400kV GIS SUBSTATION
ERECTION SEQUENCE
Presented By
Anbarasu B
Project Engineer
400kV GIS Substation
Mobilization of GIS cart Unpacking of GIS cart
400kv gis substation erection sequence
400kv gis substation erection sequence
CB ready for placing at the
position
Alignment of CB with 0mm
error
400kv gis substation erection sequence
Final alignment of CB
Current transformer under testing
CT placed on temporary
support
Disconnecting ready erect
over CT
Lifting of DS and CT after
couplingReplacing of gasket
CT and DS erected on CB After completion of all CT
& DS
Walkway platform shifted
inside the GIS
Platform during assembling
at ground floor
Platform erection over CB
After completion of walkway
platform
Diagonal bus placed on temporary support
AFTER COMPLETION OF DIAGONAL
BUS
Internal bus placed over DS
for compensation unit
After erection of
compensation unit
Main Bus support erection Main bus enclosure internal
inspection
ERECTION OF MAIN BUS ENCLOSURE
400kv gis substation erection sequence
Full body cover for internal
inspection
Connecting of internal
conductor parts
Erection of Branch bus DS
with branch bus
Erection of branch DS with
branch VT
Main bus VT and Fast earth
switch erection with main bus
After completion main bus
VT and FES
Circuit breaker inter inspection and absorbent replacement
Replacement of absorbent
Connection of DS & ES
operating inter link rod
Vacuuming of
gas chamber
CB and all SF6 gas filling
Erection GIB support Lifting of GIB after inter inspection
and fixing of conductor
Erection of Gas insulated bus and its supports
400kv gis substation erection sequence
Erection of SF6 toAir bushing
400kv gis substation erection sequence
Erection of LA Erection of CVT and Line trap
High voltage testing kit erection
SF6 Gas Leakage test Damaged branch bus enclosure
under leak test after repairing
Suspension string lifting for erection
Assembling of tension string LIFTING OF TENSION STRING
INSULATOR AND
CONDUCTOR
After completion of lifting of
insulator string and its hardware
After completion of
conductor stringing
Erection of 220V and 48V battery bank
Power and control cable laying
400kv gis substation erection sequence
Cable termination
CABLE TRAY ERECTION AND
FABRICATION
Panel base frame fabrication and erection
400kv gis substation erection sequence
1 de 43

Recomendados

220 KV Substation Operation & Maintenance por
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
5.3K vistas72 diapositivas
GIS 400kv substation por
GIS  400kv substationGIS  400kv substation
GIS 400kv substationAnbarasu Balakrishnan
6.8K vistas46 diapositivas
Construction EHV Transmission Line por
Construction EHV Transmission LineConstruction EHV Transmission Line
Construction EHV Transmission LineSURESH GOPAL
87.3K vistas151 diapositivas
Gas insulated substation. por
Gas insulated substation.Gas insulated substation.
Gas insulated substation.Pêrsêûs Sâîf
9.3K vistas24 diapositivas
Bus Bar protection por
Bus Bar protectionBus Bar protection
Bus Bar protectionsrini09
3.2K vistas52 diapositivas
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3... por
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...
High Voltage Gas Insulted Switchgear (GIS) Field Testing According to IEEE C3...Ali Sepehri
1.1K vistas11 diapositivas

Más contenido relacionado

La actualidad más candente

Substation Training presentation por
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
47K vistas20 diapositivas
Electrical substations: 132 KV por
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV Girish Gupta
72.5K vistas38 diapositivas
Gas insulated substation por
Gas insulated substationGas insulated substation
Gas insulated substationsharique_64
82.6K vistas29 diapositivas
testing formats por
testing formatstesting formats
testing formatsAbhishek Shukla
3.1K vistas201 diapositivas
Testing of transformer por
Testing of transformerTesting of transformer
Testing of transformerSMRITI KESHARWANI
32.1K vistas30 diapositivas
presentation on substation layout and BUS bar arrangement. por
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.Hemendra Kumar Rajput
40.6K vistas38 diapositivas

