SlideShare una empresa de Scribd logo
1 de 9
CURRICULM VITAE
Name:               Anikin Andrey

Date of birth :     04.12.1976

Education:          High Education. Donetsky Government Technician Universities
                                   (Ukrain) in 1998

Specialty:           Mechanical Engineer

Experience:         2005- till now   –   “EICC” Ltd. Moscow
                                         – Chief mechanical engineer
                     2001 – 2004     –   JSC “Stroytransgas”
                                         – Mechanical engineer in Algeria
                     1998 – 2001     –   "Dorstroytech" Ltd.
                                         – Mechanical engineer

Participation in
Construction of
Pipelines:
                    1. Oil pipeline KTK (Russia)
                    2. Oil pipeline in Algeria
                    3. Oil pipeline Melut Basin in Sudan
                    4. PC Ivanovskaya
                    5. Reconstruction Main gas pipeline Parabel-Kuzbass
                    6. Telecommunication gas pipeline LPU Novosibirsk
                       “Tomsktransgas”
                    7. PC Proskokovo “Tomsktransgas”


Responsibilities:   Monitoring for operation and maintenance of civil
                    Equipment & vehicles
CURRICULUM VITAE
Name:               Ereschenko Alexsander

Date of birth :     28.10.1953 г.

Education:          High Education. Ukraine Agricultural Academy in 1985

Specialty:          Automatic agricultural industry.

Experience:         2002 – till now – “EICC” Ltd. Moscow
                                    – technician, engineer, senior engineer
                     1985 – 2002 – Radio Set Factory
                                    – engineer of instrument and automatic
                                    – senior electrician engineer
                      1980 – 1985 – Komintern plant
                                    – senior electrician engineer
                                    – senior engineer of instrument and automatic

Participation in
construction of
pipelines:          1. Oil pipeline in Kouybyshev - Odessa
                    2. Oil pipeline “Friendship”
                    3. PC Ivanovskaya
                    4. Telecommunication gas pipeline LPU Novosibirsk
                        “Tomsktransgas”
                    5. PC Proskokovo “Tomsktransgas”
                    6. Oil pipeline Melut Basin in Sudan
                     7. Oil pipeline in Algeria
                         - Houd El Hamra-Arzev 34". OZ-2.
                         - Pump stations in Kenanda
                     8. Main gas pipeline Sougueur-Hadjret Ennous in Algerias

Responsibilities:    - Installation of electric power supply systems
                     - Installation and commissioning of CP
                     - Installation and commissioning of instrument and
                        control automatic system
                     - Commissioning of processing valves
                     - Commissioning
                     - Putting into operation & Start up
CURRICULUM VITEA
Name:               Fedyaev Andrey

Date of birth :     31.10.1966

Education:          High Education. Graduated from oil institute in Ufa
                    city (Russia) in 1994

Specialty:           Chemical Equipment at chemical plants. Mechanical Engineer

Experience:         2005 – till now   – “EICC” Ltd. Moscow
                                        – chief engineer
                     2000 – 2005      – “Kvantor” Co
                                         – pre-commission & commission
                                            mechanical engineer.
                      1986 – 2000 – Combined heat power plant in Ufa city
                                          – Chief of turbine department

Participation in
construction of
pipelines:          1. Gas and oil pipeline in Bashneftgas (Bashkiriay)
                    2. Oil pipeline in Tengiz - Novorossiysk, KTK (Kazakhstan)
                    3. Oil pipeline in Algeria
                    4. Oil pipeline Kenkiak – Atyrow (Kazakhstan)
                    5. Terminal of Sea Primorsk (Russia)
                    6. PC Ivanovskaya
                    7. Telecommunication gas pipeline LPU Novosibirsk
                        “Tomsktransgas”
                    8. PC Proskokovo “Tomsktransgas”
                    9. Oil pipeline Melut Basin in Sudan
                     10. Oil pipeline in Algeria
                         - Houd El Hamra-Arzev 34". OZ-2.
                         - Pump stations in Kenanda
                     11. Main gas pipeline Sougueur-Hadjret Ennous in Algerias
                     12. Main pipeline 40” Skikda


Responsibilities:    - Equipment adjusting at gas &oil pipeline
                     - Commissioning of processing valves
                     - Commissioning
                     - Putting into operation & Start up
CURRICULM VITAE
Name:              Lerner Boris

Date of birth :    19.04.1942.

