psig)
   d. Increasing the HCA buffer beyond that determined by the potential impact radius (PIR)
   e. Considering presence of electric transmission lines or other critical infrastructure within the pipeline
      right-of-way (ROW)
   f. Allowing general public/local communities to provide input into identification of HCAs

2. Strengthen requirements to implement preventative and mitigative measures for pipeline segments in HCAs:
   The current rule requires operators to take additional preventative and mitigative measures in HCAs, but these
   measures are not specified. Risk analysis is to be used to identify additional measures appropriate to the HCA,
   but the current rule does not establish objective criteria or standards on how to determine what measures should
   be taken. PHMSA is considering additional prescriptive requirements to improve selection and implementation
   decisions for preventative and mitigative measures within and, potentially, outside of HCAs.

3. Modification of repair criteria: Changes to repair criteria to provide greater assurance of anomalies/defects being
   repaired before leading to a leak or rupture and whether these criteria need to be expanded to segments outside



Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com              1
© 2011 Willbros • All Rights Reserved.
Summary: Advanced Notice of Proposed Rulemaking


   of HCAs. This could involve the following:
   a. Revision of the repair criterion to add an additional safety margin
   b. Risk ranking – conditions in HCAs addressed first, followed by non-HCA areas
   c. Adjustment of repair schedules in both HCA and non-HCA areas
   d. Potential standards to account for known accuracy of inline inspection (ILI) tools that are consistent across
      all ILI vendors and operator
   e. Potential methods for validation of tool performance such as validation digs or analysis of as-found versus
      as-predicted defect dimensions
   f. Standards for conducting inline inspections, specific interpretation of personnel qualifications, integration
      of other data sources with ILI

4. Improving requirements for collecting, validating and integrating pipeline data:
   a. Require validation methods be in place, such as pipeline excavations
   b. Require collection of data during pipeline exposure to validate information in the operator’s records
   c. Verify critical pipe data, coating, testing, and operations and maintenance (O&M) records on a periodic basis
      (requirements become more prescriptive)

5. Making requirements related to the nature and application of risk models more prescriptive: PHMSA’s experience
   indicates that majority of operators use relative index-model approaches to risk assessment. PHMSA is not convinced
   as to the robustness of this method. Possible changes discussed:
   a. Strengthen requirements on functions risk models perform
   b. Mandate usage of a specific risk model
   c. Improve existing models to assure usefulness
   d. Push to use more quantitative models is contemplated

6. Strengthening requirements for applying knowledge gained through the integrity management (IM) program: This
   is related to the current regulation requiring operators to consider other portions of their systems if an assessment
   identifies corrosion requiring repair. Intention is to strengthen requirements related to operator’s use of insights
   gained from implementation of their IM program:
   a. Potential requirements for updating risk models as additional knowledge is gained
   b. Guidelines or requirements related to data integration and/or updating of aerial imagery or patrolling
   c. Specification of a maximum time period for review and validation of risk assessments
   d. Potential data requirements for data integration

7. Strengthening requirements on the selection and use of assessment methods: Currently four methods –
   ILI, pressure test, direct assessment and other technology demonstrated to provide an equivalent understanding
   of pipe condition. Possible changes discussed:
   a. Require ILI wherever possible – include requirements to expand line modifications to accommodate ILI
   b. Restrictions on use of other assessment technologies
   c. Establish standards for conducting ILI assessments – incorporate by reference into regulations


Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com           2
© 2011 Willbros • All Rights Reserved.
Summary: Advanced Notice of Proposed Rulemaking


   d. Establish standards for conducting Internal Corrosion Direct Assessment (ICDA) and Stress Corrosion Cracking
      Direct Assessment (SCCDA) – incorporate by reference into regulations
   e. Require a onetime pressure test to address manufacturing and construction defects

Category 2: Should non-IM requirements be strengthened or expanded to address other issues associated with
pipeline system integrity?

Topics:
1. Valve spacing and the need for remotely or automatically controlled valves: Current regulation specifies block
   valve spacing by class location on newly built lines. Remotely operating and/or automatic valves are not currently
   required. Potential changes:
   a. Change spacing requirements for new lines
   b. Explicitly require new valves in the event of class change to meet spacing requirements
   c. Explicitly require new valves under other (non-class change) conditions
   d. Require remotely controlled sectionalizing block valves
   e. Require prescriptive design criteria for operator evaluation of additional valves, remote closure and/or
      valve automation

2. Corrosion control: Requirements related to external, internal and atmospheric corrosion:
   a. Require post-construction surveys for coating damage or to determine Cathodic Protection (CP) adequacy
   b. Require periodic interference current surveys (such as Close Interval Survey – CIS)
   c. Add additional measures to prevent internal corrosion (such as ILI runs or accumulated liquids sampling)
   d. Include practices or standards addressing prevention, detection, assessment and remediation of SCC – requiring
      additional surveys or shorter internal surveys based on pipeline operating temperatures and coating types
   e. Prescribe CIS external corrosion control survey timing intervals for both HCAs and non-HCAs that are used
      to determine CP effectiveness
   f. Provide specific HCA and non-HCA corrosion control measures with clearly defined conditions and appropriate
      mitigation efforts
   g. Perform a critical analysis of all factors influencing SCC to determine if a credible threat exists for each
      pipeline segment
   h. Require SCC integrity assessment in segments where a credible threat has been identified
   i. Require a periodic analysis of operator corrosion management programs, integrating all relevant data
   j. Require operators to periodically submit corrosion management performance metric data

3. Pipe manufactured using longitudinal weld seams: This is meant to address longitudinal seam weld issues with
   pipe manufactured primarily before 1970 and pressure test grandfathering for lines built prior to 1971 (allowing
   operations at a maximum allowable operating pressure (MAOP) based on the highest 5-year operating pressure
   prior to July 1, 1970 in lieu of a pressure test):
   a. Require all pipelines that have not been pressure tested at or above 1.1 times MAOP or class location test criteria
      to be pressure tested in accordance with present regulation



Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com            3
© 2011 Willbros • All Rights Reserved.
Summary: Advanced Notice of Proposed Rulemaking


   b. Alternatively, require specific types of pipe with an operating history that demonstrates systemic integrity issues
      to be pressure tested in accordance with present regulation, e.g., low-frequency electric resistance welded
      (LF-ERW), direct current electric resistance welded (DC-ERW), lap-welded, electric flash welded (EFW), furnace
      butt welded, submerged arc welded or other longitudinal seams
   c. Define alternative minimum test pressures
   d. Provide additional pressure test requirements to all pipelines, or only pipelines in HCAs, or only pipelines in
      Class 2, 3, or 4 areas
   e. Specify other technologies that may reliably find and remediate seam integrity issues

4. Establishing requirements applicable to underground gas storage: PHMSA may develop standards covering
   underground gas storage facilities. This could include:
   a. Safety standards for casing, tubing, isolation packer and wellbore communication and wellhead equipment
   b. Standards for monitoring of external/internal corrosion
   c. Standards for welding, pressure testing and design safety factors of casing and tubing
   d. Emergency shutdowns for wellhead valves
   e. Integrity and O&M intervals for key safety and CP systems
   f. Standards for emergency shutdowns, emergency shutdown stations, gas monitors, local emergency response
      communications, public communications and O&M procedures

5. Management of change: PHMSA pipeline safety regulations do not now address management process subjects
   such as management of change. PHMSA is considering adding requirements in this area to provide a greater degree
   of control over this element of pipeline risk:
   a. Development of standards governing the management of change process including requirements for IM proce-
      dures, O&M manuals, facility drawings, emergency response plans and procedures and documents required
      to be maintained for the life of the pipeline
   b. Consider incorporating like standards from other industries

6. Quality Management Systems (QMS): Quality management includes the activities and processes that an organization
   uses to achieve quality. These include formulating policy, setting objectives, planning, quality control, quality
   assurance, performance monitoring and quality improvement. PHMSA’s pipeline safety regulations do not now
   address process management issues such as QMS. PHMSA may institute formal requirements for QMS into the
   regulation. They are asking the industry for information on existing quality assurance standards and practices currently
   in use that might be adopted. Should QMS be applied to all or some pipelines and does it apply to the complete
   lifecycle? Do operators commonly require their contractors to maintain and use formal QMS?

7. Exemption of facilities installed prior to the regulations: This is to address the MAOP exemption for pre-1970 pipelines
   that operate above 72% specified minimum yield strength (SMYS) and also includes use of materials manufactured
   prior to 1970. The changes could include requirements for periodic pressure tests, in-line inspections, coating
   examination, CP surveys and expanded requirements on interference currents and depth of cover maintenance for
   these lines. This could be for all pipelines or targeted to those with a vintage history of systemic integrity issues
   in areas such as longitudinal weld seams or steel quality.



Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com              4
© 2011 Willbros • All Rights Reserved.
Summary: Advanced Notice of Proposed Rulemaking


8. Modifying the regulation of gas gathering lines: Recent developments in the field of gas exploration and production,
   such as shale gas, indicate that the existing framework for regulating gas gathering lines may no longer be appropri-
   ate. Gathering lines are being constructed to transport shale gas that range from 12 to 36 inches in diameter with
   an MAOP of 1,480 psig, far exceeding the historical operating parameters of such lines. Moreover, enforcement of
   the current requirements has been hampered by the conflicting and ambiguous language of American Petroleum
   Institute Recommended Practice 80 (API RP 80), a complex standard that can produce multiple classifications for
   the same pipeline system. Gathering regulation may be modified as follows:
   a. Require submission of annual incident and safety-related conditions reports
   b. Include a new definition for gathering in the regulation
   c. Establish new, risk-based safety requirements for large diameter, high pressure gathering lines in rural locations
   d. Consider short sections of pipeline downstream of processing, compression and similar equipment to be
      a continuation of gathering
   e. Adopt specific requirements for pipelines associated with landfill gas systems (due to increased concentrations
      of hydrogen sulfide and/or carbon dioxide)
   f. Enhance requirements for internal corrosion control
   g. Apply gas integrity management requirements to all onshore gas gathering




Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com           5
© 2011 Willbros • All Rights Reserved.

Más contenido relacionado

La actualidad más candente

Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartviihydrologyproject001
 
PII Paper for PetroMin Gas Pipeline Conference
PII Paper for PetroMin Gas Pipeline ConferencePII Paper for PetroMin Gas Pipeline Conference
PII Paper for PetroMin Gas Pipeline ConferenceJohn Grover
 
R_ActCH03_ARQD_12Mar2015
R_ActCH03_ARQD_12Mar2015R_ActCH03_ARQD_12Mar2015
R_ActCH03_ARQD_12Mar2015Kulbir Banwait
 
Richard Nussbaum, PE, RG, MDNR, Hazardous Waste Program Permits Section Updat...
Richard Nussbaum, PE, RG, MDNR, Hazardous Waste Program Permits Section Updat...Richard Nussbaum, PE, RG, MDNR, Hazardous Waste Program Permits Section Updat...
Richard Nussbaum, PE, RG, MDNR, Hazardous Waste Program Permits Section Updat...Kevin Perry
 
Aged aircraft maintenance.
Aged aircraft maintenance.Aged aircraft maintenance.
Aged aircraft maintenance.S P Singh
 
VFD_QAM_1-_AAR_M-1003_Rev_B_-_04_AUG_2014
VFD_QAM_1-_AAR_M-1003_Rev_B_-_04_AUG_2014VFD_QAM_1-_AAR_M-1003_Rev_B_-_04_AUG_2014
VFD_QAM_1-_AAR_M-1003_Rev_B_-_04_AUG_2014Brian McAuliffe
 
Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect...
 Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect... Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect...
Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect...hydrologyproject2
 
