Classification of contracts
Activities in construction project
• Engineering
– Issues related to process finalization, structural
analysis & design, technical issues related to
equipment design & selection
• Procurement
– Procurement of materials , also includes
identification of suitable vendors
• Construction
– This covers construction, installation & test run of
a constructed facility before handed to owner
Classification
• Seperated contracts
• Management contracts
• Integrated contracts
• Discretionary contracts
Separated contracts
• Lump sum contract
• Measurement contract
• Item rate
• Percentage rate
• Cost plus percentage
Management contract
• Management contract
• Construction management contract
• Design, management & construction contract
• Integrated contract
• Design build contract
• Turn key contract
• Build, operate & transfer contract
Discretionary contract
• Partnering contract
• Joint venture contract
Separated
• Traditional system & sequential process
• Division b/w design & construction responsibility
• Design - project briefing, outlining proposal,
detail design, etc.
• Delay - preparation & approval of drawings,
mistakes in design documentation
• Lengthy tendering period & suitable for small to
medium sized projects where time is not critical
• Major drawbacks
– Time consuming aspects of development process
– Effect of cost uncertainty
– Effect of buildability
– Fragmentation of organizational interfaces
Lump sum contract
• Drawings & details provided by client &
contractor quotes single lump sum figure
which is the total contact value of work
• Total sum based on analysis of rates &
estimated quantities
• Advantage - client know exact amount of
funds required to complete structure
• Successful lumpsum contract
– Quantities of items Involved are calculated at
tendering stage itself
– Nature of work done must be reasonably
measurable
– Contractor must be give All the facilities to which
he is contractually entitled
• Revision of amount in Case of change in
design by client
Measurable contract
• Payment made according to actual work
varied out, which is determined by physical
measurements
Item rate contract
• The contractor agrees to carry out a unit quantity
of particular work (cm3,m2) for particular sum of
money
• In this tender document consists of detailed BOQ
, where estimated quantity of work for each item
involved in particular work are listed along with
detailed description
• Total contract value - multiply total quantity with
quoted item rate and add cost of all items
• Some items are not covered in BOQ but
essential for completing job, in such cases
rates are given on basis of labor, material,
equipment etc
S.no Item Measurement
unit
Quantity Rate Amount
1 Cement Kgs 50 280 14000
2 Steel Ton 2 42000 84000
Percentage rate contract
• Tender document contains scheduled rates for
each work in addition to detailed estimate for
execution of work
• Contractor works out his rates for items i
usual manner& arrives at total price which is
converted to total percentage by which
amount differs
• Adopted by government departments & large
organizations
• Contractor amount -- Z
• Z > W , the % rate = (z-w)/w *100 above W
• Z < W , the % rate =(w-z)/w*100 below W
S.no Item Measure
ment unit
Quantity Rate Amount
1 Cement Kgs 50 280 14000
2 Steel Ton 2 42000 84000
W 14000+84000
Cost plus percentage
• Client agrees to pay contractor a certain % of
actual cost incurred by contractor while
completing a job in addition to cost itself.
• Tenderer only quotes his percentage
• Usually taken up when time is not available to
make estimate and workout details of items
involved
• Suitable for small jobs.
Management contract
• Managing contractor is appointed and he
deals with number of small contractors
• Client deals with only contractor and designer
• Contractor provides planning, management &
coordination services to client
• Responsibilities
– Preparing overall construction schedule
– Work package schedule
– Coordinating with designer
– Assistance in subcontractors selection
– Coordinating among different subcontractors
Construction management contract
• Construction manager appointed by client to
provide planning, management &
coordination
• Owner appoints designer & contractors
• Role of construction manager is to coordinate
among different subcontractors & ensuring
timely completion of project within budget
cost according to specifications
• Some responsibilities are
– Advising the designer
– Advising on making suitable work package
– Assisting in procurement
– Managing bidding process
Design, management & construction contract
• Client appoints single contractor to take care
of design & construction
• Basic design concepts may be provided by
client himself or through an independent
agency
• After basic concepts client calls for tender and
selects appropriate agency for designing ,
management & construction services
Integrated contract
• Design- build
– In this contractor takes the responsibilities of both
design & construction based on basic plans drawn
up by the client
– This avoids conflict b/w designer & contractor
– Often adopted when client has no in-house design
with him
– This method Reduces the cost , develops the
technical power in contractor & reduces disputes
The turn-key contract
• Responsibilities of all activities are taken up by
contracting agency
• The owner simply wants to “turn the key” at
completion to take over the facility
• All activities related to surveying , drawing
specifications , design , project planning ,
construction & test operation are given to one
large organisation
• They are useful in projects involving combination
of civil, electrical, mechanical, chemical & mining
engineering
• Mostly seen in petrochemical plants & nuclear
power stations
• STEPS
• In a project client first prepares documents
regarding requirements of facilities to be
constructed
• Later he selects the best proposal submitted by
multiple bidders