Education:         High Education. Ivanovo Chemical Technological Institute
                   (Russia) in 1965

Specialty:          Engineer of Instrumentation and Automatic

Experience:        1994 - till now – “EICC” Ltd. Moscow
                   – General manager
                   1970 – 1994      – “Gazmontaghavtomatika” Moscow
                    – foreman, chief engineer, director
                   1968 – 1970      – “Energoremnaladka” Kemerovo
                    – chief engineer
                   1965 – 1970      – plant “Kuzbasselement” Kemerovo
                    – engineer, senior engineer

Participation in
construction of
pipelines:         1. Gas pipeline Urengoy – Pomary - Uzhgorod
                   2. Gas pipeline Bukhara - Ural
                   3. Gas pipeline Middle Asia - Center
                   4. Gas pipeline “Union”
                   5. Gas pipeline Ukhta - Torzhok
                   6. Gas pipeline BGR - TFA
                   7. Oil pipeline Surgut - Polotsk
                   8. Gas pipeline and branches in Greece
                   9. Oil pipeline “Friendship”
                   10. Oil pipeline Kuybyshev - Lisichansk
                   11. Gasoline pipeline in Macedonia
                   12. Gas pipeline in Libya
                   13. Reconstruction Main gas pipeline Parabel-Kuzbass
                   14. Pump station in Riazan
                   15. Reservoirs in Nikolskoe
                   16. Ammonia pipeline Toliati – Odessa
                   17. Oil pipeline Kenkiak - Atyrow
                   18. Pump station in Kotur - Tepe
                   19. Centre calculation for oil Russia – Ukraine (Chertkovo)
                   20. Iodine plant of Krasnovodsk
                   21. Gas treatment plant of Mubarek
                   22. Multipurpose gas treatment plant in Schatlyk
                   23. Multipurpose gas treatment plant in Kenkiak
                   24. Multipurpose gas treatment plant in Schakh – Pakhty
                   25. PC Ivanovskaya
                   26. Telecommunication gas pipeline LPU Novosibirsk
                       “Tomsktransgas”
                   27. PC Proskokovo “Tomsktransgas”
                   28. Oil pipeline Melut Basin in Sudan
                    29. Oil pipeline in Algeria
                        - Houd El Hamra-Arzev 34". OZ-2.
                        - Pump stations in Kenanda
                    30. Main gas pipeline Sougueur-Hadjret Ennous in Algerias
                    31. Main pipeline GK1 40” Uled Gellal-Skikda
Responsibilities:   - Installation of electric power supply systems
                    - Installation and commissioning of CP
                    - Installation and commissioning of instrument and
                       control automatic system
                    - Commissioning of processing valves
                    - Commissioning
                    - Putting into operation & Start up
CURRICULM VITAE
Name:                   Lobach Andrey

Date of birth :         21.01.1959 г.

Education:              High Education. Moscow Electrical Institute (Russia) in 1982

Specialty:               Electrician Engineer

Experience:             1993- till now – “EICC” Ltd. Moscow (SARL ELIC)
                        – chief mechanic engineer and site manager, general manager
                          SARL ELIC
                        1984 г. – 1992 г. – “Gazmontaghavtomatika”
                         – commission engineer of instrument and avtomatic
                           control system
                        1982 г. – 1984 г. – design bureau of Communication Ministry
                            in USSR – design engineer

