INDEX&
1. Introduction55555555555555555555555555555555555555555555555555555555555555555555555555555"1"
2. Physical"Characteristics"55555555555555555555555555555555555555555555555555555555555555"1"
2.1 Type"
2.2 Location"
2.3 Size"(length)"
2.4 Manufacturer"
2.5 Other"Characteristics"
3. Technical"Specifications"55555555555555555555555555555555555555555555555555555555555555"3"
3.1 Volt/Amp/Power"ratings"
4. Control"Strategy/Parameters"5555555555555555555555555555555555555555555555555555555"4"
4.1 Parallel"MTDC"configuration"
4.2 Series"MTDC"configuration"
4.3 Control"Parameters"
4.4 Control"system"of"the"project"
4.5 DC"Voltage"Control"
4.6 Reactive"Power"Control"
4.7 Reactive"Power"Requirement"
4.8 Control"functions"
5. Operations"5555555555555555555555555555555555555555555555555555555555555555555555555555555"8"
5.1 Scheduling"and"Configurations"
5.2 Normal"Configurations"
5.3 Hybrid"Configurations"
5.4 Advantages"of"Hybrid"Configuration"
5.5 Reliability"and"Maintainability"
5.6 Interconnection"Issues5Contingency"Analysis:"Impact"of"Quebec5New"
England"on"PJM"Transmission"system"
5.7 Protection"of"the"HVDC"line"
5.8 Operational"Limitations:"Frequency"Coupling"
5.9 Results"and"field"measurements"
6. Economics"55555555555555555555555555555555555555555555555555555555555555555555555555555"16"
6.1 Capital"Construction"Cost"
6.2 Cost"of"Money"
6.3 Net"Benefits"
6.4 Economic"Justification"
6.5 Different"Losses"
7.""""""""Environmental"Considerations"55555555555555555555555555555555555555555555555555555"20"
""""""""7.1"Right5of5Way"Issues"
""""""""7.2"Emissions"and"other"offsets"
""""""""7.3"New"England"environmental"challenges"and"the"possible"actions"
""""""""7.4"Impact"of"Integrated"Actions"on"New"England"Goals"
""""""""7.5"Harmonics/Interferences"
""""""""7.6"Ground"Electrode"
8."""""""""Contractual"and"Policy"Considerations"5555555555555555555555555555555555555555555"23"
9."""""""""Future"Scope"and"Proposed"changes"for"the"Project"555555555555555555555555555"24"
10."""""""Conclusions,"Unique"Features"and"Project"Benefits"555555555555555555555555555"24"
11."""""""System"Modeling"5555555555555555555555555555555555555555555555555555555555555555555555"24"
12."""""""References"55555555555555555555555555555555555555555555555555555555555555555555555555555"26"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
List&of&Tables:&
"
Table"3.1:"Volt/Amp/Power"ratings"
Table"3.2:"AC"substation"ratings"
Table"6.1:"Project"Costs"
Table"6.2:"Cost"of"money"
Table"6.3:"Net"benefits"
"
List&of&Figures:&
"
Figure"2.1:"Location"
Figure"2.2:"One"line"diagram"of"the"HVDC"line"
Figure"4.1"Parallel"MTDC"configurations"
Figure"4.2:"series"MTDC"configurations"
Figure"4.4:"Control"system"arrangement"of"the"HVDC"line"
Figure"4.5:"DC"Voltage"Control"
Figure"4.6"DC"Voltage"limit"control"–"Reactive"power"control"
Figure"4.7:"Reactive"Power"requirement"
Figure"5.1:"Different"configurations"of"the"Hydro"Quebec5New"England"operation"
Figure"5.2:"Normal"Configurations"
Figure"5.3:"Hybrid"Configurations"
Figure"5.4:"Total"Transfer"capability"for"the"New5England"on"11/24/2015"
Figure"5.5:"The"magnitude"of"power"flow"on"an"hourly"basis"for"a"three5year"
period"is"indicated"as"per"the"figure"shown"above"
Figure"5.6:"MACH"protection"system"
Figure"5.7:"Different"sections"of"the"HVDC"project"
Figure"6.1:"Break5even"distance"compared"to"the"HVAC"costs"
Figure"6.2:"Different"losses"in"the"project"
Figure"7.1:"Environmental"impact"
Figure"7.2:"Emission"reduction"actions"
Figure"11.1:"Matlab"system"model"for"mode"1"configuration"
Figure"11.2:"Output"on"the"inverter"side"(Sandy"Pond)"mode"1"configuration"
Figure"11.3:"Power"flow"of"the"Quebec5New"England"HVDC"project"
"
! 1!
1.#Introduction:#
!
The!project!we!have!chosen!is!“Quebec6New!England!HVDC!transmission!line”,!
which! has! a! capacity! of! 2690MW.! ! This! project! came! into! operation! in! two!
phases,! phase61! in! 1987,! phase62! in! 1992.! This! line! travels! all! the! way! from!
northern! part! of! Quebec,! Canada! passes! the! Canada6USA! border! and! finally!
reaches!the!New6England!area!ending!up!at!Sandy!Pond,!Massachusetts.!This!line!
is! a! Multi6terminal! HVDC,! which! has! three! terminals! namely! Radisson,! Nicolet!
and!Sandy!Pond!that!can!operate!in!two6terminal!mode!and!also!in!hybrid!mode.!
In!this!report!we!will!be!discussing!more!details!about!this!project!as!we!move!
forward.!
!
2.#Physical#Characteristics:#
#
2.1#Type:#
This! project! is! a! point6to6point! connected,! bipolar,! multi6terminal! HVDC! with!
metallic!return.!Each!terminal!has!two!converters,!which!makes!it!each!converter!
per! pole.! The! converter! stations! are! built! of! mercury! valves! when! it! was!
commissioned,! later! the! mercury! valves! were! replaced! by! thyristors! due! to!
advancements!in!the!technology.!Each!converter!station!has!a!126pulse!bridge!
converter,!which!is!similar!to!many!of!the!existing!projects.!
!
The!Quebec6New!England!HVDC!is!the!first!large6scale!multi6terminal!designed!
and!installed!in!the!world.!It!was!constructed!in!two!phases:!
• Phase!1:!1986!(690!MW)!
• Phase!2:!1992!(2000MW)!
In!phase61!two!terminal!stations!namely!Radisson!(Quebec,!CA)!and!Sandy!Pond!
(Massachusetts,!USA)!were!built.!In!phase62!the!power!capacity!is!increased!by!
2000MW!and!also!a!new!terminal!‘Nicolet’!came!into!existence.!
!
2.2#Location:#
#
!
Figure!2.1:!Location!
!
! 2!
As!shown!in!the!figure!2.1,!it!can!be!seen!that!the!line!starts!at!Radisson!terminal!
in!Quebec,!Canada.!The!input!power!to!the!terminal!and!in!turn!the!line!comes!
from! the! La! Grande! 2! hydroelectric! power! station.! The! line! reaches! Nicolet!
terminal!at!the!Canada6USA!border!and!then!ends!up!at!Sandy!Pond!terminal!in!
Massachusetts,! USA.! There! were! two! other! terminals! Des! Cantons,! Comerford!
between!Nicolet!and!Sandy!Pond!but!were!decommissioned!due!to!dissatisfying!
results,!which!will!be!discussed!in!this!report!under!configurations.!
!
2.3#Size#(Length):#
!
!
Figure!2.2:!One!line!diagram!of!the!HVDC!line!
!
The!total!length!of!the!line!is!1500Km,!the!length!between!Radisson!to!Nicolet!is!
1022Km,!the!length!between!Nicolet!and!Des!Cantons!is!105Km!and!the!length!
from!Des!Cantons!to!Sandy!Pond!is!383Km.!In!the!online!diagram,!it!can!be!seen!
that!the!La!Grande!station!feeds!the!Radisson!terminal.!The!stations!Nicolet!and!
Comerford!were!decommissioned!as!discussed!before.!!
!
2.4#Manufacturer:!
!
The! works! of! this! project! were! carried! out! by! ABB! group.! This! project! was!
world’s! first! Multi6terminal! HVDC! system.! After! this! project! ABB! has! installed!
and!operated!many!MTDC!systems!through!out!the!world.!ABB!and!National!Grid!
celebrated!25!years!for!the!project!on!November!3rd,!2015.!ABB!has!planned!to!
make! its! impact! through! its! new! protective! system! scheme! namely! MACH! –!
Modular!Advanced!Control!for!HVDC!at!the!Sandy!Pond!terminal!in!2013.!ABB!
! 3!
has!pioneered!and!is!a!leader!in!HVDC!technology!for!the!last!60!years.!ABB!has!
done!over!100!HVDC!projects!and!is!planning!to!setup!Ultra6HVDC!in!its!future!
projects.!
!
2.5#Other#Characteristics:#
!
The! line! also! crosses! the! Saint! Lawrence! River! between! Grondines! and!
Lotbiniere,!Quebec,!Canada.!This!power!line!crossing!initially!was!an!overhead!
crossing!and!then!later!they!replaced!it!by!a!cable!tunnel.!The!negative!visual!
impact! of! the! large! towers! of! the! overhead! lines! was! the! reason! behind! the!
change.!The!length!of!the!cable!tunnel!is!3954!meters.!
!
!
3.#Technical#Specifications:!
!
3.1#Volt/Amp/Power#ratings:!
!
The! HVDC! line! is! operated! at!±450!"!through! out! its! length.! Coming! to! the!
individual!terminal!ratings,!it!can!be!tabulated!as!follows:!
!
Terminal! Power!rating! Voltage!rating!
Radisson! 2250!MW! ±500!"!
Nicolet! 2138!MW! ±475!"!
Sandy!Pond! 2000!MW! ±450!"!
Table!3.1:!Volt/Amp/Power!ratings!
!
The!calculated!DC!current!at!±450!"!transferring!a!power!of!1500!MW!will!be!
around!1670!Amperes.!The!line!is!rated!at!2690!MW!but!it!is!always!operated!at!
some!stable!value!satisfying!the!contingency!specifications!of!the!New!England!
region.!This!will!be!further!discussed!under!operations!of!the!line!in!this!report.!
!
The!AC!substation!voltages!connected!to!these!terminals!are!rated!as!follows:!
!
Terminal! Voltage!ratings!
Radisson! 735kV/315kV!
Nicolet! 735kV/230!kV!
Sandy!Pond! 345!kV!
Table!3.2:!AC!substation!ratings!
!
!
!
! 4!
4.#Control#Strategy/Parameters:#
!
The! converter! stations! are! operated! in! CSC6Current! source! converter! mode,!
which!is!also!the!Line!commutated!converter!mode.!The!converter!switches!were!
initially!mercury!valve!based!but!recently!they!have!changed!valves!to!thyristor6
based!converters.!!
!
A!multi!terminal!HVDC!can!be!connected!either!in!series!or!parallel!way,!both!
have!their!advantages!in!various!aspects.!
!
4.1#Parallel#MTDC#Configuration:#
!
!
Figure!4.1!Parallel!MTDC!configurations!
!
The! parallel! configuration! allows! DC! terminals! to! operate! around! a! common!
rated!voltage!Vdc.!If!parallel!configurations!is!used!in!an!MTDC!system!based!on!
CSC,!because!of!voltage!source!nature!of!CSCs!in!the!DC6side,!a!precise!voltage!
balancing! between! converters! are! required! through! a! special! and! complicated!
switching.! This! even! gets! worse! when! the! CSCs! are! far! away! from! each! other!
since! fast! communication! channels! are! also! required.! Therefore,! thee! control!
technique!that!should!be!adopted!in!a!parallel6CSC6MTDC!system!will!be!tough!
and!complicated!task.!This!is!why!it!is!practically!impossible!to!form!a!parallel6
CSC6MTDC!system!with!more!than!5!terminals.!The!Hydro!Quebec6New!England!
MTDC!system!was!initially!planned!to!construct!a!five!terminal!MTDC!system.!
However! due! to! the! performance! problems! predicted! to! happen! they! stop!
installing!the!other!two!stations!which!was!intended!to!connect!Des!Cantons!to!
Comerford.!
!
!
! 5!
4.2#Series#MTDC#configurations:!
!
!
Figure!4.2:!series!MTDC!configurations!
!
In!the!series!connection!where!one!of!the!converter!controls!the!current!around!
a! common! rated! current! and! the! rest! of! converters! controls! the! power.! This!
configuration!is!well!suited!for!CSC!MTDC!systems!since!CSCs!in!the!DC!side!are!
functioning!as!a!voltage!source,!which!can!be!connected!in!series!without!need!
for! special! switching.! However! this! configuration! has! several! drawbacks! as!
compared! to! other! configuration! such! as! higher! losses,! more! complicated!
insulation.! Most! importantly,! if! one! of! the! DC! lines! is! disconnected! due! to! the!
fault! occupance! the! current! in! the! entire! DC! grid! will! be! cut! off.! Due! to!
aforementioned!disadvantages,!series!configuration!is!not!recommended!to!be!
used!and!hence!in!practice!only!parallel!configuration!has!been!considered.!But#
for# the# Hydro# QuebecONew# England# project# series# configuration# is#
implemented# since# there# were# disadvantages# like# special# switching,# fast#
communications#in#parallel#operation.!
!
!
4.3#Control#Parameters:!
!
The!different!parameters!that!are!responsible!for!the!control!of!this!line!are!as!
follows:!
!
1. Voltage!control:!Tap!Changer!control!(on!AC!side),!Converter!control!on!
Inverter!side!(for!DC!voltage)!
2. Current!control:!Converter!control!on!Rectifier!side!
3. Reactive!power!control:!AC!Voltage!limitation!control,!AC!Filters!
4. Firing! angle! control:! Fixed! firing! angle! with! trigger! set! and! with! or!
without!PI!controller!
5. Extinction!angle!control!
!
!
!
!
!
!
! 6!
4.4#Control#System#of#the#project:!
!
!
Figure!4.4:!Control!system!arrangement!of!the!HVDC!line!
!
The!above!figure!is!the!general!overview!of!the!control!system!represented!in!
blocks!for!the!given!project.!As!discussed!in!the!control!parameters,!we!have!the!
tap! changer! control,! Converter! control! on! both! inverter! and! rectifier! side! and!
also!the!AC!filter.!!The!AC!Voltage!Limitation!Control!does!the!Reactive!power!
control!with!the!help!of!the!AC!Filters.!
!
4.5#DC#Voltage#control:#
!
!
Figure!4.5:!DC!Voltage!Control!
The!firing!angle!of!the!thyristors!controls!the!DC!Voltage!output!at!both!rectifier!
and!inverter!ends.!For!the!rectifier!operation!the!firing!angle!alpha!′ ∝ ′!is!varied!
from!zero!to!90!degrees,!for!the!inverter!operation!alpha!is!varied!from!90!to!
! 7!
180! degrees.! The! direction! of! current! is! changed! if! the! voltage! polarity! of! the!
converters!is!changed.!!
!
4.6# Reactive# Power# controlODC# Voltage# limit# control# through# different#
controls:!
!
!
Figure!4.6!DC!Voltage!limit!control!–!Reactive!power!control!
!
This!control!is!used!for!the!Reactive!power!control!through!Voltage!limitation,!
the! Alpha! is! also! varied! through! the! PI! controller! and! the! trigger! set! on! both!
inverter!and!rectifier!side.!The!trigger!set!controls!current!on!the!rectifier!side!
and!controls!voltage!on!the!inverter!side.!!The!extinction!angle!is!also!controlled!
here!on!the!inverter!side.!
!
4.7#Reactive#power#requirement:!
!!
The! general! reactive! power! requirement! in! this! HVDC! line! is! 50660%! of! the!
active! power! flow.! This! can! be! achieved! through! shunt! capacitances! and!
harmonic!filter!banks.!
!
Figure!4.7:!Reactive!Power!requirement!
! 8!
4.8#Control#Functions:!
!
Control!functions!at!the!rectifier:!
1. DC!current!Control!(main!control!mode)!
2. DC!Voltage!limitation!control!(backup!control!mode)!
Control!functions!at!the!inverter:!
1. DC!Voltage!control!(main!control!mode)!
2. DC!current!control!(backup!control!mode)!
3. Extinction!Angle!control!(backup!control!mode)!
!
!
5.#Operations:!
!
5.1#Scheduling#and#Configuration:!
!
The! Radisson,! Nicolet! and! Sandy! Pond! terminals! have! two! converters! each,!
therefore! we! have! six! converters! in! total,! one! operating! for! each! pole.! Each!
terminal! has! three! modes! of! operation! the! rectifier,! inverter! and! the! no!
operation!mode.!Therefore!the!total!possible!outcomes!for!configuration!would!
be!3×3×3 = 27.!Out!of!which!eight#configurations!are!used!prominently:!
!
1. Two!three6terminal!MTDC!configurations!
2. Four!two6terminal!configurations!
3. Two!hybrid!configurations!(one!Radisson!or!Sandy!Pond!pole!out)!
!
The!different!configurations!can!be!shown!as!follows:!
!
!
Figure!5.1:!Different!configurations!of!the!Hydro!Quebec6New!England!operation!
!
! 9!
5.2#Normal#Configurations:#
#
The!Configurations!1,!4,!16,!22!are!the!two!terminal!mode!operations,!while!the!
9,! 25! are! the! Multi! terminal! operation! and! the! 964,! 25622! are! the! hybrid!
configurations.! Let! us! analyze! the! configuration! 1,! the! Radisson! operates! as!
rectifier! while! the! Sandy! Pond! operates! in! Inverter! mode! and! the! Nicolet!
terminal!is!in!no!operation!mode.!Here!the!power!is!generated!in!La!Grande!and!
then!transferred!from!Radisson!to!the!loads!near!Sandy!Pond!terminal.!Also!the!
terminals!can!operate!either!in!monopole!or!bipolar!mode.!
!
Let! us! analyze! a! multi! terminal! mode! 9,! in! this! configuration! Radisson! and!
Nicolet!act!as!Rectifiers!while!the!Sandy!Pond!act!as!inverter!sucking!power!from!
the!other!two!stations.#
!
Figure!5.2:!Normal!Configurations!
!
5.3#Hybrid#Configurations:#
#
The!hybrid!configuration!is!a!combination!of!two!normal!configurations!where!
Power!is!transferred!in!two!ways,!involving!all!three!terminals!and!also!one!of!
the! terminals! operating! in! monopole! mode.! In! configuration! 469! (or! 964),! the!
Radisson!terminal!has!one!pole!in!rectifier!operation!while!the!other!pole!being!
off!for!various!other!reasons!like!schedule!maintenance,!outage.!The!terminals!
Nicolet! and! Sandy! Pond! work! in! bipolar! inverter! mode! getting! power! from!