La actualidad más candente(20)

Substation Training presentation por Kamal Mittal
Substation Training presentationSubstation Training presentation
Substation Training presentation
Kamal Mittal47K vistas
Electrical substations: 132 KV por Girish Gupta
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
Girish Gupta72.5K vistas
Gas insulated substation por sharique_64
Gas insulated substationGas insulated substation
Gas insulated substation
sharique_6482.6K vistas
presentation on substation layout and BUS bar arrangement. por Hemendra Kumar Rajput
presentation on substation layout and BUS bar arrangement.presentation on substation layout and BUS bar arrangement.
presentation on substation layout and BUS bar arrangement.
Hemendra Kumar Rajput40.6K vistas
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE por PremanandDesai
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTREUNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
UNIT - 05 DISTRIBUTION LINES AND TRANSFORMER CENTRE
PremanandDesai6.2K vistas
Practical handbook-for-relay-protection-engineers por SARAVANAN A
Practical handbook-for-relay-protection-engineersPractical handbook-for-relay-protection-engineers
Practical handbook-for-relay-protection-engineers
SARAVANAN A2K vistas
Transmisiion line design concept por Kumar VEL
Transmisiion line design conceptTransmisiion line design concept
Transmisiion line design concept
Kumar VEL38.3K vistas
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS) por Power System Operation
Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)Gas Insulated Switchgear?  Gas-Insulated High-Voltage Switchgear (GIS)
Gas Insulated Switchgear? Gas-Insulated High-Voltage Switchgear (GIS)
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment por SARAVANAN A
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard EquipmentSimple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment
Simple Capacitive Voltage Transformer (CVT) Testing for Switchyard Equipment
SARAVANAN A1.3K vistas
Electrical substation (one and half breaker scheme) por Sourabh sharma
Electrical substation (one and half breaker scheme)Electrical substation (one and half breaker scheme)
Electrical substation (one and half breaker scheme)
Sourabh sharma3.9K vistas
400kv sub-station-final-ppt-by-mohit por Mohit Awasthi
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
Mohit Awasthi19.8K vistas

Similar a 400kv gis substation erection sequence

Big Bowl centrifuge install Ensco 107 por
Big Bowl centrifuge install Ensco 107Big Bowl centrifuge install Ensco 107
Big Bowl centrifuge install Ensco 107Roy Catto
162 vistas9 diapositivas
Central West Fall Open House Presentation Deck - October 14, 2020 por
Central West Fall Open House Presentation Deck - October 14, 2020Central West Fall Open House Presentation Deck - October 14, 2020
Central West Fall Open House Presentation Deck - October 14, 2020Crosstown TO
3.7K vistas32 diapositivas
Closure Report por
Closure ReportClosure Report
Closure ReportMAYANK BHATEJA
132 vistas20 diapositivas
Fall Central Open House - Oct 21 por
Fall Central Open House  - Oct 21Fall Central Open House  - Oct 21
Fall Central Open House - Oct 21Crosstown TO
3K vistas28 diapositivas
Engineered Spring Supports (Practical, Hands-on Approach) Webinar por
Engineered Spring Supports (Practical, Hands-on Approach) WebinarEngineered Spring Supports (Practical, Hands-on Approach) Webinar
Engineered Spring Supports (Practical, Hands-on Approach) WebinarPiping Technology & Products, Inc.
6.5K vistas43 diapositivas
Engineered Spring Supports V.2 por
Engineered Spring Supports V.2Engineered Spring Supports V.2
Engineered Spring Supports V.2Piping Technology & Products, Inc.
1.2K vistas44 diapositivas

Similar a 400kv gis substation erection sequence(20)