Csa2010 cmv drivers
Csa2010 cmv driversCsa2010 cmv drivers
Csa2010 cmv driversRush Jobsite
 
Slides from 2003 structures conference
Slides from 2003 structures conference Slides from 2003 structures conference
Slides from 2003 structures conference Hifon Wong
 
Data Collection on the ProteinSimple Maurice: Driving Compliance with the Emp...
Data Collection on the ProteinSimple Maurice: Driving Compliance with the Emp...Data Collection on the ProteinSimple Maurice: Driving Compliance with the Emp...
Data Collection on the ProteinSimple Maurice: Driving Compliance with the Emp...KBI Biopharma
 
Concepts for Proposed General Permit for Well Pads and Proposed GP-5 Modifica...
Concepts for Proposed General Permit for Well Pads and Proposed GP-5 Modifica...Concepts for Proposed General Permit for Well Pads and Proposed GP-5 Modifica...
Concepts for Proposed General Permit for Well Pads and Proposed GP-5 Modifica...Marcellus Drilling News
 
Download-manuals-surface water-manual-sw-volume6designmanualwqsampling
 Download-manuals-surface water-manual-sw-volume6designmanualwqsampling Download-manuals-surface water-manual-sw-volume6designmanualwqsampling
Download-manuals-surface water-manual-sw-volume6designmanualwqsamplinghydrologyproject001
 

La actualidad más candente (17)

WestmorelandThomas-2
WestmorelandThomas-2WestmorelandThomas-2
WestmorelandThomas-2
 
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
 Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
Download-manuals-ground water-manual-gw-volume4fieldmanualgeo-hydrologypartvii
 
PII Paper for PetroMin Gas Pipeline Conference
PII Paper for PetroMin Gas Pipeline ConferencePII Paper for PetroMin Gas Pipeline Conference
PII Paper for PetroMin Gas Pipeline Conference
 
R_ActCH03_ARQD_12Mar2015
R_ActCH03_ARQD_12Mar2015R_ActCH03_ARQD_12Mar2015
R_ActCH03_ARQD_12Mar2015
 
Richard Nussbaum, PE, RG, MDNR, Hazardous Waste Program Permits Section Updat...
Richard Nussbaum, PE, RG, MDNR, Hazardous Waste Program Permits Section Updat...Richard Nussbaum, PE, RG, MDNR, Hazardous Waste Program Permits Section Updat...
Richard Nussbaum, PE, RG, MDNR, Hazardous Waste Program Permits Section Updat...
 
Aged aircraft maintenance.
Aged aircraft maintenance.Aged aircraft maintenance.
Aged aircraft maintenance.
 
VFD_QAM_1-_AAR_M-1003_Rev_B_-_04_AUG_2014
VFD_QAM_1-_AAR_M-1003_Rev_B_-_04_AUG_2014VFD_QAM_1-_AAR_M-1003_Rev_B_-_04_AUG_2014
VFD_QAM_1-_AAR_M-1003_Rev_B_-_04_AUG_2014
 
Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect...
 Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect... Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect...
Download-manuals-water quality-technicalpapers-wq-monitoringsystemforprotect...
 
Tier 3 Webinar
Tier 3 Webinar Tier 3 Webinar
Tier 3 Webinar
 
Csa2010 cmv drivers
Csa2010 cmv driversCsa2010 cmv drivers
Csa2010 cmv drivers
 
MDE's Stormwater Permitting Requirements
MDE's Stormwater Permitting RequirementsMDE's Stormwater Permitting Requirements
MDE's Stormwater Permitting Requirements
 
Slides from 2003 structures conference
Slides from 2003 structures conference Slides from 2003 structures conference
Slides from 2003 structures conference
 
Data Collection on the ProteinSimple Maurice: Driving Compliance with the Emp...
Data Collection on the ProteinSimple Maurice: Driving Compliance with the Emp...Data Collection on the ProteinSimple Maurice: Driving Compliance with the Emp...
Data Collection on the ProteinSimple Maurice: Driving Compliance with the Emp...
 
MDE Stormwater Permitting Requirements
MDE Stormwater Permitting Requirements MDE Stormwater Permitting Requirements
MDE Stormwater Permitting Requirements
 
Concepts for Proposed General Permit for Well Pads and Proposed GP-5 Modifica...
Concepts for Proposed General Permit for Well Pads and Proposed GP-5 Modifica...Concepts for Proposed General Permit for Well Pads and Proposed GP-5 Modifica...
Concepts for Proposed General Permit for Well Pads and Proposed GP-5 Modifica...
 
MAINTENANCE MANAGEMENT
MAINTENANCE MANAGEMENT MAINTENANCE MANAGEMENT
MAINTENANCE MANAGEMENT
 
Download-manuals-surface water-manual-sw-volume6designmanualwqsampling
 Download-manuals-surface water-manual-sw-volume6designmanualwqsampling Download-manuals-surface water-manual-sw-volume6designmanualwqsampling
Download-manuals-surface water-manual-sw-volume6designmanualwqsampling
 

Destacado

Destacado (8)

Bienaventuranzas de la amistad
Bienaventuranzas de la amistadBienaventuranzas de la amistad
Bienaventuranzas de la amistad
 
Regional members selling membership
Regional members selling membershipRegional members selling membership
Regional members selling membership
 
Austin
AustinAustin
Austin
 
Paul bamonte
Paul bamontePaul bamonte
Paul bamonte
 
Posicionament natural-muntanyola
Posicionament natural-muntanyolaPosicionament natural-muntanyola
Posicionament natural-muntanyola
 
2012 FEPA Presentation: Paul Smith
2012 FEPA Presentation: Paul Smith2012 FEPA Presentation: Paul Smith
2012 FEPA Presentation: Paul Smith
 
Story Time 2
Story Time 2Story Time 2
Story Time 2
 
Presentació microsoft
Presentació microsoftPresentació microsoft
Presentació microsoft
 

Similar a Willbros - Summary: Advanced Notice of Proposed Rulemaking

PHMSA: Safety of Gas Transmission & Gathering Pipelines Summary
PHMSA: Safety of Gas Transmission & Gathering Pipelines SummaryPHMSA: Safety of Gas Transmission & Gathering Pipelines Summary
PHMSA: Safety of Gas Transmission & Gathering Pipelines SummaryProject Consulting Services, Inc.
 
