Publicidad
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
Próximo SlideShare
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
Cargando en ... 3
1 de 3
Publicidad

Más contenido relacionado

Publicidad

A SATTAR DC&WI CV-II

  1. ABDUL SATTAR Al-Qamar PCO Phone: Old sui Bazar, Sui Dera Bugti (+92) 300 4107687 Dera Bugti Disst, Baluchistan, Pakistan (+92) 3128226080 PASSPORT # BM 5421581 Email: sattarbugti@gmail.com Objective · Looking for a challenging position in an organization, where I can utilize my oilfield Drilling and Production (Completion and Well Intervention) experiences, education, knowledge and skills for promotion and achievement of its goals. Professional Profile · Drilling Completion & Well Intervention Engineer with diversified experience in various disciplines of Petroleum Engineering (Drilling, completion design & Supervising Well Completion and Well Intervention operations ) and Production Operations (Well completion, well testing, , wireline, slickline, coiled tubing, thru-tubing fishing and milling and different types of well interventions and workover operations) at deep and HPHT wells. Current Status Previous Company's Profile Experience · Working in Pakistan Petroleum Limited (PPL) as a member of Production Engineering Team (Technical Services Department) from August 2010. · Oil and Gas Development Limited (OGDCL) from Aug-2009 to Aug-2010.  PPL is pioneer of natural gas industry and leading E & P Company in Pakistan.  RESPONSIBILITIES & JOB DESCRIPTIONS AT PPL (August 2010 to PRESENT) Well Completion – Independently Supervise conventional, single selective, dual string completion for development wells and effluent disposal wells. Participate in Planning and supervise Completions and W/O operations as per Sequence of Operation approved by Production Engg Dept. and have the ability to deviate programs according to well bore nature and Operational Scenario. Participated in planning and procurement of downhole completion and wellhead equipments and technically evaluated the same. Coordination with reservoir engg. Dept to design well completions and prepare downhole, wellhead and X-mass tree material requirement’s detailed specification sheet for bidders according to well bore pressure, temperature,H2S & CO2 contents and completion design. Physically inspect all well completion related material and verify technically all equipment’s are as per PO (Purchase Order). Prepare completion policy note to provide guidelines and procedure for running single or dual string well completion according to PPL’s SOP and HSE policies. Supervise Work-over Operations (Rig/ Rigless), including Running/ Pulling Well Completion, Wire line/ Slickline Jobs, Wellhead Installation & remedial work. Prepare final completion, post-completion acid stimulation reports with achievements and design well down-hole profile for official records. Stimulation and Nitrogen Kick off Jobs – Planning, handling service company Job proposals for post-DST and post-Completion acid stimulation and technically evaluating the same in selection of appropriate chemical according to wellbore nature and recommend effective volumes used for pre & post flush and main treatment fluids for acid stimulation, designed recipe (for conventional & retarded acids). Supervise the jobs at site for Matrix Acid stimulation (Post – DST & Completion) & performed post acid deliverability analysis and incorporate Coiled Tubing speed as per actual Max pumping rate achieved during CT-BHA function testing and have good experience in handling cycle’s circulations as per available volume of Brine or acid. DST - supervise DST operations (Temporary Conventional drill pipes Completion of
  2. SLB 9 5/8” 47# PIPK-DJ with 10K control Head) including post-DST acid stimulations and well killing operation. Supervise well testing for formation evaluation and submission of final report to Chief engineer production. Wireline – Supervised wireline jobs during well completion operations for supervise perforation and cased hole logging (USIT/CBL-VDL, RST & PSP) jobs. Planning and technically evaluating service company job proposals and products for selection of perforation guns for additional and re-perforation of gas wells by coordinating and cooperation with Reservoir Eng Dept and site supervising the operation. Slickline – Drive unit for down hole completion equipments maintenance such as Wr- SSCSV (Redress like changing Chevron Packings, Static and Dynamic Seals replacement) , Tr-ScSSV (FTET, PLOT and straddling Insert-Type Wr-SSCSV) , HNS replacements (Seating pressure control equipments into Nipple Profiles) and CIV or dummy straddling into SPM pockets .RIH & POOH for latching out and seating