monopole!Radisson!terminal.!!
#
!
Figure!5.3:!Hybrid!Configurations!
!
! 10!
5.4#Advantages#of#Hybrid#Configurations:#
!
There! are! various! advantages! of! the! hybrid! configurations! in! this! HVDC!
transmission,!which!are!beneficial!in!many!aspects.!Hybrid!Configurations!in!this!
project! are! characterizes! by! the! multi! terminal! Radisson6Nicolet6Sandy! Pond!
operation!of!five!converters,!three!on!the!first!pole!and!two!on!the!second.!More!
flexibility! is! attained! in! the! case! of! unavailability! of! one! pole! for! planned!
maintenance!or!outage!at!Radisson!or!Sandy!Pond.!No!hybrid!configuration!has!
been!developed!yet!for!outage!of!one!pole!at!Nicolet.!In!this!hybrid!configuration,!
one! line! section! is! operated! bipolar! while! the! other! section! is! monopole! with!
metallic!return.!
!
5.5#Reliability#and#Maintainability:#
5.5.1#Open#Access#Transmission#Tariff#(OATT):##
Section! II! of! the!ISO! New! England! Inc.! Transmission,! Markets,! and! Services!
Tariff!(ISO!Tariff)!is!known!as!the!Open!Access!Transmission!Tariff!(OATT).!The!
OATT:!
• Helps! ensure! that! all! transmission! owners! and! transmission! customers!
have!fair!and!open!access!to!transmission!service!in!New!England!
• Details! the! rights! and! responsibilities! of!transmission! owners! and!
transmission!customers!as!well!as!the!procedures!they!must!follow!and!the!fees!
transmission!customers!must!pay!to!access!the!transmission!system!
• Sets!out!the!transmission!system!planning!process!for!the!region!
• Sets! out! the! cost! recovery! and! allocation! mechanisms! for! transmission!
and!ancillary!services!in!the!region!!
Total#Transfer#Capability#(TTC):#
The!amount!of!electric!power!that!can!be!moved!or!transferred!reliably!from!one!
area!to!another!area!of!the!interconnected!transmission!systems!by!way!of!all!
transmission! lines! (or! paths)! between! those! areas! under! specified! system!
conditions.!The!Total!Transfer!Capability!for!the!New!England!(on!11/24/2015)!
system!has!been!obtained!as!follows:#
!
Figure!5.4:!Total!Transfer!capability!for!the!New6England!on!11/24/2015!
! 11!
Available#Transfer#Capability#(ATC):!
a) Capacity#Benefit#Market#(CBM):##
!!!!!The!use!of!Capacity!Benefit!Margin!(CBM)!on!Phase!I/II!HVDC6TF!is!governed!
by! the! overall! ISO! New! England! approach! to! capacity! planning! requirements.!
Load!Serving!Entities!(LSEs)!operating!in!the!New!England!Balancing!Authority!
Area!are!required!to!arrange!their!Installed!Capability!requirements!prior!to!the!
beginning! of! any! given! month! in! accordance! with! New! England! Wholesale!
market!rules.!As!such,!CBM!on!Phase!I/II!HVDC6TF!for!use!in!ATC!calculations!is!
zero!and!will!not!be!included!in!the!calculations!of!ATC.!As!long!as!this!market!
design!is!in!place!in!New!England!the!CBM!is!set!to!zero.!
b) Transmission#Reliability#Margin#(TRM):#
The!Transmission!Reliability!Margin!(TRM)!is!the!portion!of!TTC!that!cannot!be!
used!for!reservation!of!Firm!Transmission!Service!because!of!uncertainties!in!
system!operation.!These!calculated!TRM!values!shall!not!be!applied!to!non6firm!
transmission!service.!
!
Phase!I/II!Import!TRM!=!TTC!–!1200!MW!
!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!Phase!I/II!Export!TRM!=!TTC!–!500!MW!
!
c) Existing#Transmission#Commitment#(ETC):#
!!!!!A! Transmission! Provider’s! existing! transmission! capacity! obligations! which!
may! include! grandfathered! transmission! contracts,! Tariff! transmission!
reservations!(including!rollover!rights!for!extensions)!and!other!obligations!that!
impact!firm!ATC.!
!
Calculation#of#Firm#ATC:#
#
a) Firm#ATC:#
!
Firm!Available!Transfer!Capability!(Firm!ATC)!for!an!interface!is!the!capability!
for!Firm!transmission!reservations!that!remain!after!allowing!for!CBM!and!Firm!
Existing!Transmission!Commitments!(ETC).!Firm!Transmission!Service!over!the!
Phase! I/II! HVDC6TF! that! is! available! in! the! Planning! Horizon! (PH)! includes:!
Yearly,! Monthly,! Weekly,! and! Daily.! Phase! I/II! HVDC6TF! transmission!
reservations!with!any!other!status!are!not!included!in!this!Firm!ATC!calculation.!
Netting!of!Phase!I/II!HVDC6TF!transmission!reservations!is!not!considered!in!the!
ATC! calculation.! Mathematically,! Firm! ATC! in! the! PH! is! calculated! using! the!
equation:!
Firm!ATC!=!TTC!–CBM!–Firm!ETC!
!
b) NonOFirm#ATC:#
Non6Firm! ATC! in! the! PH! for! an! interface! is! the! capability! for! N6n6Firm!
transmission!reservations!that!remain!after!allowing!for!CBM,!TRM!and!Firm!and!
Non6Firm! ETCs.! As! discussed! above,! the! CBM! for! Phase! I/II! HVDC6TF! is! zero.!
Non6Firm!ATC!over!the!Phase!I/II!HVDC6TF!that!is!available!in!the!PH!includes:!
Monthly,!Weekly,!Daily!and!Hourly.!Firm!and!Non6Firm!Phase!I/II!HVDC6TF!ETCs!
! 12!
are! only! those! Firm! and! Non6Firm! transmission! reservations! with! a! status! of!
Confirmed.!Phase!I/II!HVDC6TF!transmission!reservations!with!any!other!status!
are!not!included!in!this!Non6Firm!ATC!calculation.!Netting!Phase!I/II!HVDC6TF!
transmission!reservations!is!not!considered!in!this!calculation.!Mathematically,!
Non6Firm!ATC!in!the!PH!is!calculated!using!the!equation:!!
!
Non6Firm!ATC!=!TTC!–!CBM!–!TRM!–!Firm!and!Non6Firm!ETCs!
#
5.6# Interconnection# IssuesOContingency# Analysis:# Impact# of# QuebecONew#
England#on#PJM#Transmission#System##
Phase!2!interface!has!been!in!service!since!1991!with!a!nominal!transfer!capability!
of!2000!MW!in!both!directions.!!Due!to!the!large!transfer!capability!of!this!interface!
and!the!geographic!location!of!the!New!England!Control!Area!with!respect!to!the!
rest! of! the! Eastern! Interconnection,! the! loss! of! this! facility! can! have! a! substantial!
impact! on! the! New! York! and! Pennsylvania,! New! Jersey! and! Maryland! (“PJM”)!
transmission!systems.!The!impact!of!the!loss!of!this!interface!on!the!New!York!and!
PJM!transmission!systems!is!dependent!upon!the!simultaneous!loading!on!critical!
internal!interfaces!in!both!of!these!external!transmission!systems!at!the!time!of!the!
contingency.!The!unique!geographic!location!of!the!New!England!Control!Area!with!
respect!to!the!rest!of!the!Eastern!Interconnection!bounds!the!amount!of!energy!that!
can!flow!between!New!England!and!Hydro!Quebec!over!Phase!2.!!
!
Predefined! procedures! and! the! exchange! and! coordination! of! real6time! data!
between! the! three! affected! Reliability! Coordinators! is! required! to! allow! Hydro!
Quebec! to! New! England! real6time! flows! to! be! greater! than! 1200! MW,! which! is!
referred!to!as!the!“largest!source!contingency!limit”.!There!are!instances!where!real6
time!system!conditions!exist!per!the!established!procedures!that!allow!the!flow!from!
Hydro!Quebec!to!New!England!to!reach!the!facility!rating!of!2000!MW.!Therefore!the!
import! TTC! (Hydro! Quebec! to! New! England)! is! 2000! MW.! The! export! TTC! (New!
England!to!Hydro!Quebec)!has!been!limited!to!1200!MW!since!the!facility!went!into!
service.!Comparable!procedures!would!have!to!be!developed!and!approved!by!the!
affected! Reliability! Coordinators! before! the! flow! from! New! England! to! Hydro!
Quebec!can!exceed!1200!MW;!to!date,!there!has!not!been!a!request!to!consider!the!
development!of!such!procedures.!!
!
Figure!5.5:!The!magnitude!of!power!flow!on!an!hourly!basis!for!a!three!year!period!
is!indicated!as!per!the!figure!shown!above.!
! 13!
!
5.7#Protection#of#the#HVDC#line:#
For!High!Voltage!Direct!Current!(HVDC)!applications,!the!control!and!protection!
system! plays! an! essential! role! in! the! overall! performance! of! the! transmission!
system.!The!control!and!protection!system!adopted!by!ABB!Power!Systems!uses!
the!latest!technology!from!the!fields!of!electronics!and!microprocessors.!MACH!is!
a!fully!computerized!control!and!protection!system.!The!main!characteristics!of!
the! MACH! are! the! high! degree! of! functional! integration! and! the! open! systems!
interface!approach.!
The! open! systems! strategy! is! reflected! both! in! the! use! of! industrial! standard!
serial! and! parallel! communication! buses,! as! well! as! in! the! use! of! standard!
formats!for!all!collected!data!(such!as!events,!alarms!and!disturbance!data).!This!
makes! it! possible! to! take! advantage! of! the! latest! achievements! in! electronic!
engineering,!thus!ensuring!timely!development!of!more!advanced!functions!and!
enhancement!of!performance!for!a!long!time!to!come.!Integrated!with!the!MACH!
control!and!protection!equipment!is!the!Station!Control!and!Monitoring!(SCM)!
system.! Work! stations! (PCs)! are! interconnected! by! an! Ethernet! local! area!
network.!A!field!bus!network!builds!up!the!distributed!system!for!remote!I/O,!for!
control!as!well!as!for!process!interfacing!with!the!SCM!system.!
Each!pole!control!and!protection!cubicle!includes,!in!one!framework,!all!controls;!
from!the!interstation!telecommunication!system!and!operator!control!interface!
to!the!converter!firing!control.!A!second!framework!houses!a!double!set!of!DC!
protections.! The! system! is! built! using! state6of6the6art! microprocessors! and!
digital! signal! processors! (DSPs),! connected! by! high! performance! industry!
standard!buses!and!fiber!optic!communication!links.!!
The! principle! of! the! workflow! is! shown! in! Fig.! 5.6! In! the! DPS! (Dynamic!
Performance!Study)!the!pole!control!functions!are!tested!against!an!analogue!or!
a!real6time!digital!HVDC!simulator.!The!software!released!for!the!DPS!is!identical!
with!the!software!in!the!system!design!stage,!and!revision!orders!are!used!from!
the! start! of! the! DPS.! Functional! tests! or! bench! tests! are! made! for! control! and!
protection!functions!using!simplified!simulators.!The!debugging!is!done!at!this!
stage.!
The!schematic!representation!of!the!HVDC!protection!system!is!shown!below:!
!
Figure!5.6:!MACH!protection!system!
!
Integrated! with! the! MACH! control! and! protection! equipment! is! the! Station!
Control! and! Monitoring! (SCM)! system,! a! fully! computerized! and! redundant!
system.!The!solution!with!operator!workstations!in!local!area!networks!(LAN)!is!
very! cost6effective,! and! is! also! in! perfect! agreement! with! the! open! systems!
interface! strategy.! Very! high! performance! is! achieved! mainly! because! all! data!
! 14!
collection! and! ordering! are! implemented! in! software! functions! in! distributed!
control! units! (DCUs)! integrated! into! the! control! and! protection! system.! These!
DCUs!are!single!board!computers!from!the!MACH!family.!
5.8#Operational#Limitations:#Frequency#coupling#of#HVDC#and#HVAC#system#
in#the#Hydro#QuebecONew#England#system:#
!
An! HVDC! line! running! in! parallel! with! an! HVAC! line! will! be! exposed! to! a!
fundamental! frequency! coupling.! The! coupling! effects,! if! strong! enough,! have!
been! recognized! as! an! important! subject! concerning! the! performance! and! the!
design! of! an! HVDC! system.! Equipment! both! on! the! AC! and! DC! sides! of! the!
converter! station! can! be! affected! by! this! phenomenon.! Induced! fundamental!
frequency!current!can!lead!to!saturation!of!the!converter!transformer!core!due!
to!unsymmetrical!magnetization.!Saturation!leads!to!an!increased!noise!level!and!
increased!heating!in!the!transformer.!The!commutation!in!the!converter!and!the!
saturation!of!the!transformer!may!also!generate!higher!order!harmonic!currents!
in!the!AC!and!DC!networks,!which!will!influence!the!filter!design.!
!
The! superimposed! AC! current! on! an! HVDC! transmission! line! is! based! on! two!
effects:!
!
• The!coupling!between!AC!and!DC!lines!
• The! dynamic! characteristic! of! the! HVDC! converter! with! its! terminating!
impedance,!responding!to!the!fundamental!frequency!current!on!the!DC!line.!!
!
These! two! effects! must! be! added,! thus! complicating! the! calculation! and!
evaluation!of!the!actual!coupling!to!the!DC!line.!The!analysis!must!therefore!be!
performed!both!with!and!without!the!converters!in!operation!
!
The!field!measurements!were!carried!out!on!the!northern!part!of!the!Quebec6
New!England!Phase!II!multi6terminal!HVDC!system.!This!part!of!the!system!is!a!
bipolar! 450! kV! overhead! transmission! line.! It! is! spanning! from! the! Radisson!
converter! station! (2,250! MW),! in! the! James! Bay! area,! to! the! Des! Cantons!
converter!station!(690!MW)!near!the!US!border.!The!length!is!1120!km.!A!third!
converter! station,! Nicolet! (2,138! MW),! is! located! between! the! two! previously!
mentioned! stations,! 90! km! north! of! Des! Cantons.! At! the! time! of! the! field!
measurements,! all! converter! terminals! and! their! associated! equipment! were!
disconnected.!Hence,!the!transmission!line!was!passive!and!measurements!were!
not!amplified!by!resonances!with!the!line!terminating!impedances.!
!
Three!sections!of!the!HVDC!line!were!exposed!to!AC!line!couplings,!as!shown!in!
Fig.!1!and!detailed!in!Table!1.!
• Section!I:!Radisson!6!Némiscau!
• Section!II:!Trenche/La!Tuque!6!Trois!Rivières/Des!Hêtres!
• Section!III:!Bécancour6!Nicolet!
!
! 15!
#
Figure!5.7:!Different!sections!of!the!HVDC!project!
!
The!measurements!were!carried!out!for!two!configurations!of!the!DC!line:!
a)!Configuration#1:!both!poles!of!the!DC!line!were!grounded!at!the!southern!end!
(Des!Cantons)!but!left!open6circuited!at!Radisson!where!the!pole!voltages!were!
measured.!
b)!Configuration#2:!both!poles!of!the!DC!line!were!grounded!at!both!ends!and!
the!pole!currents!were!measured!at!Radisson.!
!
A! nine6cycle! acquisition! of! the! DC! line! voltages! or! currents! was! taken! every!
minute!via!a!digital!oscilloscope!and!the!data!was!processed!to!obtain!the!first!
ten! harmonics.! While! the! above! DC! line! measurements! were! ongoing,! voltage!
and!currents!of!735!kV!line!L7063!and!of!230!kV!lines!L2370!and!L2380!were!
being! monitored! continuously! via! power! analysers! to! also! obtain! the! first! ten!
harmonics!about!ever!seven!minutes.!735!kV!line!L7062!was!not!monitored!as!it!
was!not!in!service!during!that!time!period!and!was!open6circuited!at!both!ends.!
Also,!since!the!third!coupling!section!is!relatively!short,!230!kV!lines!L2381!and!
L2382!were!not!specially!monitored!and!the!data!came!from!the!hourly!records!
of!the!system!control!center.!
!
5.9#Results#of#the#field#measurements:#
!
A.#Configuration#1#
!
On!the!DC!line,!the!recordings!lasted!for!about!24!hours!and!indicate!that!about!1!
kV!was!induced!on!each!pole.!A!
Strong!correlation!was!noticed!between!these!induced!voltages!and!the!positive!
sequence!current!on!line!L2380.!This!is!the!AC!line!running!closest!to!the!DC!line!
and!for!the!longest!coupling!section.!
!
B.#Configuration#2#
!
The! measurements! for! DC! line! configuration! 2! lasted! only! 90! minutes! and!
showed!fundamental!frequency!currents!of!1.05!and!1.20!A!rms!for!pole!1!and!
! 16!
pole!2,!respectively.!The!coupling!factor!in!configuration!2,!where!the!DC!lines!
are!short6circuited!to!ground!in!Radisson,!is!different!from!configuration!1.!The!
inductive!coupling!is!dominating!and!gives!a!higher!value!for!the!current!of!pole!
2,!due!to!its!closer!location!to!the!AC!lines.!Considering!also!the!coupling!lengths!
and! the! relative! position! of! the! lines! given,! it! can! be! confirmed! that! pole! 2! is!
exposed!to!a!stronger!inductive!coupling!compared!to!pole!1.!The!voltage!and!
currents!of!735!kV!line!L7063!and!230!kV!lines!L2370!and!L2380!are!presented!
in!Table!1.!The!table!lists!the!average!magnitudes!of!the!positive6,!negative6!and!
zero6sequence!components,!calculated!from!the!continuously!monitored!ones!in!
configuration! 2.! From! the! hourly! records,! the! average! value! of! the! positive!
sequence! magnitudes! for! 230! kV! lines! L2381! and! L2382! are! calculated.! The!
negative!and!zero!sequences!for!these!lines!have!not!been!monitored.!
