Cutover Strategy In SAP FICO
Here we try to comprehensively cover the SAP Go live strategy as a reference guide as every
business are unique and as a SAP FICO Consultant, you need to adjust accordingly.
The Go Live strategy comprises of the following:-
1) Cut off procedure
2) Pre-Go live checks.
What is meant by cut off date?
SAP system is configured as per the requirement of the client. The system is ready for the client
to use. The client now needs to migrate from the Old system (Legacy system) to the new SAP
system.
The migration from the old system to the new system is known as cut off date.
The old system is switched off and the new SAP system is switched on.
The data will be migrated from the old system to SAP. The data will henceforth be entered in
the new SAP system.
To have a smooth switch over from the Legacy system to the new SAP systems are devised the
cut off procedure.
What is meant by Pre Go live check?
It is ensuring that SAP Production system is ready to go live smoothly.
Let proceed then.
Scenario
A Ltd. is a company implementing SAP system.
The company follows a January - December period for preparing financial accounts.
Therefore the go live data decided for A Ltd is 2nd January 2096.
The Trial balance will be uploaded with date as on 31st December 2095.
The Trial balance will consist only of balance sheet items since all the expense items are already
transferred to the retained earnings account in the old system.
The activities are divided as follows:-
1) Pre Go live activities
A Ltd will upload the GL codes, cost elements in the production system on 1st December 2095.
A Ltd will complete upload of all the material masters with all the views in the production
system by 2nd December 2095.
All Bill of Material, Routings will be uploaded in the production system by 4th December 2095.
The material masters for raw and packing material will be uploaded with the moving average
prices on 4th December 2095.
The cost center Plan will be uploaded, allocation cycles and activity price calculation will be
done by 6th December 2095.
Product cost calculation will be conducted from 7th Dec 2095 to 20th December 2095 to get the
correct cost calculation from system.
All other masters will be uploaded into the production system from 5th December 2095 and
completed by 18th December 2095.
2) Cut off activities
The company closes it sales on 26th December 2095.
The company stops all its stock movement on 26th December 2095 up to 1st January 2096.
All open purchase orders will be uploaded on 28th December 2095.
The provision for stock received and invoice not received will be accounted in a separate GL
code (different than the GR/IR).
The stocks will be finalized by 29th December 2095.
The company closes it old (legacy) system on 30th December 2095.
The stocks will be uploaded on 31st December 2095 and 1st Jan 2096.
The standard cost estimate will be marked and released on 2nd January 2096.
The system is available for data entry and operation to the users from 2nd January 2096.
Accounts Receivable open items will be uploaded from 1st January 2096 to 3rd January 2096.
Thus Accounts Receivable is available from 4th January 2096 to account for customer incoming
payment.
Accounts Payable open items will be uploaded from 3rd January 2096 to 4th January 2096.
Accounts Payable is available for payment from 5th January 2096.
Fixed assets are uploaded on 5th January 2096.
The Remaining GL Balances are uploaded on 7th January 2096.
Thus entire data take over activities are to be completed by 7th January 2096.
We will divide the activities as follows:-
A) Pre-Go Live activities
B) Pre-Go Live checks
C) Upload transaction data into the system
A) Pre-Go Live activities
1. Master data Load into Production system
Ensure all the master data is loaded into the production system.
We will broadly cover the master data which needs to be loaded and the module responsible.
Material Master (SAP Material Management)
Basic responsibility MM: All the respective views of the material masters the other modules
responsible . Ensure that all the required views are uploaded.
GL codes - FI
Customer Master - FI (accounting view) and SD (sales view)
Vendor Master - FI (accounting view) and MM (purchasing view)
Cost elements - CO
Secondary cost elements - CO
Profit centers - CO
Cost center - CO
Activity type - CO
Bill of Material - PP
Work Center/ Resource - PP
Routing / Master Recipe - PP
Purchasing Info Record - MM
Service Master - MM
Bank Master - FI
Quality Info Record - QM
Quality Inspection plan
2. Upload Cost center plan
Cost center plan must be updated through transaction code KP06 or using excel upload.
3. Execute the allocation cycles within cost center accounting
The plan allocation cycles (distribution, assessment) must be executed within the cost center
accounting module. This will allocate the costs from the service cost center to the receiver cost
center.
4. Update planned activity
After executing of the plan allocation cycles, the production cost centers are now ready with the
planned costs.
You can now calculate the activity prices through the system or manually update the planned
prices by calculating it outside.
The planned activity must be updated through transaction code KP26.
5. Calculate Activity prices
Calculate the activity prices using transaction code KSPI.
6. Execute product costing run
