Ensure the security of your HCL environment by applying the Zero Trust princi...
Rockwell Meralco Business Center Presentation
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12. meralco ave ortigas ave lanuza dr j vargas Corinthian Gardens Meralco Theater Metrowalk Robinsons Galleria ortigas ave Medical City C5 Valle Verde V edsa
23. DOLE health requirements BOOK FOUR HEALTH, SAFETY AND SOCIAL WELFARE BENEFITS Art. 157. Emergency medical and dental services. It shall be the duty of every employer to furnish his employees in any locality with free medical and dental attendance and facilities consisting of: a. The services of a full-time registered nurse when the number of employees exceeds fifty (50) but not more than two hundred (200) except when the employer does not maintain hazardous workplaces, in which case, the services of a graduate first-aider shall be provided for the protection of workers, where no registered nurse is available. The Secretary of Labor and Employment shall provide by appropriate regulations, the services that shall be required where the number of employees does not exceed fifty (50) and shall determine by appropriate order, hazardous workplaces for purposes of this Article; b. The services of a full-time registered nurse, a part-time physician and dentist, and an emergency clinic, when the number of employees exceeds two hundred (200) but not more than three hundred (300); and c. The services of a full-time physician, dentist and a full-time registered nurse as well as a dental clinic and an infirmary or emergency hospital with one bed capacity for every one hundred (100) employees when the number of employees exceeds three hundred (300). Art. 158. When emergency hospital not required. The requirement for an emergency hospital or dental clinic shall not be applicable in case there is a hospital or dental clinic which is accessible from the employer’s establishment and he makes arrangement for the reservation of the necessary beds and dental facilities for the use of his employees.
29. retail applicants Betty’s Sansrival The Forest Jack’s Loft Coco Cafe Bona Coffee Nanohana Big Apple PIzza Maurizio Ristorante Banapple Sugi O Kitchen MedExpress The Forest Kohikan Grocery Fish & Co. Coffee Bean FIC Day Care Le Soufflle Café Salcedo Sebastians Salon Tsumura Tender Bob's World Bangers Nail Spa Krua Thai Earl's Deli Tapa King Watsons Mezzaluna's Tratoria Wheatberry Florings 7-Eleven Queen's Sakurayakiniku Jollibee MiniStop Old Swiss Inn Aplaya KFC NBS Express (400sm) Crazy About Garlic Lamesa Grill Brothers Burger Facial Care Crustasia Sousaku Big Chill Banco de Oro specialty restaurants (15) cafés & casual dining (7) quick service restaurants (7) services/non-food (8)
30. area breakdown 3.3mps 2.5mps 2.0mps Speed 1,600 kg or 20 person capacity 1,600 kg or 20 person capacity 1,600 kg or 20 person capacity Capacity 18 6 6 6 No. of Elevators ELEVATORS 42 16 (Top is Penthouse) 14 (Top is Penthouse) 12 (Top is Penthouse) No. Of Floors 76,281.91 29,386.87 sqm 25,337.27 sqm 21,557.77 sqm Gross Leasable Area TOTAL Tower 3 Tower 2 Tower 1 977 TOTAL 69 Basement 2 Extension 457 Basement 2 415 Basement 1 36 Open Parking SLOTS
48. PEZA schedule 2008 feb. 6 date of application mar. 31 PEZA pre-approval jun. 30 LGU approval jul. 15 re-endorsement to PEZA nov. 30 presidential proclaimation dec feb mar apr may jun jul aug sep oct nov jan
51. You’ll never find us unprepared. That’s why everything about Rockwell is well-planned. Our utilities and incrastructure include 28 megawatts of standby generator power so blackouts don’t affect us. Air conditioning, elevators, and cable TV run 24 hours. Rain or shine or super storm, our residents stay safe and comfortable. And that lets us sleep well at night. Photo taken by Inquirer lensman Jim Guiao Punzalan, on 28 September 2006, the night Milenyo hit Manila.