Big Bowl centrifuge install Ensco 107 por Roy Catto
Big Bowl centrifuge install Ensco 107Big Bowl centrifuge install Ensco 107
Big Bowl centrifuge install Ensco 107
Roy Catto162 vistas
Central West Fall Open House Presentation Deck - October 14, 2020 por Crosstown TO
Central West Fall Open House Presentation Deck - October 14, 2020Central West Fall Open House Presentation Deck - October 14, 2020
Central West Fall Open House Presentation Deck - October 14, 2020
Crosstown TO3.7K vistas
Fall Central Open House - Oct 21 por Crosstown TO
Fall Central Open House  - Oct 21Fall Central Open House  - Oct 21
Fall Central Open House - Oct 21
Crosstown TO3K vistas
Estimation of bridges and automations copy por kjanand
Estimation of bridges and automations   copyEstimation of bridges and automations   copy
Estimation of bridges and automations copy
kjanand1.5K vistas
In situ Ship repair maintenance Presentation.pptx por Hieu Dang
In situ Ship repair maintenance Presentation.pptxIn situ Ship repair maintenance Presentation.pptx
In situ Ship repair maintenance Presentation.pptx
Hieu Dang37 vistas
Fall Virtual Open House: West - Mount Dennis to Avenue Stations por Crosstown TO
Fall Virtual Open House: West - Mount Dennis to Avenue StationsFall Virtual Open House: West - Mount Dennis to Avenue Stations
Fall Virtual Open House: West - Mount Dennis to Avenue Stations
Crosstown TO6.5K vistas
Final central east open house oct282020 por Crosstown TO
Final central east open house oct282020Final central east open house oct282020
Final central east open house oct282020
Crosstown TO3.7K vistas
Central West Spring Open House Presentation Deck - March 3, 2020 por Crosstown TO
Central West Spring Open House Presentation Deck - March 3, 2020 Central West Spring Open House Presentation Deck - March 3, 2020
Central West Spring Open House Presentation Deck - March 3, 2020
Crosstown TO2.6K vistas
Mahakali Bridge Project Presentation (2077 chaitra 11) por Rabindra Shrestha
Mahakali Bridge Project Presentation (2077 chaitra 11)Mahakali Bridge Project Presentation (2077 chaitra 11)
Mahakali Bridge Project Presentation (2077 chaitra 11)
Rabindra Shrestha254 vistas
Spring Virtual Open House: West - Mount Dennis to Cedarvale por Crosstown TO
Spring Virtual Open House: West - Mount Dennis to CedarvaleSpring Virtual Open House: West - Mount Dennis to Cedarvale
Spring Virtual Open House: West - Mount Dennis to Cedarvale
Crosstown TO2.6K vistas
Standard erection manual (pressure parts) por Ashutosh Sachan
Standard erection manual (pressure parts)Standard erection manual (pressure parts)
Standard erection manual (pressure parts)
Ashutosh Sachan37.9K vistas
Central Virtual Open House 28Apr2021 por Crosstown TO
Central Virtual Open House 28Apr2021Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021
Crosstown TO2.7K vistas
Central Spring Open House Presentation Deck - March 23 2020 por Crosstown TO
Central Spring Open House Presentation Deck - March 23 2020Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020
Crosstown TO3.3K vistas
West works open house deck March 12 2020 por Crosstown TO
West works open house deck   March 12 2020 West works open house deck   March 12 2020
West works open house deck March 12 2020
Crosstown TO2.6K vistas

Último

DevOps-ITverse-2023-IIT-DU.pptx por
DevOps-ITverse-2023-IIT-DU.pptxDevOps-ITverse-2023-IIT-DU.pptx
DevOps-ITverse-2023-IIT-DU.pptxAnowar Hossain
12 vistas45 diapositivas
Generative AI Models & Their Applications por
Generative AI Models & Their ApplicationsGenerative AI Models & Their Applications
Generative AI Models & Their ApplicationsSN
8 vistas1 diapositiva
REACTJS.pdf por
REACTJS.pdfREACTJS.pdf
REACTJS.pdfArthyR3
27 vistas16 diapositivas
Effect of deep chemical mixing columns on properties of surrounding soft clay... por
Effect of deep chemical mixing columns on properties of surrounding soft clay...Effect of deep chemical mixing columns on properties of surrounding soft clay...
Effect of deep chemical mixing columns on properties of surrounding soft clay...AltinKaradagli
9 vistas10 diapositivas
MongoDB.pdf por
MongoDB.pdfMongoDB.pdf
MongoDB.pdfArthyR3
35 vistas6 diapositivas
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc... por
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...csegroupvn
5 vistas210 diapositivas