The product costing run will be executed for all semi-finished and finished materials in the
system using transaction code CK40N. This should be run after all the BOM and Master recipe
are uploaded.
The product cost finalization takes a long time and should begin well in advance before the go
live date. Normally the product costing run has to be executed again and again (3-4 times) since
data needs to be corrected and costs have to be compared with the existing legacy cost.
The possible errors in the product costing run are:-
1) Moving average prices or planned prices are not correctly maintained in the material masters.
2) Incorrect quantities in the Bill of Materials, incorrect base unit quantity in the Bill of Material.
3) Incorrect quantities (hours, KWH etc.) for activities in the Routing or Master recipe.
4) Incorrect alternate unit of Measure
The product costing is calculated and made ready. The actual Mark and release will happen on
after the stocks are uploaded into the system.
B) Pre-Go Live activities
1. Ensure all the customizing request are in the production system. Check that all the
customizing request are gone in the system and no major requests are pending. Request relating
to reports being developed can be transported as and when the reports are ready.
2. Ensure all the number ranges for all the modules have been maintained in the production
system.
3. Ensure that Operating concern has been generated.
4. Ensure that all the Customer Master data is loaded.
5. Ensure all material masters (all material types) have been loaded.
6. Ensure that all the Vendor Master data is loaded.
C) Upload transaction data into system
1. Upload Open purchase orders
Open purchase orders can well be uploaded into the system in advance before the cut off date if
no invoices are expected.
2. Stock upload
Stock upload happens in 2 steps:-
1) Finished goods: The standard prices are first uploaded through MR21 or through an ABAP
program which also uses MR21. The stock quantities are uploaded using movement type 561
through an ABAP program which calls transaction MB1C.
2) Raw Material, packing Material, stores and spare parts: The quantities and values are
uploaded at the same time using an ABAP program which calls transaction MB1C.
The stock upload will generate the following entry in the system:-
Finished goods stock a/c Debit
Semi-Finished goods stock a/c Debit
Raw Material stock a/c Debit
Packing Material stock a/c Debit
Stores and spares a/c Debit
Data take over Credit
3. Mark and Release the cost estimate
After the stock is uploaded into the system, the standard cost estimate will be marked and
released into the material master using transaction code CK40N.
4. Upload Accounts Receivable and Accounts Payable open items
The Accounts Receivable and Accounts Payable open items are uploaded through LSMW which
calls transaction code F-02 GL Account posting. The profit center is captured in the data take
over account. Baseline date must be captured, which will determine aging based on number of
days mentioned in the payment terms.
The accounting entry for Accounts Receivable open item upload is:-
Customer a/c (not GL) Debit
Data takeover a/c Credit
The accounting entry for Accounts Payable open item upload is:-
Data takeover a/c Debit
Vendor a/c (not GL) Credit
5. Asset Master and value upload
Asset Master is a special case of upload where in you upload not only the master data but also
the values. The total cost and accumulated depreciation are also uploaded at the same time.
This is done through transaction code AS91.
We will explain how it is done.
5.1 The upload of asset master and values through AS91
This upload of asset masters along with the values will not update the FI General Ledger. The FI
- GL entry balance update will be passed through another transaction.
5.2 Transfer Asset balance into profit center
Once the asset master along with the values is uploaded, the opening balance for the asset needs
to be transferred to profit center.
The asset balances opening balances are transferred into profit center accounting through
transaction code 1KEI.
5.3 Remove the GL codes for asset from 3KEH table
Remove the Asset reconciliation codes from the transaction code 3KEH. This is required because
a manual FI entry will be passed in the next step, which will duplicate posting into PCA for the
assets.
5.4 Update the FI entry for asset through transaction OASV.
We give an example of how a GL entry passed for Fixed asset upload:-
Let us take Plant and Machinery
Plant and Machinery a/c Dr 100,000
Accumulated depreciation a/c Cr 30,000
Data takeover a/c Cr 70,000
5.5 Reinstate the GL codes for asset in 3KEH
After passing the entry for asset upload update the asset reconciliation accounts in transaction
code 3KEH.
6. Upload General Ledger account balances
Finally we upload the remaining General Ledger account balances other than Fixed Assets,
Stock, Accounts Receivable and Accounts Payable. This is again uploaded through an LSMW
program which calls transaction code F-02 GL.
Posting.
Let us take an example for the accounting entry passed:-
Data takeover a/c Debit 550,000 (Balancing figure)
Cash a/c Debit 10,000
Bank a/c Debit 50,000
Advances Debit 90,000
Share capital a/c Credit 100,000
Short term Loan a/c Credit 200,000
Long term loan a/c Credit 400,000
The Data takeover will become zero on upload of this entry.

