SlideShare a Scribd company logo
1 of 20
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 1
Availability check is a process of checking the stock availability while creating sales order.
Pre-Requisites for TOR:
1. In Schedule line category
Check availability and requirement
2. Availability check/checking group
We maintain this field in "material master sales general/plant". This field controls how sales
requirements are updated in MRP.
01 - Daily requirement
02 - Individual requirement
01:System cumulates sales order requirements of particular day and updates in a single line in
MRP.
02:System updates each sales order requirement into MRP along with the sales order number.
Note: If we maintain "01" back order processing is not possible.
KP: No check
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 2
3. Requirement type should be determined into sales documentThe criteria to determine
requirement type in sales document is:
I. Strategy Group
II. MRP Group
III. Item category + MRP Type
4. In requirement class
Check availability and requirement
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 3
Note: Requirement class will help to transfer the sales order requirements to MRP.
Configuration for Availability Check:
Availability Check can be configured in 3 ways.
1. Availability Check with ATP (Availability To Promise)
2. Availability Check with Product Allocation
3. Rule based Availability Check
I. Availability Check with ATP (Availability To Promise)
Path: SPRO > S&D > Basic Functions > Availability Check & Transfer of requirement >
Availability Check > Availability check with ATP > Define Checking group
"Checking Group" is nothing but availability check field in "material master sales
general/plant"
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 4
In this configuration step we can define our own checking group. The standard checking groups
are:
01 – Daily Requirements
02 – Individual Requirement
KP - No Check
This configuration step will also help to control how the sales requirement should be
transferred to MRP.
Note:Availability check is material and plant specific
II. Define Material Block for other Users:
Path: SPRO > S&D > Basic Functions > Availability Check and Transfer of requirements >
Availability Check > Availability Check with ATP > Define material block for other users
If multiple users are accessing availability check for the same material in the same plant then
system performs availability check for the first user and block availability for the other users.
In this step with the combination of availability check and initiator we check block.
Initiator: A - Sales Order C - Reservations
B - Delivery
III. Define checking groups default values:
Path: SPRO > S&D > Basic Functions > Availability Check and Transfer of requirements >
Availability Check > Availability Check with ATP > Define checking groups default values
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 5
If we maintain checking group here it automatically proposes by default while creating material
master.
In this configuration step we maintain checking group to the combination of material type and
plant.
IV. Carry out Control for Availability Check:
We also call it as "scope of check". We configure scope of check with the combination of
"Checking group and Checking rule".
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 6
"Checking Rule" specifies in which transaction we want to configure availability check.
A - Sales Order B - Delivery
1. Include Safety stock:This is the minimum stock level which company has to maintain to meet
the future emergency requirements.
We have this field in "Material master MRP 2" view. If we check this field system will consider
safety stock also while performing availability check.
2. Stock in Transit:We use this field in STO Process
In STO two-step process where we do delivery in supplying plant the stock will be displayed as
stock in transit in receiving point.
If we check this system will consider the stock which is in transit also, while performing
availability check in receiving point.
3. Include Quality Inspection Stock:If we check this system will consider the stock which is in
quality inspection while performing availability check.
The movement type for quality inspection is "503"
Note:To check the result "post the un-restricted stock" by using movement type "503"
Stock Posting - MB1C
Stock Overview - MMBE
Check and uncheck the field and check the result.
4. Include Blocked Stock:If we check this field system will consider the stock which is blocked
while performing availability check.
The movement type for blocked store is "505"
Note:Post the blocked stock and check in stock overview. Check and uncheck this field and see
the result by creating order.
5. Check without RLT:If we check this field system will not confirm the quantities if the stock is
not available.
If we uncheck this, system will confirm the quantities in future dates based on RLT.
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 7
6. Include Purchase Orders:If we check this system will consider the inward movements (the
purchase order stock) while performing availability check.
7. Include Purchase Requisition:In real time we don't depend on purchase requisition. Because,
it is not the exact source for getting the stock.
8. Include Sales Requirement:If we check this system will deduct the open order quantities
from stock while performing availability check.
If we uncheck this system will consider the stock while performing availability check.
Note:Create material, post the stock and check the result.
Schedule line > Environment > Availability
9. Include Deliveries:Whenever we create deliveries the deliveries will also updates in "MD04".
If we check this system deducts open delivery quantities from stock while performing
availability check.
If we uncheck this system will not deduct open delivery quantities from stock while performing
availability check.
V. Define Procedure by Requirement Class:
In this configuration step we need to check requirement and availability.
VI. Define Procedure by schedule line category:
In the configuration step we check availability and requirement fields.
VII. Determine Procedure for each delivery item category:
This configuration controls whether to perform availability check in delivery document or not.
