Filled of experience Petroleum Onshore/Offshore , Power station& Heavy industry construction Project
• Planning & Co-ordination
• Piping & Steel structure
• Pressure vessels & Tanks
• Equipment
MIDOR
CURRICULUM VITAE
ABOU EL –AZEM HUSSEN ABOU EL-AZEM
TECHNIP
TTIL-SNC
AL-KHAFJI Offshore Platforms at El-Maadia fabrication yard
Offshore Platform A project of six platforms (4 legs & six legs Jackets, deck, Top side facilities ), total
weight approximately 14000 ton, including 24”, 30” & 36” risers, 20” & 36” caissons ,J- tubes. Structure
material is API 2W, X 52. Deck contains sump deck , bottom deck, middle deck, upper deck & helli deck.
Decks from 500 ton till 2700 ton As Senior Project Eng.
Kuwait Gulf Oil Company
Aramco Gulf Operations
SAQQARA Offshore Platform at El-Maadia fabrication yard
Offshore Platform A project of 1 M MHRS, was employed by bp-GUPCO As Senior Project Eng.-
(Deputy Site Manger) I Was Responsible for all activities of Fabrication &Installation
Onshore Plant I Was Responsible for all activities of Pipe rack Fabrication .
Middle East Oil Refinery MIDOR
A project of 25 M MHRS, was employed by TECHNIP As General Piping supervisor& Co-ordinator
supervise and co-ordinate I Was Responsible for all
activities of piping (process/utilities) of major units (like crude and vacuum distribution, Hydrogen plant,
Hydro cracker)& joined to the pre-commissioning and start up.,
MIDOR
TECHNIP
TTIL-SNC
• SUES OIL PROCESSING CO
• A project of 2 M MHRS, was employed by TECHNIP As General supervisor and I Was Responsible for
all mech activities.
Suez gulf power plant
A project of 3.5 M MHRS, was employed by EDF As General Piping supervisor and I Was Responsible for
Critical piping .
ARP (Acid Regeneration Plant) ANSDK
• A project of 2 M MHRS, was employed by ESACO As General supervisor & Co-ordinator
and I Was Responsible for Mechanical Work.
KTI
AMOC. Com
• project of 2 M MHRS, I was employed by ESACO As Mechanical Manager and I Was Responsible for
Mechanical WORK
Nubaria Power Station
A project of 3 M MHRS, I was employed by SCG As Mechanical Manager-(Deputy Site Manger) and I Was
Responsible for Live Line Washing System & Fire Protection Systems.
SHARM ELSHIKH International Conference Center
• A project of 0.5 M MHRS, I was employed by SCG As Senior Project Eng.-(Deputy Site Manger) and I
Was Responsible for Electro Mechanical Work.
SHAKER CONSULTANCY GROUP
KINGDOM OF SAUAD ARABIA
Planning & Co-ordination
EAST ABHA WASTEWATER TREATMENT PLANT
KHAMIS MUSHAYT SEPTGE TREATMENT PLANT
PIPE LINE
Abou el azm CV
Abou el azm CV
Abou el azm CV
Abou el azm CV
Abou el azm CV
Abou el azm CV
Abou el azm CV
Abou el azm CV
Abou el azm CV

More Related Content

Similar to Abou el azm CV

EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015John Wood
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1robinking277
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R S Rajaram
 
Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018SanjuBK
 
Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017Ibrahim Nabawy
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)Hassan Halhoul
 
Gl Tauzin Resume 2011 Generic
Gl Tauzin Resume 2011 GenericGl Tauzin Resume 2011 Generic
Gl Tauzin Resume 2011 GenericGaryTauzin
 
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...Javier Cantera
 
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...DEGIMA SA
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull
 
Walchandnagar Industries
Walchandnagar IndustriesWalchandnagar Industries
Walchandnagar Industriesketan.pole
 

Similar to Abou el azm CV (20)

EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015
 
Yasser Hatem CV
Yasser Hatem CVYasser Hatem CV
Yasser Hatem CV
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
 