More Related Content

What's hot

Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variationVj NiroSh
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008AYM1979
 
Contracts and their types
Contracts and their typesContracts and their types
Contracts and their typesTouqeer1
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16Arvind Solanki
 
Construction Claims Explained
Construction Claims ExplainedConstruction Claims Explained
Construction Claims Explainedclaimsconsultancy
 
Contract Conditions
Contract ConditionsContract Conditions
Contract ConditionsDr K M SONI
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and ArbitrationJIT KUMAR GUPTA
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-ContractsNikhil Kumar
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Processarpantripathi2
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tenderingvvsasane
 
Contract - Construction Contracts and Specification
Contract - Construction Contracts and SpecificationContract - Construction Contracts and Specification
Contract - Construction Contracts and SpecificationMANNU KUMAR
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentationelliotfus
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentationcynfang Fong
 

What's hot (20)

Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
 
ACH 231 Lecture 07 (Contract Documents) Part 1
ACH 231 Lecture 07 (Contract Documents) Part 1ACH 231 Lecture 07 (Contract Documents) Part 1
ACH 231 Lecture 07 (Contract Documents) Part 1
 
Construction contracts docuements_08092008
Construction contracts docuements_08092008Construction contracts docuements_08092008
Construction contracts docuements_08092008
 
Contracts
ContractsContracts
Contracts
 
Construction tender process
Construction tender processConstruction tender process
Construction tender process
 
Contracts and their types
Contracts and their typesContracts and their types
Contracts and their types
 
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16CONTRACT ADMINISTRATION- Presentation dated 22.11.16
CONTRACT ADMINISTRATION- Presentation dated 22.11.16
 
Construction Claims Explained
Construction Claims ExplainedConstruction Claims Explained
Construction Claims Explained
 
Fidic contracts management introduction
Fidic contracts management introductionFidic contracts management introduction
Fidic contracts management introduction
 
Contract Conditions
Contract ConditionsContract Conditions
Contract Conditions
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and Arbitration
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
Types of Tender and their Process
Types of Tender and their ProcessTypes of Tender and their Process
Types of Tender and their Process
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tendering
 
Contract - Construction Contracts and Specification
Contract - Construction Contracts and SpecificationContract - Construction Contracts and Specification
Contract - Construction Contracts and Specification
 
Unit-2_Tender
Unit-2_TenderUnit-2_Tender
Unit-2_Tender
 
Construction Law Presentation
Construction Law PresentationConstruction Law Presentation
Construction Law Presentation
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Epc contracts.
Epc contracts.Epc contracts.
Epc contracts.
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentation
 

Viewers also liked

Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction ManagementShahin MB
 
Types of contract
Types of contractTypes of contract
Types of contractSweetp999
 
Pozvánka na eGovernment SR 2011
Pozvánka na eGovernment SR 2011Pozvánka na eGovernment SR 2011
Pozvánka na eGovernment SR 2011Geokomunita
 
Pert cpm-120421125920-phpapp02
Pert cpm-120421125920-phpapp02Pert cpm-120421125920-phpapp02
Pert cpm-120421125920-phpapp02kongara
 
