District Roads Management System version 2
DROMAS 2
Presentation to Stakeholder Meeting PMORALG August 2015
CARDNO-IT TRANSPORT/arnold
DROMAS 2 WHAT DOES IT DO?
• Defines and records the District Road,
bridge and culvert inventory in each
district.
• Shows roads on Map
• Records road condition and tracks
changes year by year.
• Records Traffic Data and tracks changes
year by year.
• Allows Engineer to enter Annual work
plan, agreed in Performance agreement.
CARDNO-IT TRANSPORT/arnold
DROMAS 2 WHAT DOES IT DO?
• Allows engineer to package work into contracts (using
MOW/TANROADS standard work items) and records contract details.
• Allows Engineer to enter contract awarded prices and details
• Allows engineer to Manage contracts and report progress. (can
output to HMS or MIS)
• Produces interim contract payment certificates
• Produces monthly and quarterly reports at district , region and
national level
• Shows contract progress on Map.
CARDNO-IT TRANSPORT/arnold
CARDNO-IT TRANSPORT/arnold
Admin Menu: Users must login, select Region, select District/LGA and Fiscal year,.
Passwords will be available to the DEs, RE, PMORALG HQ, and RFB. (different
permissions for different users)
Note: Different DC/TC/MC = Different user rights.
CARDNO-IT TRANSPORT/arnold
'Load Geometry' to load geometry for a selected road editing is required to prepare clean shapefile in GIS
from the GPS track. Engineer will use QGIS programme to do this and also add a column for the road code
and enter the proper road code number. The geometry should be a clean shapefile in single part.
Road Network
The road network menu gives the engineer ability to add roads to network and adjust details.
Geometry (shape line) of each road is also in this tool.
CARDNO-IT TRANSPORT/arnold
ARMP (Annual Road Maintenance Planning)
The annual maintenance plan, entered by the engineer when Performance agreement is signed.
includes the rates, systems for routine, recurrent, periodic, specific, bridge and emergency
maintenance.
Once entered view of summary of the annual maintenance works can be seen as list and on map.
CARDNO-IT TRANSPORT/arnold
ARMP-Annual Road Maintenance Program
• Armp Rates-Armp Budgetary Rates-An Engineer Input Rates with
relation to the respective rates for all activities.
• Routine-Select Road-Here you select a road(with road code) and
defining its work description with relation to the length covered of
that specific activity.(Fill in the spaces rounded Blue colour)
• Routine-Prepare Details-Here you prepare details of the activities and
we keep the quantities of the details Fill in the spaces rounded Blue
colour)
CARDNO-IT TRANSPORT/arnold
Summary Plan can be viewed at Regional and national level for overall picture
CARDNO-IT TRANSPORT/arnold
Contract Management
Engineer packages the work into contracts and enters details in DROMAS.
Details of the contract, BOQ, rates and contractor details are shown in the DROMAS and can be
reported.
CARDNO-IT TRANSPORT/arnold
QPR (Quarterly Progress Report);
Engineer puts in progress of work monthly and DROMAS automatically calculates payment due.
DROMAS 2 Then shows the Quarterly Report at council and regional level. These reports can be
viewed live by PMORALG HQ and RFB (view access only).
CARDNO-IT TRANSPORT/arnold
Cost System; Allows the Engineering to work out unit rates from basic costs, and adding
appropriate overheads. DROMAS 2 will track these unit rates across the regions.
CARDNO-IT TRANSPORT/arnold
• Quarterly report for whole country
CARDNO-IT TRANSPORT/arnold
DROMAS Tracks interim payment certificates and quantities from
contract paid for. As long as the Engineer has entered the figures into
the reporting system.
CARDNO-IT TRANSPORT/arnold
DROMAS Map,
DROMAS 2 is a GIS based system. That means all data stored is geo-referenced and can be shown
on the map. The road inventory once entered by the engineer shows on the map. The work plan in
the performance agreement APA shows on the map. Eventually as Engineer enters monthly progress
of contracts it will show on the map.
Map can be viewed with plain background or with, Google Physical, Google Streets, or google
satelite
CARDNO-IT TRANSPORT/arnold
CARDNO-IT TRANSPORT/arnold
CARDNO-IT TRANSPORT/arnold
CARDNO-IT TRANSPORT/arnold
Infrastructure Development Division:
Director’s Desk 2018
CARDNO-IT TRANSPORT/arnold
Better Clear Roads Ahead
Thank You
CARDNO-IT TRANSPORT/arnold