Participation in
construction of
pipelines:              1. Oil pipeline construction in Cuba
                        2. Gas pipeline and branches in Greece
                        3. Gasoline pipeline in Macedonia
                        4. Oil pipeline in Algeria
                        5. Urengou – Pomary – Yzhgorod in Russia
                        6. Oil pipeline in Algeria
                             - Houd El Hamra-Arzev 34". OZ-2.
                             - Pump stations in Kenanda
                         7. Main gas pipeline Sougueur-Hadjret Ennous in Algerias
                         8. Main pipeline GK1 40” Uled Gellal-Skikda
                         9. Gas pipeline GREO 28” Rocade Est-Ouest
                         10. Gas pipeline LZ2 24” GPL Hassi-Rmel-Arzev

Responsibilities:        - Installation of electric power supply systems
                         - Installation and commissioning of CP
                         - Installation and commissioning of instrument and
                            control automatic system
                         - Commissioning of processing valves
                         - Commissioning
                         - Putting into operation & Start up

Foreign language:          English

Promoted to position:      Chief Coordinator
CURRICULM VITAE
Name:               Struzh Roman

Date of birth :     17.12.1966

Education:          High Education. Forestry engineering Institute in L’vov in 1980

Specialty:          Automatic process
                    Engineer of instrument and automatic

Experience:         2002 - till now –     “EICC” Ltd. Moscow
                    Senior- engineer;
                    - foreman.
                    2000 – 2001       –   “Eventa” Ltd.
                     - chief mechanic
                     - chief engineer


Participation in
construction of
pipelines:          1. Oil pipeline Kuybyschev - Odessa
                    2. Oil pipeline in Algeria
                    3. Main gas pipeline in Greece
                    4. PC Ivanovskaya
                    5. Telecommunication gas pipeline LPU Novosibirsk
                        “Tomsktransgas”
                    6. PC Proskokovo “Tomsktransgas”
                    7. Oil pipeline Melut Basin in Sudan
                     8. Oil pipeline in Algeria
                         - Houd El Hamra-Arzev 34". OZ-2.
                         - Pump stations in Kenanda
                     9. Main gas pipeline Sougueur-Hadjret Ennous in Algerias
                     10. Gas pipeline in Tourkmenia

Responsibilities:    - Installation of electric power supply systems
                     - Installation and commissioning of CP
                     - Installation and commissioning of instrument and
                        control automatic system
                     - Commissioning of processing valves
                     - Putting into operation
CURRICULM VITAE
Name:               Tuzhik Vladimir

Date of birth :     14.08.1950 г.

Education:          Zhitomir Technicial School N1 in 1968

Specialty:           Cogeneration and turbine plants of thermoelectric
                     power station

Experience:         2003- till now    –   “EICC” Ltd. Moscow
                                          – senior engineer
                     2001 - 2003      –   OAO “Stroytransgaz”
                                          – installer, engineer construction
                     1991 - 1998      –   OAO “Zarubezhneftegazstroy”
                                          – installer, engineer construction
                     1990 - 1991      –   Specialized directorate №20 of the
                                          “Priobtruboprovodstroy” Trust
                                          – installer of pipelines
                     1989 - 1990      –   OAO “Zarubezhneftegazstroy”
                                          – installer of pipelines
                     1981 - 1989      –   Specialized directorate №20 of the
                                          “Priobtruboprovodstroy” Trust
                                          – installer of pipelines

Participation in
construction of
pipelines:          1. The Igrim – Serov Gas Pipeline
                    2. The Urengoy – Pomary - Uzhgorod Gas pipeline
                    3. Oil pipeline in Iraq
                    4. Gas Pipeline and branches in Greece
                    5. Gas pipeline in Libya
                    6. Reconstruction Main gas pipeline Parabel-Kuzbass
                    7. PC Ivanovskaya
                    8. Telecommunication LPU Novosibirsk “Tomsktransgas”
                    9. PC Proskokovo “Tomsktransgas”
                    10. Oil pipeline Melut Basin in Sudan
                    11. Oil pipeline in Algeria
                        - Houd El Hamra-Arzev 34". OZ-2.
                        - Pump stations in Kenanda
                     12. Main gas pipeline Sougueur-Hadjret Ennous in Algerias

Responsibilities:    - Installation of pipelines
                     - Installation, pre-commissioning of block valves
                     - Commissioning of processing valves
                     - Delivery of product
                     - Commissioning
                     - Putting into operation & Start up
CURRICULM VITAE
Name:               Zakharov Mikhail

