2. Sequence of Events by: Roger Huron
2006 2007 2008 2009 2010 2011 2012
November January 2: March: Survey Mid 2011: Late 2012:
3: FPL files Sarasota County engineering & Start Power line is
FPL Letter Corridor approves right-of-way construction of energized & in
on selected Certification modifications acquisition power line service
route issued Application
with DEP
Summer:
Recommendatio
Before April n expected from
16: Judge.
13 Alternate
Corridors
filed by 3
parties.
October 28:
Governor &
October 22: Cabinet approve
Certificatio corridor
n Hearing
set for FPL
November:
Certification
Hearing for
FPL deferred
3.
4. Within study area , 19,089 acres
of wetlands were inventoried.
Within study area, 118,665 acres
of uplands were inventoried.
Within preferred corridor,
3,260 acres of wetlands were
inventoried.
5. No schools or daycares were
found within the Preferred
Corridor.
No schools or daycares were
observed with the 400 FT
buffer.
Closest daycare to buffer is
0.23 miles.
Closest school to buffer is 0.78
miles.
6. 31 homes were inventories
within the preferred corridor.
54 homes were inventoried
inside the 400 FT buffer.
7. Proposed Length is 24.51 miles.
Approximate cost per mile is 1.5
million dollars.
Total cost of project is
approximately 74 million
dollars when accounting for the
cost of equipment use per
mile, permit fees, settlements,
etc.
Once the final route is decided
upon, a more accurate cost for
this project will be provided.
8. Conclusion
A variety of sights were evaluated and compared to our final
sight. Our final sight is the best choice since it has a minimal
impact to conservation land, homes, and schools. Since the impact
to schools and homes is minimal, costs for settlements if required
will be very low thus allowing for most revenue to be applied
toward materials, labor, and fees.
It has been a pleasure to work with your community and I know
that our project will bring jobs to your area not to mention the
long-term job security that our company will provide. As you know,
once this project is complete, we will be filling vacancies to assist in
running long-term operations. Again, thank you for your attention
and our company looks forward to a long-term commitment with
your community.