More Related Content

What's hot

Document splitting in New GL in SAP
Document splitting in New GL in SAPDocument splitting in New GL in SAP
Document splitting in New GL in SAP
Rajesh Shanbhag
 

What's hot (20)

Accounting entries in sap
Accounting entries in sapAccounting entries in sap
Accounting entries in sap
 
Withholding tax in sap
Withholding tax in sapWithholding tax in sap
Withholding tax in sap
 
Sap funds management training
Sap funds management trainingSap funds management training
Sap funds management training
 
SAP FI-BANK
SAP  FI-BANKSAP  FI-BANK
SAP FI-BANK
 
Important Interview questions in SAP CO
Important Interview questions in SAP COImportant Interview questions in SAP CO
Important Interview questions in SAP CO
 
SAP Accounts Reveivable SAP Documents | http://sapdocs.info
SAP Accounts Reveivable SAP Documents | http://sapdocs.infoSAP Accounts Reveivable SAP Documents | http://sapdocs.info
SAP Accounts Reveivable SAP Documents | http://sapdocs.info
 
Document splitting in New GL in SAP
Document splitting in New GL in SAPDocument splitting in New GL in SAP
Document splitting in New GL in SAP
 
Report Painter in SAP: Introduction
Report Painter in SAP: IntroductionReport Painter in SAP: Introduction
Report Painter in SAP: Introduction
 
Valuation & Split valuation in MM
Valuation & Split valuation in MMValuation & Split valuation in MM
Valuation & Split valuation in MM
 
SAP Roll Out - An Introduction and Advantages
SAP Roll Out - An Introduction and AdvantagesSAP Roll Out - An Introduction and Advantages
SAP Roll Out - An Introduction and Advantages
 
55811936 product-costing-cost-estimation-in-sap
55811936 product-costing-cost-estimation-in-sap55811936 product-costing-cost-estimation-in-sap
55811936 product-costing-cost-estimation-in-sap
 
Migration Guide For SAP S/4 HANA 1809 FICO
Migration Guide For SAP S/4 HANA 1809 FICOMigration Guide For SAP S/4 HANA 1809 FICO
Migration Guide For SAP S/4 HANA 1809 FICO
 
Sap Fico Configuration Material
Sap Fico Configuration MaterialSap Fico Configuration Material
Sap Fico Configuration Material
 
SAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive DocumentSAP CO Configuration Guide - Exclusive Document
SAP CO Configuration Guide - Exclusive Document
 
Sap fico tutorial
Sap fico tutorialSap fico tutorial
Sap fico tutorial
 
SAP CO overview
SAP CO overview SAP CO overview
SAP CO overview
 
SAP FICO General Ledger EndUser Training | www.sapdocs.info
SAP FICO General Ledger EndUser Training | www.sapdocs.infoSAP FICO General Ledger EndUser Training | www.sapdocs.info
SAP FICO General Ledger EndUser Training | www.sapdocs.info
 
Overcoming the Top 7 Intercompany Accounting Challenges in SAP ERP Financials
Overcoming the Top 7 Intercompany Accounting Challenges in SAP ERP FinancialsOvercoming the Top 7 Intercompany Accounting Challenges in SAP ERP Financials
Overcoming the Top 7 Intercompany Accounting Challenges in SAP ERP Financials
 
Transfer pricing in sap
Transfer pricing in sapTransfer pricing in sap
Transfer pricing in sap
 
Sap fico configuration
Sap fico configurationSap fico configuration
Sap fico configuration
 