!
The!values!recorded!are!tabulated!as!shown!below:!
!
!
Figure!5.8:!Field!results!of!the!configurations!
!
6.#Economics:#
The!various!economic!aspects!of!the!Quebec6New!England!project!have!been!
listed!below!
6.1#Capital#Construction#Cost:!!!!!!!!!!!
The!total!cost!incurred!for!the!phase62!of!the!project!is!calculated!to!be!585!million!
dollars.!
!!!!!!!!!!!!!!!!
ITEM# COST#ESTIMATE#(in#Millions#
of#Dollars)#
(As#of#1990)#
133.2!miles!of!∓450!kV!DC!Transmission!Line! 182!
One!1800!MW!converter!station!connected!to!Sandy!
Pond!
252!
36!miles!of!345!kV!AC!Transmission!Line!connecting!
Sandy!Pond!and!Millbury!No.3!Substations!
40.5!
16.1!miles!of!345!kV!AC!Transmission!Line!connecting! 17.7!
! 17!
Millbury!No.3!and!West!Medway!Substations!
3456kV!AC!circuit!breakers!and!miscellaneous!
equipment!at!Sandy!Pond,!Millbury!No.3!,!and!West!
Medway!substations!
18.3!
Remove!and!rebuild!two!sections!of!two!1156kV!AC!
transmission!lines!and!remove!and!rebuild!portions!
of! two! 69! 6kV! AC! transmission! lines! and! support!
structures!on!the!Sandy!Pond!to!Millbury!right6of6
way;! install! 1156kV! AC! circuit! breakers! and!
miscellaneous!substation!equipment!
46.5!
Other!miscellaneous!facilities! 28!
Total! 585!
Table!6.1:!Project!Costs!
#
6.2#Cost#of#Money:#
#
DC#Facilities# 60%!Debt!@!11.0!%!
40%!Equity!@!14.0!%!
Weighted!Total!12.2%#
AC#Lines# 45%!Debt!@!11.0%!
10%!Preferred!Stock!@10.0%!
45%!Equity!@!14.0%!
Weighted!Total!12.25%!
Present#Worth#Rate# 10.4%!
Property#Taxes#
a) Converters!
b) AC!and!DC!Lines!
c) Escalation!Rate!
!
1.0%!of!Project!Capital!Cost!
2.5%!of!Project!Capital!Cost!
2.5%!per!year!
O&M#Costs#
• !!Converters!
• AC!!
• DC!Lines!
• Escalation!Rate#
• Land!/!Right!Of!Way!Lease!Charges#
#
1.9%!of!Project!Capital!Cost!
0.6%!of!Project!Capital!Cost!
0.7%!of!Project!Capital!Cost!
5.0%!per!year!
2.3%!of!Project!Capital!Cost#
! 18!
List#of#Facilities#
a) Tax!
!
b) Book!
!
c) Normalized!
!
15!years!for!personal!property!
18!years!for!real!property!
10!years!for!DC!Line!and!Converter!
30!years!for!AC!Lines!
10!years!for!DC!Line!and!Converter!
30!years!for!AC!Lines!
Tax#Income#
a) Federal!Income!
b) Massachusetts!Income!
c) New!Hampshire!Income!
d) Investment!Tax!Credit!
!
46.0%!
6.5%!(70%!subject!to!Income!Tax)!
9.03%!(30%!subject!to!Income!Tax)!
10%!deferred!and!amortized!over!book!life!
Depreciation#
a) Book:!
b) Tax:!
!
Straight!Line!
Rate!Set!by!Accelerated!Cost!Recovery!
System!Tax!Laws!
In!Service!Date! December!1990!
Table!6.2:!Cost!of!money!
!
6.3#Net#Benefits:#
#
Fossil#Fuel#Prices# Gross#Savings# Project#Costs# Net#
Benefits#
Capital#Costs# Cumulative#
Present#Worth#
!
660%!
!
886!
+25%!
Base!
625%!
1119!
897!
675!
6233!
611!
211!
!
625%!
!
1369!
+25%!
Base!
625%!
1119!
897!
675!
250!
472!
694!
!
Base!
!
1729!
+25%!
Base!
625%!
1119!
897!
675!
610!
832!
1054!
!
+25%!
!
2069!
+25%!
Base!
625%!
1119!
897!
675!
950!
1172!
1394!
Table!6.3:!Net!benefits!
! 19!
6.4#Economic#Justification:#
Despite!the!Net!benefits!of!the!project!under!section!6.3,!a!break!even!analysis!of!
the!project!costs!when!compared!to!HVAC!is!done!in!excel!sheets!and!the!results!
are!drawn!as!follows:!
!
!
figure!6.1:!Break!even!distance!compared!to!the!HVAC!costs!
The!scale!of!the!graph!is:!1unit!on!X6axis!=!10!miles,!1unit!on!Y6axis!=!100million!
dollars!
After!considering!all!the!relative!costs!the!break!even!distance!is!calculated!to!be!
“152!miles”!(for!phase!62only)!
This!project!is!economically!viable!and!profits!are!expected!high!when!compared!
to!HVAC!also.!
!
6.5#Different#Losses:#
#
Figure!6.2:!Different!losses!in!the!project!
! 20!
The! figure! 6.2! resembles! the! different! losses! in! this! project,! the! transformer!
losses!being!the!highest!of!losses!accounting!for!57%,!the!next!being!thyristor!
losses! of! 24%.! The! other! losses! are! from! filters,! smoothing! reactors! and! line!
losses.!
#
7.#Environmental#Considerations:#
#
7.1#RightOofOWay#Issues:!
As! necessary,! transmission! line! rights6of6way! would! be! cleared! of! trees! to!
facilitate!(1)!staking,!access,!assembly,!and!erection!of!structures;!(2)!installation!
of!conductors;!and!(3)!maintenance.!This!would!also!provide!adequate!clearance!
for!energized!lines.!The!clearing!program!would!be!planned!and!implemented!to!
stabilize! the! rights6of6way! against! erosion! and! provide! for! natural! vegetation!
control.!
• Access#and#Maintenance#Roads#
To! the! extent! possible,! existing! roads! would! be! used! to! gain! access! to!
project!sites.!Some!new!access!roads!would!be!required!both!within!the!
rights6of6way! and! from! existing! roads! to! the! rights6of6way! .! Off6road!
access!may!be!pursued!in!special!cases.!
• Support#Structure#Installation,#Framing,#and#Stringing#
In! upland! area! setting! for! the! support! structure! might! include! a!
foundation! with! steel! pole! angle! support! structure! for! instance! would!
either! require! concrete! cylindrical! caisson! foundations,! concrete!
cylindrical!caisson!foundations,!spread6footing!foundation,!steel!grillage!
foundation!structure.!
In!Wetland!areas!the!method!for!placement!would!be!wetlands.!(1)!Direct!
embedment! within! an! excavation.! (2)! Drive! piles! into! underlying! firm!
ground! and! attach! the! structures! to! the! piles.! (3)! Install! a! concrete!
foundation!and!set!the!structure!on!the!foundation.!
• Converter#Terminal#
Construct!ion!of!the!proposed!converter!terminal!would!include!(1)!site!
preparation,! (2)! foundation! work,! (3)! erection! of! buildings! and!
structures,! (4)! installation! of! power! equipment,! and! (5)! testing! and!
commissioning.!
• Expansion#of#the#Ground#Electrode#
The!Ground!electrode!for!the!phase!II!will!be!an!extension!of!the!phase!I!
ground! electrode! it! would! necessitate! the! improvement! of! the! existing!
logging!road.!Additionally,!a!short,!1!56m!(506ft)!wide!corridor!would!be!
cleared!for!the!proposed!ground!electrode!feeder!connector.!
#
7.2#Emissions#and#other#offsets#
• Air#Quality6No!serious!air6quality!impacts!are!anticipated!if!the!project!is!
implemented.!
• Land#Features,#Hydrology,#Water#Quality,#and#Water#Use6!Despite!the!
use!of!mitigate!measures!to!control!erosion,!some!unavoidable!increases!
of!soil!erosion!and!sedimentation!within!creeks!and!rivers!would!result!
from!construction!activities,!particularly!during!the!thunderstorm!season.!
! 21!
Construction!activities!would!result!in!temporarily!increased!suspended!
solids!and!turbidity!in!surface!water!bodies!of!the!project!area.!
• Land# Features# and# Use6Impacts! related! to! unstable! slopes! would! be!
mitigated! through! the! use! of! careful! siting! of! structures! and! use! of!
thoroughly!supervised!construction!practices.!Judicious!siting!of!project!
facilities! would! be! employed! to! minimize! the! impacts! associated! with!
geological! instability,! such! as! landslides,! slumping,! mass! wasting,! and!
earthquakes.!
• Ecology6! About! 147! ha! (364! acres)! of! forest! habitat! at! the! proposed!
converter! station,! ground! electrode! site,! and! along! the! proposed! route!
would!be!cleared,!but!it!is!not!anticipated!that!this!would!result!in!serious!
effects! upon! local! wildlife! populations.! Indeed,! some! species! would!
benefit!from!the!clearing!of!the!wooded!habitat.!Disturbance!of!aquatic!
and! wetland! habitats! and! their! associated! biota! would! be! an!
environmental!impact!of!the!proposed!project!and!would!primarily!occur!
during!construction!activities.!
• Socioeconomics# and# Cultural# Resources6! No! unavoidable! adverse!
effects!to!socioeconomics!and!cultural!resources!currently!are!identified.!
• Health# and# Safety6! A! conservative! interpretation! of! the! available! data!
leads!to!the!conclusion!that!electrostatic!fields!and!air!ion!concentration!s!
in!the!right6of6way!have!the!potential!in!very!infrequent!circumstances!of!
inducing! insignificant! and! transient! physiological! and! psychological!
alterations!in!persons!frequenting!this!area!.!
• Historical#Structures6!Al!though!prehistoric!sites!may!contain!structures!
and!historic!sites!may!lack!them!,!historic!structures!may!be!considered!
separately! because! the! methods! employed! for! inventory! and! impact!
assessment!differ!from!those!applied!to!other!cultural!resources!.!
• Electric#and#Magnetic#environment6!Due!to!the!presence!of!AC!and!DC!
lines!there!will!be!electric!and!magnetic!field!in!the!surrounding!and!it!
will!be!maximum!near!the!conductors!but!as!the!clearance!height!of!the!
conductor!is!high!it!would!not!affect!the!surrounding!environment.!
7.3#New#England#environment#challenges#and#the#possible#actions#
!
! 22!
!
Figure!7.1:!Environmental!impact!
#
7.4#Impact#of#Integrated#Actions#on#New#England#Goals#
#
#
Figure!7.2:!Emission!reduction!actions!
!
7.5#Harmonics/Interferences#
• A!typical!Harmonics!Disturbances!in!the!system!is!the!11th!and!the!13th!
Harmonics!due!to!which!was!reduced!by!the!proper!ST!filter!but!due!to!
the!increase!in!the!effect!of!the!harmonic!current!in!the!system!newer!C6
Type!filter!are!being!used!to!replace!the!old!one.!
• The!Coupling!effect!between!the!HVAC!and!HVDC!line!were!calculated!to!
be!between!162.5!A!as!per!the!worst6case!scenario.!And!a!distance!of!1.5!
KM!was!measured!to!avoid!this!effect.!
• During!the!spring!of!1991,!several!severe!geomagnetic!disturbances!were!
recorded!in!North!America,!and!particularly!in!Northern!Quebec,!where!
Hydro6Quebec's!La!Grande!generation!complex!and!transmission!system!
are!located.!As!a!result!of!these!disturbances,!the!Quebec6New!England!
! 23!
Phase! 1! HVDC! system! was! affected! by! transformer! saturation! and!
harmonic!voltage!distortion!due!to!geomagnetic!induced!current!(GIC).!
!
7.6#Ground#Electrode#
• The!ground!electrode!would!correct!for!current!imbalance!between!the!
positive! and! negative! halves! of! the! HVDC! interconnection! and!
accommodate!abnormal!operating!conditions.!
• During! normal! operation! of! the! proposed! DC! line,! approximately! 20!
amperes! of! electricity! at! less! than! 500! volts! would! flow! over! the!
electrode!feeder!and!through!the!ground!electrode.!
• In! cases! of! abnormal! operating! conditions,! the! maximum! voltage! to!
ground! would! not! exceed! 15! kV! at! a! current! of! 2450! amperes.! The!
ground!electrode!is!designed!to!operate!at!this!level!for!15!minutes.!The!
ground! electrode! is! expected! to! be! used! for! abnormal! operating!
conditions!20!to!30!times!per!year.!
8.#Contractual#and#Policy#Considerations.#
Quebec! segment! ownership! by! HQ6TransEnergie! and! US! segment! ownership!
jointly!between!NU!and!NSTAR.!
Relevant!Considerations!
• Project!is!not!a!merchant!project!
• Project!is!participant!funded,!with!cost6based!rates!
• Transmission!Service!Agreement!to!be!filed!with!FERC!for!approval!
• Power!Purchase!Agreement!to!be!approved!by!state!regulators!
• Project!to!be!vetted!through!ISO6NE!planning!process!
• Project!to!be!turned!over!to!ISO6NE!for!operation!
• Project!is!subject!to!state!siting!requirements!
!
1. Joint#Development#Agreement#
• NU! and! HQ6Trans! Energie! for! the! design! and! construction! of! the!
HVDC!line!
• Des!Cantons!is!the!expected!northern!terminus!
• Southern!terminus!has!several!viable!alternatives!identified!
2. Transmission#Services#Agreement#
• Firm!transmission!services!for!HQ6US!under!this!bilateral!agreement!
• HQ!will!pay!for!the!HVDC!line!–participant!funded!
• Negotiated,!cost!based!rates!with!FERC!filing!for!approval!
• Not!merchant!and!no!market6based!pricing!
3. Purchase#Power#Agreement#
• Available!to!NU,!NSTAR!and!other!qualified!New!England!buyers!
• No!less!than!20!year!term!
• All6in!priced!power!(including!the!costs!of!the!transmission!line)!
• State!regulators!will!have!approval!for!the!power!purchase!by!their!
respective!utilities!
! 24!
9.#Future#Scope#and#Proposed#Changes#for#the#Project:#
• ABB!will!now!replace!the!206yearold!control!and!protection!systems!with!
the! newest! modular! advanced! control! systems! (MACH)! for! HVDC!
equipment.!
• The! project! scope! also! includes! refurbishment! of! two! cable! transition!
stations!and!a!control!and!protection!system!replica!for!a!test!center!in!
Canada,! which! will! be! operational! by! 2016.! Apart! from! the! Protection!
system!the!Automatic!reclosure!system!is!going!to!be!replaced.!
10.##Conclusions,#Unique#Features#and#Project#Benefits:#
• Only! MTDC! System! in! North! America! and! also! links! two! asynchronous!
Systems.!
• CO2! Emissions:! Injecting! 1,200! MW! of! new! hydro! power! would! reduce!
CO2emissions!by!up!to!6!million!tons!representing!30%!of!the!2025!“gap!
to!target”!
• Other! environmental! benefits:! Power! will! displace! marginal! fossil!
generation! and! associated! environmental! impacts! –frees! up! enough!
natural!gas!to!heat!1!million!homes!
• Fuel! Diversity:! Increase! in! hydro! power! to! New! England! significantly!
increases!the!region’s!fuel!diversity,!reducing!the!dependence!on!oil!and!
gas!
• Market!Power!Prices:!The!scale!of!the!project!is!expected!to!lower!market!
prices!for!power!for!all!customers!
• PPA!benefits:!A!pricing!structure!that!will!be!competitive!with!the!market!
• Participant! Funded:! The! required! investment! in! HVDC! facilities! will! be!
borne!by!the!parties!without!regional!cost!allocation!
!
11.#System#Modelling:#
The MATLAB modelling of Mode 1 Configuration as discussed under 5.1 section of
the Quebec – New England HVDC Project is as shown below:#
!
!
Figure!11.1:!Matlab!system!model!for!mode!1!configuration!
! 25!
The!ouput!result!on!the!Sandy!Pond!inverter!side!simulated!is!as!follows:!
!
Figure!11.2:!Ouput!on!the!inverter!side!(Sandy!Pond)!mode!1!configuration!
Power!world!simulation!for!the!project!has!also!been!performed!which!can!be!
shown!as!follows:!
!
Figure!11.3:!Power!flow!of!the!Quebec6New!England!HVDC!project!
!
In!this!simulation!we!have!the!three!terminals!Radisson,!Nicolet!and!Sandy!Pond!
with!their!corresponding!generators,!loads!and!the!reactive!power!requirement.!
All!the!three!terminals!are!connected!through!DC!transmission!lines!available!in!
the! Power! world.! There! are! also! supporting! generators! at! buses! 3! and! 5! to!
support!the!contingency!when!the!Radisson!generator!is!lost.!The!rectifier!and!!
inverter! of! the! DC! lines! are! inbuild! within! the! line,! the! parameters! can! be!
changed!accordingly!depending!on!the!control!strategy!and!configuration!type.!
!
!
! 26!
12.#References:#
!
1.!"Phase!I/II!HVDC6TF!TTC,!CBM,!TRM!and!ATC!METHODOLOGY"!
2.! "Proposed! economic! study! to! assess! potential! regional! benefits! for! increased!
operating!limit!on!New!England/Quebec!Interconnector"!
3.!"ISO!New!England!Available!Transfer!Capability!Implementation!Document!
!!!!!Version!1.0"!
4."ISO!NEW!ENGLAND!OPEN!ACCESS!TRANSMISSION!TARIFF"!
5.! "Environment! Impact! Statement! 6! New! England/Hydro6Quebec! ±! 450! kv!
Transmission!Line!Interconnection66!Phase!II"!
6."Fundamental!frequency!coupling!between!HVAC!and!HVDC!lines!in!the!Quebec6!
!!!!New!England!multi!terminal!system!6!Comparison!between!field!measurements!
!!!!and!EMTDC!simulations"!
7.!"MODERN!CONTROL!AND!PROTECTION!SYSTEM!FOR!HVDC"!
8.!Environmental!impact!statement6!US!department!of!Energy!(publication)!
9.! NU! /! NSTAR! Proposed! HVDC! Transmission! Line6! Allen! W.! Schindler! NPCC! 2009!
General!Meeting!Cambridge,!MA!September!23,!2009!
10.!Interconnection!and!operators!agreement!2012!(publication)!
11.! ! “Feedback! on! the! Quebec6New! England! MTDC! line! 20! years! of! operation”! by!
Danielle!McNabb,!Hydro!Quebec!TransEngergie!
12.! “Planning! HVDC! and! FACTS! in! New! England”! by! Michael! I.Henderson,! Director,!
Regional!Planning!&!Coordination,!ISO!New!England!
!
!

