2. P.GC in a Glance:
Companies look to something with the idea of regional
markets to export technical and engineering services
and formed the founding group of senior engineers with
decades of experience in the implementation of various
projects in Iran
During a brief period with the dozens of projects
implemented in the region with a view to complying with
international standards as a GC to execute EPC projects
as established.
www. prgco.ir2
3. Co-centurydreamphenomenainengineering,industrialandcivilprojectscarriedsuppliesandgoodsisactive.
Managingtheincreasedemphasisonattitudesandsatisfaction,continuousoptimizationservicestoclientsintheprocess,
protect the environment and human agenda in its duties.
In addition to the foregoing commitment and adherence to legal requirements and other relevant requirements, it is
believed that the use of management system standards ISO9001: 2008 - ISO14001 :2004-OHSAS18001: 2007 as
Executive models excellence in order to take action.
Policy outline is as follows:
1.Achieve predetermined objectives and plans of the Board
2. Commitment to professional ethics and the ethics of being preferred over material interests
3. Improve the processes and activities associated with projects focusing on quality, timely execution and cost manage-
ment of projects in order to increase stakeholder satisfaction
4. Regular planning and action for the prevention of injuries, illnesses and accidents of controlling harmful work environ-
ment (especially chemical and physical agents, ergonomic factors in headquarters and administrative units)
5. Regular planning and action to prevent environmental pollution (especially to prevent contamination of soil, air and
water units and reduced resource consumption in equity executive and administrative)
6. Implementing organizational structures and management company for export of engineering services conforming to
international standards
7. Promote the scientific level, managerial and technical skills of employees through training
8. Development and quality infrastructure in order to achieve the general contractor (GC)
9. Registration, recording and exploitation and transfer of technical knowledge gained from projects to local partners
I am also committed to pursuing continuous improvement of the system in order to achieve goals and review the terms
of this
Policy on an annual basis and according to the requirements of financial, operational, organizational and personnel,
including managers, experts and officials have demanded that the important principles glory, wisdom and how to com-
municate with the public, employers, consultant, contractor component and other interested parties and the priority set
of professional value, all of their efforts to achieve the goals and plans communicated to operate.
CEO
Majid Kiani
www. prgco.ir 3
IntegratedManagementSystemPolicy
4. EngineeringandConsultingServices
Project engineering services in the specialized field of marine
structures , underground structures , geo technics (land and
water)andgeologicalengineeringandsurveyingbusinessalready
has a special position , so that in addition to full coverage of the
advisory needs ( research , design and monitoring ) and research ,
dozens of independent projects done or is in progress .
Abilities:
• Designandengineeringservicesinallcivilandindustrialtrends
• Geotechnical Engineering Services (land and water)
• Geological Engineering and Surveying
• Project Management Services
• Consultation and supervision (higher and resident)
• Engineering services for coping with earthquake retrofitting
buildings
www. prgco.ir4
5. Name of project Status
lanoitanretni yb dengised sgnidliub loohcS lacideM dna latneD ,lacideM Unfinished
)Shrine to Shrine Highway Engineering Management Services (Qom to Mashhad Under implementation
Rail Project Phase 1 study area Yazd, Isfahan and Shiraz Unfinished
Design and Engineering Services martyr Zinedine Tehran Highway Unfinished
Engineering and design of highway tunnels martyr Faith Shiraz Unfinished
Engineering and design studies martyr Motahari Crossing and Tehran Highway Unfinished
Advisory services and preparation of tender documents for the Tehran Metro Line 6 Unfinished
Consulting services and documentation Karaj Metro Under implementation
Engineering and consulting services Project 16 Phase 15 of South Pars gas field Under implementation
Design and engineering and consulting services for water treatment plants of Mazandaran, Shiraz Unfinished
Mining equipment design, engineering and consulting services Khamroud Unfinished
Engineering services and studies a new international airport in Iran Under implementation
Engineering services and design studies Bushehr InternationalAirport Under implementation
www. prgco.ir 5
6. Havingestablishedintheadministrativebuildings
Having established in the administrative buildings and structures -
Business - University of the Health Check and the rapid implementation
of international standards of design and construction operations in EPC
or PC to fulfill the following.
OneoftheflagshipprojectsandthecompanyplanstoexpandPGCporch
and courtyard housing with the Commander of the Faithful pilgrimage
shrine of Fatima al-Zahra (sa) in Iraq.
Other projects implemented or under implementation are as follows.
www. prgco.ir6
7. StatusName of project
Unfinished
Design and construction of the International School
of Dental Medicine and Biomedical Sciences
Unfinished
Completed construction and operation of
mechanical and electrical slow Hospital
Under implementationPark Construction Landscape Tabriz Museum
Under implementation
Manufacturing of Songun copper smelter and
sulfuric acid plant
Under implementation
Design, construction, supervision and project
development supreme shrine of ImamAli (AS)
www. prgco.ir 7
8. Road,Rail&Tunnel
PGC in the structure of Underwater beginning of its activities in the field
of tunnel construction, effective presence has increased dramatically
in the field of manufacturing of highways, main roads and ancillary
infrastructure for rail and even upgrade and repair the band airports in
the record run has and with regard to the implementation of dozens of
tunnelswithdifferentuserprofilesandshapesincomplexandtechnical,
arenowregardedasoneofthemajorcontractorsinthefieldofroadand
railway tunnels are considered.
