Objectives
•Define power factor.
•Calculate the capacitor value required to correct AC
series parallel networks to the desired apparent power.
•Compare currents, voltages, and power in AC series
parallel networks before and after power factor
correction.
Importance of Power Factor
•Consider the following example: A generator is
rated at 600 V and supplies one of two possible
loads.
•
Load 1: P = 120 kW, P.F = 1
Load 2: P = 120 kW, P.F = 0.6
•Generator current required to supplythe load
Importance of Power Factor
• For the load with Fp = 0.6, the generator
had to supply 133 more amperes in order to
do the same work .
• Larger current means larger equipment
(wires, transformers, generators) which cost
more.
• Larger current also means larger
transmission losses (think I2
R).
POWER-FACTOR CORRECTION
FIG. shows the impact of power-factor
correction on the power triangle.
Power factor correction capacitors for A, B, and C
phases at the Crofton , MD substation
Rating: 230 kV, 360 MVAR
size comparison Capacitor banks
Power Factor Correction
•Almost all loads are inductive.
•To cancel the reactive component of power, we
must add reactance of the opposite type. This is
called power factor correction.
Capacitor bank in
shipboard power panel
for FP correction
Power Factor Correction
•Almost all loads (commercial, industrial and
residential) look inductive (due to motors,
fluorescent lamp).
•Hence, almost all power factor correction consists of
adding capacitance.
Power Factor Correction Solution Steps
1. Calculate the reactive power (Q) of the load
2. Insert a component in parallel of the load that will cancel out that
reactive power
e.g. If the load has QLD=512 VAR, insert a capacitor with QC=-512
VAR.
3. Calculate the reactance (X) that will give this value of Q
Q=V2
/X
1. Calculate the component value (F ) required to provide that
reactance.
Power Factor Correction
•Transmission lines and generators must be sized to
handle the larger current requirements of an
unbalanced load.
•Industrial customers are frequently fined by the
utility if their power factor deviates from the
prescribed value established by the utility.
Thank you

More Related Content

What's hot

Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
Md Irshad Ahmad
 
Measurement of high_voltage_and_high_currentunit_iv_full_version
Measurement of high_voltage_and_high_currentunit_iv_full_versionMeasurement of high_voltage_and_high_currentunit_iv_full_version
Measurement of high_voltage_and_high_currentunit_iv_full_version
Aman Ansari
 

What's hot (20)

Power factor improvement
Power factor improvement Power factor improvement
Power factor improvement
 
Transmission & distribution of electrical power
Transmission & distribution of electrical powerTransmission & distribution of electrical power
Transmission & distribution of electrical power
 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvement
 
INTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLERINTERLINE FLOW CONTROLLER
INTERLINE FLOW CONTROLLER
 
Switchgear and protection 1
Switchgear and protection 1Switchgear and protection 1
Switchgear and protection 1
 
Factors to be considered while selecting CT
Factors to be considered while selecting CTFactors to be considered while selecting CT
Factors to be considered while selecting CT
 
DISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROLDISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROL
 
Tcsc ppt
Tcsc pptTcsc ppt
Tcsc ppt
 
Dynamic voltage restorer (dvr)2
Dynamic voltage restorer (dvr)2Dynamic voltage restorer (dvr)2
Dynamic voltage restorer (dvr)2
 
Distribution systems
Distribution systemsDistribution systems
Distribution systems
 
Measurement of high_voltage_and_high_currentunit_iv_full_version
Measurement of high_voltage_and_high_currentunit_iv_full_versionMeasurement of high_voltage_and_high_currentunit_iv_full_version
Measurement of high_voltage_and_high_currentunit_iv_full_version
 
Testing of circuit breakers
Testing of circuit breakersTesting of circuit breakers
Testing of circuit breakers
 
auto-reclosure
auto-reclosureauto-reclosure
auto-reclosure
 
Firing angle control
Firing angle controlFiring angle control
Firing angle control
 
Synchronous generator
Synchronous generatorSynchronous generator
Synchronous generator
 
Voltage source Converters as a building block of HVDC and FACTS
Voltage source Converters as a building block of HVDC and FACTSVoltage source Converters as a building block of HVDC and FACTS
Voltage source Converters as a building block of HVDC and FACTS
 
Power quality ppt
Power quality pptPower quality ppt
Power quality ppt
 
Testing of transformer
Testing of transformerTesting of transformer
Testing of transformer
 
MARX Generator.pptx
MARX Generator.pptxMARX Generator.pptx
MARX Generator.pptx
 
Unit 03 Protective relays
Unit  03 Protective relaysUnit  03 Protective relays
Unit 03 Protective relays
 