More Related Content

What's hot

Ultrasound Imaging of Placenta
Ultrasound Imaging of PlacentaUltrasound Imaging of Placenta
Ultrasound Imaging of PlacentaVishwanath R S
 
Load-Flow dengan Gauss Seidel dan Newton Raphson.pptx
Load-Flow dengan Gauss Seidel dan Newton Raphson.pptxLoad-Flow dengan Gauss Seidel dan Newton Raphson.pptx
Load-Flow dengan Gauss Seidel dan Newton Raphson.pptxAmitKumar103259
 
Fetal circulation
Fetal circulationFetal circulation
Fetal circulationdypradio
 
Doppler in obstetric power point presentation (4)
Doppler in obstetric power point presentation (4)Doppler in obstetric power point presentation (4)
Doppler in obstetric power point presentation (4)RiyadhWaheed
 
Recent advances in Mammography
Recent advances in MammographyRecent advances in Mammography
Recent advances in MammographyDr.Suhas Basavaiah
 
Design of shunt active power filter to mitigate harmonic
Design of shunt active power filter to mitigate harmonicDesign of shunt active power filter to mitigate harmonic
Design of shunt active power filter to mitigate harmonicsager alswed
 
Doppler interpretation in pregnancy
Doppler interpretation in pregnancyDoppler interpretation in pregnancy
Doppler interpretation in pregnancyAboubakr Elnashar
 
Uniform plane wave equation
Uniform plane wave equationUniform plane wave equation
Uniform plane wave equationAwaab Fakih
 
Fetal anomaly scan
Fetal anomaly scanFetal anomaly scan
Fetal anomaly scanSahroz Khan
 
Target scan for fetal anomalies
Target scan for fetal anomalies Target scan for fetal anomalies
Target scan for fetal anomalies mohamedrafi112
 
12-placenta imaging Dr Ahmed Esawy
12-placenta imaging Dr Ahmed Esawy12-placenta imaging Dr Ahmed Esawy
12-placenta imaging Dr Ahmed EsawyAHMED ESAWY
 
Delineation of breast cancer part iii
Delineation of breast cancer part iiiDelineation of breast cancer part iii
Delineation of breast cancer part iiiMohammed Fathy
 
Lemon and Banana signs
Lemon and Banana signsLemon and Banana signs
Lemon and Banana signsSameer Dikshit
 
Chapter 01
Chapter 01Chapter 01
Chapter 01Tha Mike
 
Chapter 4 (power factor correction)
Chapter 4 (power factor correction)Chapter 4 (power factor correction)
Chapter 4 (power factor correction)fairuzid
 
Microwave Engineering Lecture Notes
Microwave Engineering Lecture NotesMicrowave Engineering Lecture Notes
Microwave Engineering Lecture NotesFellowBuddy.com
 
ULTRASOUND IN TWIN PREGNANCY.pptx
ULTRASOUND IN TWIN PREGNANCY.pptxULTRASOUND IN TWIN PREGNANCY.pptx
ULTRASOUND IN TWIN PREGNANCY.pptxAnkitaGoyal72
 

What's hot (20)

Ultrasound Imaging of Placenta
Ultrasound Imaging of PlacentaUltrasound Imaging of Placenta
Ultrasound Imaging of Placenta
 
Load-Flow dengan Gauss Seidel dan Newton Raphson.pptx
Load-Flow dengan Gauss Seidel dan Newton Raphson.pptxLoad-Flow dengan Gauss Seidel dan Newton Raphson.pptx
Load-Flow dengan Gauss Seidel dan Newton Raphson.pptx
 
Fetal circulation
Fetal circulationFetal circulation
Fetal circulation
 
Doppler in obstetric power point presentation (4)
Doppler in obstetric power point presentation (4)Doppler in obstetric power point presentation (4)
Doppler in obstetric power point presentation (4)
 
Recent advances in Mammography
Recent advances in MammographyRecent advances in Mammography
Recent advances in Mammography
 
Design of shunt active power filter to mitigate harmonic
Design of shunt active power filter to mitigate harmonicDesign of shunt active power filter to mitigate harmonic
Design of shunt active power filter to mitigate harmonic
 
Doppler interpretation in pregnancy
Doppler interpretation in pregnancyDoppler interpretation in pregnancy
Doppler interpretation in pregnancy
 
Uniform plane wave equation
Uniform plane wave equationUniform plane wave equation
Uniform plane wave equation
 
Fetal anomaly scan
Fetal anomaly scanFetal anomaly scan
Fetal anomaly scan
 
Target scan for fetal anomalies
Target scan for fetal anomalies Target scan for fetal anomalies
Target scan for fetal anomalies
 
12-placenta imaging Dr Ahmed Esawy
12-placenta imaging Dr Ahmed Esawy12-placenta imaging Dr Ahmed Esawy
12-placenta imaging Dr Ahmed Esawy
 
Delineation of breast cancer part iii
Delineation of breast cancer part iiiDelineation of breast cancer part iii
Delineation of breast cancer part iii
 
Lemon and Banana signs
Lemon and Banana signsLemon and Banana signs
Lemon and Banana signs
 
UOG Journal Club: Improving strategies for diagnosing ovarian cancer: a summa...
UOG Journal Club: Improving strategies for diagnosing ovarian cancer: a summa...UOG Journal Club: Improving strategies for diagnosing ovarian cancer: a summa...
UOG Journal Club: Improving strategies for diagnosing ovarian cancer: a summa...
 
