1. Filled of experience Petroleum Onshore/Offshore , Power station& Heavy industry construction Project
• Planning & Co-ordination
• Piping & Steel structure
• Pressure vessels & Tanks
• Equipment
MIDOR
CURRICULUM VITAE
ABOU EL –AZEM HUSSEN ABOU EL-AZEM
TECHNIP
TTIL-SNC
2. AL-KHAFJI Offshore Platforms at El-Maadia fabrication yard
Offshore Platform A project of six platforms (4 legs & six legs Jackets, deck, Top side facilities ), total
weight approximately 14000 ton, including 24”, 30” & 36” risers, 20” & 36” caissons ,J- tubes. Structure
material is API 2W, X 52. Deck contains sump deck , bottom deck, middle deck, upper deck & helli deck.
Decks from 500 ton till 2700 ton As Senior Project Eng.
Kuwait Gulf Oil Company
Aramco Gulf Operations
3. SAQQARA Offshore Platform at El-Maadia fabrication yard
Offshore Platform A project of 1 M MHRS, was employed by bp-GUPCO As Senior Project Eng.-
(Deputy Site Manger) I Was Responsible for all activities of Fabrication &Installation
Onshore Plant I Was Responsible for all activities of Pipe rack Fabrication .
4. Middle East Oil Refinery MIDOR
A project of 25 M MHRS, was employed by TECHNIP As General Piping supervisor& Co-ordinator
supervise and co-ordinate I Was Responsible for all
activities of piping (process/utilities) of major units (like crude and vacuum distribution, Hydrogen plant,
Hydro cracker)& joined to the pre-commissioning and start up.,
MIDOR
TECHNIP
TTIL-SNC
5. • SUES OIL PROCESSING CO
• A project of 2 M MHRS, was employed by TECHNIP As General supervisor and I Was Responsible for
all mech activities.
6. Suez gulf power plant
A project of 3.5 M MHRS, was employed by EDF As General Piping supervisor and I Was Responsible for
Critical piping .
7. ARP (Acid Regeneration Plant) ANSDK
• A project of 2 M MHRS, was employed by ESACO As General supervisor & Co-ordinator
and I Was Responsible for Mechanical Work.
8. KTI
AMOC. Com
• project of 2 M MHRS, I was employed by ESACO As Mechanical Manager and I Was Responsible for
Mechanical WORK
9. Nubaria Power Station
A project of 3 M MHRS, I was employed by SCG As Mechanical Manager-(Deputy Site Manger) and I Was
Responsible for Live Line Washing System & Fire Protection Systems.
10. SHARM ELSHIKH International Conference Center
• A project of 0.5 M MHRS, I was employed by SCG As Senior Project Eng.-(Deputy Site Manger) and I
Was Responsible for Electro Mechanical Work.
SHAKER CONSULTANCY GROUP
11. KINGDOM OF SAUAD ARABIA
Planning & Co-ordination
EAST ABHA WASTEWATER TREATMENT PLANT
KHAMIS MUSHAYT SEPTGE TREATMENT PLANT
PIPE LINE