More Related Content

Similar to Dromas 2 presentation v4

CAV Smart Work Zones
CAV Smart Work ZonesCAV Smart Work Zones
CAV Smart Work ZonesAcey Roberts
 
IRJET- Review on Recent Traffic Signs in Lane Markings
IRJET- Review on Recent Traffic Signs in Lane MarkingsIRJET- Review on Recent Traffic Signs in Lane Markings
IRJET- Review on Recent Traffic Signs in Lane MarkingsIRJET Journal
 
DMUG 2016 - Michel Vedrenne, Ricardo Energy & Environment
DMUG 2016 - Michel Vedrenne, Ricardo Energy & EnvironmentDMUG 2016 - Michel Vedrenne, Ricardo Energy & Environment
DMUG 2016 - Michel Vedrenne, Ricardo Energy & EnvironmentIES / IAQM
 
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendix
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendixRoadroid user guide version 2.3.2- pro 0.9, incl calibration appendix
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendixLars Forslöf
 
Tilos for linear project
Tilos for linear projectTilos for linear project
Tilos for linear projectThanh Hoang Lam
 
Maximizing Conduit Manager For Electric Distribution
Maximizing Conduit Manager For Electric DistributionMaximizing Conduit Manager For Electric Distribution
Maximizing Conduit Manager For Electric DistributionSSP Innovations
 
Geometric pavement model for computer-aided design of pavement maintenance ac...
Geometric pavement model for computer-aided design of pavement maintenance ac...Geometric pavement model for computer-aided design of pavement maintenance ac...
Geometric pavement model for computer-aided design of pavement maintenance ac...Johan Granlund
 
Csr 2018-19-page-no-1-to-295
Csr 2018-19-page-no-1-to-295Csr 2018-19-page-no-1-to-295
Csr 2018-19-page-no-1-to-295Ramesh Meti
 
Diagrama electrico volvo c30 2008
Diagrama electrico volvo c30 2008Diagrama electrico volvo c30 2008
Diagrama electrico volvo c30 2008VicTanchez
 
Traffic Volume Study And Congestion Solution Using VisSim Software
Traffic Volume Study And Congestion Solution Using VisSim SoftwareTraffic Volume Study And Congestion Solution Using VisSim Software
Traffic Volume Study And Congestion Solution Using VisSim SoftwareIRJET Journal
 
Automatic Fetching of Vehicle details using ANPR Camera
Automatic Fetching of Vehicle details using ANPR CameraAutomatic Fetching of Vehicle details using ANPR Camera
Automatic Fetching of Vehicle details using ANPR CameraIRJET Journal
 
toyota-Challenges towards New Software Platform for Automated Driving.pdf
toyota-Challenges towards New Software Platform for Automated Driving.pdftoyota-Challenges towards New Software Platform for Automated Driving.pdf
toyota-Challenges towards New Software Platform for Automated Driving.pdfxmumiao
 
CHALLANGES IN URBAN WATER SUPPLY PRESENTATION 15-09-2017.ppt
CHALLANGES IN URBAN WATER SUPPLY PRESENTATION 15-09-2017.pptCHALLANGES IN URBAN WATER SUPPLY PRESENTATION 15-09-2017.ppt
CHALLANGES IN URBAN WATER SUPPLY PRESENTATION 15-09-2017.pptRajeshGangwal
 
TRAFFIC VOLUME STUDIES
TRAFFIC VOLUME STUDIESTRAFFIC VOLUME STUDIES
TRAFFIC VOLUME STUDIEStp jayamohan
 

Similar to Dromas 2 presentation v4 (20)