In below scenarios we perform availability check in delivery document.
a. Delivery without reference
b. Adding new line items in deliveries
c. Increase or decrease the quantities in deliveries
d. Stock Transfer
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 8
Exercise:
1. Create Order without posting stock and check how it is proposing the stock?
System is not confirming any quantity as there is no stock
2. Post stock with quantity 5 and created order with 5 quantity and check
Order quantity is 5 and system also confirmed quantity of 5.
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 9
3. Now create order with quantity 10 and check.
When we enter order quantity and press enter system will check the availability. As we have
stock of 5 quantity system is proposing only 5 quantities.
Click on tick mark and check the schedule lines.
Even the order quantity is 10 system confirms only 5.
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 10
4. Maintain RLT (2 days) in Material master and uncheck the field check without RLT in
scope of check and create order.
In this scenario we can see that system is confirming the 5 quantity and proposing the delivery
date for another 5 quantity in future as we maintained RLT.
Click on the tick mark and check the schedule lines.
System confirming the quantities on 2 different dates.
This is all about the availability check. We can do same this by posting quality inspection stock,
block stock, stock in transit etc.
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 11
Back Order Processing:
Whenever high delivery priority customer places an order, if the stock is not available then we
go back to open orders of low delivery priority customers and cancel the confirmations and
assign to high delivery priority customer order.
Note: The back order processing is available only for those materials that have the individual
requirements i.e., in material master record the parameter for "availability check" must be
"02".
The T. Code to create checking rule is “OPJL”
The T. Code to assign checking rule to availability check is “OVZ9”
After maintaining these setting continue with the configuration for back order processing.
Configuration for Back Order Processing:
1. Checking Rule for updating backorders:
Path: SPRO > S&D > Basic functions > Availability check and transfer of requirements >
Availability check with ATP > Checking rule for updating back orders
Here we assign checking rule "BO" to our plant
If we don’t find our plant in this path, in this case we need to maintain plant parameters.
Path: SPRO > Production > Material Requirements Planning > Plant Parameters > Carry out
overall maintenance of plant parameters > Create
2. Carryout control for availability check:
Here maintain the combination for checking group "02" and checking rule "BO"
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 12
Note:
a. If the plant is not displayed in backorder then maintain plant parameter for that plant.
Path: SPRO > MM > Inventory management & Physical inventory > Plant Parameter
Select the standard Plant 1000 and click on copy and maintain plant parameter
b. Maintain plant parameter in production
Path: SPRO > Production > Material requirement planning > Plant parameter > Carryout
overall maintenance of plant parameters
Click on copy
"1000" in from plant
"SPI1" in to plant and again click on copy.
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 13
3. Define Default Settings:
Fixed date and quantity: If we check this system will not allow users to change delivery dates
and confirmed quantities.
Availability checking rule:In case of shortages system proposes dialogue box with the help of
availability check rule.
Scenario for Back Order Processing:
i. Create a Material: P-Mobile
MRP Type: PD Availability check: 02 Strategy group: 10
ii. Create 2 Customer:
112 – Low delivery priority customer
130 – High delivery priority customer
iii. Do stock posting for created material
T.Code: MB1C Qty: 5
iv. Create order for low delivery priority customer (Qty:2) and check in schedule line data
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 14
v. Create another order for low delivery priority customer (Qty: 3) and check the confirmed
quantity in schedule line data.
vi. Create another order for high delivery priority customer (Qty: 3) and check the confirmed
quantity in schedule line data.
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 15
System will not confirm any quantity as there is no stock.
So in order to confirm the quantity to high delivery priority customer do the back order
processing.
T.Code: v_ra
Enter material, plant and execute.
Select the orders from which we want to cancel the confirmations and select the order to which
you want to assign the confirmed quantity
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 16
Select both and click on Backorders.
Select the Confirmed order and click on change confirmation.
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 17
Remove committed quantity and click on okay
We can see that the confirmed quantity becomes “0”. After that click on high delivery priority
customer order and click on change confirmation.
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 18
Enter the committed quantity and click on okay .
And save the document.
Go to the order of high delivery priority customer and check the committed quantity in
schedule lines. System confirms the quantity.
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 19
Re-scheduling:
If system performs backorder processing automatically then we call it as re-scheduling.
i. Create Material and post the stock of 5 quantities. In our case it is Q-Mobile.
ii. Create order for low delivery priority customer and save. (Qty: 5)
And check in schedule line to see how much quantity got confirmed.
iii. Create order of high delivery priority customer and check schedule line. (Qty: 5)
AVAILABILITY CHECK
By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 20
iv. T.Code for Re-scheduling is V_V2
Here we can see the for high delivery priority customer quantity has been confirmed
automatically.
And also check the same in schedule lines for high delivery priority customers order.
This is all about availability check, back order processing and re-scheduling process.

