SlideShare a Scribd company logo
1 of 15
Download to read offline
BIM for Project Scheduling
Case study: The Nile Corniche Project – Cairo, Egypt
Gunnar Godawa
HOCHTIEF ViCon Qatar W.L.L.
www.hochtief-vicon.com

Gunnar Godawa
HOCHTIEF ViCon

1
1. The Project
The Nile Corniche
Key facts:

BIM Use Cases:

Started in August 2008

3D Design Coordination

9,361 m² Footprint –
±200,000 m2 GFA

Full Quantification from the
3D Model

Includes a 5-star hotel
and restaurants

4D Construction Model

37 stories
4-level parking facility
± 165,000m3 concrete
± 40,000t reinforcement

Integration of BoQ and unit
cost in the database
4D Progress and Cost
Monitoring

Gunnar Godawa
HOCHTIEF ViCon

2
1. The Project
A collaborative BIM project setup
•

Project developer is the driver of BIM

•

BIM Manager coordinates 4D model
and ensures quality of data delivery

•

PM/ CM uses BIM for project
controls

•

Contractor provides the BIM
services related to his scope of
works

•

Project
Developer
BIM
Manager
PM/CM

Designer

Consultant

Contractor

Designer and Consultants use BIM
results

Gunnar Godawa
HOCHTIEF ViCon

3
1. The Project

3D Model
creation

3D Quantity
Model

4D Schedule
and Progress

Software

Applied Use-case

Software

Overview of used software systems

Gunnar Godawa
HOCHTIEF ViCon

4
2. Applied Use-cases
Project phases and supported processes
Design

2D
ARC/STR

2D
MEP

Construction

WBS

Project
schedule

Cost
estimate

Specs.
BoQ

3D model

4D model

3D design coordination

4D program verification
4D progress monitoring
4D cost monitoring
Model based quantity takeoff
User interface

Design Coordination System

Building Information System

Gunnar Godawa
HOCHTIEF ViCon

5
2. Applied Use-cases
Quantification from the 3D Model
1

3D Modeling

2

3D Quantity Take Off

3D model
Consolidated
3D model
Linking of Specification
with 3D Model

Specifications
WBS

Calculation of Quantities

3D Quantity
Model

Export of Quantities to the database

© HOCHTIEF ViCon

4

Usage for Estimation and Scheduling

3

Bill of Quantities / Database

Gunnar Godawa
HOCHTIEF ViCon

6
2. Applied Use-cases
Quantification from the 3D Model – Success factors

•

Modeling Guidelines to ensure the reusage of the model in the project lifecycle

•

The 3D model is developed according
to the project WBS

•

Additional attributes in the 4D model
support the easy link with the schedule

•

Specs

POMI

3D Model
and QTO

Split of 3D geometry and numerical
data enable the flexibility to reuse data
in various software tools
BoQ
Gunnar Godawa
HOCHTIEF ViCon

7
2. Applied Use-cases
Verification of the Construction Program
1

4D modeling

2

4D schedule analysis

3D model
Consolidated
3D model
Constructability check
and report
Linking

4D
Database

Project
Schedules

Product integrity: Detection of errors
Process integrity: Detection of conflicts

© HOCHTIEF ViCon

4

Revision of schedules

3

4D program verification meeting

Gunnar Godawa
HOCHTIEF ViCon

8
2. Applied Use-cases
Verification of the Construction Program – Success factors

•

Ensure quality of 4D model by checking
that all activities are linked to the model

•

Visualize the construction sequence to
allow additional schedule analysis

•

Include automated verification of the
resource distribution over time

•

Create reports to document the results
of the program verification

Gunnar Godawa
HOCHTIEF ViCon

9
2. Applied Use-cases
Usage of the 4D Model for Progress and Cost monitoring
1

Progress recording
Actual/planned working schedule

2

3

Update database & Visualization
4D Construction
Progress Visualization

4D model update
Actual/ planned
Schedule

Building Information System (BIS)
4D
database

© HOCHTIEF ViCon

4

4D progress monitoring/
4D cost monitoring

Gunnar Godawa
HOCHTIEF ViCon

10
2. Applied Use-cases
Usage of a 4D Model for Progress Monitoring – Success factors

