Publicidad

BASIC PRODUCTION LOG SCHEDULE.docx

26 de Mar de 2023
Publicidad

Más contenido relacionado

Publicidad

BASIC PRODUCTION LOG SCHEDULE.docx

  1. PRODUCTION LOG D. Burrowes: Media Studies 1 IDEA, SCREENPLAY 24.10.22 – Very initial pitch and exploration of ideas. 14.11.22 – Final Pitch and narrative. 11.12.22 – Script written, workshopped and finalized. LOCATION SCOUTING 20.11.22 – location scouting complete: lockers and corridor and forest. CASTING 22.11.22 – finalised cast and assigned roles. We needed our ‘clique to be blonde’ and our ‘jock’ to be a bigger build. AV EQUIPMENT bt EXPERIMENTS 15.11.22 – While filming our sample scene we experimented with av equipment: DSLR mono-pod and tripod as well as sound recording equipment: mini microphone. IDENTS 10.11.22 – completed my initial idents and added text. Plan to complete my second ident by 15.12.22. PROPS, MISE-EN-SCENE, MAKE-UP, COSTUME (+ ASSISTANTS) 1.12.222 – Finalized costume and make up decisions, planned all the outfit and make up. 6.12.22 – Props and costumes bought and prepared for shoot. BUDGET, PURCHASES 6.12.22 – Bought all costume and props: fake blood, hoop earring and accessories. SAMPLE SCENES (SHOOTS, EDITS, FEEDBACK) 15.11.22 – Sample Scene 1 filmed and edited. 8.12.22 - Sample scene 1 and 2 filmed. PARTIAL ROUGH CUTS 23.01.23 - our partial rough cut TITLES EXPERIMENTS, DESIGN 19.01.23- experimenting with titles FULL ROUGH CUTS WITH TITLES/IDENTS 23.02.23 - Final rough cut with titles, foley sound and all changes. FOLEY SOUND 20.01.23 - All the foley sounds for locker scene 19.02.2023 - Go to the forest and finish all the foley sounds. SOUNDTRACK (TRACK/S, COMPOSER/S?) 1.02.23- Soundtrack, Killer Queen Acoustic version complete
Publicidad