Treatment plant capacity – 180,000 m3/day; Construction of Raw Water Intake pumping station (4 pumps with each pump capacity 737 l/s), Flocculation and Clarification Units (total V=12500m3), Gravity Filters (total V=7000m3), Contact/Clear Water Tanks (totalV=10000m3), Treated Water PS, Sludge treatment Units, Chemical, Chlorine and Administrative buildings. Total in-situ reinforced concrete quantity – 21000m3;