Chain surveying
Chain Surveying
• Chain (Tape) surveying is the simplest form of detail surveying.
• In this method the lengths of lines marked on the field are measured,
while the details are measured by offsets from these line.
• Chain surveying is the type of surveying in which only linear
measurements are taken in the field.
• This type of surveying is done for surveying of small extent to
describe the boundaries of plots of land and to locate the existing
feature on them.
• It is the method of surveying in which the area is divided into
network of triangles and the sides of the various triangles are
measured directly in the field with a chain or a tape and no angular
measurements are taken.
Principles of Chain Surveying
• The principle of chain surveying is to divide the area into a number
of triangles .
• As a triangle is the only simple plane geometrical figure which can
be plotted from the length of the three sides even if the angles are
not known.
• A network of triangles is preferred to chain surveying.
• Triangulation is the principle of chain surveying.
• If the area to be surveyed is triangle in shape and if the lengths and
sequence of its three sides are recorded, the plan of the area can be
easily drawn.
Principles of Chain Surveying
Principles of Chain Surveying
FIELD WORK & OFFICE WORK
Reconnaissance-
The preliminary inspection of the area to be surveyed is called reconnaissance.
Marking stations-
Stations are marked with ranging rod, or wooden peg, driving a nail or spikes if hard surface, or embedding stone
with a cross mark
Reference sketches-
After marking the station should be referenced i.e. located by measurement called ties taken from 3 permanent
points which are easily identified such as corner of building.
Running survey line-
After the preliminary work, chaining is started from base line and carried throughout all the line of the framework
continuously. So chain is laid and kept lying, offset are taken to locate the nearby details. Make ranging wherever
necessary.
Suitability of chain surveying:
Ground surface is more or less level.
Area is small.
Small-scale map is required to prepare.
Formation of well conditioned triangle is easy.
Chain surveying is not recommended when:
Area is crowded with many details.
Area consists of too many undulations.
Area is very large.
Formation of well conditioned triangle is not easy.
Well conditioned triangle, ill conditioned
triangle and ideal triangle.
• A triangle is said to be well conditioned triangle when no
angle in it is neither less than 30 nor greater than 120.
• If in a triangle an angle is less than 30 or greater than
120 is called ill conditioned triangle.
• An equilateral triangle having each angle of 60 is an ideal
triangle.
Well conditioned triangle, ill conditioned
triangle and ideal triangle.
Ranging and Chaining
Ranging [Direct and Indirect]
Reciprocal Ranging
Setting Perpendiculars
Traversing
Plotting
SCALE
• Scale is a fixed ratio that every distance on the plan bears with corresponding distance on the ground.
• One centimetre on the plan represents some whole number of the metres on the ground.
1cm = 10m [This type of scale is called engineering scale].
• 1 unit of length on the plan represents some number of same units of length on the ground.
i.e. 1/1000 etc.
• This ratio of map distance to the corresponding ground distance independent of units of measurement is
called Representative Factor (RF).
• For example,
1cm = 50m
RF = 1/(50×100) = 1/5000
• Above two types of scales are also known as numerical scales.

More Related Content

What's hot

levelling and contouring
 levelling and  contouring levelling and  contouring
levelling and contouringAbdul Majid
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levellingParimal Jha
 
surveying- lecture notes for engineers
surveying- lecture notes for engineerssurveying- lecture notes for engineers
surveying- lecture notes for engineersmusadoto
 
Surveying Complete Notes of Unit 1.pptx
Surveying Complete Notes of Unit 1.pptxSurveying Complete Notes of Unit 1.pptx
Surveying Complete Notes of Unit 1.pptxDenish Jangid
 
Balancing of traverse
Balancing of traverseBalancing of traverse
Balancing of traverseAditya Mistry
 
Tacheometric surveying ppt
Tacheometric surveying pptTacheometric surveying ppt
Tacheometric surveying pptNaufil Sayyad
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in SurveyingPhurba Tamang
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & RangingRakesh Verma
 
Surveying part 1 unit 1 and 2
Surveying part 1 unit 1 and 2Surveying part 1 unit 1 and 2
Surveying part 1 unit 1 and 2Warish Khan
 