Último(20)

DevOps-ITverse-2023-IIT-DU.pptx por Anowar Hossain
DevOps-ITverse-2023-IIT-DU.pptxDevOps-ITverse-2023-IIT-DU.pptx
DevOps-ITverse-2023-IIT-DU.pptx
Anowar Hossain12 vistas
Generative AI Models & Their Applications por SN
Generative AI Models & Their ApplicationsGenerative AI Models & Their Applications
Generative AI Models & Their Applications
SN8 vistas
REACTJS.pdf por ArthyR3
REACTJS.pdfREACTJS.pdf
REACTJS.pdf
ArthyR327 vistas
Effect of deep chemical mixing columns on properties of surrounding soft clay... por AltinKaradagli
Effect of deep chemical mixing columns on properties of surrounding soft clay...Effect of deep chemical mixing columns on properties of surrounding soft clay...
Effect of deep chemical mixing columns on properties of surrounding soft clay...
AltinKaradagli9 vistas
MongoDB.pdf por ArthyR3
MongoDB.pdfMongoDB.pdf
MongoDB.pdf
ArthyR335 vistas
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc... por csegroupvn
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
csegroupvn5 vistas
Design_Discover_Develop_Campaign.pptx por ShivanshSeth6
Design_Discover_Develop_Campaign.pptxDesign_Discover_Develop_Campaign.pptx
Design_Discover_Develop_Campaign.pptx
ShivanshSeth632 vistas
BCIC - Manufacturing Conclave - Technology-Driven Manufacturing for Growth por Innomantra
BCIC - Manufacturing Conclave -  Technology-Driven Manufacturing for GrowthBCIC - Manufacturing Conclave -  Technology-Driven Manufacturing for Growth
BCIC - Manufacturing Conclave - Technology-Driven Manufacturing for Growth
Innomantra 6 vistas
SPICE PARK DEC2023 (6,625 SPICE Models) por Tsuyoshi Horigome
SPICE PARK DEC2023 (6,625 SPICE Models) SPICE PARK DEC2023 (6,625 SPICE Models)
SPICE PARK DEC2023 (6,625 SPICE Models)
Tsuyoshi Horigome28 vistas
Investigation of Physicochemical Changes of Soft Clay around Deep Geopolymer ... por AltinKaradagli
Investigation of Physicochemical Changes of Soft Clay around Deep Geopolymer ...Investigation of Physicochemical Changes of Soft Clay around Deep Geopolymer ...
Investigation of Physicochemical Changes of Soft Clay around Deep Geopolymer ...
AltinKaradagli12 vistas
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx por lwang78
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
lwang7883 vistas
Design of machine elements-UNIT 3.pptx por gopinathcreddy
Design of machine elements-UNIT 3.pptxDesign of machine elements-UNIT 3.pptx
Design of machine elements-UNIT 3.pptx
gopinathcreddy32 vistas
MSA Website Slideshow (16).pdf por msaucla
MSA Website Slideshow (16).pdfMSA Website Slideshow (16).pdf
MSA Website Slideshow (16).pdf
msaucla76 vistas
_MAKRIADI-FOTEINI_diploma thesis.pptx por fotinimakriadi
_MAKRIADI-FOTEINI_diploma thesis.pptx_MAKRIADI-FOTEINI_diploma thesis.pptx
_MAKRIADI-FOTEINI_diploma thesis.pptx
fotinimakriadi8 vistas
fakenews_DBDA_Mar23.pptx por deepmitra8
fakenews_DBDA_Mar23.pptxfakenews_DBDA_Mar23.pptx
fakenews_DBDA_Mar23.pptx
deepmitra815 vistas

400kv gis substation erection sequence