Chapter 01
Chapter 01Chapter 01
Chapter 01
 
Chapter 4 (power factor correction)
Chapter 4 (power factor correction)Chapter 4 (power factor correction)
Chapter 4 (power factor correction)
 
Microwave Engineering Lecture Notes
Microwave Engineering Lecture NotesMicrowave Engineering Lecture Notes
Microwave Engineering Lecture Notes
 
ULTRASOUND IN TWIN PREGNANCY.pptx
ULTRASOUND IN TWIN PREGNANCY.pptxULTRASOUND IN TWIN PREGNANCY.pptx
ULTRASOUND IN TWIN PREGNANCY.pptx
 
Meckle's scan
Meckle's scan Meckle's scan
Meckle's scan
 
Obstetric doppler
Obstetric dopplerObstetric doppler
Obstetric doppler
 

Similar to P3-Report-Quebec-NewEngland

Semester Project 1: Offshore Wind Farms - Horns Rev and Anholt
Semester Project 1: Offshore Wind Farms - Horns Rev and AnholtSemester Project 1: Offshore Wind Farms - Horns Rev and Anholt
Semester Project 1: Offshore Wind Farms - Horns Rev and AnholtSøren Aagaard
 
#12 SUSB Expo 2014 Grown Drones
#12 SUSB Expo 2014 Grown Drones#12 SUSB Expo 2014 Grown Drones
#12 SUSB Expo 2014 Grown DronessUAS News
 
Gck lv switchgear pt
Gck lv switchgear ptGck lv switchgear pt
Gck lv switchgear ptJoeChueng
 
Lightning Talk - Energy: Green Hydrogen Transport Cost Assessment in the Cont...
Lightning Talk - Energy: Green Hydrogen Transport Cost Assessment in the Cont...Lightning Talk - Energy: Green Hydrogen Transport Cost Assessment in the Cont...
Lightning Talk - Energy: Green Hydrogen Transport Cost Assessment in the Cont...World Bank Infrastructure
 
Vessel efficiency compeition case study andrew flockhart cmal
Vessel efficiency compeition case study   andrew flockhart  cmalVessel efficiency compeition case study   andrew flockhart  cmal
Vessel efficiency compeition case study andrew flockhart cmalKTN
 
Arctic-Hydrographic-Research-Vessel-Briefing
Arctic-Hydrographic-Research-Vessel-BriefingArctic-Hydrographic-Research-Vessel-Briefing
Arctic-Hydrographic-Research-Vessel-BriefingKevin Rahardjo
 
SBEE CABLES INDIA LTD
SBEE CABLES INDIA LTDSBEE CABLES INDIA LTD
SBEE CABLES INDIA LTDbkishore
 
Taking Charge of Your Energy Future
Taking Charge of Your Energy FutureTaking Charge of Your Energy Future
Taking Charge of Your Energy FutureCapeLightEnergy
 
HV Termination Specialist PRESENTATION._Kojis.pdf
HV Termination Specialist PRESENTATION._Kojis.pdfHV Termination Specialist PRESENTATION._Kojis.pdf
HV Termination Specialist PRESENTATION._Kojis.pdfOGBONNAYAMARTINS1
 
Pipeline weld inspection
Pipeline weld inspectionPipeline weld inspection
Pipeline weld inspectionDavid Gray
 
Offshore wind supply chain bilbao alan 28 feb 2012
Offshore wind supply chain bilbao   alan 28 feb 2012Offshore wind supply chain bilbao   alan 28 feb 2012
Offshore wind supply chain bilbao alan 28 feb 2012British Embassy Madrid
 
Gcs lv switchgear draw out type
Gcs lv switchgear draw out typeGcs lv switchgear draw out type
Gcs lv switchgear draw out typeJoeChueng
 
CTC Global ACCC conductor overview august 2016
CTC Global ACCC conductor overview august 2016CTC Global ACCC conductor overview august 2016
CTC Global ACCC conductor overview august 2016Dave Bryant
 
Design of a 20,000 t double acting ice class general cargo ship of service ...
Design of a 20,000 t double acting ice class general cargo ship   of service ...Design of a 20,000 t double acting ice class general cargo ship   of service ...
Design of a 20,000 t double acting ice class general cargo ship of service ...Md. Ashifur Rahaman
 
Water pipe Lines Progress Planned Vs actual.pptx
Water pipe Lines  Progress Planned Vs actual.pptxWater pipe Lines  Progress Planned Vs actual.pptx
Water pipe Lines Progress Planned Vs actual.pptxDILIP KUMAR M.Tech (ACT)
 

Similar to P3-Report-Quebec-NewEngland (20)

Semester Project 1: Offshore Wind Farms - Horns Rev and Anholt
Semester Project 1: Offshore Wind Farms - Horns Rev and AnholtSemester Project 1: Offshore Wind Farms - Horns Rev and Anholt
Semester Project 1: Offshore Wind Farms - Horns Rev and Anholt
 
#12 SUSB Expo 2014 Grown Drones
#12 SUSB Expo 2014 Grown Drones#12 SUSB Expo 2014 Grown Drones
#12 SUSB Expo 2014 Grown Drones
 
Gck lv switchgear pt
Gck lv switchgear ptGck lv switchgear pt
Gck lv switchgear pt
 
Lightning Talk - Energy: Green Hydrogen Transport Cost Assessment in the Cont...
Lightning Talk - Energy: Green Hydrogen Transport Cost Assessment in the Cont...Lightning Talk - Energy: Green Hydrogen Transport Cost Assessment in the Cont...
Lightning Talk - Energy: Green Hydrogen Transport Cost Assessment in the Cont...
 
Vessel efficiency compeition case study andrew flockhart cmal
Vessel efficiency compeition case study   andrew flockhart  cmalVessel efficiency compeition case study   andrew flockhart  cmal
Vessel efficiency compeition case study andrew flockhart cmal
 
Arctic-Hydrographic-Research-Vessel-Briefing
Arctic-Hydrographic-Research-Vessel-BriefingArctic-Hydrographic-Research-Vessel-Briefing
Arctic-Hydrographic-Research-Vessel-Briefing
 
OGI_SOQv2.1
OGI_SOQv2.1OGI_SOQv2.1
OGI_SOQv2.1
 
SBEE CABLES INDIA LTD
SBEE CABLES INDIA LTDSBEE CABLES INDIA LTD
SBEE CABLES INDIA LTD
 
Taking Charge of Your Energy Future
Taking Charge of Your Energy FutureTaking Charge of Your Energy Future
Taking Charge of Your Energy Future
 
RIGPRO_Brochure
RIGPRO_BrochureRIGPRO_Brochure
RIGPRO_Brochure
 
C.V. Cover Letter
C.V. Cover LetterC.V. Cover Letter
C.V. Cover Letter
 
HV Termination Specialist PRESENTATION._Kojis.pdf
HV Termination Specialist PRESENTATION._Kojis.pdfHV Termination Specialist PRESENTATION._Kojis.pdf
HV Termination Specialist PRESENTATION._Kojis.pdf
 
Pipeline weld inspection
Pipeline weld inspectionPipeline weld inspection
Pipeline weld inspection
 
Capstone Project
Capstone ProjectCapstone Project
Capstone Project
 
Offshore wind supply chain bilbao alan 28 feb 2012
Offshore wind supply chain bilbao   alan 28 feb 2012Offshore wind supply chain bilbao   alan 28 feb 2012
Offshore wind supply chain bilbao alan 28 feb 2012
 
Gcs lv switchgear draw out type
Gcs lv switchgear draw out typeGcs lv switchgear draw out type
Gcs lv switchgear draw out type
 
CTC Global ACCC conductor overview august 2016
CTC Global ACCC conductor overview august 2016CTC Global ACCC conductor overview august 2016
CTC Global ACCC conductor overview august 2016
 
Kptl final report
Kptl final reportKptl final report
Kptl final report
 
Design of a 20,000 t double acting ice class general cargo ship of service ...
Design of a 20,000 t double acting ice class general cargo ship   of service ...Design of a 20,000 t double acting ice class general cargo ship   of service ...
Design of a 20,000 t double acting ice class general cargo ship of service ...
 
Water pipe Lines Progress Planned Vs actual.pptx
Water pipe Lines  Progress Planned Vs actual.pptxWater pipe Lines  Progress Planned Vs actual.pptx
Water pipe Lines Progress Planned Vs actual.pptx
 

More from Akshay Nerurkar

More from Akshay Nerurkar (7)

EE-524 Project report
EE-524 Project reportEE-524 Project report
EE-524 Project report
 
Technical Writing.
Technical Writing.Technical Writing.
Technical Writing.
 
PROBLEMSETEE443.docx
PROBLEMSETEE443.docxPROBLEMSETEE443.docx
PROBLEMSETEE443.docx
 
EE526 Final Report Group 4
EE526 Final Report Group 4EE526 Final Report Group 4
EE526 Final Report Group 4
 
EE 521 PROJECT DESIGN CASE 2
EE 521 PROJECT DESIGN CASE 2EE 521 PROJECT DESIGN CASE 2
EE 521 PROJECT DESIGN CASE 2
 
EE 521 PROJECT DESIGN CASE 2
EE 521 PROJECT DESIGN CASE 2EE 521 PROJECT DESIGN CASE 2
EE 521 PROJECT DESIGN CASE 2
 
Akshay AME 544 Lab Report
Akshay AME 544 Lab ReportAkshay AME 544 Lab Report
Akshay AME 544 Lab Report
 