Natural Gas Storage Sample Memo
Natural Gas Storage Sample MemoNatural Gas Storage Sample Memo
Natural Gas Storage Sample MemoChad Colton
 
ACI 214R-11 Guide To Evaluation Of Strength Test Results Of Concrete
ACI 214R-11 Guide To Evaluation Of Strength Test Results Of ConcreteACI 214R-11 Guide To Evaluation Of Strength Test Results Of Concrete
ACI 214R-11 Guide To Evaluation Of Strength Test Results Of ConcreteApril Smith
 
07_Biofuels_Mngt_of_Change.pptx
07_Biofuels_Mngt_of_Change.pptx07_Biofuels_Mngt_of_Change.pptx
07_Biofuels_Mngt_of_Change.pptxAkshayG52
 
Corrosion control
Corrosion controlCorrosion control
Corrosion controlDuy Vu
 
Presentaion: Updates to Good Manufacturing Practices
Presentaion: Updates to Good Manufacturing PracticesPresentaion: Updates to Good Manufacturing Practices
Presentaion: Updates to Good Manufacturing PracticesTGA Australia
 
PHMSA Final Rule (part 1) for Gas Transmission Pipelines
PHMSA Final Rule (part 1) for Gas Transmission Pipelines PHMSA Final Rule (part 1) for Gas Transmission Pipelines
PHMSA Final Rule (part 1) for Gas Transmission Pipelines Audubon Engineering Company
 
ASME-BTH-standards-committee.pdf
ASME-BTH-standards-committee.pdfASME-BTH-standards-committee.pdf
ASME-BTH-standards-committee.pdfMuhammad79350
 
Presentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission Pipelines
Presentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission PipelinesPresentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission Pipelines
Presentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission PipelinesAudubon Engineering Company
 
Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...
Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...
Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...Global CCS Institute
 
NQA - ISO 13485 Gap Guide
NQA - ISO 13485 Gap GuideNQA - ISO 13485 Gap Guide
NQA - ISO 13485 Gap GuideNA Putra
 
NQA ISO 13485 Gap Guide – what’s changed?
NQA ISO 13485 Gap Guide – what’s changed?NQA ISO 13485 Gap Guide – what’s changed?
NQA ISO 13485 Gap Guide – what’s changed?NQA
 
DesignCriteriaManual DesignCriteriaManual.pdf
DesignCriteriaManual DesignCriteriaManual.pdfDesignCriteriaManual DesignCriteriaManual.pdf
DesignCriteriaManual DesignCriteriaManual.pdfkahlaoui1
 

Similar a Willbros - Summary: Advanced Notice of Proposed Rulemaking (20)

PHMSA: Safety of Gas Transmission & Gathering Pipelines Summary
PHMSA: Safety of Gas Transmission & Gathering Pipelines SummaryPHMSA: Safety of Gas Transmission & Gathering Pipelines Summary
PHMSA: Safety of Gas Transmission & Gathering Pipelines Summary
 
Natural Gas Storage Sample Memo
Natural Gas Storage Sample MemoNatural Gas Storage Sample Memo
Natural Gas Storage Sample Memo
 
ISO 14067
ISO 14067ISO 14067
ISO 14067
 
Structural R.
Structural R.Structural R.
Structural R.
 
Ipea api579
Ipea api579Ipea api579
Ipea api579
 
ACI 214R-11 Guide To Evaluation Of Strength Test Results Of Concrete
ACI 214R-11 Guide To Evaluation Of Strength Test Results Of ConcreteACI 214R-11 Guide To Evaluation Of Strength Test Results Of Concrete
ACI 214R-11 Guide To Evaluation Of Strength Test Results Of Concrete
 
07_Biofuels_Mngt_of_Change.pptx
07_Biofuels_Mngt_of_Change.pptx07_Biofuels_Mngt_of_Change.pptx
07_Biofuels_Mngt_of_Change.pptx
 
Corrosion control
Corrosion controlCorrosion control
Corrosion control
 
Presentaion: Updates to Good Manufacturing Practices
Presentaion: Updates to Good Manufacturing PracticesPresentaion: Updates to Good Manufacturing Practices
Presentaion: Updates to Good Manufacturing Practices
 
PHMSA Final Rule (part 1) for Gas Transmission Pipelines
PHMSA Final Rule (part 1) for Gas Transmission Pipelines PHMSA Final Rule (part 1) for Gas Transmission Pipelines
PHMSA Final Rule (part 1) for Gas Transmission Pipelines
 
software Paper published.pdf
software Paper published.pdfsoftware Paper published.pdf
software Paper published.pdf
 
ASME-BTH-standards-committee.pdf
ASME-BTH-standards-committee.pdfASME-BTH-standards-committee.pdf
ASME-BTH-standards-committee.pdf
 
Presentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission Pipelines
Presentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission PipelinesPresentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission Pipelines
Presentation Slides: PHMSA Final Rule (Part 1) for Gas Transmission Pipelines
 
Oil contamination paper_published_version
Oil contamination paper_published_versionOil contamination paper_published_version
Oil contamination paper_published_version
 
Maintainability engineering
Maintainability engineeringMaintainability engineering
Maintainability engineering
 
Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...
Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...
Railroad Commission of Texas - Regulations for Geologic Storage of Carbon Dio...
 
NQA - ISO 13485 Gap Guide
NQA - ISO 13485 Gap GuideNQA - ISO 13485 Gap Guide
NQA - ISO 13485 Gap Guide
 
NQA ISO 13485 Gap Guide – what’s changed?
NQA ISO 13485 Gap Guide – what’s changed?NQA ISO 13485 Gap Guide – what’s changed?
NQA ISO 13485 Gap Guide – what’s changed?
 