Date of birth :     09.11.1978

Education:          High Education. Building Institute in Rostov (Russia) in 2000

Specialty:           Rail Road Engineer

Experience:          2005 – till now – “EICC” Ltd. Moscow
                     – Senior engineer
                     2000 – 2005      – SD “Uzhenergogas”
                      – senior engineer
Participation in
construction of
pipelines:          1. Gas pipeline “Orenburg – Zainsk” Orenburgasprom
                    2. Gasoline pipeline “Orenburg – Tuimazy” Orenburgasprom
                    3. Gasoline pipelines Orenburgasprom
                    4. Gas pipeline “Belousovo – Leningrad” Mostransgas
                    5. Gas pipeline “Gorkiy – Center” Mostransgas
                    6. Gas pipeline “Vykhino – Golovno” Mostransgas
                    7. Gas pipeline “Torzhok – Minsk - Ivatschevichi” Lentransgas
                    8. Oil pipeline in Sudan
                     9. PC Ivanovskaya
                    10. Telecommunication LPU Novosibirsk “Tomsktransgas”
                    11. PC Proskokovo “Tomsktransgas”
                     12. Oil pipeline Melut Basin in Sudan
                     29. Oil pipeline in Algeria
                         - Houd El Hamra-Arzev 34". OZ-2.
                         - Pump stations in Kenanda


Responsibilities:    - Installation of electric power supply systems
                     - Installation and commissioning of CP
                     - Installation and commissioning of instrument and
                        control automatic system
                     - Commissioning
                     - Putting into operation & Start up

Más contenido relacionado

Destacado

1. power ofattorney sonatrach
1. power ofattorney sonatrach1. power ofattorney sonatrach
1. power ofattorney sonatrachzemm1
 
12. audit account
12. audit account12. audit account
12. audit accountzemm1
 
3. quality management manual
3. quality management manual3. quality management manual
3. quality management manualzemm1
 
4. oh&s policy
4. oh&s policy4. oh&s policy
4. oh&s policyzemm1
 
13. company profile
13. company profile13. company profile
13. company profilezemm1
 
Hướng dẫn lấy mẫu thuốc xác định chất lượng.
Hướng dẫn lấy mẫu thuốc xác định chất lượng.Hướng dẫn lấy mẫu thuốc xác định chất lượng.
Hướng dẫn lấy mẫu thuốc xác định chất lượng.Tư vấn GMP, cGMP, ISO
 
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
134 cơ sở sản xuất đạt chứng nhận who gmp glp gspTư vấn GMP, cGMP, ISO
 
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1 Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1 Tư vấn GMP, cGMP, ISO
 
10. list of equipments
10. list of equipments10. list of equipments
10. list of equipmentszemm1
 
Validation of friability test apapraturs
Validation of friability test apapratursValidation of friability test apapraturs
Validation of friability test apapratursRam Mohan S R
 
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.Tư vấn GMP, cGMP, ISO
 
Cv marwa ben abda
Cv marwa ben abdaCv marwa ben abda
Cv marwa ben abdamarwaba
 
Deepening the Dive into ISO 14001:2015
Deepening the Dive into ISO 14001:2015Deepening the Dive into ISO 14001:2015
Deepening the Dive into ISO 14001:2015DQS Inc.
 
ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3DQS Inc.
 
INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
 INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY  INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY Ram Mohan S R
 

Destacado (20)

1. power ofattorney sonatrach
1. power ofattorney sonatrach1. power ofattorney sonatrach
1. power ofattorney sonatrach
 
12. audit account
12. audit account12. audit account
12. audit account
 
design qualification
design qualification design qualification
design qualification
 
3. quality management manual
3. quality management manual3. quality management manual
3. quality management manual
 
4. oh&s policy
4. oh&s policy4. oh&s policy
4. oh&s policy
 
13. company profile
13. company profile13. company profile
13. company profile
 
Market complaints
Market complaintsMarket complaints
Market complaints
 
Tunnel thermographs
Tunnel thermographsTunnel thermographs
Tunnel thermographs
 
Hướng dẫn lấy mẫu thuốc xác định chất lượng.
Hướng dẫn lấy mẫu thuốc xác định chất lượng.Hướng dẫn lấy mẫu thuốc xác định chất lượng.
Hướng dẫn lấy mẫu thuốc xác định chất lượng.
 
