2. Primarily engaged in Hydrology and Watershed related
activities, Hydrological and Hydraulic modelling of river
systems
NESAC Activities till now:
3. 3
Flood Early Warning Systems (FLEWS) Project Works
Post FLEWS Field survey of major flood prone rivers in Assam
NER-DRR Centralized Infrastructure database preparation
Development & Dissemination of web-based Spatial Decision
Support Systems (SDSSs) for FLOOD under NER-DRR programme
SBIK Level 1 Flood Zonation database generation For North Eastern
States
Activities of 2014
4. 4
Upgrading existing FLEWS parameters & procedure
◦ Correction of digital river database
◦ Preparation of LULC and Soil data for model preparation
◦ Catchment Delineation and model preparation using HEC-GeoHMS
◦ Correction to newly built HEC-HMS models
Research & Development Activities
Operational FLEWS activities
Activities of 2015
5. River Systems digitized from high resolution imageries.
DEM (SRTM 30M/SRTM 90M) filtered, hydrologically corrected,
digitized rivers burned and finally delineated.
Manual correction of outlets, junctions and delineated sub-
basins.
The main river routing model has been changed from
Muskingum to Muskingum-Cunge keeping in view its suitability
for Ungauged Catchments
Consideration of Antecedent Moisture Content (AMC) to account
for rainfall variability during the flood season.
Calibration of models with existing stage-discharge database
6. 1. LAND USE
SBIK LULC 11-12 2nd cycle data
LULC classes sliced down to 26 classes from 4 broad classes previously to
increase SCS Curve Number heterogeneity
Land
Forest
Water
Built-Up
7. 2. SOIL
• SBIK 250k Soil database
• The four main classes of soil A,B,C & D has been computed using
texture, drainage pattern and type of soil
11. Urban/Flash Flood studies
◦ AOI - Shillong Urban,Guwahati
◦ Softwares – HEC-HMS, MIKE FLOOD, HEC-RAS, SWMM, FLO-2D
◦ Creation of the Guwahati Urban watershed model with inputs
from GMDA, ASDMA and IIT Guwahati
◦ Testing MIKE 21 two-dimensional module with complex
bathymetry
Source Sinks pairs
Building footprints
Riverine Flooding study
◦ Lakhimpur - Ranganadi River, Goalpara – Krishnai, Dudhnoi
Rivers, Dhansiri River, Nagaland
HEC-HMS accuracy test with available DEMs
14. FLOOD SIMULATION using MIKE 21 Hydraulic Model
Two-Dimensional Hydraulic Simulation
(Case study in Ranganadi river in Lakhimpur
District, Assam)
Simulation of
rainfall over
Guwahati using
Source & Sink pairs
15.
16. Proposed locations of ARG stations for Guwahati on the
request of Assam State Disaster Management Authority
(ASDMA).
17. WRF Input
to the
HEC-HMS
Model
Heavy Rainfall
Forecast
FLOOD
ALERTComputed high discharge peak
ASDMA
Disaster
Control Room
District
Administratio
n
IMD
Alert
uploaded
in
ASDMA
website
(being
implementin
g agency)
Alert
Recipients
19. Total no. of alerts
issued (till date) –
144
Total no. of
absolute success –
89
Total no. of partial
success – 43
Total no. of failures
– 12 (including 2
alerts without
validation)
60%
32%
8%
Alerts Issued: 2014
Absolute
Success
Partial
Success
62%
30%
8%
Alerts Issued: 2015
Absolute
Success
Partial
Success
Failure
20. Integration of combined MIKE NAM hydrologic model + MIKE 11
hydraulic model in FLEWS operational module to strengthen the
present hydrological analysis of FLEWS.
Also Urban Flash flood Alert system can be started with MIKE
Urban Module/PCSWMM availability.
Sediment transport and morphological modelling study
incorporation under NER-DRR.
Automation of FLEWS for better decision support help. In the first
phase, automation of field data collection and alert
dissemination will be targeted.
LIDAR DSM integration can be started after a pilot study which
we have taken up recently.
Building flood forecasting models for all the flood prone states
of North-East.
21. MIKE FLOOD setup in Krishnai-Dudhnoi RiversInundation using MIKE FloodComparison with NRSC historic inundation dataVillages inundatedRC Level Inundation check
22. 3
2
1
Minor
River
Junction
Main Channel
Initial Flow Condition
y = 12.706x2 - 2158.4x + 91663
0
500
1000
1500
85 90 95
Rating Curve - Dikhow
Q
Poly. (Q)
Upstream
Boundary
Condition -
1 Upstream Boundary
Condition -2
Inundation
Check Site