Viewers also liked

Presentation training
Presentation trainingPresentation training
Presentation training
Srajan Raj
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
Jamilah Abbas
 
Automatic Power Factor Correction using Microcontroller 8051
Automatic Power Factor Correction using Microcontroller 8051Automatic Power Factor Correction using Microcontroller 8051
Automatic Power Factor Correction using Microcontroller 8051
Neehar NLN
 
132kv Substation
132kv Substation132kv Substation
132kv Substation
guestecdd58
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
Ishank Ranjan
 

Viewers also liked (20)

Chapter 4 (power factor correction)
Chapter 4 (power factor correction)Chapter 4 (power factor correction)
Chapter 4 (power factor correction)
 
Power Quality Systems and Power Factor Correction Presentation
Power Quality Systems and Power Factor Correction PresentationPower Quality Systems and Power Factor Correction Presentation
Power Quality Systems and Power Factor Correction Presentation
 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvement
 
System Works Knowledge Sharing
System Works Knowledge SharingSystem Works Knowledge Sharing
System Works Knowledge Sharing
 
Presentation training
Presentation trainingPresentation training
Presentation training
 
Power factor correction
Power factor correctionPower factor correction
Power factor correction
 
A guide to power factor correction for the plant engineer
A guide to power factor correction for the plant engineerA guide to power factor correction for the plant engineer
A guide to power factor correction for the plant engineer
 
Mohsin rana
Mohsin ranaMohsin rana
Mohsin rana
 
Mit ppt 132/33kv ppt
Mit ppt 132/33kv pptMit ppt 132/33kv ppt
Mit ppt 132/33kv ppt
 
Automatic Power Factor Correction using Microcontroller 8051
Automatic Power Factor Correction using Microcontroller 8051Automatic Power Factor Correction using Microcontroller 8051
Automatic Power Factor Correction using Microcontroller 8051
 
132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL132KV SUBSTATION UPPTCL
132KV SUBSTATION UPPTCL
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentation
 
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, AllahabadSummer Training presentation on 132/33 KV sub-station Minto park, Allahabad
Summer Training presentation on 132/33 KV sub-station Minto park, Allahabad
 
Micro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System ReportMicro-controller based Automatic Power Factor Correction System Report
Micro-controller based Automatic Power Factor Correction System Report
 
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, JaipurTraining from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
132kv Substation
132kv Substation132kv Substation
132kv Substation
 
PPt on 220 kV substation
PPt on 220 kV substationPPt on 220 kV substation
PPt on 220 kV substation
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
Power factor
Power factorPower factor
Power factor
 

Similar to Power factor correction

Energy Efficiency in Electrical Systems.pptx
Energy  Efficiency in Electrical Systems.pptxEnergy  Efficiency in Electrical Systems.pptx
Energy Efficiency in Electrical Systems.pptx
PoojaAnupGarg
 
1590053 634881478003587500
1590053 6348814780035875001590053 634881478003587500
1590053 634881478003587500
Navyasri Jiguru
 
Reactive Power Compensation in 132kv & 33kv Grid of Narsinghpur Area
Reactive Power Compensation in 132kv & 33kv Grid of Narsinghpur AreaReactive Power Compensation in 132kv & 33kv Grid of Narsinghpur Area
Reactive Power Compensation in 132kv & 33kv Grid of Narsinghpur Area
ijceronline
 

Similar to Power factor correction (20)

Power Factor : Basics and Benefits of Improvement
Power Factor : Basics and  Benefits of ImprovementPower Factor : Basics and  Benefits of Improvement
Power Factor : Basics and Benefits of Improvement
 
EDS Unit 5.pptx
EDS Unit 5.pptxEDS Unit 5.pptx
EDS Unit 5.pptx
 
REACTIVE POWER
REACTIVE POWERREACTIVE POWER
REACTIVE POWER
 
Reactive Power : Problems and Solutions
Reactive Power : Problems and SolutionsReactive Power : Problems and Solutions
Reactive Power : Problems and Solutions
 
Improvement of Load Power Factor by Using Capacitor
Improvement of Load Power Factor by Using CapacitorImprovement of Load Power Factor by Using Capacitor
Improvement of Load Power Factor by Using Capacitor
 
Power factor and its importance
Power factor and its importancePower factor and its importance
Power factor and its importance
 
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUESpower factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
power factor and power factor correction schneider EMERSON EDUARDO RODRIGUES
 
power factor correction soham+niraj
power factor correction soham+nirajpower factor correction soham+niraj
power factor correction soham+niraj
 