CAV Smart Work Zones
CAV Smart Work ZonesCAV Smart Work Zones
CAV Smart Work Zones
 
Bransys GPS
Bransys GPSBransys GPS
Bransys GPS
 
IRJET- Review on Recent Traffic Signs in Lane Markings
IRJET- Review on Recent Traffic Signs in Lane MarkingsIRJET- Review on Recent Traffic Signs in Lane Markings
IRJET- Review on Recent Traffic Signs in Lane Markings
 
Gdmp model workshop 5 - structure of tim
Gdmp model workshop   5 - structure of timGdmp model workshop   5 - structure of tim
Gdmp model workshop 5 - structure of tim
 
DMUG 2016 - Michel Vedrenne, Ricardo Energy & Environment
DMUG 2016 - Michel Vedrenne, Ricardo Energy & EnvironmentDMUG 2016 - Michel Vedrenne, Ricardo Energy & Environment
DMUG 2016 - Michel Vedrenne, Ricardo Energy & Environment
 
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendix
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendixRoadroid user guide version 2.3.2- pro 0.9, incl calibration appendix
Roadroid user guide version 2.3.2- pro 0.9, incl calibration appendix
 
Building ssr 2013-14
Building ssr 2013-14Building ssr 2013-14
Building ssr 2013-14
 
Tilos for linear project
Tilos for linear projectTilos for linear project
Tilos for linear project
 
Maximizing Conduit Manager For Electric Distribution
Maximizing Conduit Manager For Electric DistributionMaximizing Conduit Manager For Electric Distribution
Maximizing Conduit Manager For Electric Distribution
 
Geometric pavement model for computer-aided design of pavement maintenance ac...
Geometric pavement model for computer-aided design of pavement maintenance ac...Geometric pavement model for computer-aided design of pavement maintenance ac...
Geometric pavement model for computer-aided design of pavement maintenance ac...
 
Gis for cgd
Gis for cgdGis for cgd
Gis for cgd
 
Csr 2018-19-page-no-1-to-295
Csr 2018-19-page-no-1-to-295Csr 2018-19-page-no-1-to-295
Csr 2018-19-page-no-1-to-295
 
Diagrama electrico volvo c30 2008
Diagrama electrico volvo c30 2008Diagrama electrico volvo c30 2008
Diagrama electrico volvo c30 2008
 
Traffic Volume Study And Congestion Solution Using VisSim Software
Traffic Volume Study And Congestion Solution Using VisSim SoftwareTraffic Volume Study And Congestion Solution Using VisSim Software
Traffic Volume Study And Congestion Solution Using VisSim Software
 
CSBU
CSBUCSBU
CSBU
 
Automatic Fetching of Vehicle details using ANPR Camera
Automatic Fetching of Vehicle details using ANPR CameraAutomatic Fetching of Vehicle details using ANPR Camera
Automatic Fetching of Vehicle details using ANPR Camera
 
toyota-Challenges towards New Software Platform for Automated Driving.pdf
toyota-Challenges towards New Software Platform for Automated Driving.pdftoyota-Challenges towards New Software Platform for Automated Driving.pdf
toyota-Challenges towards New Software Platform for Automated Driving.pdf
 
CHALLANGES IN URBAN WATER SUPPLY PRESENTATION 15-09-2017.ppt
CHALLANGES IN URBAN WATER SUPPLY PRESENTATION 15-09-2017.pptCHALLANGES IN URBAN WATER SUPPLY PRESENTATION 15-09-2017.ppt
CHALLANGES IN URBAN WATER SUPPLY PRESENTATION 15-09-2017.ppt
 
TRAFFIC VOLUME STUDIES
TRAFFIC VOLUME STUDIESTRAFFIC VOLUME STUDIES
TRAFFIC VOLUME STUDIES
 
VMS
VMSVMS
VMS
 

Recently uploaded

The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...Roi Lipman
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Lovely Professional University
 
Quiz application system project report..pdf
Quiz application system project report..pdfQuiz application system project report..pdf
Quiz application system project report..pdfKamal Acharya
 