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
134 cơ sở sản xuất đạt chứng nhận who gmp glp gsp
 
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1 Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
Hướng dẫn thực hành tốt sản xuất dược phẩm – phần 1
 
10. list of equipments
10. list of equipments10. list of equipments
10. list of equipments
 
Design qualification
Design qualificationDesign qualification
Design qualification
 
Huong dan quan ly chat luong thuoc.
Huong dan quan ly chat luong thuoc.Huong dan quan ly chat luong thuoc.
Huong dan quan ly chat luong thuoc.
 
Validation of friability test apapraturs
Validation of friability test apapratursValidation of friability test apapraturs
Validation of friability test apapraturs
 
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
Hướng dẫn thực hành tốt sản xuất (gmp) thực phẩm chức năng.
 
Cv marwa ben abda
Cv marwa ben abdaCv marwa ben abda
Cv marwa ben abda
 
Deepening the Dive into ISO 14001:2015
Deepening the Dive into ISO 14001:2015Deepening the Dive into ISO 14001:2015
Deepening the Dive into ISO 14001:2015
 
ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3ISO 9001:2015 Revision Overview: part 3
ISO 9001:2015 Revision Overview: part 3
 
INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
 INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY  INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
INSTRUMENTATION OF FLAME EMISSION SPECTROSCOPY
 

Similar a 9. c vs of staff

Engineering and design company DniproVNIPIenergoprom presentation (2013)
Engineering and design company DniproVNIPIenergoprom presentation (2013)Engineering and design company DniproVNIPIenergoprom presentation (2013)
Engineering and design company DniproVNIPIenergoprom presentation (2013)Design Institute DneprVNIPIenergoprom
 
Electrical Machines Department
Electrical Machines DepartmentElectrical Machines Department
Electrical Machines DepartmentOleksii Duniev
 
Cv джураев м.-Mechanical Supervisor LUKOIL
Cv джураев м.-Mechanical Supervisor LUKOILCv джураев м.-Mechanical Supervisor LUKOIL
Cv джураев м.-Mechanical Supervisor LUKOILMurodillo Djuraev
 
Resume Tiberiu Neagu - Rig Electrician
Resume Tiberiu Neagu - Rig ElectricianResume Tiberiu Neagu - Rig Electrician
Resume Tiberiu Neagu - Rig ElectricianTiberiu Neagu
 

Similar a 9. c vs of staff (6)

Engineering and design company DniproVNIPIenergoprom presentation (2013)
Engineering and design company DniproVNIPIenergoprom presentation (2013)Engineering and design company DniproVNIPIenergoprom presentation (2013)
Engineering and design company DniproVNIPIenergoprom presentation (2013)
 
Electrical Machines Department
Electrical Machines DepartmentElectrical Machines Department
Electrical Machines Department
 
Cv джураев м.-Mechanical Supervisor LUKOIL
Cv джураев м.-Mechanical Supervisor LUKOILCv джураев м.-Mechanical Supervisor LUKOIL
Cv джураев м.-Mechanical Supervisor LUKOIL
 
Projects
ProjectsProjects
Projects
 
Mehrzad_Hosseini2
Mehrzad_Hosseini2Mehrzad_Hosseini2
Mehrzad_Hosseini2
 
Resume Tiberiu Neagu - Rig Electrician
Resume Tiberiu Neagu - Rig ElectricianResume Tiberiu Neagu - Rig Electrician
Resume Tiberiu Neagu - Rig Electrician
 

Último

Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 

Último (20)

Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 

9. c vs of staff

  • 1. CURRICULM VITAE Name: Anikin Andrey Date of birth : 04.12.1976 Education: High Education. Donetsky Government Technician Universities (Ukrain) in 1998 Specialty: Mechanical Engineer Experience: 2005- till now – “EICC” Ltd. Moscow – Chief mechanical engineer 2001 – 2004 – JSC “Stroytransgas” – Mechanical engineer in Algeria 1998 – 2001 – "Dorstroytech" Ltd. – Mechanical engineer Participation in Construction of Pipelines: 1. Oil pipeline KTK (Russia) 2. Oil pipeline in Algeria 3. Oil pipeline Melut Basin in Sudan 4. PC Ivanovskaya 5. Reconstruction Main gas pipeline Parabel-Kuzbass 6. Telecommunication gas pipeline LPU Novosibirsk “Tomsktransgas” 7. PC Proskokovo “Tomsktransgas” Responsibilities: Monitoring for operation and maintenance of civil Equipment & vehicles
  • 2. CURRICULUM VITAE Name: Ereschenko Alexsander Date of birth : 28.10.1953 г. Education: High Education. Ukraine Agricultural Academy in 1985 Specialty: Automatic agricultural industry. Experience: 2002 – till now – “EICC” Ltd. Moscow – technician, engineer, senior engineer 1985 – 2002 – Radio Set Factory – engineer of instrument and automatic – senior electrician engineer 1980 – 1985 – Komintern plant – senior electrician engineer – senior engineer of instrument and automatic Participation in construction of pipelines: 1. Oil pipeline in Kouybyshev - Odessa 2. Oil pipeline “Friendship” 3. PC Ivanovskaya 4. Telecommunication gas pipeline LPU Novosibirsk “Tomsktransgas” 5. PC Proskokovo “Tomsktransgas” 6. Oil pipeline Melut Basin in Sudan 7. Oil pipeline in Algeria - Houd El Hamra-Arzev 34". OZ-2. - Pump stations in Kenanda 8. Main gas pipeline Sougueur-Hadjret Ennous in Algerias Responsibilities: - Installation of electric power supply systems - Installation and commissioning of CP - Installation and commissioning of instrument and control automatic system - Commissioning of processing valves - Commissioning - Putting into operation & Start up
  • 3. CURRICULUM VITEA Name: Fedyaev Andrey Date of birth : 31.10.1966 Education: High Education. Graduated from oil institute in Ufa city (Russia) in 1994 Specialty: Chemical Equipment at chemical plants. Mechanical Engineer Experience: 2005 – till now – “EICC” Ltd. Moscow – chief engineer 2000 – 2005 – “Kvantor” Co – pre-commission & commission mechanical engineer. 1986 – 2000 – Combined heat power plant in Ufa city – Chief of turbine department Participation in construction of pipelines: 1. Gas and oil pipeline in Bashneftgas (Bashkiriay) 2. Oil pipeline in Tengiz - Novorossiysk, KTK (Kazakhstan) 3. Oil pipeline in Algeria 4. Oil pipeline Kenkiak – Atyrow (Kazakhstan) 5. Terminal of Sea Primorsk (Russia) 6. PC Ivanovskaya 7. Telecommunication gas pipeline LPU Novosibirsk “Tomsktransgas” 8. PC Proskokovo “Tomsktransgas” 9. Oil pipeline Melut Basin in Sudan 10. Oil pipeline in Algeria - Houd El Hamra-Arzev 34". OZ-2. - Pump stations in Kenanda 11. Main gas pipeline Sougueur-Hadjret Ennous in Algerias 12. Main pipeline 40” Skikda Responsibilities: - Equipment adjusting at gas &oil pipeline - Commissioning of processing valves - Commissioning - Putting into operation & Start up