More Related Content

What's hot

Sd configuration steps for automatic batch determination in delivery
Sd   configuration steps for automatic batch determination in deliverySd   configuration steps for automatic batch determination in delivery
Sd configuration steps for automatic batch determination in deliveryShivaprakash Shastri Hiremath
 
STO process with config 4th method
STO process with config 4th methodSTO process with config 4th method
STO process with config 4th methodMohammed Azhad
 
Availability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements SalesAvailability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements Salesguest9d4260
 
Important tables for sap sd
Important tables for sap sd Important tables for sap sd
Important tables for sap sd Roshan Prasad
 
SAP SD Training | SAP SD Configuration Guide | SAP SD Study Material
SAP SD Training | SAP SD Configuration Guide | SAP SD Study MaterialSAP SD Training | SAP SD Configuration Guide | SAP SD Study Material
SAP SD Training | SAP SD Configuration Guide | SAP SD Study MaterialSAP SD Training By Praveen
 
Sap sd important interview concepts
Sap sd important interview concepts Sap sd important interview concepts
Sap sd important interview concepts Mohit Amitabh
 
SAP SD third party process
SAP SD third party processSAP SD third party process
SAP SD third party processSD Tutorial
 

What's hot (20)

Credit Management in SAP SD
Credit Management in SAP SDCredit Management in SAP SD
Credit Management in SAP SD
 
Route determination
Route determinationRoute determination
Route determination
 
SAP SD Configuration Document
SAP SD Configuration DocumentSAP SD Configuration Document
SAP SD Configuration Document
 
Sd configuration steps for automatic batch determination in delivery
Sd   configuration steps for automatic batch determination in deliverySd   configuration steps for automatic batch determination in delivery
Sd configuration steps for automatic batch determination in delivery
 
SAP SD Copy Controls
SAP SD Copy ControlsSAP SD Copy Controls
SAP SD Copy Controls
 
Material listing & exclusion
Material listing & exclusionMaterial listing & exclusion
Material listing & exclusion
 
Third party process
Third party processThird party process
Third party process
 
SAP SD Notes
SAP SD NotesSAP SD Notes
SAP SD Notes
 
Text determination
Text determinationText determination
Text determination
 
Consignment process
Consignment processConsignment process
Consignment process
 
STO process with config 4th method
STO process with config 4th methodSTO process with config 4th method
STO process with config 4th method
 
Availability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements SalesAvailability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements Sales
 
Important tables for sap sd
Important tables for sap sd Important tables for sap sd
Important tables for sap sd
 
Revenue account determination
Revenue account determinationRevenue account determination
Revenue account determination
 
Important tables for sap sd
Important tables for sap sdImportant tables for sap sd
Important tables for sap sd
 
Free goods determination
Free goods determinationFree goods determination
Free goods determination
 
SAP SD Training | SAP SD Configuration Guide | SAP SD Study Material
SAP SD Training | SAP SD Configuration Guide | SAP SD Study MaterialSAP SD Training | SAP SD Configuration Guide | SAP SD Study Material
SAP SD Training | SAP SD Configuration Guide | SAP SD Study Material
 
Intercompany config
Intercompany configIntercompany config
Intercompany config
 
Sap sd important interview concepts
Sap sd important interview concepts Sap sd important interview concepts
Sap sd important interview concepts
 
SAP SD third party process
SAP SD third party processSAP SD third party process
SAP SD third party process
 

Viewers also liked

SAP SD Practice Exam
SAP SD Practice ExamSAP SD Practice Exam
SAP SD Practice ExamIT LearnMore
 