Introduction to Surveying
Introduction to SurveyingIntroduction to Surveying
Introduction to SurveyingPhurba Tamang
 
Detailed analysis of plane table surveying
Detailed analysis of plane table surveyingDetailed analysis of plane table surveying
Detailed analysis of plane table surveyingsumitvikram
 
Chain surveying
Chain surveyingChain surveying
Chain surveyingJNTUK
 

What's hot (20)

surveying and geomatics
surveying and geomaticssurveying and geomatics
surveying and geomatics
 
levelling and contouring
 levelling and  contouring levelling and  contouring
levelling and contouring
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
 
surveying- lecture notes for engineers
surveying- lecture notes for engineerssurveying- lecture notes for engineers
surveying- lecture notes for engineers
 
Surveying Complete Notes of Unit 1.pptx
Surveying Complete Notes of Unit 1.pptxSurveying Complete Notes of Unit 1.pptx
Surveying Complete Notes of Unit 1.pptx
 
Balancing of traverse
Balancing of traverseBalancing of traverse
Balancing of traverse
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Tacheometric surveying ppt
Tacheometric surveying pptTacheometric surveying ppt
Tacheometric surveying ppt
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
SURVEYING UNIT-1 31033
SURVEYING UNIT-1 31033SURVEYING UNIT-1 31033
SURVEYING UNIT-1 31033
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
 
Surveying part 1 unit 1 and 2
Surveying part 1 unit 1 and 2Surveying part 1 unit 1 and 2
Surveying part 1 unit 1 and 2
 
Levelling
LevellingLevelling
Levelling
 
Introduction to Surveying
Introduction to SurveyingIntroduction to Surveying
Introduction to Surveying
 
Method Of Chaining On Sloping Ground
Method Of Chaining On Sloping GroundMethod Of Chaining On Sloping Ground
Method Of Chaining On Sloping Ground
 
2.2 linear measurement
2.2 linear measurement2.2 linear measurement
2.2 linear measurement
 
Curves
CurvesCurves
Curves
 
Detailed analysis of plane table surveying
Detailed analysis of plane table surveyingDetailed analysis of plane table surveying
Detailed analysis of plane table surveying
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
 
Compass Surveying
Compass Surveying Compass Surveying
Compass Surveying
 

Similar to Module-I SURVEYING-I [BTCVC304]

Chain Surveying 2020.ppt
 Chain Surveying 2020.ppt Chain Surveying 2020.ppt
Chain Surveying 2020.pptAsadKhan606012
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYINGDEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYINGKamal B
 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aRai University
 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aRai University
 
1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptxJanak82
 
Triangulation and Trilateration
Triangulation and TrilaterationTriangulation and Trilateration
Triangulation and TrilaterationPramesh Hada
 
surveyf tururu ururtu65 6ru5uu56 686585 868
surveyf tururu ururtu65 6ru5uu56 686585 868surveyf tururu ururtu65 6ru5uu56 686585 868
surveyf tururu ururtu65 6ru5uu56 686585 868RahulSinghParihar18
 
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.ppt
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.pptChain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.ppt
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.pptImashaSJayathissa
 
TECHNIQUES IN BASIC SURVEYING.ppt
TECHNIQUES IN BASIC SURVEYING.pptTECHNIQUES IN BASIC SURVEYING.ppt
TECHNIQUES IN BASIC SURVEYING.pptArisamTom
 
Classification of Surveying.pptx
Classification of Surveying.pptxClassification of Surveying.pptx
Classification of Surveying.pptxivargarud
 
lecture3.pptx
lecture3.pptxlecture3.pptx
lecture3.pptxivargarud
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Gokul Saud
 
contouring Surveying of Civil Engineering.pptx
contouring Surveying of Civil Engineering.pptxcontouring Surveying of Civil Engineering.pptx
contouring Surveying of Civil Engineering.pptxramjan14
 

Similar to Module-I SURVEYING-I [BTCVC304] (20)

Chain Surveying 2020.ppt
 Chain Surveying 2020.ppt Chain Surveying 2020.ppt
Chain Surveying 2020.ppt
 
30838893 chain-survey
30838893 chain-survey30838893 chain-survey
30838893 chain-survey
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
 
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYINGDEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
 