  • 4. CURRICULM VITAE Name: Lerner Boris Date of birth : 19.04.1942. Education: High Education. Ivanovo Chemical Technological Institute (Russia) in 1965 Specialty: Engineer of Instrumentation and Automatic Experience: 1994 - till now – “EICC” Ltd. Moscow – General manager 1970 – 1994 – “Gazmontaghavtomatika” Moscow – foreman, chief engineer, director 1968 – 1970 – “Energoremnaladka” Kemerovo – chief engineer 1965 – 1970 – plant “Kuzbasselement” Kemerovo – engineer, senior engineer Participation in construction of pipelines: 1. Gas pipeline Urengoy – Pomary - Uzhgorod 2. Gas pipeline Bukhara - Ural 3. Gas pipeline Middle Asia - Center 4. Gas pipeline “Union” 5. Gas pipeline Ukhta - Torzhok 6. Gas pipeline BGR - TFA 7. Oil pipeline Surgut - Polotsk 8. Gas pipeline and branches in Greece 9. Oil pipeline “Friendship” 10. Oil pipeline Kuybyshev - Lisichansk 11. Gasoline pipeline in Macedonia 12. Gas pipeline in Libya 13. Reconstruction Main gas pipeline Parabel-Kuzbass 14. Pump station in Riazan 15. Reservoirs in Nikolskoe 16. Ammonia pipeline Toliati – Odessa 17. Oil pipeline Kenkiak - Atyrow 18. Pump station in Kotur - Tepe 19. Centre calculation for oil Russia – Ukraine (Chertkovo) 20. Iodine plant of Krasnovodsk 21. Gas treatment plant of Mubarek 22. Multipurpose gas treatment plant in Schatlyk 23. Multipurpose gas treatment plant in Kenkiak 24. Multipurpose gas treatment plant in Schakh – Pakhty 25. PC Ivanovskaya 26. Telecommunication gas pipeline LPU Novosibirsk “Tomsktransgas” 27. PC Proskokovo “Tomsktransgas” 28. Oil pipeline Melut Basin in Sudan 29. Oil pipeline in Algeria - Houd El Hamra-Arzev 34". OZ-2. - Pump stations in Kenanda 30. Main gas pipeline Sougueur-Hadjret Ennous in Algerias 31. Main pipeline GK1 40” Uled Gellal-Skikda
  • 5. Responsibilities: - Installation of electric power supply systems - Installation and commissioning of CP - Installation and commissioning of instrument and control automatic system - Commissioning of processing valves - Commissioning - Putting into operation & Start up
  • 6. CURRICULM VITAE Name: Lobach Andrey Date of birth : 21.01.1959 г. Education: High Education. Moscow Electrical Institute (Russia) in 1982 Specialty: Electrician Engineer Experience: 1993- till now – “EICC” Ltd. Moscow (SARL ELIC) – chief mechanic engineer and site manager, general manager SARL ELIC 1984 г. – 1992 г. – “Gazmontaghavtomatika” – commission engineer of instrument and avtomatic control system 1982 г. – 1984 г. – design bureau of Communication Ministry in USSR – design engineer Participation in construction of pipelines: 1. Oil pipeline construction in Cuba 2. Gas pipeline and branches in Greece 3. Gasoline pipeline in Macedonia 4. Oil pipeline in Algeria 5. Urengou – Pomary – Yzhgorod in Russia 6. Oil pipeline in Algeria - Houd El Hamra-Arzev 34". OZ-2. - Pump stations in Kenanda 7. Main gas pipeline Sougueur-Hadjret Ennous in Algerias 8. Main pipeline GK1 40” Uled Gellal-Skikda 9. Gas pipeline GREO 28” Rocade Est-Ouest 10. Gas pipeline LZ2 24” GPL Hassi-Rmel-Arzev Responsibilities: - Installation of electric power supply systems - Installation and commissioning of CP - Installation and commissioning of instrument and control automatic system - Commissioning of processing valves - Commissioning - Putting into operation & Start up Foreign language: English Promoted to position: Chief Coordinator