Air Barrier Systems in Buildings
Air Barrier Systems in BuildingsAir Barrier Systems in Buildings
Air Barrier Systems in BuildingsShahin MB
 
Types of contract - Legal Environment of Business - Business Law - Manu Melwi...
Types of contract - Legal Environment of Business - Business Law - Manu Melwi...Types of contract - Legal Environment of Business - Business Law - Manu Melwi...
Types of contract - Legal Environment of Business - Business Law - Manu Melwi...manumelwin
 
PERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTPERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTsalsa moyara
 
Rate Analysis Site Meeting
Rate Analysis   Site MeetingRate Analysis   Site Meeting
Rate Analysis Site MeetingSanjay Patnaik
 
Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisAsif Sultan Razu
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniquesguestc8140fe
 
Introduction to contract law - offer by Maxwell ranasinghe
Introduction to contract law  - offer by Maxwell ranasingheIntroduction to contract law  - offer by Maxwell ranasinghe
Introduction to contract law - offer by Maxwell ranasingheMaxwell Ranasinghe
 
project-report-on-working-capital
project-report-on-working-capitalproject-report-on-working-capital
project-report-on-working-capitalRamesh Ankathi
 
Types of contract in Project management
Types of contract in Project managementTypes of contract in Project management
Types of contract in Project managementAli Heydari
 
Network Problem CPM & PERT
Network Problem CPM &  PERTNetwork Problem CPM &  PERT
Network Problem CPM & PERTPulchowk Campus
 

Viewers also liked (20)

Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
Types of contract
Types of contractTypes of contract
Types of contract
 
Pozvánka na eGovernment SR 2011
Pozvánka na eGovernment SR 2011Pozvánka na eGovernment SR 2011
Pozvánka na eGovernment SR 2011
 
Pert cpm-120421125920-phpapp02
Pert cpm-120421125920-phpapp02Pert cpm-120421125920-phpapp02
Pert cpm-120421125920-phpapp02
 
Item rate contract
Item rate contractItem rate contract
Item rate contract
 
Plainsboro cts update
Plainsboro cts updatePlainsboro cts update
Plainsboro cts update
 
Air Barrier Systems in Buildings
Air Barrier Systems in BuildingsAir Barrier Systems in Buildings
Air Barrier Systems in Buildings
 
Types of contract - Legal Environment of Business - Business Law - Manu Melwi...
Types of contract - Legal Environment of Business - Business Law - Manu Melwi...Types of contract - Legal Environment of Business - Business Law - Manu Melwi...
Types of contract - Legal Environment of Business - Business Law - Manu Melwi...
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
PERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENTPERT AND CPM PROJECT MANAGEMENT
PERT AND CPM PROJECT MANAGEMENT
 
Rate Analysis Site Meeting
Rate Analysis   Site MeetingRate Analysis   Site Meeting
Rate Analysis Site Meeting
 
Pert Cpm Nis
Pert   Cpm NisPert   Cpm Nis
Pert Cpm Nis
 
Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network Analysis
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniques
 
Nature of contract
Nature of contractNature of contract
Nature of contract
 
Introduction to contract law - offer by Maxwell ranasinghe
Introduction to contract law  - offer by Maxwell ranasingheIntroduction to contract law  - offer by Maxwell ranasinghe
Introduction to contract law - offer by Maxwell ranasinghe
 
project-report-on-working-capital
project-report-on-working-capitalproject-report-on-working-capital
project-report-on-working-capital
 
Datta_Resume
Datta_ResumeDatta_Resume
Datta_Resume
 
Types of contract in Project management
Types of contract in Project managementTypes of contract in Project management
Types of contract in Project management
 
Network Problem CPM & PERT
Network Problem CPM &  PERTNetwork Problem CPM &  PERT
Network Problem CPM & PERT
 

Similar to Classification of contracts

types-170309142854.pptx
types-170309142854.pptxtypes-170309142854.pptx
types-170309142854.pptxssuser42980c
 
Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureHASMANIRA
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionWaleed Liaqat
 
Measure And Pay Contract
Measure And Pay Contract Measure And Pay Contract
Measure And Pay Contract Venuri Lakshani
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentationTimun Loh
 
Construction Documents
Construction DocumentsConstruction Documents
Construction DocumentsAllan Berry
 
Construction Management - L1 (1).ppt
Construction Management - L1 (1).pptConstruction Management - L1 (1).ppt
Construction Management - L1 (1).pptmona700185
 
Construction management l1
Construction management   l1Construction management   l1
Construction management l1Faisal Rana
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyorLY97
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor温 庄壁
 
Professional practices (lec 03) by k.iqbal
Professional practices (lec 03) by k.iqbalProfessional practices (lec 03) by k.iqbal
Professional practices (lec 03) by k.iqbalZakee Kazmee
 
Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Felix Vong
 
The Design Assist Method of Project Delivery
The Design Assist Method of Project DeliveryThe Design Assist Method of Project Delivery
The Design Assist Method of Project DeliverySHKLaw
 
Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014SHKLaw
 

Similar to Classification of contracts (20)

types-170309142854.pptx
types-170309142854.pptxtypes-170309142854.pptx
types-170309142854.pptx
 
TOPIC2.pdf
TOPIC2.pdfTOPIC2.pdf
TOPIC2.pdf
 
Contract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment StructureContract Management - Contracts Types and Payment Structure
Contract Management - Contracts Types and Payment Structure
 
Muckle LLP - Which contract should I be using?
Muckle LLP - Which contract should I be using?Muckle LLP - Which contract should I be using?
Muckle LLP - Which contract should I be using?
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
 
Lecture 1.pptx
Lecture 1.pptxLecture 1.pptx
Lecture 1.pptx
 
Measure And Pay Contract
Measure And Pay Contract Measure And Pay Contract
Measure And Pay Contract
 
Professional practice-1-presentation
Professional practice-1-presentationProfessional practice-1-presentation
Professional practice-1-presentation
 
Construction Documents
Construction DocumentsConstruction Documents
Construction Documents
 
Construction Management - L1 (1).ppt
Construction Management - L1 (1).pptConstruction Management - L1 (1).ppt
Construction Management - L1 (1).ppt
 
Construction management l1
Construction management   l1Construction management   l1
Construction management l1
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Professional practices (lec 03) by k.iqbal
Professional practices (lec 03) by k.iqbalProfessional practices (lec 03) by k.iqbal
Professional practices (lec 03) by k.iqbal
 
Preparation of boq
Preparation of boqPreparation of boq
Preparation of boq
 
SANPPT
SANPPTSANPPT
SANPPT
 
TOPIC1.pdf
TOPIC1.pdfTOPIC1.pdf
TOPIC1.pdf
 
Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014Quantity surveying drawing FNBE 2014
Quantity surveying drawing FNBE 2014
 
The Design Assist Method of Project Delivery
The Design Assist Method of Project DeliveryThe Design Assist Method of Project Delivery
The Design Assist Method of Project Delivery
 
Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014Affinity institute design assist november 25 2014
Affinity institute design assist november 25 2014
 