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDrGurudutt
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectRased Khan
 
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5T.D. Shashikala
 
Artificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian ReasoningArtificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian Reasoninghotman30312
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AISheetal Jain
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsMathias Magdowski
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringC Sai Kiran
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfJNTUA
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2T.D. Shashikala
 
E-Commerce Shopping using MERN Stack where different modules are present
E-Commerce Shopping using MERN Stack where different modules are presentE-Commerce Shopping using MERN Stack where different modules are present
E-Commerce Shopping using MERN Stack where different modules are presentjatinraor66
 
Electrical shop management system project report.pdf
Electrical shop management system project report.pdfElectrical shop management system project report.pdf
Electrical shop management system project report.pdfKamal Acharya
 
solid state electronics ktu module 5 slides
solid state electronics ktu module 5 slidessolid state electronics ktu module 5 slides
solid state electronics ktu module 5 slidesARUN AV
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdfKamal Acharya
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edgePaco Orozco
 
Dairy management system project report..pdf
Dairy management system project report..pdfDairy management system project report..pdf
Dairy management system project report..pdfKamal Acharya
 
Attraction and Repulsion type Moving Iron Instruments.pptx
Attraction and Repulsion type Moving Iron Instruments.pptxAttraction and Repulsion type Moving Iron Instruments.pptx
Attraction and Repulsion type Moving Iron Instruments.pptxkarthikeyanS725446
 

Recently uploaded (20)

The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
 
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
Activity Planning: Objectives, Project Schedule, Network Planning Model. Time...
 
Quiz application system project report..pdf
Quiz application system project report..pdfQuiz application system project report..pdf
Quiz application system project report..pdf
 
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdfDR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
DR PROF ING GURUDUTT SAHNI WIKIPEDIA.pdf
 
Arduino based vehicle speed tracker project
Arduino based vehicle speed tracker projectArduino based vehicle speed tracker project
Arduino based vehicle speed tracker project
 
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
RM&IPR M5 notes.pdfResearch Methodolgy & Intellectual Property Rights Series 5
 
Artificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian ReasoningArtificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian Reasoning
 
Introduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AIIntroduction to Artificial Intelligence and History of AI
Introduction to Artificial Intelligence and History of AI
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical EngineeringIntroduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
Introduction to Machine Learning Unit-4 Notes for II-II Mechanical Engineering
 
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdfRESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
RESORT MANAGEMENT AND RESERVATION SYSTEM PROJECT REPORT.pdf
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2
 
E-Commerce Shopping using MERN Stack where different modules are present
E-Commerce Shopping using MERN Stack where different modules are presentE-Commerce Shopping using MERN Stack where different modules are present
E-Commerce Shopping using MERN Stack where different modules are present
 
Electrical shop management system project report.pdf
Electrical shop management system project report.pdfElectrical shop management system project report.pdf
Electrical shop management system project report.pdf
 
solid state electronics ktu module 5 slides
solid state electronics ktu module 5 slidessolid state electronics ktu module 5 slides
solid state electronics ktu module 5 slides
 
School management system project report.pdf
School management system project report.pdfSchool management system project report.pdf
School management system project report.pdf
 
2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge2024 DevOps Pro Europe - Growing at the edge
2024 DevOps Pro Europe - Growing at the edge
 
Dairy management system project report..pdf
Dairy management system project report..pdfDairy management system project report..pdf
Dairy management system project report..pdf
 
Attraction and Repulsion type Moving Iron Instruments.pptx
Attraction and Repulsion type Moving Iron Instruments.pptxAttraction and Repulsion type Moving Iron Instruments.pptx
Attraction and Repulsion type Moving Iron Instruments.pptx
 