Contouring
ContouringContouring
Contouring
 
Triangulation
Triangulation Triangulation
Triangulation
 
Basic Civil and Mechanical Engineering
Basic Civil and Mechanical EngineeringBasic Civil and Mechanical Engineering
Basic Civil and Mechanical Engineering
 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying a
 
Diploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying aDiploma(civil) sem i boce_unit 2_ elementary surveying a
Diploma(civil) sem i boce_unit 2_ elementary surveying a
 
1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx
 
Triangulation and Trilateration
Triangulation and TrilaterationTriangulation and Trilateration
Triangulation and Trilateration
 
surveyf tururu ururtu65 6ru5uu56 686585 868
surveyf tururu ururtu65 6ru5uu56 686585 868surveyf tururu ururtu65 6ru5uu56 686585 868
surveyf tururu ururtu65 6ru5uu56 686585 868
 
1. Intro to Surveying.pdf
1. Intro to Surveying.pdf1. Intro to Surveying.pdf
1. Intro to Surveying.pdf
 
Surveying
Surveying Surveying
Surveying
 
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.ppt
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.pptChain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.ppt
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.ppt
 
TECHNIQUES IN BASIC SURVEYING.ppt
TECHNIQUES IN BASIC SURVEYING.pptTECHNIQUES IN BASIC SURVEYING.ppt
TECHNIQUES IN BASIC SURVEYING.ppt
 
Classification of Surveying.pptx
Classification of Surveying.pptxClassification of Surveying.pptx
Classification of Surveying.pptx
 
lecture3.pptx
lecture3.pptxlecture3.pptx
lecture3.pptx
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...
 
contouring Surveying of Civil Engineering.pptx
contouring Surveying of Civil Engineering.pptxcontouring Surveying of Civil Engineering.pptx
contouring Surveying of Civil Engineering.pptx
 

More from Dr. BASWESHWAR JIRWANKAR

MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606
MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606
MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606Dr. BASWESHWAR JIRWANKAR
 
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606Dr. BASWESHWAR JIRWANKAR
 
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702Dr. BASWESHWAR JIRWANKAR
 
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702Dr. BASWESHWAR JIRWANKAR
 
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702Dr. BASWESHWAR JIRWANKAR
 
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702Dr. BASWESHWAR JIRWANKAR
 
MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702Dr. BASWESHWAR JIRWANKAR
 
MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]
MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]
MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]Dr. BASWESHWAR JIRWANKAR
 

More from Dr. BASWESHWAR JIRWANKAR (20)

M3_IE_D&HE.pdf
M3_IE_D&HE.pdfM3_IE_D&HE.pdf
M3_IE_D&HE.pdf
 
TRANSPORTATION_ENGINEERING_BRIDGING.pdf
TRANSPORTATION_ENGINEERING_BRIDGING.pdfTRANSPORTATION_ENGINEERING_BRIDGING.pdf
TRANSPORTATION_ENGINEERING_BRIDGING.pdf
 
TRANSPORTATION_ENGINEERING_M5.pdf
TRANSPORTATION_ENGINEERING_M5.pdfTRANSPORTATION_ENGINEERING_M5.pdf
TRANSPORTATION_ENGINEERING_M5.pdf
 
TRANSPORTATION_ENGINEERING_M4.pdf
TRANSPORTATION_ENGINEERING_M4.pdfTRANSPORTATION_ENGINEERING_M4.pdf
TRANSPORTATION_ENGINEERING_M4.pdf
 
TRANSPORTATION_ENGINEERING_M3.pdf
TRANSPORTATION_ENGINEERING_M3.pdfTRANSPORTATION_ENGINEERING_M3.pdf
TRANSPORTATION_ENGINEERING_M3.pdf
 
TRANSPORTATION_ENGINEERING_M2.pdf
TRANSPORTATION_ENGINEERING_M2.pdfTRANSPORTATION_ENGINEERING_M2.pdf
TRANSPORTATION_ENGINEERING_M2.pdf
 
TRANSPORTATION_ENGINEERING_M1.pdf
TRANSPORTATION_ENGINEERING_M1.pdfTRANSPORTATION_ENGINEERING_M1.pdf
TRANSPORTATION_ENGINEERING_M1.pdf
 