•

Define a database structure to ensure data integrity

•

Enable the team to access the project schedule
without expert software

•

Implement regular progress updates in the project
database

•

Integrate the provided information in regular project
tasks such as progress reporting

•

Visualize the construction progress for better
evaluation and common understanding

Gunnar Godawa
HOCHTIEF ViCon

11
2. Applied Use-cases
Collaboration in the project– One data pool
Approach
CM

Contractor

Management
Procurement

global
Project
project
database

data base

Estimator

Draftsman

Scheduler

Ensure quality and save
time and costs through:
• Re-usage of data by
all stakeholders
• Better collaboration
through common data
• Improved data
interoperability

Qto specialist

© HOCHTIEF ViCon

Gunnar Godawa
HOCHTIEF ViCon

12
3. Case study
Project and Site Management – BIM interface
•

One single system with
remote access to 3D
model and information

•

Various project
documents are
integrated in database

•

Considers progress
definition of planning
department

© HOCHTIEF ViCon

Gunnar Godawa
HOCHTIEF ViCon

13
Valuable Project Experiences
Proven Team Benefits - Survey

•

Always current data available
through remote access to the
information

•

4D/ 5D Model is continuously used
for reporting purposes

•

Database with life-cycle approach
will support later operation phase

•

Easy user interface supports the
usage of BIM data

Gunnar Godawa
HOCHTIEF ViCon

14
Thank you for your attention!

Gunnar Godawa
Senior Project Manager
HOCHTIEF ViCon Qatar W.L.L.
E-Mail:
gunnar.godawa@hochtief.de
Mobile: +974 66 60 91 63 (Qatar)
www.hochtief-vicon.com
Gunnar Godawa
HOCHTIEF ViCon

15

More Related Content

Viewers also liked

Arrêté relatif à la déclaration sociale nominative
Arrêté relatif à la déclaration sociale nominativeArrêté relatif à la déclaration sociale nominative
Arrêté relatif à la déclaration sociale nominativeSociété Tripalio
 
David Mitchell 5D bim today’s workflow for cost certainty
David Mitchell 5D bim today’s workflow for cost certainty David Mitchell 5D bim today’s workflow for cost certainty
David Mitchell 5D bim today’s workflow for cost certainty Informa Australia
 
Building Information Modelling (BIM)
Building Information Modelling (BIM)Building Information Modelling (BIM)
Building Information Modelling (BIM)Sara Teymoor
 
Bim 5 d_cost estimating
Bim  5 d_cost estimatingBim  5 d_cost estimating
Bim 5 d_cost estimatingJustin Tran
 
BIM Construction Scheduling 4D Simulation in Navisworks
BIM Construction Scheduling 4D Simulation in NavisworksBIM Construction Scheduling 4D Simulation in Navisworks
BIM Construction Scheduling 4D Simulation in NavisworksLe Zhang
 
5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoption
5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoption5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoption
5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoptionBIM User Day
 
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!bimservicesindia1
 
Enterprise Resource Planning
Enterprise Resource PlanningEnterprise Resource Planning
Enterprise Resource PlanningJoveria Beg
 
project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 waleed hamdy
 
5th Qatar BIM User Day, BIM Introduction
5th Qatar BIM User Day, BIM Introduction5th Qatar BIM User Day, BIM Introduction
5th Qatar BIM User Day, BIM IntroductionBIM User Day
 
محاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEot
محاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEotمحاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEot
محاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEotKhaled M. Al Kolfat MS.Eng,MoP,P3O,PMOC,PMP,M.ASCE
 
Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Ir. Abdul Aziz Abas
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts finalFitBlar Mit
 
BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information ModellingNemat Syed
 
Bim Presentation
Bim PresentationBim Presentation
Bim Presentationrsalbin
 

Viewers also liked (17)

Arrêté relatif à la déclaration sociale nominative
Arrêté relatif à la déclaration sociale nominativeArrêté relatif à la déclaration sociale nominative
Arrêté relatif à la déclaration sociale nominative
 
David Mitchell 5D bim today’s workflow for cost certainty
David Mitchell 5D bim today’s workflow for cost certainty David Mitchell 5D bim today’s workflow for cost certainty
David Mitchell 5D bim today’s workflow for cost certainty
 