Sap sd overview and config
Sap sd overview and configSap sd overview and config
Sap sd overview and configBen Kumar
 
Variant Configuration Overview
Variant  Configuration  OverviewVariant  Configuration  Overview
Variant Configuration Overviewarun_bala1
 
SAP SD Variant configuration-training-document 2
SAP SD Variant configuration-training-document 2SAP SD Variant configuration-training-document 2
SAP SD Variant configuration-training-document 2ramesh Charantimath
 
SAP Plant Maintenance Training Material | www.sapdocs.info
SAP Plant Maintenance Training Material | www.sapdocs.infoSAP Plant Maintenance Training Material | www.sapdocs.info
SAP Plant Maintenance Training Material | www.sapdocs.infosapdocs. info
 
SAP MM Configuration - Real Project Documentation
SAP MM Configuration - Real Project DocumentationSAP MM Configuration - Real Project Documentation
SAP MM Configuration - Real Project Documentationsapdocs. info
 

Viewers also liked (7)

Output for picking list
Output for picking listOutput for picking list
Output for picking list
 
SAP SD Practice Exam
SAP SD Practice ExamSAP SD Practice Exam
SAP SD Practice Exam
 
Sap sd overview and config
Sap sd overview and configSap sd overview and config
Sap sd overview and config
 
Variant Configuration Overview
Variant  Configuration  OverviewVariant  Configuration  Overview
Variant Configuration Overview
 
SAP SD Variant configuration-training-document 2
SAP SD Variant configuration-training-document 2SAP SD Variant configuration-training-document 2
SAP SD Variant configuration-training-document 2
 
SAP Plant Maintenance Training Material | www.sapdocs.info
SAP Plant Maintenance Training Material | www.sapdocs.infoSAP Plant Maintenance Training Material | www.sapdocs.info
SAP Plant Maintenance Training Material | www.sapdocs.info
 
SAP MM Configuration - Real Project Documentation
SAP MM Configuration - Real Project DocumentationSAP MM Configuration - Real Project Documentation
SAP MM Configuration - Real Project Documentation
 

Similar to Availability Check Configuration

Availability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements SalesAvailability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements Salesmradwan101
 
12856009 availability-check-transfer-of-requirements-sales
12856009 availability-check-transfer-of-requirements-sales12856009 availability-check-transfer-of-requirements-sales
12856009 availability-check-transfer-of-requirements-salesmanishankara
 
Sap mrp-configuration-pp
Sap mrp-configuration-ppSap mrp-configuration-pp
Sap mrp-configuration-ppLokesh Modem
 
Quality Inspection.pdf
Quality Inspection.pdfQuality Inspection.pdf
Quality Inspection.pdfNand Singh
 
Oracle R12 SCM Functional Interview Questions - Order Management
Oracle R12 SCM Functional Interview Questions - Order ManagementOracle R12 SCM Functional Interview Questions - Order Management
Oracle R12 SCM Functional Interview Questions - Order ManagementBoopathy CS
 
Sap production planning
Sap production planningSap production planning
Sap production planningSourav Dass
 
Ewm erp qm_basic_inspection_process
Ewm erp qm_basic_inspection_processEwm erp qm_basic_inspection_process
Ewm erp qm_basic_inspection_processManikandanVijayan2
 
Just in time and lean thinking
Just in time and lean thinkingJust in time and lean thinking
Just in time and lean thinkingPrashant Sharma
 
Availability To Promise
Availability To Promise Availability To Promise
Availability To Promise Mohammed Azhad
 
Online Retailing Database System on Amazon
Online Retailing Database System on AmazonOnline Retailing Database System on Amazon
Online Retailing Database System on AmazonHung-Chih(Henry) Huang
 
Preguntas y respuestas examen de SAP PP
Preguntas y respuestas examen de SAP PPPreguntas y respuestas examen de SAP PP
Preguntas y respuestas examen de SAP PPMario Rodriguez
 
MATERIAL MANAGEMENT.docx
MATERIAL MANAGEMENT.docxMATERIAL MANAGEMENT.docx
MATERIAL MANAGEMENT.docxARVINRAMIREZ3
 
Rollout solution template SAP SD
Rollout solution template   SAP SDRollout solution template   SAP SD
Rollout solution template SAP SDMohammed Azhad
 