of several WR-SCSSV of Baker Model C/W locks BFVE, BFVE-10, BGVE, BFX-11, B & BA-Nipple Sep. Sleeves, L-type SSD LME, LSE and many Flow Control Equips like FWG, FMH & FSG plugs and redress same all and Same for Otis Model Wr-SCSSV of FXE model, Sep. Sleeves and Dummy Chokes, PX-Plugs etc for Standard and Heavy Tubings etc. Supervised operation for BHP & T by using Canada Tech.memory gauges via slickline and submission of daily activity report to Chief engineer production Plan and supervise pressurized annulus investigation to check existing Completion string Integrity in single and dual gas producer wells via Wire line like Conventional or Un-conventional (Quartz Gauges Logging Tools) to determine and locate completion equipments posing negative integrity and causing Pressurized Annulus and recommending remedial operation like straddle Pack-off or W/O. Water shut-off job– As per job proposal planned from Reservoir Engineering Dept. Supervise Coiled tubing operations for Water Shut-off in wells by setting CaCO3 across bottom perforation intervals contributing with high water production rate and carrying out acid stimulation job across upper gas producing formations. Thru Tubing Milling / Fishing Well Intervention – Plan and supervise many thru tubing well intervention jobs for Milling fish into Well bore strings and removed restrictions for running gauges. Milling jobs were carried out with Coiled Tubing and Slick line using conventional tools for Sui-91 and Adhi-5. RESPONSIBILITIES &JOB DESCRIPTIONS AT OGDCL (Aug 2009 to Aug 2010) • Drilling & Well Completion - Involved and participated in all pre-drilling activities like rig up as per SOP and participated in pressure test of Mud discharge line, function testing of Mud pumps, pressure test of BOP & Exhaust fittings, shale shaker and Solid control equipments before Spudding (commencement of Drilling Operation). • Practically supported in designing & running BHA of 24 ½ “, 17 ½ ', 12 ½ or 12 ¼ “' & 8 ½ or 8 ¼ “for 20" 13 3/8" 9 5/8” and 7” Liners respectively and actively involved in monitoring Wellbore quality for deviation during Drilling/ tripping, curing losses against severe loss zones, recommending on Slurry designs, improvising on performance and tracking flat time/ casing running operations.
  3. • Worked in mud system and have vast experience in preparing Water or Oil-based Drilling fluid, maintaining by means of calculations for reducing mud weight by Oil or Water, increasing mud weights by adding Barites and Caco3 etc Retort Analysis and evaluation of hydro cyclone, Centrifuges and full knowledge in maintaining Oil/Water ratio by means of Retort Analysis Provide technical coordination of drilling, completions activities to ensure maximum safety, minimal interruption of drilling, and completion operations. • Rig maintenance activity redressing various mechanical parts like mud pumps ,Swivels, Elevators, BOP, Annular BOP, Kelly Valves and Down Hole BHA parts like Sleeve Stabilizers, Rotary Reamers, Scrapers, KSW, Kelly Valves, RDCV & RFCV etc • Have done several successful Technical Evaluations of drilling Surface & BHA equipment like Swivels, BOPs Elevators, Kelly Valves, Stabilizers, DC, Drill Pipes & WHDP, Shock Absorbers RDCV, RFCV, Vacuum Subs etc. • Supervised over all operation in DST and Cased Hole well Completion, using schlumberger DHCEs and High shot density SLB perforation guns for 5 wells for OGDCL for the project of Uch Gas Phase-II. • Safe Installation of Well Head and perforations as per Company’s Policies and SOPs  Computer Skills and Software MS Office & Internet management. SAP (for SR, RFQ FWO and SES). HIS ( Creating new Index and editing of exiting tool specs)  ADDITIONAL RESPONSIBILITIES Raise Purchase orders and technically evaluate bids for downhole completion and wellhead/ X’Mas tree equipment, Technically Evaluate services like DST and Well Testing services , Coiled Tubing for acid stimulation perforation wash, wireline, BHP surveillance etc Arrange PRs and Pos to maintain Inventory level for production maintenances, service requisitions and Framework orders to hire services from vendors . Academic Record · B.S. Petroleum Engineering (March 2009) Baluchistan University of Engineering & Technology and Management Science, Quetta Pakistan Average percentage (1st, division). Interpersonal Competencies · Good written and verbal communication skills · Commitment to work · Public Presentation skills · Easily adjusts in new environment · Good convincing skills · Ability to work independently as well as team member Languages · Fluent in English, Urdu, Balushi. Interests References · Reading books, playing Football & cricket. · Will be furnished on request.
Publicidad