Dam engineering 6
Dam engineering 6Dam engineering 6
Dam engineering 6
 
DesignCriteriaManual DesignCriteriaManual.pdf
DesignCriteriaManual DesignCriteriaManual.pdfDesignCriteriaManual DesignCriteriaManual.pdf
DesignCriteriaManual DesignCriteriaManual.pdf
 

Más de Willbros Group, Inc.

Rebuilding the World's Pipeline Infrastructure
Rebuilding the World's Pipeline InfrastructureRebuilding the World's Pipeline Infrastructure
Rebuilding the World's Pipeline InfrastructureWillbros Group, Inc.
 
Up in the Clouds: Cloud Computing and GIS
Up in the Clouds: Cloud Computing and GISUp in the Clouds: Cloud Computing and GIS
Up in the Clouds: Cloud Computing and GISWillbros Group, Inc.
 
Willbros Group at D.A. Davidson's 11th Annual Engineering & Construction Con...
Willbros Group at  D.A. Davidson's 11th Annual Engineering & Construction Con...Willbros Group at  D.A. Davidson's 11th Annual Engineering & Construction Con...
Willbros Group at D.A. Davidson's 11th Annual Engineering & Construction Con...Willbros Group, Inc.
 
Willbros - Credit Suisse Engineering & Construction Conference
Willbros - Credit Suisse Engineering & Construction ConferenceWillbros - Credit Suisse Engineering & Construction Conference
Willbros - Credit Suisse Engineering & Construction ConferenceWillbros Group, Inc.
 
Willbros - Capital One Southcoast, Inc Energy Conference Presentation
Willbros - Capital One Southcoast, Inc Energy Conference PresentationWillbros - Capital One Southcoast, Inc Energy Conference Presentation
Willbros - Capital One Southcoast, Inc Energy Conference PresentationWillbros Group, Inc.
 
Willbros - Jefferies & Co. Global Energy Conference
Willbros - Jefferies & Co. Global Energy ConferenceWillbros - Jefferies & Co. Global Energy Conference
Willbros - Jefferies & Co. Global Energy ConferenceWillbros Group, Inc.
 
Willbros GITA Presentation on GIS-Based Risk Assessment
Willbros GITA Presentation on GIS-Based Risk AssessmentWillbros GITA Presentation on GIS-Based Risk Assessment
Willbros GITA Presentation on GIS-Based Risk AssessmentWillbros Group, Inc.
 
Willbros - D.A. Davidson Conference Presentation
Willbros - D.A. Davidson Conference PresentationWillbros - D.A. Davidson Conference Presentation
Willbros - D.A. Davidson Conference PresentationWillbros Group, Inc.
 
Willbros HSE&S 2010-2011 Annual Report
Willbros HSE&S 2010-2011 Annual ReportWillbros HSE&S 2010-2011 Annual Report
Willbros HSE&S 2010-2011 Annual ReportWillbros Group, Inc.
 
Willbros - 2011 Credit Suisse Presentation
Willbros - 2011 Credit Suisse PresentationWillbros - 2011 Credit Suisse Presentation
Willbros - 2011 Credit Suisse PresentationWillbros Group, Inc.
 

Más de Willbros Group, Inc. (13)

Talisman Safety Program
Talisman Safety ProgramTalisman Safety Program
Talisman Safety Program
 
Rebuilding the World's Pipeline Infrastructure
Rebuilding the World's Pipeline InfrastructureRebuilding the World's Pipeline Infrastructure
Rebuilding the World's Pipeline Infrastructure
 
Up in the Clouds: Cloud Computing and GIS
Up in the Clouds: Cloud Computing and GISUp in the Clouds: Cloud Computing and GIS
Up in the Clouds: Cloud Computing and GIS
 
Willbros Group at D.A. Davidson's 11th Annual Engineering & Construction Con...
Willbros Group at  D.A. Davidson's 11th Annual Engineering & Construction Con...Willbros Group at  D.A. Davidson's 11th Annual Engineering & Construction Con...
Willbros Group at D.A. Davidson's 11th Annual Engineering & Construction Con...
 
Willbros - Credit Suisse Engineering & Construction Conference
Willbros - Credit Suisse Engineering & Construction ConferenceWillbros - Credit Suisse Engineering & Construction Conference
Willbros - Credit Suisse Engineering & Construction Conference
 
Willbros Canada Brochure
Willbros Canada BrochureWillbros Canada Brochure
Willbros Canada Brochure
 
Willbros - Capital One Southcoast, Inc Energy Conference Presentation
Willbros - Capital One Southcoast, Inc Energy Conference PresentationWillbros - Capital One Southcoast, Inc Energy Conference Presentation
Willbros - Capital One Southcoast, Inc Energy Conference Presentation
 
Willbros - Jefferies & Co. Global Energy Conference
Willbros - Jefferies & Co. Global Energy ConferenceWillbros - Jefferies & Co. Global Energy Conference
Willbros - Jefferies & Co. Global Energy Conference
 
Willbros GITA Presentation on GIS-Based Risk Assessment
Willbros GITA Presentation on GIS-Based Risk AssessmentWillbros GITA Presentation on GIS-Based Risk Assessment
Willbros GITA Presentation on GIS-Based Risk Assessment
 
Willbros - D.A. Davidson Conference Presentation
Willbros - D.A. Davidson Conference PresentationWillbros - D.A. Davidson Conference Presentation
Willbros - D.A. Davidson Conference Presentation
 
Willbros 2010 Annual Report
Willbros 2010 Annual ReportWillbros 2010 Annual Report
Willbros 2010 Annual Report
 
Willbros HSE&S 2010-2011 Annual Report
Willbros HSE&S 2010-2011 Annual ReportWillbros HSE&S 2010-2011 Annual Report
Willbros HSE&S 2010-2011 Annual Report
 