Building Information Modelling (BIM)
Building Information Modelling (BIM)Building Information Modelling (BIM)
Building Information Modelling (BIM)
 
Bim 5 d_cost estimating
Bim  5 d_cost estimatingBim  5 d_cost estimating
Bim 5 d_cost estimating
 
BIM Construction Scheduling 4D Simulation in Navisworks
BIM Construction Scheduling 4D Simulation in NavisworksBIM Construction Scheduling 4D Simulation in Navisworks
BIM Construction Scheduling 4D Simulation in Navisworks
 
5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoption
5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoption5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoption
5th Qatar BIM User Day, Perspectives on UK BIM standards & local adoption
 
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
 
Enterprise Resource Planning
Enterprise Resource PlanningEnterprise Resource Planning
Enterprise Resource Planning
 
project control using earned value analysis - Part 01
project control using earned value analysis - Part 01 project control using earned value analysis - Part 01
project control using earned value analysis - Part 01
 
5th Qatar BIM User Day, BIM Introduction
5th Qatar BIM User Day, BIM Introduction5th Qatar BIM User Day, BIM Introduction
5th Qatar BIM User Day, BIM Introduction
 
محاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEot
محاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEotمحاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEot
محاضرة تمهيدية في إعداد و تحليل المطالبات الزمنيةEot
 
Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)
 
Virtual Design and Construction
Virtual Design and ConstructionVirtual Design and Construction
Virtual Design and Construction
 
The Bim Process Explained
The Bim Process ExplainedThe Bim Process Explained
The Bim Process Explained
 
Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts final
 
BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information Modelling
 
Bim Presentation
Bim PresentationBim Presentation
Bim Presentation
 

More from BIM User Day

5th Qatar BIM User Day, Expanding BIM into Augmented and Virtual Reality
5th Qatar BIM User Day, Expanding BIM into Augmented and Virtual Reality5th Qatar BIM User Day, Expanding BIM into Augmented and Virtual Reality
5th Qatar BIM User Day, Expanding BIM into Augmented and Virtual RealityBIM User Day
 
5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single project5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single projectBIM User Day
 
5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM
5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM
5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLMBIM User Day
 
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIMBIM User Day
 
5th Qatar BIM User Day, RICS – Decision making, training and BIM
5th Qatar BIM User Day, RICS – Decision making, training and BIM5th Qatar BIM User Day, RICS – Decision making, training and BIM
5th Qatar BIM User Day, RICS – Decision making, training and BIMBIM User Day
 
5th Qatar BIM User Day, Defining the role of the BIM Manager
5th Qatar BIM User Day, Defining the role of the BIM Manager5th Qatar BIM User Day, Defining the role of the BIM Manager
5th Qatar BIM User Day, Defining the role of the BIM ManagerBIM User Day
 
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...BIM User Day
 
4th Qatar BIM User Day, Market Outlook
4th Qatar BIM User Day, Market Outlook4th Qatar BIM User Day, Market Outlook
4th Qatar BIM User Day, Market OutlookBIM User Day
 
4th Qatar BIM User Day, Collaboration or Co-Operation
4th Qatar BIM User Day, Collaboration or Co-Operation4th Qatar BIM User Day, Collaboration or Co-Operation
4th Qatar BIM User Day, Collaboration or Co-OperationBIM User Day
 
4th Qatar BIM User Day, BIM Solutions and Strategies
4th Qatar BIM User Day, BIM Solutions and Strategies4th Qatar BIM User Day, BIM Solutions and Strategies
4th Qatar BIM User Day, BIM Solutions and StrategiesBIM User Day
 
4th Qatar BIM User Day, BIM Protocols for Qatar
4th Qatar BIM User Day, BIM Protocols for Qatar4th Qatar BIM User Day, BIM Protocols for Qatar
4th Qatar BIM User Day, BIM Protocols for QatarBIM User Day
 
4th Qatar BIM User Day, BIM in Contracts
4th Qatar BIM User Day, BIM in Contracts4th Qatar BIM User Day, BIM in Contracts
4th Qatar BIM User Day, BIM in ContractsBIM User Day
 