Oracle Quality setup
Oracle Quality setupOracle Quality setup
Oracle Quality setupMina Lotfy
 
qualitysetup-220216115609.pdf
qualitysetup-220216115609.pdfqualitysetup-220216115609.pdf
qualitysetup-220216115609.pdfssuserf9d4211
 
Oracle SCM Functional Interview Questions & Answers - Inventory Module - Part...
Oracle SCM Functional Interview Questions & Answers - Inventory Module - Part...Oracle SCM Functional Interview Questions & Answers - Inventory Module - Part...
Oracle SCM Functional Interview Questions & Answers - Inventory Module - Part...Boopathy CS
 

Similar to Availability Check Configuration (20)

Availability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements SalesAvailability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements Sales
 
12856009 availability-check-transfer-of-requirements-sales
12856009 availability-check-transfer-of-requirements-sales12856009 availability-check-transfer-of-requirements-sales
12856009 availability-check-transfer-of-requirements-sales
 
Sap mrp-configuration-pp
Sap mrp-configuration-ppSap mrp-configuration-pp
Sap mrp-configuration-pp
 
MRP views in Material Master
MRP views in Material MasterMRP views in Material Master
MRP views in Material Master
 
Quality Inspection.pdf
Quality Inspection.pdfQuality Inspection.pdf
Quality Inspection.pdf
 
Oracle R12 SCM Functional Interview Questions - Order Management
Oracle R12 SCM Functional Interview Questions - Order ManagementOracle R12 SCM Functional Interview Questions - Order Management
Oracle R12 SCM Functional Interview Questions - Order Management
 
Sap production planning
Sap production planningSap production planning
Sap production planning
 
Ewm erp qm_basic_inspection_process
Ewm erp qm_basic_inspection_processEwm erp qm_basic_inspection_process
Ewm erp qm_basic_inspection_process
 
Just in time and lean thinking
Just in time and lean thinkingJust in time and lean thinking
Just in time and lean thinking
 
Erp in business
Erp in businessErp in business
Erp in business
 
Availability To Promise
Availability To Promise Availability To Promise
Availability To Promise
 
Online Retailing Database System on Amazon
Online Retailing Database System on AmazonOnline Retailing Database System on Amazon
Online Retailing Database System on Amazon
 
Preguntas y respuestas examen de SAP PP
Preguntas y respuestas examen de SAP PPPreguntas y respuestas examen de SAP PP
Preguntas y respuestas examen de SAP PP
 
frppt.ims.pptx
frppt.ims.pptxfrppt.ims.pptx
frppt.ims.pptx
 
KDFJ
KDFJKDFJ
KDFJ
 
MATERIAL MANAGEMENT.docx
MATERIAL MANAGEMENT.docxMATERIAL MANAGEMENT.docx
MATERIAL MANAGEMENT.docx
 
Rollout solution template SAP SD
Rollout solution template   SAP SDRollout solution template   SAP SD
Rollout solution template SAP SD
 
Oracle Quality setup
Oracle Quality setupOracle Quality setup
Oracle Quality setup
 
qualitysetup-220216115609.pdf
qualitysetup-220216115609.pdfqualitysetup-220216115609.pdf
qualitysetup-220216115609.pdf
 
Oracle SCM Functional Interview Questions & Answers - Inventory Module - Part...
Oracle SCM Functional Interview Questions & Answers - Inventory Module - Part...Oracle SCM Functional Interview Questions & Answers - Inventory Module - Part...
Oracle SCM Functional Interview Questions & Answers - Inventory Module - Part...
 

Recently uploaded

9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 

Recently uploaded (20)