Willbros - 2011 Credit Suisse Presentation
Willbros - 2011 Credit Suisse PresentationWillbros - 2011 Credit Suisse Presentation
Willbros - 2011 Credit Suisse Presentation
 

Último

MoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor PresentationMoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor Presentationbaron83
 
Lecture_6.pptx English speaking easyb to
Lecture_6.pptx English speaking easyb toLecture_6.pptx English speaking easyb to
Lecture_6.pptx English speaking easyb toumarfarooquejamali32
 
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for BusinessQ2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for BusinessAPCO
 
Introduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxIntroduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxJemalSeid25
 
Graham and Doddsville - Issue 1 - Winter 2006 (1).pdf
Graham and Doddsville - Issue 1 - Winter 2006 (1).pdfGraham and Doddsville - Issue 1 - Winter 2006 (1).pdf
Graham and Doddsville - Issue 1 - Winter 2006 (1).pdfAnhNguyen97152
 
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 Building Your Personal Brand on LinkedIn - Expert Planet-  2024 Building Your Personal Brand on LinkedIn - Expert Planet-  2024
Building Your Personal Brand on LinkedIn - Expert Planet- 2024Stephan Koning
 
NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023Steve Rader
 
Upgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsUpgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsIntellect Design Arena Ltd
 
PDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdfPDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdfHajeJanKamps
 
A flour, rice and Suji company in Jhang.
A flour, rice and Suji company in Jhang.A flour, rice and Suji company in Jhang.
A flour, rice and Suji company in Jhang.mcshagufta46
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access
 
HELENE HECKROTTE'S PROFESSIONAL PORTFOLIO.pptx
HELENE HECKROTTE'S PROFESSIONAL PORTFOLIO.pptxHELENE HECKROTTE'S PROFESSIONAL PORTFOLIO.pptx
HELENE HECKROTTE'S PROFESSIONAL PORTFOLIO.pptxHelene Heckrotte
 
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...Khaled Al Awadi
 
To Create Your Own Wig Online To Create Your Own Wig Online
To Create Your Own Wig Online  To Create Your Own Wig OnlineTo Create Your Own Wig Online  To Create Your Own Wig Online
To Create Your Own Wig Online To Create Your Own Wig Onlinelng ths
 
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...Brian Solis
 
Live-Streaming in the Music Industry Webinar
Live-Streaming in the Music Industry WebinarLive-Streaming in the Music Industry Webinar
Live-Streaming in the Music Industry WebinarNathanielSchmuck
 
Developing Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, OursDeveloping Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, OursKaiNexus
 
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxCracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxWorkforce Group
 
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003believeminhh
 
Michael Vidyakin: Introduction to PMO (UA)
Michael Vidyakin: Introduction to PMO (UA)Michael Vidyakin: Introduction to PMO (UA)
Michael Vidyakin: Introduction to PMO (UA)Lviv Startup Club
 

Último (20)

MoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor PresentationMoneyBridge Pitch Deck - Investor Presentation
MoneyBridge Pitch Deck - Investor Presentation
 
Lecture_6.pptx English speaking easyb to
Lecture_6.pptx English speaking easyb toLecture_6.pptx English speaking easyb to
Lecture_6.pptx English speaking easyb to
 
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for BusinessQ2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
Q2 2024 APCO Geopolitical Radar - The Global Operating Environment for Business
 
Introduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptxIntroduction to The overview of GAAP LO 1-5.pptx
Introduction to The overview of GAAP LO 1-5.pptx
 
Graham and Doddsville - Issue 1 - Winter 2006 (1).pdf
Graham and Doddsville - Issue 1 - Winter 2006 (1).pdfGraham and Doddsville - Issue 1 - Winter 2006 (1).pdf
Graham and Doddsville - Issue 1 - Winter 2006 (1).pdf
 
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 Building Your Personal Brand on LinkedIn - Expert Planet-  2024 Building Your Personal Brand on LinkedIn - Expert Planet-  2024
Building Your Personal Brand on LinkedIn - Expert Planet- 2024
 
NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023NASA CoCEI Scaling Strategy - November 2023
NASA CoCEI Scaling Strategy - November 2023
 
Upgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking ApplicationsUpgrade Your Banking Experience with Advanced Core Banking Applications
Upgrade Your Banking Experience with Advanced Core Banking Applications
 
PDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdfPDT 88 - 4 million seed - Seed - Protecto.pdf
PDT 88 - 4 million seed - Seed - Protecto.pdf
 
A flour, rice and Suji company in Jhang.
A flour, rice and Suji company in Jhang.A flour, rice and Suji company in Jhang.
A flour, rice and Suji company in Jhang.
 
Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024Borderless Access - Global Panel book-unlock 2024
Borderless Access - Global Panel book-unlock 2024
 
HELENE HECKROTTE'S PROFESSIONAL PORTFOLIO.pptx
HELENE HECKROTTE'S PROFESSIONAL PORTFOLIO.pptxHELENE HECKROTTE'S PROFESSIONAL PORTFOLIO.pptx
HELENE HECKROTTE'S PROFESSIONAL PORTFOLIO.pptx
 
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...NewBase  25 March  2024  Energy News issue - 1710 by Khaled Al Awadi_compress...
NewBase 25 March 2024 Energy News issue - 1710 by Khaled Al Awadi_compress...
 
To Create Your Own Wig Online To Create Your Own Wig Online
To Create Your Own Wig Online  To Create Your Own Wig OnlineTo Create Your Own Wig Online  To Create Your Own Wig Online
To Create Your Own Wig Online To Create Your Own Wig Online
 
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
The End of Business as Usual: Rewire the Way You Work to Succeed in the Consu...
 