4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and Standards4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and StandardsBIM User Day
 
4th Qatar BIM User Day, BIM and the Law
4th Qatar BIM User Day, BIM and the Law4th Qatar BIM User Day, BIM and the Law
4th Qatar BIM User Day, BIM and the LawBIM User Day
 
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FMBIM User Day
 
2nd Qatar BIM User Day Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day Scheduling, QTO and Estimating TechnologyBIM User Day
 
2nd Qatar BIM User Day BIM Technology Outlook
2nd Qatar BIM User Day  BIM Technology Outlook2nd Qatar BIM User Day  BIM Technology Outlook
2nd Qatar BIM User Day BIM Technology OutlookBIM User Day
 
2nd Qatar BIM User Day Document Control and Collaboration Technologies
2nd Qatar BIM User Day  Document Control and Collaboration Technologies2nd Qatar BIM User Day  Document Control and Collaboration Technologies
2nd Qatar BIM User Day Document Control and Collaboration TechnologiesBIM User Day
 
2nd Qatar BIM User Day BIM Technology Market Demand
2nd Qatar BIM User Day  BIM Technology  Market Demand2nd Qatar BIM User Day  BIM Technology  Market Demand
2nd Qatar BIM User Day BIM Technology Market DemandBIM User Day
 
2nd Qatar BIM User Day Design Technology
2nd Qatar BIM User Day  Design Technology2nd Qatar BIM User Day  Design Technology
2nd Qatar BIM User Day Design TechnologyBIM User Day
 

More from BIM User Day (20)

5th Qatar BIM User Day, Expanding BIM into Augmented and Virtual Reality
5th Qatar BIM User Day, Expanding BIM into Augmented and Virtual Reality5th Qatar BIM User Day, Expanding BIM into Augmented and Virtual Reality
5th Qatar BIM User Day, Expanding BIM into Augmented and Virtual Reality
 
5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single project5th Qatar BIM User Day, Live modeling techniques on a single project
5th Qatar BIM User Day, Live modeling techniques on a single project
 
5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM
5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM
5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM
 
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
 
5th Qatar BIM User Day, RICS – Decision making, training and BIM
5th Qatar BIM User Day, RICS – Decision making, training and BIM5th Qatar BIM User Day, RICS – Decision making, training and BIM
5th Qatar BIM User Day, RICS – Decision making, training and BIM
 
5th Qatar BIM User Day, Defining the role of the BIM Manager
5th Qatar BIM User Day, Defining the role of the BIM Manager5th Qatar BIM User Day, Defining the role of the BIM Manager
5th Qatar BIM User Day, Defining the role of the BIM Manager
 
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
5th Qatar BIM User Day, BIM process implementation and management on Qatar me...
 
4th Qatar BIM User Day, Market Outlook
4th Qatar BIM User Day, Market Outlook4th Qatar BIM User Day, Market Outlook
4th Qatar BIM User Day, Market Outlook
 
4th Qatar BIM User Day, Collaboration or Co-Operation
4th Qatar BIM User Day, Collaboration or Co-Operation4th Qatar BIM User Day, Collaboration or Co-Operation
4th Qatar BIM User Day, Collaboration or Co-Operation
 
4th Qatar BIM User Day, BIM Solutions and Strategies
4th Qatar BIM User Day, BIM Solutions and Strategies4th Qatar BIM User Day, BIM Solutions and Strategies
4th Qatar BIM User Day, BIM Solutions and Strategies
 
4th Qatar BIM User Day, BIM Protocols for Qatar
4th Qatar BIM User Day, BIM Protocols for Qatar4th Qatar BIM User Day, BIM Protocols for Qatar
4th Qatar BIM User Day, BIM Protocols for Qatar
 
4th Qatar BIM User Day, BIM in Contracts
4th Qatar BIM User Day, BIM in Contracts4th Qatar BIM User Day, BIM in Contracts
4th Qatar BIM User Day, BIM in Contracts
 
4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and Standards4th Qatar BIM User Day, BIM Guides and Standards
4th Qatar BIM User Day, BIM Guides and Standards
 