Dromas 2 presentation v4

  • 1. District Roads Management System version 2 DROMAS 2 Presentation to Stakeholder Meeting PMORALG August 2015 CARDNO-IT TRANSPORT/arnold
  • 2. DROMAS 2 WHAT DOES IT DO? • Defines and records the District Road, bridge and culvert inventory in each district. • Shows roads on Map • Records road condition and tracks changes year by year. • Records Traffic Data and tracks changes year by year. • Allows Engineer to enter Annual work plan, agreed in Performance agreement. CARDNO-IT TRANSPORT/arnold
  • 3. DROMAS 2 WHAT DOES IT DO? • Allows engineer to package work into contracts (using MOW/TANROADS standard work items) and records contract details. • Allows Engineer to enter contract awarded prices and details • Allows engineer to Manage contracts and report progress. (can output to HMS or MIS) • Produces interim contract payment certificates • Produces monthly and quarterly reports at district , region and national level • Shows contract progress on Map. CARDNO-IT TRANSPORT/arnold
  • 5. Admin Menu: Users must login, select Region, select District/LGA and Fiscal year,. Passwords will be available to the DEs, RE, PMORALG HQ, and RFB. (different permissions for different users) Note: Different DC/TC/MC = Different user rights. CARDNO-IT TRANSPORT/arnold
  • 6. 'Load Geometry' to load geometry for a selected road editing is required to prepare clean shapefile in GIS from the GPS track. Engineer will use QGIS programme to do this and also add a column for the road code and enter the proper road code number. The geometry should be a clean shapefile in single part. Road Network The road network menu gives the engineer ability to add roads to network and adjust details. Geometry (shape line) of each road is also in this tool. CARDNO-IT TRANSPORT/arnold
  • 7. ARMP (Annual Road Maintenance Planning) The annual maintenance plan, entered by the engineer when Performance agreement is signed. includes the rates, systems for routine, recurrent, periodic, specific, bridge and emergency maintenance. Once entered view of summary of the annual maintenance works can be seen as list and on map. CARDNO-IT TRANSPORT/arnold
  • 8. ARMP-Annual Road Maintenance Program • Armp Rates-Armp Budgetary Rates-An Engineer Input Rates with relation to the respective rates for all activities. • Routine-Select Road-Here you select a road(with road code) and defining its work description with relation to the length covered of that specific activity.(Fill in the spaces rounded Blue colour) • Routine-Prepare Details-Here you prepare details of the activities and we keep the quantities of the details Fill in the spaces rounded Blue colour) CARDNO-IT TRANSPORT/arnold
  • 9. Summary Plan can be viewed at Regional and national level for overall picture CARDNO-IT TRANSPORT/arnold
  • 10. Contract Management Engineer packages the work into contracts and enters details in DROMAS. Details of the contract, BOQ, rates and contractor details are shown in the DROMAS and can be reported. CARDNO-IT TRANSPORT/arnold
  • 11. QPR (Quarterly Progress Report); Engineer puts in progress of work monthly and DROMAS automatically calculates payment due. DROMAS 2 Then shows the Quarterly Report at council and regional level. These reports can be viewed live by PMORALG HQ and RFB (view access only). CARDNO-IT TRANSPORT/arnold
  • 12. Cost System; Allows the Engineering to work out unit rates from basic costs, and adding appropriate overheads. DROMAS 2 will track these unit rates across the regions. CARDNO-IT TRANSPORT/arnold
  • 13. • Quarterly report for whole country CARDNO-IT TRANSPORT/arnold
  • 14. DROMAS Tracks interim payment certificates and quantities from contract paid for. As long as the Engineer has entered the figures into the reporting system. CARDNO-IT TRANSPORT/arnold
  • 15. DROMAS Map, DROMAS 2 is a GIS based system. That means all data stored is geo-referenced and can be shown on the map. The road inventory once entered by the engineer shows on the map. The work plan in the performance agreement APA shows on the map. Eventually as Engineer enters monthly progress of contracts it will show on the map. Map can be viewed with plain background or with, Google Physical, Google Streets, or google satelite CARDNO-IT TRANSPORT/arnold
  • 19. Infrastructure Development Division: Director’s Desk 2018 CARDNO-IT TRANSPORT/arnold
  • 20. Better Clear Roads Ahead Thank You CARDNO-IT TRANSPORT/arnold