P3-Report-Quebec-NewEngland

  • 2. & INDEX& 1. Introduction55555555555555555555555555555555555555555555555555555555555555555555555555555"1" 2. Physical"Characteristics"55555555555555555555555555555555555555555555555555555555555555"1" 2.1 Type" 2.2 Location" 2.3 Size"(length)" 2.4 Manufacturer" 2.5 Other"Characteristics" 3. Technical"Specifications"55555555555555555555555555555555555555555555555555555555555555"3" 3.1 Volt/Amp/Power"ratings" 4. Control"Strategy/Parameters"5555555555555555555555555555555555555555555555555555555"4" 4.1 Parallel"MTDC"configuration" 4.2 Series"MTDC"configuration" 4.3 Control"Parameters" 4.4 Control"system"of"the"project" 4.5 DC"Voltage"Control" 4.6 Reactive"Power"Control" 4.7 Reactive"Power"Requirement" 4.8 Control"functions" 5. Operations"5555555555555555555555555555555555555555555555555555555555555555555555555555555"8" 5.1 Scheduling"and"Configurations" 5.2 Normal"Configurations" 5.3 Hybrid"Configurations" 5.4 Advantages"of"Hybrid"Configuration" 5.5 Reliability"and"Maintainability" 5.6 Interconnection"Issues5Contingency"Analysis:"Impact"of"Quebec5New" England"on"PJM"Transmission"system" 5.7 Protection"of"the"HVDC"line" 5.8 Operational"Limitations:"Frequency"Coupling" 5.9 Results"and"field"measurements" 6. Economics"55555555555555555555555555555555555555555555555555555555555555555555555555555"16" 6.1 Capital"Construction"Cost" 6.2 Cost"of"Money" 6.3 Net"Benefits" 6.4 Economic"Justification" 6.5 Different"Losses" 7.""""""""Environmental"Considerations"55555555555555555555555555555555555555555555555555555"20" """"""""7.1"Right5of5Way"Issues" """"""""7.2"Emissions"and"other"offsets" """"""""7.3"New"England"environmental"challenges"and"the"possible"actions" """"""""7.4"Impact"of"Integrated"Actions"on"New"England"Goals" """"""""7.5"Harmonics/Interferences"
  • 4. " List&of&Tables:& " Table"3.1:"Volt/Amp/Power"ratings" Table"3.2:"AC"substation"ratings" Table"6.1:"Project"Costs" Table"6.2:"Cost"of"money" Table"6.3:"Net"benefits" " List&of&Figures:& " Figure"2.1:"Location" Figure"2.2:"One"line"diagram"of"the"HVDC"line" Figure"4.1"Parallel"MTDC"configurations" Figure"4.2:"series"MTDC"configurations" Figure"4.4:"Control"system"arrangement"of"the"HVDC"line" Figure"4.5:"DC"Voltage"Control" Figure"4.6"DC"Voltage"limit"control"–"Reactive"power"control" Figure"4.7:"Reactive"Power"requirement" Figure"5.1:"Different"configurations"of"the"Hydro"Quebec5New"England"operation" Figure"5.2:"Normal"Configurations" Figure"5.3:"Hybrid"Configurations" Figure"5.4:"Total"Transfer"capability"for"the"New5England"on"11/24/2015" Figure"5.5:"The"magnitude"of"power"flow"on"an"hourly"basis"for"a"three5year" period"is"indicated"as"per"the"figure"shown"above" Figure"5.6:"MACH"protection"system" Figure"5.7:"Different"sections"of"the"HVDC"project" Figure"6.1:"Break5even"distance"compared"to"the"HVAC"costs" Figure"6.2:"Different"losses"in"the"project" Figure"7.1:"Environmental"impact" Figure"7.2:"Emission"reduction"actions" Figure"11.1:"Matlab"system"model"for"mode"1"configuration" Figure"11.2:"Output"on"the"inverter"side"(Sandy"Pond)"mode"1"configuration" Figure"11.3:"Power"flow"of"the"Quebec5New"England"HVDC"project" "
  • 5. ! 1! 1.#Introduction:# ! The!project!we!have!chosen!is!“Quebec6New!England!HVDC!transmission!line”,! which! has! a! capacity! of! 2690MW.! ! This! project! came! into! operation! in! two! phases,! phase61! in! 1987,! phase62! in! 1992.! This! line! travels! all! the! way! from! northern! part! of! Quebec,! Canada! passes! the! Canada6USA! border! and! finally! reaches!the!New6England!area!ending!up!at!Sandy!Pond,!Massachusetts.!This!line! is! a! Multi6terminal! HVDC,! which! has! three! terminals! namely! Radisson,! Nicolet! and!Sandy!Pond!that!can!operate!in!two6terminal!mode!and!also!in!hybrid!mode.! In!this!report!we!will!be!discussing!more!details!about!this!project!as!we!move! forward.! ! 2.#Physical#Characteristics:# # 2.1#Type:# This! project! is! a! point6to6point! connected,! bipolar,! multi6terminal! HVDC! with! metallic!return.!Each!terminal!has!two!converters,!which!makes!it!each!converter! per! pole.! The! converter! stations! are! built! of! mercury! valves! when! it! was! commissioned,! later! the! mercury! valves! were! replaced! by! thyristors! due! to! advancements!in!the!technology.!Each!converter!station!has!a!126pulse!bridge! converter,!which!is!similar!to!many!of!the!existing!projects.! ! The!Quebec6New!England!HVDC!is!the!first!large6scale!multi6terminal!designed! and!installed!in!the!world.!It!was!constructed!in!two!phases:! • Phase!1:!1986!(690!MW)! • Phase!2:!1992!(2000MW)! In!phase61!two!terminal!stations!namely!Radisson!(Quebec,!CA)!and!Sandy!Pond! (Massachusetts,!USA)!were!built.!In!phase62!the!power!capacity!is!increased!by! 2000MW!and!also!a!new!terminal!‘Nicolet’!came!into!existence.! ! 2.2#Location:# # ! Figure!2.1:!Location! !
  • 6. ! 2! As!shown!in!the!figure!2.1,!it!can!be!seen!that!the!line!starts!at!Radisson!terminal! in!Quebec,!Canada.!The!input!power!to!the!terminal!and!in!turn!the!line!comes! from! the! La! Grande! 2! hydroelectric! power! station.! The! line! reaches! Nicolet! terminal!at!the!Canada6USA!border!and!then!ends!up!at!Sandy!Pond!terminal!in! Massachusetts,! USA.! There! were! two! other! terminals! Des! Cantons,! Comerford! between!Nicolet!and!Sandy!Pond!but!were!decommissioned!due!to!dissatisfying! results,!which!will!be!discussed!in!this!report!under!configurations.! ! 2.3#Size#(Length):# ! ! Figure!2.2:!One!line!diagram!of!the!HVDC!line! ! The!total!length!of!the!line!is!1500Km,!the!length!between!Radisson!to!Nicolet!is! 1022Km,!the!length!between!Nicolet!and!Des!Cantons!is!105Km!and!the!length! from!Des!Cantons!to!Sandy!Pond!is!383Km.!In!the!online!diagram,!it!can!be!seen! that!the!La!Grande!station!feeds!the!Radisson!terminal.!The!stations!Nicolet!and! Comerford!were!decommissioned!as!discussed!before.!! ! 2.4#Manufacturer:! ! The! works! of! this! project! were! carried! out! by! ABB! group.! This! project! was! world’s! first! Multi6terminal! HVDC! system.! After! this! project! ABB! has! installed! and!operated!many!MTDC!systems!through!out!the!world.!ABB!and!National!Grid! celebrated!25!years!for!the!project!on!November!3rd,!2015.!ABB!has!planned!to! make! its! impact! through! its! new! protective! system! scheme! namely! MACH! –! Modular!Advanced!Control!for!HVDC!at!the!Sandy!Pond!terminal!in!2013.!ABB!
  • 7. ! 3! has!pioneered!and!is!a!leader!in!HVDC!technology!for!the!last!60!years.!ABB!has! done!over!100!HVDC!projects!and!is!planning!to!setup!Ultra6HVDC!in!its!future! projects.! ! 2.5#Other#Characteristics:# ! The! line! also! crosses! the! Saint! Lawrence! River! between! Grondines! and! Lotbiniere,!Quebec,!Canada.!This!power!line!crossing!initially!was!an!overhead! crossing!and!then!later!they!replaced!it!by!a!cable!tunnel.!The!negative!visual! impact! of! the! large! towers! of! the! overhead! lines! was! the! reason! behind! the! change.!The!length!of!the!cable!tunnel!is!3954!meters.! ! ! 3.#Technical#Specifications:! ! 3.1#Volt/Amp/Power#ratings:! ! The! HVDC! line! is! operated! at!±450!"!through! out! its! length.! Coming! to! the! individual!terminal!ratings,!it!can!be!tabulated!as!follows:! ! Terminal! Power!rating! Voltage!rating! Radisson! 2250!MW! ±500!"! Nicolet! 2138!MW! ±475!"! Sandy!Pond! 2000!MW! ±450!"! Table!3.1:!Volt/Amp/Power!ratings! ! The!calculated!DC!current!at!±450!"!transferring!a!power!of!1500!MW!will!be! around!1670!Amperes.!The!line!is!rated!at!2690!MW!but!it!is!always!operated!at! some!stable!value!satisfying!the!contingency!specifications!of!the!New!England! region.!This!will!be!further!discussed!under!operations!of!the!line!in!this!report.! ! The!AC!substation!voltages!connected!to!these!terminals!are!rated!as!follows:! ! Terminal! Voltage!ratings! Radisson! 735kV/315kV! Nicolet! 735kV/230!kV! Sandy!Pond! 345!kV! Table!3.2:!AC!substation!ratings! ! ! !
  • 8. ! 4! 4.#Control#Strategy/Parameters:# ! The! converter! stations! are! operated! in! CSC6Current! source! converter! mode,! which!is!also!the!Line!commutated!converter!mode.!The!converter!switches!were! initially!mercury!valve!based!but!recently!they!have!changed!valves!to!thyristor6 based!converters.!! ! A!multi!terminal!HVDC!can!be!connected!either!in!series!or!parallel!way,!both! have!their!advantages!in!various!aspects.! ! 4.1#Parallel#MTDC#Configuration:# ! ! Figure!4.1!Parallel!MTDC!configurations! ! The! parallel! configuration! allows! DC! terminals! to! operate! around! a! common! rated!voltage!Vdc.!If!parallel!configurations!is!used!in!an!MTDC!system!based!on! CSC,!because!of!voltage!source!nature!of!CSCs!in!the!DC6side,!a!precise!voltage! balancing! between! converters! are! required! through! a! special! and! complicated! switching.! This! even! gets! worse! when! the! CSCs! are! far! away! from! each! other! since! fast! communication! channels! are! also! required.! Therefore,! thee! control! technique!that!should!be!adopted!in!a!parallel6CSC6MTDC!system!will!be!tough! and!complicated!task.!This!is!why!it!is!practically!impossible!to!form!a!parallel6 CSC6MTDC!system!with!more!than!5!terminals.!The!Hydro!Quebec6New!England! MTDC!system!was!initially!planned!to!construct!a!five!terminal!MTDC!system.! However! due! to! the! performance! problems! predicted! to! happen! they! stop! installing!the!other!two!stations!which!was!intended!to!connect!Des!Cantons!to! Comerford.! ! !
  • 9. ! 5! 4.2#Series#MTDC#configurations:! ! ! Figure!4.2:!series!MTDC!configurations! ! In!the!series!connection!where!one!of!the!converter!controls!the!current!around! a! common! rated! current! and! the! rest! of! converters! controls! the! power.! This! configuration!is!well!suited!for!CSC!MTDC!systems!since!CSCs!in!the!DC!side!are! functioning!as!a!voltage!source,!which!can!be!connected!in!series!without!need! for! special! switching.! However! this! configuration! has! several! drawbacks! as! compared! to! other! configuration! such! as! higher! losses,! more! complicated! insulation.! Most! importantly,! if! one! of! the! DC! lines! is! disconnected! due! to! the! fault! occupance! the! current! in! the! entire! DC! grid! will! be! cut! off.! Due! to! aforementioned!disadvantages,!series!configuration!is!not!recommended!to!be! used!and!hence!in!practice!only!parallel!configuration!has!been!considered.!But# for# the# Hydro# QuebecONew# England# project# series# configuration# is# implemented# since# there# were# disadvantages# like# special# switching,# fast# communications#in#parallel#operation.! ! ! 4.3#Control#Parameters:! ! The!different!parameters!that!are!responsible!for!the!control!of!this!line!are!as! follows:! ! 1. Voltage!control:!Tap!Changer!control!(on!AC!side),!Converter!control!on! Inverter!side!(for!DC!voltage)! 2. Current!control:!Converter!control!on!Rectifier!side! 3. Reactive!power!control:!AC!Voltage!limitation!control,!AC!Filters! 4. Firing! angle! control:! Fixed! firing! angle! with! trigger! set! and! with! or! without!PI!controller! 5. Extinction!angle!control! ! ! ! ! ! !
  • 10. ! 6! 4.4#Control#System#of#the#project:! ! ! Figure!4.4:!Control!system!arrangement!of!the!HVDC!line! ! The!above!figure!is!the!general!overview!of!the!control!system!represented!in! blocks!for!the!given!project.!As!discussed!in!the!control!parameters,!we!have!the! tap! changer! control,! Converter! control! on! both! inverter! and! rectifier! side! and! also!the!AC!filter.!!The!AC!Voltage!Limitation!Control!does!the!Reactive!power! control!with!the!help!of!the!AC!Filters.! ! 4.5#DC#Voltage#control:# ! ! Figure!4.5:!DC!Voltage!Control! The!firing!angle!of!the!thyristors!controls!the!DC!Voltage!output!at!both!rectifier! and!inverter!ends.!For!the!rectifier!operation!the!firing!angle!alpha!′ ∝ ′!is!varied! from!zero!to!90!degrees,!for!the!inverter!operation!alpha!is!varied!from!90!to!
  • 11. ! 7! 180! degrees.! The! direction! of! current! is! changed! if! the! voltage! polarity! of! the! converters!is!changed.!! ! 4.6# Reactive# Power# controlODC# Voltage# limit# control# through# different# controls:! ! ! Figure!4.6!DC!Voltage!limit!control!–!Reactive!power!control! ! This!control!is!used!for!the!Reactive!power!control!through!Voltage!limitation,! the! Alpha! is! also! varied! through! the! PI! controller! and! the! trigger! set! on! both! inverter!and!rectifier!side.!The!trigger!set!controls!current!on!the!rectifier!side! and!controls!voltage!on!the!inverter!side.!!The!extinction!angle!is!also!controlled! here!on!the!inverter!side.! ! 4.7#Reactive#power#requirement:! !! The! general! reactive! power! requirement! in! this! HVDC! line! is! 50660%! of! the! active! power! flow.! This! can! be! achieved! through! shunt! capacitances! and! harmonic!filter!banks.! ! Figure!4.7:!Reactive!Power!requirement!
  • 12. ! 8! 4.8#Control#Functions:! ! Control!functions!at!the!rectifier:! 1. DC!current!Control!(main!control!mode)! 2. DC!Voltage!limitation!control!(backup!control!mode)! Control!functions!at!the!inverter:! 1. DC!Voltage!control!(main!control!mode)! 2. DC!current!control!(backup!control!mode)! 3. Extinction!Angle!control!(backup!control!mode)! ! ! 5.#Operations:! ! 5.1#Scheduling#and#Configuration:! ! The! Radisson,! Nicolet! and! Sandy! Pond! terminals! have! two! converters! each,! therefore! we! have! six! converters! in! total,! one! operating! for! each! pole.! Each! terminal! has! three! modes! of! operation! the! rectifier,! inverter! and! the! no! operation!mode.!Therefore!the!total!possible!outcomes!for!configuration!would! be!3×3×3 = 27.!Out!of!which!eight#configurations!are!used!prominently:! ! 1. Two!three6terminal!MTDC!configurations! 2. Four!two6terminal!configurations! 3. Two!hybrid!configurations!(one!Radisson!or!Sandy!Pond!pole!out)! ! The!different!configurations!can!be!shown!as!follows:! ! ! Figure!5.1:!Different!configurations!of!the!Hydro!Quebec6New!England!operation! !
  • 13. ! 9! 5.2#Normal#Configurations:# # The!Configurations!1,!4,!16,!22!are!the!two!terminal!mode!operations,!while!the! 9,! 25! are! the! Multi! terminal! operation! and! the! 964,! 25622! are! the! hybrid! configurations.! Let! us! analyze! the! configuration! 1,! the! Radisson! operates! as! rectifier! while! the! Sandy! Pond! operates! in! Inverter! mode! and! the! Nicolet! terminal!is!in!no!operation!mode.!Here!the!power!is!generated!in!La!Grande!and! then!transferred!from!Radisson!to!the!loads!near!Sandy!Pond!terminal.!Also!the! terminals!can!operate!either!in!monopole!or!bipolar!mode.! ! Let! us! analyze! a! multi! terminal! mode! 9,! in! this! configuration! Radisson! and! Nicolet!act!as!Rectifiers!while!the!Sandy!Pond!act!as!inverter!sucking!power!from! the!other!two!stations.# ! Figure!5.2:!Normal!Configurations! ! 5.3#Hybrid#Configurations:# # The!hybrid!configuration!is!a!combination!of!two!normal!configurations!where! Power!is!transferred!in!two!ways,!involving!all!three!terminals!and!also!one!of! the! terminals! operating! in! monopole! mode.! In! configuration! 469! (or! 964),! the! Radisson!terminal!has!one!pole!in!rectifier!operation!while!the!other!pole!being! off!for!various!other!reasons!like!schedule!maintenance,!outage.!The!terminals! Nicolet! and! Sandy! Pond! work! in! bipolar! inverter! mode! getting! power! from! monopole!Radisson!terminal.!! # ! Figure!5.3:!Hybrid!Configurations! !