  • 7. CURRICULM VITAE Name: Struzh Roman Date of birth : 17.12.1966 Education: High Education. Forestry engineering Institute in L’vov in 1980 Specialty: Automatic process Engineer of instrument and automatic Experience: 2002 - till now – “EICC” Ltd. Moscow Senior- engineer; - foreman. 2000 – 2001 – “Eventa” Ltd. - chief mechanic - chief engineer Participation in construction of pipelines: 1. Oil pipeline Kuybyschev - Odessa 2. Oil pipeline in Algeria 3. Main gas pipeline in Greece 4. PC Ivanovskaya 5. Telecommunication gas pipeline LPU Novosibirsk “Tomsktransgas” 6. PC Proskokovo “Tomsktransgas” 7. Oil pipeline Melut Basin in Sudan 8. Oil pipeline in Algeria - Houd El Hamra-Arzev 34". OZ-2. - Pump stations in Kenanda 9. Main gas pipeline Sougueur-Hadjret Ennous in Algerias 10. Gas pipeline in Tourkmenia Responsibilities: - Installation of electric power supply systems - Installation and commissioning of CP - Installation and commissioning of instrument and control automatic system - Commissioning of processing valves - Putting into operation
  • 8. CURRICULM VITAE Name: Tuzhik Vladimir Date of birth : 14.08.1950 г. Education: Zhitomir Technicial School N1 in 1968 Specialty: Cogeneration and turbine plants of thermoelectric power station Experience: 2003- till now – “EICC” Ltd. Moscow – senior engineer 2001 - 2003 – OAO “Stroytransgaz” – installer, engineer construction 1991 - 1998 – OAO “Zarubezhneftegazstroy” – installer, engineer construction 1990 - 1991 – Specialized directorate №20 of the “Priobtruboprovodstroy” Trust – installer of pipelines 1989 - 1990 – OAO “Zarubezhneftegazstroy” – installer of pipelines 1981 - 1989 – Specialized directorate №20 of the “Priobtruboprovodstroy” Trust – installer of pipelines Participation in construction of pipelines: 1. The Igrim – Serov Gas Pipeline 2. The Urengoy – Pomary - Uzhgorod Gas pipeline 3. Oil pipeline in Iraq 4. Gas Pipeline and branches in Greece 5. Gas pipeline in Libya 6. Reconstruction Main gas pipeline Parabel-Kuzbass 7. PC Ivanovskaya 8. Telecommunication LPU Novosibirsk “Tomsktransgas” 9. PC Proskokovo “Tomsktransgas” 10. Oil pipeline Melut Basin in Sudan 11. Oil pipeline in Algeria - Houd El Hamra-Arzev 34". OZ-2. - Pump stations in Kenanda 12. Main gas pipeline Sougueur-Hadjret Ennous in Algerias Responsibilities: - Installation of pipelines - Installation, pre-commissioning of block valves - Commissioning of processing valves - Delivery of product - Commissioning - Putting into operation & Start up
  • 9. CURRICULM VITAE Name: Zakharov Mikhail Date of birth : 09.11.1978 Education: High Education. Building Institute in Rostov (Russia) in 2000 Specialty: Rail Road Engineer Experience: 2005 – till now – “EICC” Ltd. Moscow – Senior engineer 2000 – 2005 – SD “Uzhenergogas” – senior engineer Participation in construction of pipelines: 1. Gas pipeline “Orenburg – Zainsk” Orenburgasprom 2. Gasoline pipeline “Orenburg – Tuimazy” Orenburgasprom 3. Gasoline pipelines Orenburgasprom 4. Gas pipeline “Belousovo – Leningrad” Mostransgas 5. Gas pipeline “Gorkiy – Center” Mostransgas 6. Gas pipeline “Vykhino – Golovno” Mostransgas 7. Gas pipeline “Torzhok – Minsk - Ivatschevichi” Lentransgas 8. Oil pipeline in Sudan 9. PC Ivanovskaya 10. Telecommunication LPU Novosibirsk “Tomsktransgas” 11. PC Proskokovo “Tomsktransgas” 12. Oil pipeline Melut Basin in Sudan 29. Oil pipeline in Algeria - Houd El Hamra-Arzev 34". OZ-2. - Pump stations in Kenanda Responsibilities: - Installation of electric power supply systems - Installation and commissioning of CP - Installation and commissioning of instrument and control automatic system - Commissioning - Putting into operation & Start up