Live-Streaming in the Music Industry Webinar
Live-Streaming in the Music Industry WebinarLive-Streaming in the Music Industry Webinar
Live-Streaming in the Music Industry Webinar
 
Developing Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, OursDeveloping Coaching Skills: Mine, Yours, Ours
Developing Coaching Skills: Mine, Yours, Ours
 
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptxCracking the ‘Business Process Outsourcing’ Code Main.pptx
Cracking the ‘Business Process Outsourcing’ Code Main.pptx
 
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
The Vietnam Believer Newsletter_MARCH 25, 2024_EN_Vol. 003
 
Michael Vidyakin: Introduction to PMO (UA)
Michael Vidyakin: Introduction to PMO (UA)Michael Vidyakin: Introduction to PMO (UA)
Michael Vidyakin: Introduction to PMO (UA)
 

Willbros - Summary: Advanced Notice of Proposed Rulemaking

  • 1. Summary: Advanced Notice of Proposed Rulemaking Released August 2011 By John Beets Principal GIS Technologist, Willbros Engineering An Advanced Notice of Proposed Rulemaking (ANPRM) was released by the Pipeline and Hazardous Materials Safety Administration (PHMSA) in August 2011. High profile incidents, such as the PG&E failure in San Bruno, CA, have instigated a push by Federal regulatory agencies for additional safety measures for gas transmission pipelines. This ANPRM is requesting public comment on 14 specific topics in two broad categories. At some point following the review period, PHMSA will release a Notice of Proposed Rulemaking (NPRM) that will incorporate comments/questions they receive as a result of this ANPRM. This will allow another round of public comment/questions before a final rule is released. It is difficult to predict the time frame for release of a final rule – past experience might indicate this could occur very late in 2012, but more likely sometime in 2013. The purpose of this document is to provide a brief summary of the content of the ANPRM in order to present a snapshot of issues that may be under consideration for a revised final rule. An analysis of the information contained in the ANPRM is not included. Category 1: Should integrity management requirements be revised and strengthened to bring more pipeline mileage under integrity management requirements and to better assure safety of pipeline segments in high-consequence areas (HCAs)? Topics: 1. Modify HCA definition to expand pipeline mileage in HCAs? This could be done by: a. Revising (decreasing) the count for buildings intended for human occupancy b. Expanding the definition of identified sites c. Making all Class 3 and 4 locations HCA – also increase the width for determining class location on pipelines over 24” outside diameter (OD) operating above 1,000 pounds per square inch gauge (psig) d. Increasing the HCA buffer beyond that determined by the potential impact radius (PIR) e. Considering presence of electric transmission lines or other critical infrastructure within the pipeline right-of-way (ROW) f. Allowing general public/local communities to provide input into identification of HCAs 2. Strengthen requirements to implement preventative and mitigative measures for pipeline segments in HCAs: The current rule requires operators to take additional preventative and mitigative measures in HCAs, but these measures are not specified. Risk analysis is to be used to identify additional measures appropriate to the HCA, but the current rule does not establish objective criteria or standards on how to determine what measures should be taken. PHMSA is considering additional prescriptive requirements to improve selection and implementation decisions for preventative and mitigative measures within and, potentially, outside of HCAs. 3. Modification of repair criteria: Changes to repair criteria to provide greater assurance of anomalies/defects being repaired before leading to a leak or rupture and whether these criteria need to be expanded to segments outside Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com 1 © 2011 Willbros • All Rights Reserved.
  • 2. Summary: Advanced Notice of Proposed Rulemaking of HCAs. This could involve the following: a. Revision of the repair criterion to add an additional safety margin b. Risk ranking – conditions in HCAs addressed first, followed by non-HCA areas c. Adjustment of repair schedules in both HCA and non-HCA areas d. Potential standards to account for known accuracy of inline inspection (ILI) tools that are consistent across all ILI vendors and operator e. Potential methods for validation of tool performance such as validation digs or analysis of as-found versus as-predicted defect dimensions f. Standards for conducting inline inspections, specific interpretation of personnel qualifications, integration of other data sources with ILI 4. Improving requirements for collecting, validating and integrating pipeline data: a. Require validation methods be in place, such as pipeline excavations b. Require collection of data during pipeline exposure to validate information in the operator’s records c. Verify critical pipe data, coating, testing, and operations and maintenance (O&M) records on a periodic basis (requirements become more prescriptive) 5. Making requirements related to the nature and application of risk models more prescriptive: PHMSA’s experience indicates that majority of operators use relative index-model approaches to risk assessment. PHMSA is not convinced as to the robustness of this method. Possible changes discussed: a. Strengthen requirements on functions risk models perform b. Mandate usage of a specific risk model c. Improve existing models to assure usefulness d. Push to use more quantitative models is contemplated 6. Strengthening requirements for applying knowledge gained through the integrity management (IM) program: This is related to the current regulation requiring operators to consider other portions of their systems if an assessment identifies corrosion requiring repair. Intention is to strengthen requirements related to operator’s use of insights gained from implementation of their IM program: a. Potential requirements for updating risk models as additional knowledge is gained b. Guidelines or requirements related to data integration and/or updating of aerial imagery or patrolling c. Specification of a maximum time period for review and validation of risk assessments d. Potential data requirements for data integration 7. Strengthening requirements on the selection and use of assessment methods: Currently four methods – ILI, pressure test, direct assessment and other technology demonstrated to provide an equivalent understanding of pipe condition. Possible changes discussed: a. Require ILI wherever possible – include requirements to expand line modifications to accommodate ILI b. Restrictions on use of other assessment technologies c. Establish standards for conducting ILI assessments – incorporate by reference into regulations Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com 2 © 2011 Willbros • All Rights Reserved.