  • 14. ! 10! 5.4#Advantages#of#Hybrid#Configurations:# ! There! are! various! advantages! of! the! hybrid! configurations! in! this! HVDC! transmission,!which!are!beneficial!in!many!aspects.!Hybrid!Configurations!in!this! project! are! characterizes! by! the! multi! terminal! Radisson6Nicolet6Sandy! Pond! operation!of!five!converters,!three!on!the!first!pole!and!two!on!the!second.!More! flexibility! is! attained! in! the! case! of! unavailability! of! one! pole! for! planned! maintenance!or!outage!at!Radisson!or!Sandy!Pond.!No!hybrid!configuration!has! been!developed!yet!for!outage!of!one!pole!at!Nicolet.!In!this!hybrid!configuration,! one! line! section! is! operated! bipolar! while! the! other! section! is! monopole! with! metallic!return.! ! 5.5#Reliability#and#Maintainability:# 5.5.1#Open#Access#Transmission#Tariff#(OATT):## Section! II! of! the!ISO! New! England! Inc.! Transmission,! Markets,! and! Services! Tariff!(ISO!Tariff)!is!known!as!the!Open!Access!Transmission!Tariff!(OATT).!The! OATT:! • Helps! ensure! that! all! transmission! owners! and! transmission! customers! have!fair!and!open!access!to!transmission!service!in!New!England! • Details! the! rights! and! responsibilities! of!transmission! owners! and! transmission!customers!as!well!as!the!procedures!they!must!follow!and!the!fees! transmission!customers!must!pay!to!access!the!transmission!system! • Sets!out!the!transmission!system!planning!process!for!the!region! • Sets! out! the! cost! recovery! and! allocation! mechanisms! for! transmission! and!ancillary!services!in!the!region!! Total#Transfer#Capability#(TTC):# The!amount!of!electric!power!that!can!be!moved!or!transferred!reliably!from!one! area!to!another!area!of!the!interconnected!transmission!systems!by!way!of!all! transmission! lines! (or! paths)! between! those! areas! under! specified! system! conditions.!The!Total!Transfer!Capability!for!the!New!England!(on!11/24/2015)! system!has!been!obtained!as!follows:# ! Figure!5.4:!Total!Transfer!capability!for!the!New6England!on!11/24/2015!
  • 15. ! 11! Available#Transfer#Capability#(ATC):! a) Capacity#Benefit#Market#(CBM):## !!!!!The!use!of!Capacity!Benefit!Margin!(CBM)!on!Phase!I/II!HVDC6TF!is!governed! by! the! overall! ISO! New! England! approach! to! capacity! planning! requirements.! Load!Serving!Entities!(LSEs)!operating!in!the!New!England!Balancing!Authority! Area!are!required!to!arrange!their!Installed!Capability!requirements!prior!to!the! beginning! of! any! given! month! in! accordance! with! New! England! Wholesale! market!rules.!As!such,!CBM!on!Phase!I/II!HVDC6TF!for!use!in!ATC!calculations!is! zero!and!will!not!be!included!in!the!calculations!of!ATC.!As!long!as!this!market! design!is!in!place!in!New!England!the!CBM!is!set!to!zero.! b) Transmission#Reliability#Margin#(TRM):# The!Transmission!Reliability!Margin!(TRM)!is!the!portion!of!TTC!that!cannot!be! used!for!reservation!of!Firm!Transmission!Service!because!of!uncertainties!in! system!operation.!These!calculated!TRM!values!shall!not!be!applied!to!non6firm! transmission!service.! ! Phase!I/II!Import!TRM!=!TTC!–!1200!MW! ! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!Phase!I/II!Export!TRM!=!TTC!–!500!MW! ! c) Existing#Transmission#Commitment#(ETC):# !!!!!A! Transmission! Provider’s! existing! transmission! capacity! obligations! which! may! include! grandfathered! transmission! contracts,! Tariff! transmission! reservations!(including!rollover!rights!for!extensions)!and!other!obligations!that! impact!firm!ATC.! ! Calculation#of#Firm#ATC:# # a) Firm#ATC:# ! Firm!Available!Transfer!Capability!(Firm!ATC)!for!an!interface!is!the!capability! for!Firm!transmission!reservations!that!remain!after!allowing!for!CBM!and!Firm! Existing!Transmission!Commitments!(ETC).!Firm!Transmission!Service!over!the! Phase! I/II! HVDC6TF! that! is! available! in! the! Planning! Horizon! (PH)! includes:! Yearly,! Monthly,! Weekly,! and! Daily.! Phase! I/II! HVDC6TF! transmission! reservations!with!any!other!status!are!not!included!in!this!Firm!ATC!calculation.! Netting!of!Phase!I/II!HVDC6TF!transmission!reservations!is!not!considered!in!the! ATC! calculation.! Mathematically,! Firm! ATC! in! the! PH! is! calculated! using! the! equation:! Firm!ATC!=!TTC!–CBM!–Firm!ETC! ! b) NonOFirm#ATC:# Non6Firm! ATC! in! the! PH! for! an! interface! is! the! capability! for! N6n6Firm! transmission!reservations!that!remain!after!allowing!for!CBM,!TRM!and!Firm!and! Non6Firm! ETCs.! As! discussed! above,! the! CBM! for! Phase! I/II! HVDC6TF! is! zero.! Non6Firm!ATC!over!the!Phase!I/II!HVDC6TF!that!is!available!in!the!PH!includes:! Monthly,!Weekly,!Daily!and!Hourly.!Firm!and!Non6Firm!Phase!I/II!HVDC6TF!ETCs!
  • 16. ! 12! are! only! those! Firm! and! Non6Firm! transmission! reservations! with! a! status! of! Confirmed.!Phase!I/II!HVDC6TF!transmission!reservations!with!any!other!status! are!not!included!in!this!Non6Firm!ATC!calculation.!Netting!Phase!I/II!HVDC6TF! transmission!reservations!is!not!considered!in!this!calculation.!Mathematically,! Non6Firm!ATC!in!the!PH!is!calculated!using!the!equation:!! ! Non6Firm!ATC!=!TTC!–!CBM!–!TRM!–!Firm!and!Non6Firm!ETCs! # 5.6# Interconnection# IssuesOContingency# Analysis:# Impact# of# QuebecONew# England#on#PJM#Transmission#System## Phase!2!interface!has!been!in!service!since!1991!with!a!nominal!transfer!capability! of!2000!MW!in!both!directions.!!Due!to!the!large!transfer!capability!of!this!interface! and!the!geographic!location!of!the!New!England!Control!Area!with!respect!to!the! rest! of! the! Eastern! Interconnection,! the! loss! of! this! facility! can! have! a! substantial! impact! on! the! New! York! and! Pennsylvania,! New! Jersey! and! Maryland! (“PJM”)! transmission!systems.!The!impact!of!the!loss!of!this!interface!on!the!New!York!and! PJM!transmission!systems!is!dependent!upon!the!simultaneous!loading!on!critical! internal!interfaces!in!both!of!these!external!transmission!systems!at!the!time!of!the! contingency.!The!unique!geographic!location!of!the!New!England!Control!Area!with! respect!to!the!rest!of!the!Eastern!Interconnection!bounds!the!amount!of!energy!that! can!flow!between!New!England!and!Hydro!Quebec!over!Phase!2.!! ! Predefined! procedures! and! the! exchange! and! coordination! of! real6time! data! between! the! three! affected! Reliability! Coordinators! is! required! to! allow! Hydro! Quebec! to! New! England! real6time! flows! to! be! greater! than! 1200! MW,! which! is! referred!to!as!the!“largest!source!contingency!limit”.!There!are!instances!where!real6 time!system!conditions!exist!per!the!established!procedures!that!allow!the!flow!from! Hydro!Quebec!to!New!England!to!reach!the!facility!rating!of!2000!MW.!Therefore!the! import! TTC! (Hydro! Quebec! to! New! England)! is! 2000! MW.! The! export! TTC! (New! England!to!Hydro!Quebec)!has!been!limited!to!1200!MW!since!the!facility!went!into! service.!Comparable!procedures!would!have!to!be!developed!and!approved!by!the! affected! Reliability! Coordinators! before! the! flow! from! New! England! to! Hydro! Quebec!can!exceed!1200!MW;!to!date,!there!has!not!been!a!request!to!consider!the! development!of!such!procedures.!! ! Figure!5.5:!The!magnitude!of!power!flow!on!an!hourly!basis!for!a!three!year!period! is!indicated!as!per!the!figure!shown!above.!
  • 17. ! 13! ! 5.7#Protection#of#the#HVDC#line:# For!High!Voltage!Direct!Current!(HVDC)!applications,!the!control!and!protection! system! plays! an! essential! role! in! the! overall! performance! of! the! transmission! system.!The!control!and!protection!system!adopted!by!ABB!Power!Systems!uses! the!latest!technology!from!the!fields!of!electronics!and!microprocessors.!MACH!is! a!fully!computerized!control!and!protection!system.!The!main!characteristics!of! the! MACH! are! the! high! degree! of! functional! integration! and! the! open! systems! interface!approach.! The! open! systems! strategy! is! reflected! both! in! the! use! of! industrial! standard! serial! and! parallel! communication! buses,! as! well! as! in! the! use! of! standard! formats!for!all!collected!data!(such!as!events,!alarms!and!disturbance!data).!This! makes! it! possible! to! take! advantage! of! the! latest! achievements! in! electronic! engineering,!thus!ensuring!timely!development!of!more!advanced!functions!and! enhancement!of!performance!for!a!long!time!to!come.!Integrated!with!the!MACH! control!and!protection!equipment!is!the!Station!Control!and!Monitoring!(SCM)! system.! Work! stations! (PCs)! are! interconnected! by! an! Ethernet! local! area! network.!A!field!bus!network!builds!up!the!distributed!system!for!remote!I/O,!for! control!as!well!as!for!process!interfacing!with!the!SCM!system.! Each!pole!control!and!protection!cubicle!includes,!in!one!framework,!all!controls;! from!the!interstation!telecommunication!system!and!operator!control!interface! to!the!converter!firing!control.!A!second!framework!houses!a!double!set!of!DC! protections.! The! system! is! built! using! state6of6the6art! microprocessors! and! digital! signal! processors! (DSPs),! connected! by! high! performance! industry! standard!buses!and!fiber!optic!communication!links.!! The! principle! of! the! workflow! is! shown! in! Fig.! 5.6! In! the! DPS! (Dynamic! Performance!Study)!the!pole!control!functions!are!tested!against!an!analogue!or! a!real6time!digital!HVDC!simulator.!The!software!released!for!the!DPS!is!identical! with!the!software!in!the!system!design!stage,!and!revision!orders!are!used!from! the! start! of! the! DPS.! Functional! tests! or! bench! tests! are! made! for! control! and! protection!functions!using!simplified!simulators.!The!debugging!is!done!at!this! stage.! The!schematic!representation!of!the!HVDC!protection!system!is!shown!below:! ! Figure!5.6:!MACH!protection!system! ! Integrated! with! the! MACH! control! and! protection! equipment! is! the! Station! Control! and! Monitoring! (SCM)! system,! a! fully! computerized! and! redundant! system.!The!solution!with!operator!workstations!in!local!area!networks!(LAN)!is! very! cost6effective,! and! is! also! in! perfect! agreement! with! the! open! systems! interface! strategy.! Very! high! performance! is! achieved! mainly! because! all! data!
  • 18. ! 14! collection! and! ordering! are! implemented! in! software! functions! in! distributed! control! units! (DCUs)! integrated! into! the! control! and! protection! system.! These! DCUs!are!single!board!computers!from!the!MACH!family.! 5.8#Operational#Limitations:#Frequency#coupling#of#HVDC#and#HVAC#system# in#the#Hydro#QuebecONew#England#system:# ! An! HVDC! line! running! in! parallel! with! an! HVAC! line! will! be! exposed! to! a! fundamental! frequency! coupling.! The! coupling! effects,! if! strong! enough,! have! been! recognized! as! an! important! subject! concerning! the! performance! and! the! design! of! an! HVDC! system.! Equipment! both! on! the! AC! and! DC! sides! of! the! converter! station! can! be! affected! by! this! phenomenon.! Induced! fundamental! frequency!current!can!lead!to!saturation!of!the!converter!transformer!core!due! to!unsymmetrical!magnetization.!Saturation!leads!to!an!increased!noise!level!and! increased!heating!in!the!transformer.!The!commutation!in!the!converter!and!the! saturation!of!the!transformer!may!also!generate!higher!order!harmonic!currents! in!the!AC!and!DC!networks,!which!will!influence!the!filter!design.! ! The! superimposed! AC! current! on! an! HVDC! transmission! line! is! based! on! two! effects:! ! • The!coupling!between!AC!and!DC!lines! • The! dynamic! characteristic! of! the! HVDC! converter! with! its! terminating! impedance,!responding!to!the!fundamental!frequency!current!on!the!DC!line.!! ! These! two! effects! must! be! added,! thus! complicating! the! calculation! and! evaluation!of!the!actual!coupling!to!the!DC!line.!The!analysis!must!therefore!be! performed!both!with!and!without!the!converters!in!operation! ! The!field!measurements!were!carried!out!on!the!northern!part!of!the!Quebec6 New!England!Phase!II!multi6terminal!HVDC!system.!This!part!of!the!system!is!a! bipolar! 450! kV! overhead! transmission! line.! It! is! spanning! from! the! Radisson! converter! station! (2,250! MW),! in! the! James! Bay! area,! to! the! Des! Cantons! converter!station!(690!MW)!near!the!US!border.!The!length!is!1120!km.!A!third! converter! station,! Nicolet! (2,138! MW),! is! located! between! the! two! previously! mentioned! stations,! 90! km! north! of! Des! Cantons.! At! the! time! of! the! field! measurements,! all! converter! terminals! and! their! associated! equipment! were! disconnected.!Hence,!the!transmission!line!was!passive!and!measurements!were! not!amplified!by!resonances!with!the!line!terminating!impedances.! ! Three!sections!of!the!HVDC!line!were!exposed!to!AC!line!couplings,!as!shown!in! Fig.!1!and!detailed!in!Table!1.! • Section!I:!Radisson!6!Némiscau! • Section!II:!Trenche/La!Tuque!6!Trois!Rivières/Des!Hêtres! • Section!III:!Bécancour6!Nicolet! !
  • 19. ! 15! # Figure!5.7:!Different!sections!of!the!HVDC!project! ! The!measurements!were!carried!out!for!two!configurations!of!the!DC!line:! a)!Configuration#1:!both!poles!of!the!DC!line!were!grounded!at!the!southern!end! (Des!Cantons)!but!left!open6circuited!at!Radisson!where!the!pole!voltages!were! measured.! b)!Configuration#2:!both!poles!of!the!DC!line!were!grounded!at!both!ends!and! the!pole!currents!were!measured!at!Radisson.! ! A! nine6cycle! acquisition! of! the! DC! line! voltages! or! currents! was! taken! every! minute!via!a!digital!oscilloscope!and!the!data!was!processed!to!obtain!the!first! ten! harmonics.! While! the! above! DC! line! measurements! were! ongoing,! voltage! and!currents!of!735!kV!line!L7063!and!of!230!kV!lines!L2370!and!L2380!were! being! monitored! continuously! via! power! analysers! to! also! obtain! the! first! ten! harmonics!about!ever!seven!minutes.!735!kV!line!L7062!was!not!monitored!as!it! was!not!in!service!during!that!time!period!and!was!open6circuited!at!both!ends.! Also,!since!the!third!coupling!section!is!relatively!short,!230!kV!lines!L2381!and! L2382!were!not!specially!monitored!and!the!data!came!from!the!hourly!records! of!the!system!control!center.! ! 5.9#Results#of#the#field#measurements:# ! A.#Configuration#1# ! On!the!DC!line,!the!recordings!lasted!for!about!24!hours!and!indicate!that!about!1! kV!was!induced!on!each!pole.!A! Strong!correlation!was!noticed!between!these!induced!voltages!and!the!positive! sequence!current!on!line!L2380.!This!is!the!AC!line!running!closest!to!the!DC!line! and!for!the!longest!coupling!section.! ! B.#Configuration#2# ! The! measurements! for! DC! line! configuration! 2! lasted! only! 90! minutes! and! showed!fundamental!frequency!currents!of!1.05!and!1.20!A!rms!for!pole!1!and!