Energy Efficiency in Electrical Systems.pptx
Energy  Efficiency in Electrical Systems.pptxEnergy  Efficiency in Electrical Systems.pptx
Energy Efficiency in Electrical Systems.pptx
 
capacitors
capacitorscapacitors
capacitors
 
2011 ced capacitors
2011 ced capacitors2011 ced capacitors
2011 ced capacitors
 
power-factor-correction.pptx
power-factor-correction.pptxpower-factor-correction.pptx
power-factor-correction.pptx
 
Power Factor Improvement.pptx
Power Factor Improvement.pptxPower Factor Improvement.pptx
Power Factor Improvement.pptx
 
IARE_RPCM_PPT_0.pdf
IARE_RPCM_PPT_0.pdfIARE_RPCM_PPT_0.pdf
IARE_RPCM_PPT_0.pdf
 
Automatic power factor correction and its advantage
Automatic power factor correction and its advantageAutomatic power factor correction and its advantage
Automatic power factor correction and its advantage
 
Power factor improvement
Power factor improvementPower factor improvement
Power factor improvement
 
1590053 634881478003587500
1590053 6348814780035875001590053 634881478003587500
1590053 634881478003587500
 
Power Factor Improvement
Power Factor ImprovementPower Factor Improvement
Power Factor Improvement
 
Reactive Power Compensation in 132kv & 33kv Grid of Narsinghpur Area
Reactive Power Compensation in 132kv & 33kv Grid of Narsinghpur AreaReactive Power Compensation in 132kv & 33kv Grid of Narsinghpur Area
Reactive Power Compensation in 132kv & 33kv Grid of Narsinghpur Area
 
Day 3: Power Supply Quality in Buildings
Day 3: Power Supply Quality in Buildings Day 3: Power Supply Quality in Buildings
Day 3: Power Supply Quality in Buildings
 

More from Abdur rehman (8)

PAKISTAN AS A GEO THERMAL COUNTRY
PAKISTAN AS A GEO THERMAL COUNTRYPAKISTAN AS A GEO THERMAL COUNTRY
PAKISTAN AS A GEO THERMAL COUNTRY
 
Habits of HAZRAT MUHAMMAD (P.B.U.H)
Habits of HAZRAT MUHAMMAD (P.B.U.H) Habits of HAZRAT MUHAMMAD (P.B.U.H)
Habits of HAZRAT MUHAMMAD (P.B.U.H)
 
child labour
child labourchild labour
child labour
 
Personal writing
Personal writingPersonal writing
Personal writing
 
Marketing strategies
Marketing strategiesMarketing strategies
Marketing strategies
 
Negative effects-of-technology
Negative effects-of-technologyNegative effects-of-technology
Negative effects-of-technology
 
Types of relay
Types of relayTypes of relay
Types of relay
 
Irrigation methods
 Irrigation methods Irrigation methods
Irrigation methods
 

Recently uploaded

Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 

Recently uploaded (20)

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 

Power factor correction

  • 2. Objectives •Define power factor. •Calculate the capacitor value required to correct AC series parallel networks to the desired apparent power. •Compare currents, voltages, and power in AC series parallel networks before and after power factor correction.
  • 3. Importance of Power Factor •Consider the following example: A generator is rated at 600 V and supplies one of two possible loads. • Load 1: P = 120 kW, P.F = 1 Load 2: P = 120 kW, P.F = 0.6 •Generator current required to supplythe load
  • 4. Importance of Power Factor • For the load with Fp = 0.6, the generator had to supply 133 more amperes in order to do the same work . • Larger current means larger equipment (wires, transformers, generators) which cost more. • Larger current also means larger transmission losses (think I2 R).
  • 5. POWER-FACTOR CORRECTION FIG. shows the impact of power-factor correction on the power triangle.
  • 6. Power factor correction capacitors for A, B, and C phases at the Crofton , MD substation Rating: 230 kV, 360 MVAR size comparison Capacitor banks
  • 7. Power Factor Correction •Almost all loads are inductive. •To cancel the reactive component of power, we must add reactance of the opposite type. This is called power factor correction. Capacitor bank in shipboard power panel for FP correction
  • 8. Power Factor Correction •Almost all loads (commercial, industrial and residential) look inductive (due to motors, fluorescent lamp). •Hence, almost all power factor correction consists of adding capacitance.
  • 9. Power Factor Correction Solution Steps 1. Calculate the reactive power (Q) of the load 2. Insert a component in parallel of the load that will cancel out that reactive power e.g. If the load has QLD=512 VAR, insert a capacitor with QC=-512 VAR. 3. Calculate the reactance (X) that will give this value of Q Q=V2 /X 1. Calculate the component value (F ) required to provide that reactance.