  • 3. Summary: Advanced Notice of Proposed Rulemaking d. Establish standards for conducting Internal Corrosion Direct Assessment (ICDA) and Stress Corrosion Cracking Direct Assessment (SCCDA) – incorporate by reference into regulations e. Require a onetime pressure test to address manufacturing and construction defects Category 2: Should non-IM requirements be strengthened or expanded to address other issues associated with pipeline system integrity? Topics: 1. Valve spacing and the need for remotely or automatically controlled valves: Current regulation specifies block valve spacing by class location on newly built lines. Remotely operating and/or automatic valves are not currently required. Potential changes: a. Change spacing requirements for new lines b. Explicitly require new valves in the event of class change to meet spacing requirements c. Explicitly require new valves under other (non-class change) conditions d. Require remotely controlled sectionalizing block valves e. Require prescriptive design criteria for operator evaluation of additional valves, remote closure and/or valve automation 2. Corrosion control: Requirements related to external, internal and atmospheric corrosion: a. Require post-construction surveys for coating damage or to determine Cathodic Protection (CP) adequacy b. Require periodic interference current surveys (such as Close Interval Survey – CIS) c. Add additional measures to prevent internal corrosion (such as ILI runs or accumulated liquids sampling) d. Include practices or standards addressing prevention, detection, assessment and remediation of SCC – requiring additional surveys or shorter internal surveys based on pipeline operating temperatures and coating types e. Prescribe CIS external corrosion control survey timing intervals for both HCAs and non-HCAs that are used to determine CP effectiveness f. Provide specific HCA and non-HCA corrosion control measures with clearly defined conditions and appropriate mitigation efforts g. Perform a critical analysis of all factors influencing SCC to determine if a credible threat exists for each pipeline segment h. Require SCC integrity assessment in segments where a credible threat has been identified i. Require a periodic analysis of operator corrosion management programs, integrating all relevant data j. Require operators to periodically submit corrosion management performance metric data 3. Pipe manufactured using longitudinal weld seams: This is meant to address longitudinal seam weld issues with pipe manufactured primarily before 1970 and pressure test grandfathering for lines built prior to 1971 (allowing operations at a maximum allowable operating pressure (MAOP) based on the highest 5-year operating pressure prior to July 1, 1970 in lieu of a pressure test): a. Require all pipelines that have not been pressure tested at or above 1.1 times MAOP or class location test criteria to be pressure tested in accordance with present regulation Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com 3 © 2011 Willbros • All Rights Reserved.
  • 4. Summary: Advanced Notice of Proposed Rulemaking b. Alternatively, require specific types of pipe with an operating history that demonstrates systemic integrity issues to be pressure tested in accordance with present regulation, e.g., low-frequency electric resistance welded (LF-ERW), direct current electric resistance welded (DC-ERW), lap-welded, electric flash welded (EFW), furnace butt welded, submerged arc welded or other longitudinal seams c. Define alternative minimum test pressures d. Provide additional pressure test requirements to all pipelines, or only pipelines in HCAs, or only pipelines in Class 2, 3, or 4 areas e. Specify other technologies that may reliably find and remediate seam integrity issues 4. Establishing requirements applicable to underground gas storage: PHMSA may develop standards covering underground gas storage facilities. This could include: a. Safety standards for casing, tubing, isolation packer and wellbore communication and wellhead equipment b. Standards for monitoring of external/internal corrosion c. Standards for welding, pressure testing and design safety factors of casing and tubing d. Emergency shutdowns for wellhead valves e. Integrity and O&M intervals for key safety and CP systems f. Standards for emergency shutdowns, emergency shutdown stations, gas monitors, local emergency response communications, public communications and O&M procedures 5. Management of change: PHMSA pipeline safety regulations do not now address management process subjects such as management of change. PHMSA is considering adding requirements in this area to provide a greater degree of control over this element of pipeline risk: a. Development of standards governing the management of change process including requirements for IM proce- dures, O&M manuals, facility drawings, emergency response plans and procedures and documents required to be maintained for the life of the pipeline b. Consider incorporating like standards from other industries 6. Quality Management Systems (QMS): Quality management includes the activities and processes that an organization uses to achieve quality. These include formulating policy, setting objectives, planning, quality control, quality assurance, performance monitoring and quality improvement. PHMSA’s pipeline safety regulations do not now address process management issues such as QMS. PHMSA may institute formal requirements for QMS into the regulation. They are asking the industry for information on existing quality assurance standards and practices currently in use that might be adopted. Should QMS be applied to all or some pipelines and does it apply to the complete lifecycle? Do operators commonly require their contractors to maintain and use formal QMS? 7. Exemption of facilities installed prior to the regulations: This is to address the MAOP exemption for pre-1970 pipelines that operate above 72% specified minimum yield strength (SMYS) and also includes use of materials manufactured prior to 1970. The changes could include requirements for periodic pressure tests, in-line inspections, coating examination, CP surveys and expanded requirements on interference currents and depth of cover maintenance for these lines. This could be for all pipelines or targeted to those with a vintage history of systemic integrity issues in areas such as longitudinal weld seams or steel quality. Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com 4 © 2011 Willbros • All Rights Reserved.
  • 5. Summary: Advanced Notice of Proposed Rulemaking 8. Modifying the regulation of gas gathering lines: Recent developments in the field of gas exploration and production, such as shale gas, indicate that the existing framework for regulating gas gathering lines may no longer be appropri- ate. Gathering lines are being constructed to transport shale gas that range from 12 to 36 inches in diameter with an MAOP of 1,480 psig, far exceeding the historical operating parameters of such lines. Moreover, enforcement of the current requirements has been hampered by the conflicting and ambiguous language of American Petroleum Institute Recommended Practice 80 (API RP 80), a complex standard that can produce multiple classifications for the same pipeline system. Gathering regulation may be modified as follows: a. Require submission of annual incident and safety-related conditions reports b. Include a new definition for gathering in the regulation c. Establish new, risk-based safety requirements for large diameter, high pressure gathering lines in rural locations d. Consider short sections of pipeline downstream of processing, compression and similar equipment to be a continuation of gathering e. Adopt specific requirements for pipelines associated with landfill gas systems (due to increased concentrations of hydrogen sulfide and/or carbon dioxide) f. Enhance requirements for internal corrosion control g. Apply gas integrity management requirements to all onshore gas gathering Willbros Group, Inc. • 4400 Post Oak Parkway, Suite 1000, Houston, Texas 77027 • 713.403.8000 • www.willbros.com 5 © 2011 Willbros • All Rights Reserved.