Recently uploaded

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 

Classification of contracts

  • 2. Activities in construction project • Engineering – Issues related to process finalization, structural analysis & design, technical issues related to equipment design & selection • Procurement – Procurement of materials , also includes identification of suitable vendors • Construction – This covers construction, installation & test run of a constructed facility before handed to owner
  • 3. Classification • Seperated contracts • Management contracts • Integrated contracts • Discretionary contracts
  • 4. Separated contracts • Lump sum contract • Measurement contract • Item rate • Percentage rate • Cost plus percentage
  • 5. Management contract • Management contract • Construction management contract • Design, management & construction contract • Integrated contract • Design build contract • Turn key contract • Build, operate & transfer contract
  • 6. Discretionary contract • Partnering contract • Joint venture contract
  • 7. Separated • Traditional system & sequential process • Division b/w design & construction responsibility • Design - project briefing, outlining proposal, detail design, etc. • Delay - preparation & approval of drawings, mistakes in design documentation • Lengthy tendering period & suitable for small to medium sized projects where time is not critical
  • 8. • Major drawbacks – Time consuming aspects of development process – Effect of cost uncertainty – Effect of buildability – Fragmentation of organizational interfaces
  • 9. Lump sum contract • Drawings & details provided by client & contractor quotes single lump sum figure which is the total contact value of work • Total sum based on analysis of rates & estimated quantities • Advantage - client know exact amount of funds required to complete structure
  • 10. • Successful lumpsum contract – Quantities of items Involved are calculated at tendering stage itself – Nature of work done must be reasonably measurable – Contractor must be give All the facilities to which he is contractually entitled • Revision of amount in Case of change in design by client
  • 11. Measurable contract • Payment made according to actual work varied out, which is determined by physical measurements
  • 12. Item rate contract • The contractor agrees to carry out a unit quantity of particular work (cm3,m2) for particular sum of money • In this tender document consists of detailed BOQ , where estimated quantity of work for each item involved in particular work are listed along with detailed description • Total contract value - multiply total quantity with quoted item rate and add cost of all items
  • 13. • Some items are not covered in BOQ but essential for completing job, in such cases rates are given on basis of labor, material, equipment etc S.no Item Measurement unit Quantity Rate Amount 1 Cement Kgs 50 280 14000 2 Steel Ton 2 42000 84000
  • 14. Percentage rate contract • Tender document contains scheduled rates for each work in addition to detailed estimate for execution of work • Contractor works out his rates for items i usual manner& arrives at total price which is converted to total percentage by which amount differs • Adopted by government departments & large organizations
  • 15. • Contractor amount -- Z • Z > W , the % rate = (z-w)/w *100 above W • Z < W , the % rate =(w-z)/w*100 below W S.no Item Measure ment unit Quantity Rate Amount 1 Cement Kgs 50 280 14000 2 Steel Ton 2 42000 84000 W 14000+84000
  • 16. Cost plus percentage • Client agrees to pay contractor a certain % of actual cost incurred by contractor while completing a job in addition to cost itself. • Tenderer only quotes his percentage • Usually taken up when time is not available to make estimate and workout details of items involved • Suitable for small jobs.
  • 17. Management contract • Managing contractor is appointed and he deals with number of small contractors • Client deals with only contractor and designer • Contractor provides planning, management & coordination services to client
  • 18. • Responsibilities – Preparing overall construction schedule – Work package schedule – Coordinating with designer – Assistance in subcontractors selection – Coordinating among different subcontractors
  • 19. Construction management contract • Construction manager appointed by client to provide planning, management & coordination • Owner appoints designer & contractors • Role of construction manager is to coordinate among different subcontractors & ensuring timely completion of project within budget cost according to specifications
  • 20. • Some responsibilities are – Advising the designer – Advising on making suitable work package – Assisting in procurement – Managing bidding process
  • 21. Design, management & construction contract • Client appoints single contractor to take care of design & construction • Basic design concepts may be provided by client himself or through an independent agency • After basic concepts client calls for tender and selects appropriate agency for designing , management & construction services
  • 22. Integrated contract • Design- build – In this contractor takes the responsibilities of both design & construction based on basic plans drawn up by the client – This avoids conflict b/w designer & contractor – Often adopted when client has no in-house design with him – This method Reduces the cost , develops the technical power in contractor & reduces disputes
  • 23. The turn-key contract • Responsibilities of all activities are taken up by contracting agency • The owner simply wants to “turn the key” at completion to take over the facility • All activities related to surveying , drawing specifications , design , project planning , construction & test operation are given to one large organisation
  • 24. • They are useful in projects involving combination of civil, electrical, mechanical, chemical & mining engineering • Mostly seen in petrochemical plants & nuclear power stations • STEPS • In a project client first prepares documents regarding requirements of facilities to be constructed • Later he selects the best proposal submitted by multiple bidders