4th Qatar BIM User Day, BIM and the Law
4th Qatar BIM User Day, BIM and the Law4th Qatar BIM User Day, BIM and the Law
4th Qatar BIM User Day, BIM and the Law
 
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
4th Qatar BIM User Day, Pragmatic Use of COBie As-Built BIM for FM
 
2nd Qatar BIM User Day Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology2nd Qatar BIM User Day  Scheduling, QTO and Estimating Technology
2nd Qatar BIM User Day Scheduling, QTO and Estimating Technology
 
2nd Qatar BIM User Day BIM Technology Outlook
2nd Qatar BIM User Day  BIM Technology Outlook2nd Qatar BIM User Day  BIM Technology Outlook
2nd Qatar BIM User Day BIM Technology Outlook
 
2nd Qatar BIM User Day Document Control and Collaboration Technologies
2nd Qatar BIM User Day  Document Control and Collaboration Technologies2nd Qatar BIM User Day  Document Control and Collaboration Technologies
2nd Qatar BIM User Day Document Control and Collaboration Technologies
 
2nd Qatar BIM User Day BIM Technology Market Demand
2nd Qatar BIM User Day  BIM Technology  Market Demand2nd Qatar BIM User Day  BIM Technology  Market Demand
2nd Qatar BIM User Day BIM Technology Market Demand
 
2nd Qatar BIM User Day Design Technology
2nd Qatar BIM User Day  Design Technology2nd Qatar BIM User Day  Design Technology
2nd Qatar BIM User Day Design Technology
 

Recently uploaded

The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterMydbops
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxBkGupta21
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
What is Artificial Intelligence?????????
What is Artificial Intelligence?????????What is Artificial Intelligence?????????
What is Artificial Intelligence?????????blackmambaettijean
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Ryan Mahoney - Will Artificial Intelligence Replace Real Estate Agents
Ryan Mahoney - Will Artificial Intelligence Replace Real Estate AgentsRyan Mahoney - Will Artificial Intelligence Replace Real Estate Agents
Ryan Mahoney - Will Artificial Intelligence Replace Real Estate AgentsRyan Mahoney
 

Recently uploaded (20)

The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL Router
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
unit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptxunit 4 immunoblotting technique complete.pptx
unit 4 immunoblotting technique complete.pptx
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
What is Artificial Intelligence?????????
What is Artificial Intelligence?????????What is Artificial Intelligence?????????
What is Artificial Intelligence?????????
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Ryan Mahoney - Will Artificial Intelligence Replace Real Estate Agents
Ryan Mahoney - Will Artificial Intelligence Replace Real Estate AgentsRyan Mahoney - Will Artificial Intelligence Replace Real Estate Agents
Ryan Mahoney - Will Artificial Intelligence Replace Real Estate Agents
 