Skema LER
Skema LERSkema LER
Skema LER
 
Trdrag 04 13 16
Trdrag 04 13 16Trdrag 04 13 16
Trdrag 04 13 16
 
WQ-2
WQ-2WQ-2
WQ-2
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018Cv kanysh komyshev_21_12_2018
Cv kanysh komyshev_21_12_2018
 
Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017
 
AMOD RESUME
AMOD RESUMEAMOD RESUME
AMOD RESUME
 
AMOD RESUME
AMOD RESUMEAMOD RESUME
AMOD RESUME
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
Gl Tauzin Resume 2011 Generic
Gl Tauzin Resume 2011 GenericGl Tauzin Resume 2011 Generic
Gl Tauzin Resume 2011 Generic
 
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
 
Ronald-Smith
Ronald-SmithRonald-Smith
Ronald-Smith
 
My Cv 05-2014
My Cv 05-2014My Cv 05-2014
My Cv 05-2014
 
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 
Walchandnagar Industries
Walchandnagar IndustriesWalchandnagar Industries
Walchandnagar Industries
 

Abou el azm CV

  • 1. Filled of experience Petroleum Onshore/Offshore , Power station& Heavy industry construction Project • Planning & Co-ordination • Piping & Steel structure • Pressure vessels & Tanks • Equipment MIDOR CURRICULUM VITAE ABOU EL –AZEM HUSSEN ABOU EL-AZEM TECHNIP TTIL-SNC
  • 2. AL-KHAFJI Offshore Platforms at El-Maadia fabrication yard Offshore Platform A project of six platforms (4 legs & six legs Jackets, deck, Top side facilities ), total weight approximately 14000 ton, including 24”, 30” & 36” risers, 20” & 36” caissons ,J- tubes. Structure material is API 2W, X 52. Deck contains sump deck , bottom deck, middle deck, upper deck & helli deck. Decks from 500 ton till 2700 ton As Senior Project Eng. Kuwait Gulf Oil Company Aramco Gulf Operations
  • 3. SAQQARA Offshore Platform at El-Maadia fabrication yard Offshore Platform A project of 1 M MHRS, was employed by bp-GUPCO As Senior Project Eng.- (Deputy Site Manger) I Was Responsible for all activities of Fabrication &Installation Onshore Plant I Was Responsible for all activities of Pipe rack Fabrication .
  • 4. Middle East Oil Refinery MIDOR A project of 25 M MHRS, was employed by TECHNIP As General Piping supervisor& Co-ordinator supervise and co-ordinate I Was Responsible for all activities of piping (process/utilities) of major units (like crude and vacuum distribution, Hydrogen plant, Hydro cracker)& joined to the pre-commissioning and start up., MIDOR TECHNIP TTIL-SNC
  • 5. • SUES OIL PROCESSING CO • A project of 2 M MHRS, was employed by TECHNIP As General supervisor and I Was Responsible for all mech activities.
  • 6. Suez gulf power plant A project of 3.5 M MHRS, was employed by EDF As General Piping supervisor and I Was Responsible for Critical piping .
  • 7. ARP (Acid Regeneration Plant) ANSDK • A project of 2 M MHRS, was employed by ESACO As General supervisor & Co-ordinator and I Was Responsible for Mechanical Work.
  • 8. KTI AMOC. Com • project of 2 M MHRS, I was employed by ESACO As Mechanical Manager and I Was Responsible for Mechanical WORK
  • 9. Nubaria Power Station A project of 3 M MHRS, I was employed by SCG As Mechanical Manager-(Deputy Site Manger) and I Was Responsible for Live Line Washing System & Fire Protection Systems.
  • 10. SHARM ELSHIKH International Conference Center • A project of 0.5 M MHRS, I was employed by SCG As Senior Project Eng.-(Deputy Site Manger) and I Was Responsible for Electro Mechanical Work. SHAKER CONSULTANCY GROUP
  • 11. KINGDOM OF SAUAD ARABIA Planning & Co-ordination EAST ABHA WASTEWATER TREATMENT PLANT KHAMIS MUSHAYT SEPTGE TREATMENT PLANT PIPE LINE