  • 20. ! 16! pole!2,!respectively.!The!coupling!factor!in!configuration!2,!where!the!DC!lines! are!short6circuited!to!ground!in!Radisson,!is!different!from!configuration!1.!The! inductive!coupling!is!dominating!and!gives!a!higher!value!for!the!current!of!pole! 2,!due!to!its!closer!location!to!the!AC!lines.!Considering!also!the!coupling!lengths! and! the! relative! position! of! the! lines! given,! it! can! be! confirmed! that! pole! 2! is! exposed!to!a!stronger!inductive!coupling!compared!to!pole!1.!The!voltage!and! currents!of!735!kV!line!L7063!and!230!kV!lines!L2370!and!L2380!are!presented! in!Table!1.!The!table!lists!the!average!magnitudes!of!the!positive6,!negative6!and! zero6sequence!components,!calculated!from!the!continuously!monitored!ones!in! configuration! 2.! From! the! hourly! records,! the! average! value! of! the! positive! sequence! magnitudes! for! 230! kV! lines! L2381! and! L2382! are! calculated.! The! negative!and!zero!sequences!for!these!lines!have!not!been!monitored.! ! The!values!recorded!are!tabulated!as!shown!below:! ! ! Figure!5.8:!Field!results!of!the!configurations! ! 6.#Economics:# The!various!economic!aspects!of!the!Quebec6New!England!project!have!been! listed!below! 6.1#Capital#Construction#Cost:!!!!!!!!!!! The!total!cost!incurred!for!the!phase62!of!the!project!is!calculated!to!be!585!million! dollars.! !!!!!!!!!!!!!!!! ITEM# COST#ESTIMATE#(in#Millions# of#Dollars)# (As#of#1990)# 133.2!miles!of!∓450!kV!DC!Transmission!Line! 182! One!1800!MW!converter!station!connected!to!Sandy! Pond! 252! 36!miles!of!345!kV!AC!Transmission!Line!connecting! Sandy!Pond!and!Millbury!No.3!Substations! 40.5! 16.1!miles!of!345!kV!AC!Transmission!Line!connecting! 17.7!
  • 21. ! 17! Millbury!No.3!and!West!Medway!Substations! 3456kV!AC!circuit!breakers!and!miscellaneous! equipment!at!Sandy!Pond,!Millbury!No.3!,!and!West! Medway!substations! 18.3! Remove!and!rebuild!two!sections!of!two!1156kV!AC! transmission!lines!and!remove!and!rebuild!portions! of! two! 69! 6kV! AC! transmission! lines! and! support! structures!on!the!Sandy!Pond!to!Millbury!right6of6 way;! install! 1156kV! AC! circuit! breakers! and! miscellaneous!substation!equipment! 46.5! Other!miscellaneous!facilities! 28! Total! 585! Table!6.1:!Project!Costs! # 6.2#Cost#of#Money:# # DC#Facilities# 60%!Debt!@!11.0!%! 40%!Equity!@!14.0!%! Weighted!Total!12.2%# AC#Lines# 45%!Debt!@!11.0%! 10%!Preferred!Stock!@10.0%! 45%!Equity!@!14.0%! Weighted!Total!12.25%! Present#Worth#Rate# 10.4%! Property#Taxes# a) Converters! b) AC!and!DC!Lines! c) Escalation!Rate! ! 1.0%!of!Project!Capital!Cost! 2.5%!of!Project!Capital!Cost! 2.5%!per!year! O&M#Costs# • !!Converters! • AC!! • DC!Lines! • Escalation!Rate# • Land!/!Right!Of!Way!Lease!Charges# # 1.9%!of!Project!Capital!Cost! 0.6%!of!Project!Capital!Cost! 0.7%!of!Project!Capital!Cost! 5.0%!per!year! 2.3%!of!Project!Capital!Cost#
  • 22. ! 18! List#of#Facilities# a) Tax! ! b) Book! ! c) Normalized! ! 15!years!for!personal!property! 18!years!for!real!property! 10!years!for!DC!Line!and!Converter! 30!years!for!AC!Lines! 10!years!for!DC!Line!and!Converter! 30!years!for!AC!Lines! Tax#Income# a) Federal!Income! b) Massachusetts!Income! c) New!Hampshire!Income! d) Investment!Tax!Credit! ! 46.0%! 6.5%!(70%!subject!to!Income!Tax)! 9.03%!(30%!subject!to!Income!Tax)! 10%!deferred!and!amortized!over!book!life! Depreciation# a) Book:! b) Tax:! ! Straight!Line! Rate!Set!by!Accelerated!Cost!Recovery! System!Tax!Laws! In!Service!Date! December!1990! Table!6.2:!Cost!of!money! ! 6.3#Net#Benefits:# # Fossil#Fuel#Prices# Gross#Savings# Project#Costs# Net# Benefits# Capital#Costs# Cumulative# Present#Worth# ! 660%! ! 886! +25%! Base! 625%! 1119! 897! 675! 6233! 611! 211! ! 625%! ! 1369! +25%! Base! 625%! 1119! 897! 675! 250! 472! 694! ! Base! ! 1729! +25%! Base! 625%! 1119! 897! 675! 610! 832! 1054! ! +25%! ! 2069! +25%! Base! 625%! 1119! 897! 675! 950! 1172! 1394! Table!6.3:!Net!benefits!
  • 24. ! 20! The! figure! 6.2! resembles! the! different! losses! in! this! project,! the! transformer! losses!being!the!highest!of!losses!accounting!for!57%,!the!next!being!thyristor! losses! of! 24%.! The! other! losses! are! from! filters,! smoothing! reactors! and! line! losses.! # 7.#Environmental#Considerations:# # 7.1#RightOofOWay#Issues:! As! necessary,! transmission! line! rights6of6way! would! be! cleared! of! trees! to! facilitate!(1)!staking,!access,!assembly,!and!erection!of!structures;!(2)!installation! of!conductors;!and!(3)!maintenance.!This!would!also!provide!adequate!clearance! for!energized!lines.!The!clearing!program!would!be!planned!and!implemented!to! stabilize! the! rights6of6way! against! erosion! and! provide! for! natural! vegetation! control.! • Access#and#Maintenance#Roads# To! the! extent! possible,! existing! roads! would! be! used! to! gain! access! to! project!sites.!Some!new!access!roads!would!be!required!both!within!the! rights6of6way! and! from! existing! roads! to! the! rights6of6way! .! Off6road! access!may!be!pursued!in!special!cases.! • Support#Structure#Installation,#Framing,#and#Stringing# In! upland! area! setting! for! the! support! structure! might! include! a! foundation! with! steel! pole! angle! support! structure! for! instance! would! either! require! concrete! cylindrical! caisson! foundations,! concrete! cylindrical!caisson!foundations,!spread6footing!foundation,!steel!grillage! foundation!structure.! In!Wetland!areas!the!method!for!placement!would!be!wetlands.!(1)!Direct! embedment! within! an! excavation.! (2)! Drive! piles! into! underlying! firm! ground! and! attach! the! structures! to! the! piles.! (3)! Install! a! concrete! foundation!and!set!the!structure!on!the!foundation.! • Converter#Terminal# Construct!ion!of!the!proposed!converter!terminal!would!include!(1)!site! preparation,! (2)! foundation! work,! (3)! erection! of! buildings! and! structures,! (4)! installation! of! power! equipment,! and! (5)! testing! and! commissioning.! • Expansion#of#the#Ground#Electrode# The!Ground!electrode!for!the!phase!II!will!be!an!extension!of!the!phase!I! ground! electrode! it! would! necessitate! the! improvement! of! the! existing! logging!road.!Additionally,!a!short,!1!56m!(506ft)!wide!corridor!would!be! cleared!for!the!proposed!ground!electrode!feeder!connector.! # 7.2#Emissions#and#other#offsets# • Air#Quality6No!serious!air6quality!impacts!are!anticipated!if!the!project!is! implemented.! • Land#Features,#Hydrology,#Water#Quality,#and#Water#Use6!Despite!the! use!of!mitigate!measures!to!control!erosion,!some!unavoidable!increases! of!soil!erosion!and!sedimentation!within!creeks!and!rivers!would!result! from!construction!activities,!particularly!during!the!thunderstorm!season.!
  • 25. ! 21! Construction!activities!would!result!in!temporarily!increased!suspended! solids!and!turbidity!in!surface!water!bodies!of!the!project!area.! • Land# Features# and# Use6Impacts! related! to! unstable! slopes! would! be! mitigated! through! the! use! of! careful! siting! of! structures! and! use! of! thoroughly!supervised!construction!practices.!Judicious!siting!of!project! facilities! would! be! employed! to! minimize! the! impacts! associated! with! geological! instability,! such! as! landslides,! slumping,! mass! wasting,! and! earthquakes.! • Ecology6! About! 147! ha! (364! acres)! of! forest! habitat! at! the! proposed! converter! station,! ground! electrode! site,! and! along! the! proposed! route! would!be!cleared,!but!it!is!not!anticipated!that!this!would!result!in!serious! effects! upon! local! wildlife! populations.! Indeed,! some! species! would! benefit!from!the!clearing!of!the!wooded!habitat.!Disturbance!of!aquatic! and! wetland! habitats! and! their! associated! biota! would! be! an! environmental!impact!of!the!proposed!project!and!would!primarily!occur! during!construction!activities.! • Socioeconomics# and# Cultural# Resources6! No! unavoidable! adverse! effects!to!socioeconomics!and!cultural!resources!currently!are!identified.! • Health# and# Safety6! A! conservative! interpretation! of! the! available! data! leads!to!the!conclusion!that!electrostatic!fields!and!air!ion!concentration!s! in!the!right6of6way!have!the!potential!in!very!infrequent!circumstances!of! inducing! insignificant! and! transient! physiological! and! psychological! alterations!in!persons!frequenting!this!area!.! • Historical#Structures6!Al!though!prehistoric!sites!may!contain!structures! and!historic!sites!may!lack!them!,!historic!structures!may!be!considered! separately! because! the! methods! employed! for! inventory! and! impact! assessment!differ!from!those!applied!to!other!cultural!resources!.! • Electric#and#Magnetic#environment6!Due!to!the!presence!of!AC!and!DC! lines!there!will!be!electric!and!magnetic!field!in!the!surrounding!and!it! will!be!maximum!near!the!conductors!but!as!the!clearance!height!of!the! conductor!is!high!it!would!not!affect!the!surrounding!environment.! 7.3#New#England#environment#challenges#and#the#possible#actions# !
  • 26. ! 22! ! Figure!7.1:!Environmental!impact! # 7.4#Impact#of#Integrated#Actions#on#New#England#Goals# # # Figure!7.2:!Emission!reduction!actions! ! 7.5#Harmonics/Interferences# • A!typical!Harmonics!Disturbances!in!the!system!is!the!11th!and!the!13th! Harmonics!due!to!which!was!reduced!by!the!proper!ST!filter!but!due!to! the!increase!in!the!effect!of!the!harmonic!current!in!the!system!newer!C6 Type!filter!are!being!used!to!replace!the!old!one.! • The!Coupling!effect!between!the!HVAC!and!HVDC!line!were!calculated!to! be!between!162.5!A!as!per!the!worst6case!scenario.!And!a!distance!of!1.5! KM!was!measured!to!avoid!this!effect.! • During!the!spring!of!1991,!several!severe!geomagnetic!disturbances!were! recorded!in!North!America,!and!particularly!in!Northern!Quebec,!where! Hydro6Quebec's!La!Grande!generation!complex!and!transmission!system! are!located.!As!a!result!of!these!disturbances,!the!Quebec6New!England!
  • 27. ! 23! Phase! 1! HVDC! system! was! affected! by! transformer! saturation! and! harmonic!voltage!distortion!due!to!geomagnetic!induced!current!(GIC).! ! 7.6#Ground#Electrode# • The!ground!electrode!would!correct!for!current!imbalance!between!the! positive! and! negative! halves! of! the! HVDC! interconnection! and! accommodate!abnormal!operating!conditions.! • During! normal! operation! of! the! proposed! DC! line,! approximately! 20! amperes! of! electricity! at! less! than! 500! volts! would! flow! over! the! electrode!feeder!and!through!the!ground!electrode.! • In! cases! of! abnormal! operating! conditions,! the! maximum! voltage! to! ground! would! not! exceed! 15! kV! at! a! current! of! 2450! amperes.! The! ground!electrode!is!designed!to!operate!at!this!level!for!15!minutes.!The! ground! electrode! is! expected! to! be! used! for! abnormal! operating! conditions!20!to!30!times!per!year.! 8.#Contractual#and#Policy#Considerations.# Quebec! segment! ownership! by! HQ6TransEnergie! and! US! segment! ownership! jointly!between!NU!and!NSTAR.! Relevant!Considerations! • Project!is!not!a!merchant!project! • Project!is!participant!funded,!with!cost6based!rates! • Transmission!Service!Agreement!to!be!filed!with!FERC!for!approval! • Power!Purchase!Agreement!to!be!approved!by!state!regulators! • Project!to!be!vetted!through!ISO6NE!planning!process! • Project!to!be!turned!over!to!ISO6NE!for!operation! • Project!is!subject!to!state!siting!requirements! ! 1. Joint#Development#Agreement# • NU! and! HQ6Trans! Energie! for! the! design! and! construction! of! the! HVDC!line! • Des!Cantons!is!the!expected!northern!terminus! • Southern!terminus!has!several!viable!alternatives!identified! 2. Transmission#Services#Agreement# • Firm!transmission!services!for!HQ6US!under!this!bilateral!agreement! • HQ!will!pay!for!the!HVDC!line!–participant!funded! • Negotiated,!cost!based!rates!with!FERC!filing!for!approval! • Not!merchant!and!no!market6based!pricing! 3. Purchase#Power#Agreement# • Available!to!NU,!NSTAR!and!other!qualified!New!England!buyers! • No!less!than!20!year!term! • All6in!priced!power!(including!the!costs!of!the!transmission!line)! • State!regulators!will!have!approval!for!the!power!purchase!by!their! respective!utilities!
  • 28. ! 24! 9.#Future#Scope#and#Proposed#Changes#for#the#Project:# • ABB!will!now!replace!the!206yearold!control!and!protection!systems!with! the! newest! modular! advanced! control! systems! (MACH)! for! HVDC! equipment.! • The! project! scope! also! includes! refurbishment! of! two! cable! transition! stations!and!a!control!and!protection!system!replica!for!a!test!center!in! Canada,! which! will! be! operational! by! 2016.! Apart! from! the! Protection! system!the!Automatic!reclosure!system!is!going!to!be!replaced.! 10.##Conclusions,#Unique#Features#and#Project#Benefits:# • Only! MTDC! System! in! North! America! and! also! links! two! asynchronous! Systems.! • CO2! Emissions:! Injecting! 1,200! MW! of! new! hydro! power! would! reduce! CO2emissions!by!up!to!6!million!tons!representing!30%!of!the!2025!“gap! to!target”! • Other! environmental! benefits:! Power! will! displace! marginal! fossil! generation! and! associated! environmental! impacts! –frees! up! enough! natural!gas!to!heat!1!million!homes! • Fuel! Diversity:! Increase! in! hydro! power! to! New! England! significantly! increases!the!region’s!fuel!diversity,!reducing!the!dependence!on!oil!and! gas! • Market!Power!Prices:!The!scale!of!the!project!is!expected!to!lower!market! prices!for!power!for!all!customers! • PPA!benefits:!A!pricing!structure!that!will!be!competitive!with!the!market! • Participant! Funded:! The! required! investment! in! HVDC! facilities! will! be! borne!by!the!parties!without!regional!cost!allocation! ! 11.#System#Modelling:# The MATLAB modelling of Mode 1 Configuration as discussed under 5.1 section of the Quebec – New England HVDC Project is as shown below:# ! ! Figure!11.1:!Matlab!system!model!for!mode!1!configuration!
  • 29. ! 25! The!ouput!result!on!the!Sandy!Pond!inverter!side!simulated!is!as!follows:! ! Figure!11.2:!Ouput!on!the!inverter!side!(Sandy!Pond)!mode!1!configuration! Power!world!simulation!for!the!project!has!also!been!performed!which!can!be! shown!as!follows:! ! Figure!11.3:!Power!flow!of!the!Quebec6New!England!HVDC!project! ! In!this!simulation!we!have!the!three!terminals!Radisson,!Nicolet!and!Sandy!Pond! with!their!corresponding!generators,!loads!and!the!reactive!power!requirement.! All!the!three!terminals!are!connected!through!DC!transmission!lines!available!in! the! Power! world.! There! are! also! supporting! generators! at! buses! 3! and! 5! to! support!the!contingency!when!the!Radisson!generator!is!lost.!The!rectifier!and!! inverter! of! the! DC! lines! are! inbuild! within! the! line,! the! parameters! can! be! changed!accordingly!depending!on!the!control!strategy!and!configuration!type.! ! !
  • 30. ! 26! 12.#References:# ! 1.!"Phase!I/II!HVDC6TF!TTC,!CBM,!TRM!and!ATC!METHODOLOGY"! 2.! "Proposed! economic! study! to! assess! potential! regional! benefits! for! increased! operating!limit!on!New!England/Quebec!Interconnector"! 3.!"ISO!New!England!Available!Transfer!Capability!Implementation!Document! !!!!!Version!1.0"! 4."ISO!NEW!ENGLAND!OPEN!ACCESS!TRANSMISSION!TARIFF"! 5.! "Environment! Impact! Statement! 6! New! England/Hydro6Quebec! ±! 450! kv! Transmission!Line!Interconnection66!Phase!II"! 6."Fundamental!frequency!coupling!between!HVAC!and!HVDC!lines!in!the!Quebec6! !!!!New!England!multi!terminal!system!6!Comparison!between!field!measurements! !!!!and!EMTDC!simulations"! 7.!"MODERN!CONTROL!AND!PROTECTION!SYSTEM!FOR!HVDC"! 8.!Environmental!impact!statement6!US!department!of!Energy!(publication)! 9.! NU! /! NSTAR! Proposed! HVDC! Transmission! Line6! Allen! W.! Schindler! NPCC! 2009! General!Meeting!Cambridge,!MA!September!23,!2009! 10.!Interconnection!and!operators!agreement!2012!(publication)! 11.! ! “Feedback! on! the! Quebec6New! England! MTDC! line! 20! years! of! operation”! by! Danielle!McNabb,!Hydro!Quebec!TransEngergie! 12.! “Planning! HVDC! and! FACTS! in! New! England”! by! Michael! I.Henderson,! Director,! Regional!Planning!&!Coordination,!ISO!New!England! ! !