9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 

Availability Check Configuration

  • 1. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 1 Availability check is a process of checking the stock availability while creating sales order. Pre-Requisites for TOR: 1. In Schedule line category Check availability and requirement 2. Availability check/checking group We maintain this field in "material master sales general/plant". This field controls how sales requirements are updated in MRP. 01 - Daily requirement 02 - Individual requirement 01:System cumulates sales order requirements of particular day and updates in a single line in MRP. 02:System updates each sales order requirement into MRP along with the sales order number. Note: If we maintain "01" back order processing is not possible. KP: No check
  • 2. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 2 3. Requirement type should be determined into sales documentThe criteria to determine requirement type in sales document is: I. Strategy Group II. MRP Group III. Item category + MRP Type 4. In requirement class Check availability and requirement
  • 3. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 3 Note: Requirement class will help to transfer the sales order requirements to MRP. Configuration for Availability Check: Availability Check can be configured in 3 ways. 1. Availability Check with ATP (Availability To Promise) 2. Availability Check with Product Allocation 3. Rule based Availability Check I. Availability Check with ATP (Availability To Promise) Path: SPRO > S&D > Basic Functions > Availability Check & Transfer of requirement > Availability Check > Availability check with ATP > Define Checking group "Checking Group" is nothing but availability check field in "material master sales general/plant"
  • 4. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 4 In this configuration step we can define our own checking group. The standard checking groups are: 01 – Daily Requirements 02 – Individual Requirement KP - No Check This configuration step will also help to control how the sales requirement should be transferred to MRP. Note:Availability check is material and plant specific II. Define Material Block for other Users: Path: SPRO > S&D > Basic Functions > Availability Check and Transfer of requirements > Availability Check > Availability Check with ATP > Define material block for other users If multiple users are accessing availability check for the same material in the same plant then system performs availability check for the first user and block availability for the other users. In this step with the combination of availability check and initiator we check block. Initiator: A - Sales Order C - Reservations B - Delivery III. Define checking groups default values: Path: SPRO > S&D > Basic Functions > Availability Check and Transfer of requirements > Availability Check > Availability Check with ATP > Define checking groups default values
  • 5. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 5 If we maintain checking group here it automatically proposes by default while creating material master. In this configuration step we maintain checking group to the combination of material type and plant. IV. Carry out Control for Availability Check: We also call it as "scope of check". We configure scope of check with the combination of "Checking group and Checking rule".
  • 6. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 6 "Checking Rule" specifies in which transaction we want to configure availability check. A - Sales Order B - Delivery 1. Include Safety stock:This is the minimum stock level which company has to maintain to meet the future emergency requirements. We have this field in "Material master MRP 2" view. If we check this field system will consider safety stock also while performing availability check. 2. Stock in Transit:We use this field in STO Process In STO two-step process where we do delivery in supplying plant the stock will be displayed as stock in transit in receiving point. If we check this system will consider the stock which is in transit also, while performing availability check in receiving point. 3. Include Quality Inspection Stock:If we check this system will consider the stock which is in quality inspection while performing availability check. The movement type for quality inspection is "503" Note:To check the result "post the un-restricted stock" by using movement type "503" Stock Posting - MB1C Stock Overview - MMBE Check and uncheck the field and check the result. 4. Include Blocked Stock:If we check this field system will consider the stock which is blocked while performing availability check. The movement type for blocked store is "505" Note:Post the blocked stock and check in stock overview. Check and uncheck this field and see the result by creating order. 5. Check without RLT:If we check this field system will not confirm the quantities if the stock is not available. If we uncheck this, system will confirm the quantities in future dates based on RLT.
  • 7. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 7 6. Include Purchase Orders:If we check this system will consider the inward movements (the purchase order stock) while performing availability check. 7. Include Purchase Requisition:In real time we don't depend on purchase requisition. Because, it is not the exact source for getting the stock. 8. Include Sales Requirement:If we check this system will deduct the open order quantities from stock while performing availability check. If we uncheck this system will consider the stock while performing availability check. Note:Create material, post the stock and check the result. Schedule line > Environment > Availability 9. Include Deliveries:Whenever we create deliveries the deliveries will also updates in "MD04". If we check this system deducts open delivery quantities from stock while performing availability check. If we uncheck this system will not deduct open delivery quantities from stock while performing availability check. V. Define Procedure by Requirement Class: In this configuration step we need to check requirement and availability. VI. Define Procedure by schedule line category: In the configuration step we check availability and requirement fields. VII. Determine Procedure for each delivery item category: This configuration controls whether to perform availability check in delivery document or not. In below scenarios we perform availability check in delivery document. a. Delivery without reference b. Adding new line items in deliveries c. Increase or decrease the quantities in deliveries d. Stock Transfer