Abilities:
• Road and highway design and implementation
• Design and implementation of main and secondary roads
• Design and implementation of rail lines and related facilities.
• Design and implementation of railway infrastructure
• Design and implementation of hydropower tunnels
• Design and implementation of road tunnels and runways
• Transformer cavern excavation and consolidation of operations
and the elevator shaft Dam and Power Plant
• Exploratory drilling and galleries Dam and Power Plant
www. prgco.ir8
9. StatusName of project
Unfinishedmad ,lennut noisrevid retaw fo noitcurtsnoC zaraH fo slennut yawllips dna
UnfinishedRoad construction Shahindej - TAKAB
UnfinishedCompleting the Borazjan - Ganaveh
UnfinishedRoad construction Kangan - Dvrahk
Under implementationHighway construction in Bushehr - late as the primary way of pars
UnfinishedZahedan road Nosratabad
UnfinishedGorgan railway - border Incheh
UnfinishedThe construction of the dam access road and qiz Khoda afarin wildlife crossings
Unfinished3-piece rail infrastructure Gol-Gohar - Shiraz length of 100 km.
Under implementationQazvin -Alamut
UnfinishedPart V rail Maragheh - Urmia
Under implementationFreeway shrine to shrine (Qom – Branch)
UnfinishedHamedan railway infrastructure - Sanandaj
Under implementationKermanshah-Khosravi rail
Under implementationThe first piece of high-speed rail infrastructure Qom - Esfahan
www. prgco.ir 9
10. Damsandirrigationschemesdrainage
Water crisis as one of the major challenges facing humanity in this
century, has attracted worldwide attention. Resource management
and development of dams and irrigation canals and drainage networks
including places of work priorities.
Dozens of companies and network of irrigation and drainage canals huge
project area has implemented several thousand acres of irrigation and
drainage and irrigation canal network of the project already has.
Abilities:
• Design and implementation of irrigation and drainage networks.
• Design and implementation of irrigation canals
• Dependent on irrigation and drainage facilities, network design and
implementation
• Design and implementation of large earthen dams, rockfill, concrete
and RCC
• Design and construction of hydropower plants and tall concrete
structures
• Design and implementation of levee walls, curtains, sealing, drilling
and injection Consolidation
• Designed, installed and operated instrumentation projects, dams,
tunnels and power plants
www. prgco.ir10
11. StatusName of project
UnfinishednamreK ot nuf si mad eht morf retaw refsnart ot nalP
UnfinishedDam building Polrood
UnfinishedWater Supply Dam to Hamedan Talwar
Under implementationCochrane Dam
Under implementationLane of Haraz Dam
UnfinishedDam Klqan tea
UnfinishedDam construction Lylan tea
UnfinishedDam water release delivery system, Qorveh Plains - Dehgalan
UnfinishedThe second half of the transmission line carrying water from the well to Zahedan
Under implementationImplementation of housing and utility Chraghvys Dam
UnfinishedPlan to transfer water from the dam to Kerman
Under implementationShrfshah Dam
Under implementationWater from the dam to Kermanshah
Under implementationShrfshah Dam
UnfinishedAmendment Iyushan Dam
UnfinishedWater Supply Dam to Hamedan Talwar
www. prgco.ir 11
12. MiningandMetallurgicalIndustry
PGChavinguniquefacilitiessuchasadvanceddrillingmachines,drilling
wagons all Hydraulic, mining fleet is equipped and able to implement
the project in three exploration, extraction and processing as a general
contractor (GC) surfaces different (EPC, ...) .
With regard to the objective of developing the mineral industry, mineral
industry, sponge iron plants, such as construction, manufacturing
concentrate,copper,ironandAluminumsmeltingandrefiningofmetals
has begun.
Abilities
• Network discovery and exploration plans
• Exploratory boreholes and sampling depths and under different
conditions
• Exploratory digging tunnels and trenches
• Geochemical and geophysical exploration
• Geo electrics well logging operations and data processing
• Design and surface mining, including metallic and non-metallic
• Network design and implementation of drilling and blasting
• Design and underground mining
www. prgco.ir12
13. StatusName of project
Under implementationPMS eussit namreK leets gnitsac dna gnitlem yb derutcafunaM
Under implementation
Sponge Iron and Steel Plant handlingAzerbaijan
)Miyaneh Steel Design(
Under implementationManufacturing of Songun copper smelter and sulfuric acid plant
Under implementationSongun Copper Refinery Plant Complex
Unfinished
Construction and commissioning of steel casting machine
Mobarakeh
UnfinishedManufacturing of Songun copper smelter and sulfuric acid plant
Under implementation
Songun copper complex method development project
)concentrated EPC (construction phase
Under implementationSongun Copper Refinery Plant Complex
www. prgco.ir 13