2nd Qatar BIM User Day BIM Technology Case Study #1

  • 1. BIM for Project Scheduling Case study: The Nile Corniche Project – Cairo, Egypt Gunnar Godawa HOCHTIEF ViCon Qatar W.L.L. www.hochtief-vicon.com Gunnar Godawa HOCHTIEF ViCon 1
  • 2. 1. The Project The Nile Corniche Key facts: BIM Use Cases: Started in August 2008 3D Design Coordination 9,361 m² Footprint – ±200,000 m2 GFA Full Quantification from the 3D Model Includes a 5-star hotel and restaurants 4D Construction Model 37 stories 4-level parking facility ± 165,000m3 concrete ± 40,000t reinforcement Integration of BoQ and unit cost in the database 4D Progress and Cost Monitoring Gunnar Godawa HOCHTIEF ViCon 2
  • 3. 1. The Project A collaborative BIM project setup • Project developer is the driver of BIM • BIM Manager coordinates 4D model and ensures quality of data delivery • PM/ CM uses BIM for project controls • Contractor provides the BIM services related to his scope of works • Project Developer BIM Manager PM/CM Designer Consultant Contractor Designer and Consultants use BIM results Gunnar Godawa HOCHTIEF ViCon 3
  • 4. 1. The Project 3D Model creation 3D Quantity Model 4D Schedule and Progress Software Applied Use-case Software Overview of used software systems Gunnar Godawa HOCHTIEF ViCon 4
  • 5. 2. Applied Use-cases Project phases and supported processes Design 2D ARC/STR 2D MEP Construction WBS Project schedule Cost estimate Specs. BoQ 3D model 4D model 3D design coordination 4D program verification 4D progress monitoring 4D cost monitoring Model based quantity takeoff User interface Design Coordination System Building Information System Gunnar Godawa HOCHTIEF ViCon 5
  • 6. 2. Applied Use-cases Quantification from the 3D Model 1 3D Modeling 2 3D Quantity Take Off 3D model Consolidated 3D model Linking of Specification with 3D Model Specifications WBS Calculation of Quantities 3D Quantity Model Export of Quantities to the database © HOCHTIEF ViCon 4 Usage for Estimation and Scheduling 3 Bill of Quantities / Database Gunnar Godawa HOCHTIEF ViCon 6
  • 7. 2. Applied Use-cases Quantification from the 3D Model – Success factors • Modeling Guidelines to ensure the reusage of the model in the project lifecycle • The 3D model is developed according to the project WBS • Additional attributes in the 4D model support the easy link with the schedule • Specs POMI 3D Model and QTO Split of 3D geometry and numerical data enable the flexibility to reuse data in various software tools BoQ Gunnar Godawa HOCHTIEF ViCon 7
  • 8. 2. Applied Use-cases Verification of the Construction Program 1 4D modeling 2 4D schedule analysis 3D model Consolidated 3D model Constructability check and report Linking 4D Database Project Schedules Product integrity: Detection of errors Process integrity: Detection of conflicts © HOCHTIEF ViCon 4 Revision of schedules 3 4D program verification meeting Gunnar Godawa HOCHTIEF ViCon 8
  • 9. 2. Applied Use-cases Verification of the Construction Program – Success factors • Ensure quality of 4D model by checking that all activities are linked to the model • Visualize the construction sequence to allow additional schedule analysis • Include automated verification of the resource distribution over time • Create reports to document the results of the program verification Gunnar Godawa HOCHTIEF ViCon 9
  • 10. 2. Applied Use-cases Usage of the 4D Model for Progress and Cost monitoring 1 Progress recording Actual/planned working schedule 2 3 Update database & Visualization 4D Construction Progress Visualization 4D model update Actual/ planned Schedule Building Information System (BIS) 4D database © HOCHTIEF ViCon 4 4D progress monitoring/ 4D cost monitoring Gunnar Godawa HOCHTIEF ViCon 10
  • 11. 2. Applied Use-cases Usage of a 4D Model for Progress Monitoring – Success factors • Define a database structure to ensure data integrity • Enable the team to access the project schedule without expert software • Implement regular progress updates in the project database • Integrate the provided information in regular project tasks such as progress reporting • Visualize the construction progress for better evaluation and common understanding Gunnar Godawa HOCHTIEF ViCon 11
  • 12. 2. Applied Use-cases Collaboration in the project– One data pool Approach CM Contractor Management Procurement global Project project database data base Estimator Draftsman Scheduler Ensure quality and save time and costs through: • Re-usage of data by all stakeholders • Better collaboration through common data • Improved data interoperability Qto specialist © HOCHTIEF ViCon Gunnar Godawa HOCHTIEF ViCon 12
  • 13. 3. Case study Project and Site Management – BIM interface • One single system with remote access to 3D model and information • Various project documents are integrated in database • Considers progress definition of planning department © HOCHTIEF ViCon Gunnar Godawa HOCHTIEF ViCon 13
  • 14. Valuable Project Experiences Proven Team Benefits - Survey • Always current data available through remote access to the information • 4D/ 5D Model is continuously used for reporting purposes • Database with life-cycle approach will support later operation phase • Easy user interface supports the usage of BIM data Gunnar Godawa HOCHTIEF ViCon 14
  • 15. Thank you for your attention! Gunnar Godawa Senior Project Manager HOCHTIEF ViCon Qatar W.L.L. E-Mail: gunnar.godawa@hochtief.de Mobile: +974 66 60 91 63 (Qatar) www.hochtief-vicon.com Gunnar Godawa HOCHTIEF ViCon 15