  • 8. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 8 Exercise: 1. Create Order without posting stock and check how it is proposing the stock? System is not confirming any quantity as there is no stock 2. Post stock with quantity 5 and created order with 5 quantity and check Order quantity is 5 and system also confirmed quantity of 5.
  • 9. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 9 3. Now create order with quantity 10 and check. When we enter order quantity and press enter system will check the availability. As we have stock of 5 quantity system is proposing only 5 quantities. Click on tick mark and check the schedule lines. Even the order quantity is 10 system confirms only 5.
  • 10. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 10 4. Maintain RLT (2 days) in Material master and uncheck the field check without RLT in scope of check and create order. In this scenario we can see that system is confirming the 5 quantity and proposing the delivery date for another 5 quantity in future as we maintained RLT. Click on the tick mark and check the schedule lines. System confirming the quantities on 2 different dates. This is all about the availability check. We can do same this by posting quality inspection stock, block stock, stock in transit etc.
  • 11. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 11 Back Order Processing: Whenever high delivery priority customer places an order, if the stock is not available then we go back to open orders of low delivery priority customers and cancel the confirmations and assign to high delivery priority customer order. Note: The back order processing is available only for those materials that have the individual requirements i.e., in material master record the parameter for "availability check" must be "02". The T. Code to create checking rule is “OPJL” The T. Code to assign checking rule to availability check is “OVZ9” After maintaining these setting continue with the configuration for back order processing. Configuration for Back Order Processing: 1. Checking Rule for updating backorders: Path: SPRO > S&D > Basic functions > Availability check and transfer of requirements > Availability check with ATP > Checking rule for updating back orders Here we assign checking rule "BO" to our plant If we don’t find our plant in this path, in this case we need to maintain plant parameters. Path: SPRO > Production > Material Requirements Planning > Plant Parameters > Carry out overall maintenance of plant parameters > Create 2. Carryout control for availability check: Here maintain the combination for checking group "02" and checking rule "BO"
  • 12. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 12 Note: a. If the plant is not displayed in backorder then maintain plant parameter for that plant. Path: SPRO > MM > Inventory management & Physical inventory > Plant Parameter Select the standard Plant 1000 and click on copy and maintain plant parameter b. Maintain plant parameter in production Path: SPRO > Production > Material requirement planning > Plant parameter > Carryout overall maintenance of plant parameters Click on copy "1000" in from plant "SPI1" in to plant and again click on copy.
  • 13. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 13 3. Define Default Settings: Fixed date and quantity: If we check this system will not allow users to change delivery dates and confirmed quantities. Availability checking rule:In case of shortages system proposes dialogue box with the help of availability check rule. Scenario for Back Order Processing: i. Create a Material: P-Mobile MRP Type: PD Availability check: 02 Strategy group: 10 ii. Create 2 Customer: 112 – Low delivery priority customer 130 – High delivery priority customer iii. Do stock posting for created material T.Code: MB1C Qty: 5 iv. Create order for low delivery priority customer (Qty:2) and check in schedule line data
  • 14. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 14 v. Create another order for low delivery priority customer (Qty: 3) and check the confirmed quantity in schedule line data. vi. Create another order for high delivery priority customer (Qty: 3) and check the confirmed quantity in schedule line data.
  • 15. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 15 System will not confirm any quantity as there is no stock. So in order to confirm the quantity to high delivery priority customer do the back order processing. T.Code: v_ra Enter material, plant and execute. Select the orders from which we want to cancel the confirmations and select the order to which you want to assign the confirmed quantity
  • 16. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 16 Select both and click on Backorders. Select the Confirmed order and click on change confirmation.
  • 17. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 17 Remove committed quantity and click on okay We can see that the confirmed quantity becomes “0”. After that click on high delivery priority customer order and click on change confirmation.
  • 18. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 18 Enter the committed quantity and click on okay . And save the document. Go to the order of high delivery priority customer and check the committed quantity in schedule lines. System confirms the quantity.
  • 19. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 19 Re-scheduling: If system performs backorder processing automatically then we call it as re-scheduling. i. Create Material and post the stock of 5 quantities. In our case it is Q-Mobile. ii. Create order for low delivery priority customer and save. (Qty: 5) And check in schedule line to see how much quantity got confirmed. iii. Create order of high delivery priority customer and check schedule line. (Qty: 5)
  • 20. AVAILABILITY CHECK By Srinivasulu Algaskhanpet (SAP SD Consultant) Page 20 iv. T.Code for Re-scheduling is V_V2 Here we can see the for high delivery priority customer quantity has been confirmed automatically. And also check the same in schedule lines for high delivery priority customers order. This is all about availability check, back order processing and re-scheduling process.