MODULE 5 EG.pdf
MODULE 5 EG.pdfMODULE 5 EG.pdf
MODULE 5 EG.pdf
 
MODULE-4 EG.pdf
MODULE-4 EG.pdfMODULE-4 EG.pdf
MODULE-4 EG.pdf
 
MODULE-3 EG.pdf
MODULE-3 EG.pdfMODULE-3 EG.pdf
MODULE-3 EG.pdf
 
MODULE-I EG.pdf
MODULE-I EG.pdfMODULE-I EG.pdf
MODULE-I EG.pdf
 
MODULE-II EG
MODULE-II EGMODULE-II EG
MODULE-II EG
 
MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606
MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606
MODULE-VI BUILDING PLANNING AND DESIGN BTCVC606
 
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
MODULE-III BUILDING PLANNING AND DESIGN BTCVC606
 
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
 
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-III INFRASTRUCTURE ENGINEERING BTCVC702
 
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-II INFRASTRUCTURE ENGINEERING BTCVC702
 
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-V INFRASTRUCTURE ENGINEERING BTCVC702
 
MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-I INFRASTRUCTURE ENGINEERING BTCVC702
 
MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]
MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]
MODULE-II BUILDING PLANNING AND DESIGN [BTCVC606]
 

Recently uploaded

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 

Recently uploaded (20)

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 

Module-I SURVEYING-I [BTCVC304]

  • 2. Chain Surveying • Chain (Tape) surveying is the simplest form of detail surveying. • In this method the lengths of lines marked on the field are measured, while the details are measured by offsets from these line. • Chain surveying is the type of surveying in which only linear measurements are taken in the field. • This type of surveying is done for surveying of small extent to describe the boundaries of plots of land and to locate the existing feature on them. • It is the method of surveying in which the area is divided into network of triangles and the sides of the various triangles are measured directly in the field with a chain or a tape and no angular measurements are taken.
  • 3. Principles of Chain Surveying • The principle of chain surveying is to divide the area into a number of triangles . • As a triangle is the only simple plane geometrical figure which can be plotted from the length of the three sides even if the angles are not known. • A network of triangles is preferred to chain surveying. • Triangulation is the principle of chain surveying. • If the area to be surveyed is triangle in shape and if the lengths and sequence of its three sides are recorded, the plan of the area can be easily drawn.
  • 6. FIELD WORK & OFFICE WORK Reconnaissance- The preliminary inspection of the area to be surveyed is called reconnaissance. Marking stations- Stations are marked with ranging rod, or wooden peg, driving a nail or spikes if hard surface, or embedding stone with a cross mark Reference sketches- After marking the station should be referenced i.e. located by measurement called ties taken from 3 permanent points which are easily identified such as corner of building. Running survey line- After the preliminary work, chaining is started from base line and carried throughout all the line of the framework continuously. So chain is laid and kept lying, offset are taken to locate the nearby details. Make ranging wherever necessary.
  • 7. Suitability of chain surveying: Ground surface is more or less level. Area is small. Small-scale map is required to prepare. Formation of well conditioned triangle is easy. Chain surveying is not recommended when: Area is crowded with many details. Area consists of too many undulations. Area is very large. Formation of well conditioned triangle is not easy.
  • 8. Well conditioned triangle, ill conditioned triangle and ideal triangle. • A triangle is said to be well conditioned triangle when no angle in it is neither less than 30 nor greater than 120. • If in a triangle an angle is less than 30 or greater than 120 is called ill conditioned triangle. • An equilateral triangle having each angle of 60 is an ideal triangle.
  • 9. Well conditioned triangle, ill conditioned triangle and ideal triangle.
  • 11. Ranging [Direct and Indirect]
  • 16. SCALE • Scale is a fixed ratio that every distance on the plan bears with corresponding distance on the ground. • One centimetre on the plan represents some whole number of the metres on the ground. 1cm = 10m [This type of scale is called engineering scale]. • 1 unit of length on the plan represents some number of same units of length on the ground. i.e. 1/1000 etc. • This ratio of map distance to the corresponding ground distance independent of units of measurement is called Representative Factor (RF). • For example, 1cm = 50m RF = 1/(50×100) = 1/5000 • Above two types of scales are also known as numerical scales.