Similar to Cutover strategy in sap fico

HOLMES INSTITUTE FACULTY OF HIGHER EDUCATION .docx
HOLMES INSTITUTE  FACULTY OF HIGHER EDUCATION .docxHOLMES INSTITUTE  FACULTY OF HIGHER EDUCATION .docx
HOLMES INSTITUTE FACULTY OF HIGHER EDUCATION .docx
madlynplamondon
 
Product costing343411327309984
Product costing343411327309984Product costing343411327309984
Product costing343411327309984
shivaprakash
 
SAP FICO Interview Questions By Garudatrainings
SAP FICO Interview Questions By GarudatrainingsSAP FICO Interview Questions By Garudatrainings
SAP FICO Interview Questions By Garudatrainings
piyushchawala
 

Similar to Cutover strategy in sap fico (20)

cutoverstrategy - Copy.ppt
cutoverstrategy - Copy.pptcutoverstrategy - Copy.ppt
cutoverstrategy - Copy.ppt
 
cutoverstrategy.ppt
cutoverstrategy.pptcutoverstrategy.ppt
cutoverstrategy.ppt
 
SAP S/4 Simple Finance Implementation Strategy: Central Finance Deployment Op...
SAP S/4 Simple Finance Implementation Strategy: Central Finance Deployment Op...SAP S/4 Simple Finance Implementation Strategy: Central Finance Deployment Op...
SAP S/4 Simple Finance Implementation Strategy: Central Finance Deployment Op...
 
Sage 100 User Group – Nov 2017
Sage 100 User Group – Nov 2017Sage 100 User Group – Nov 2017
Sage 100 User Group – Nov 2017
 
SAP Treasury
SAP TreasurySAP Treasury
SAP Treasury
 
HOLMES INSTITUTE FACULTY OF HIGHER EDUCATION .docx
HOLMES INSTITUTE  FACULTY OF HIGHER EDUCATION .docxHOLMES INSTITUTE  FACULTY OF HIGHER EDUCATION .docx
HOLMES INSTITUTE FACULTY OF HIGHER EDUCATION .docx
 
Product costing343411327309984
Product costing343411327309984Product costing343411327309984
Product costing343411327309984
 
Production Module & Report Completion Sub-Module. .pptx
Production Module & Report Completion Sub-Module. .pptxProduction Module & Report Completion Sub-Module. .pptx
Production Module & Report Completion Sub-Module. .pptx
 
Gsp workshop
Gsp workshopGsp workshop
Gsp workshop
 
Productcostingsample
ProductcostingsampleProductcostingsample
Productcostingsample
 
J62_S4HANA2021_BPD_EN_FR.pdf
J62_S4HANA2021_BPD_EN_FR.pdfJ62_S4HANA2021_BPD_EN_FR.pdf
J62_S4HANA2021_BPD_EN_FR.pdf
 
Calculating cost of goods sold in manufacturing
Calculating cost of goods sold in manufacturingCalculating cost of goods sold in manufacturing
Calculating cost of goods sold in manufacturing
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
 
Transforming supply chain Harish Bawari - Hero MotoCorp May 2016
Transforming supply chain Harish Bawari - Hero MotoCorp May 2016Transforming supply chain Harish Bawari - Hero MotoCorp May 2016
Transforming supply chain Harish Bawari - Hero MotoCorp May 2016
 
SAP FICO Interview Questions By Garudatrainings
SAP FICO Interview Questions By GarudatrainingsSAP FICO Interview Questions By Garudatrainings
SAP FICO Interview Questions By Garudatrainings
 
Sap scm ewm na muk 11 02
Sap scm ewm na muk 11  02 Sap scm ewm na muk 11  02
Sap scm ewm na muk 11 02
 
Time based progress analysis in project system (revenue recognition) sap blogs
Time based progress analysis in project system (revenue recognition)   sap blogsTime based progress analysis in project system (revenue recognition)   sap blogs
Time based progress analysis in project system (revenue recognition) sap blogs
 
SAP MM IM Physical inventory -cycle counting
SAP MM IM Physical inventory -cycle countingSAP MM IM Physical inventory -cycle counting
SAP MM IM Physical inventory -cycle counting
 
Sap sd configuration
Sap sd configurationSap sd configuration
Sap sd configuration
 

Recently uploaded

Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
gajnagarg
 
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...
nirzagarg
 
Top profile Call Girls In Gangtok [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Gangtok [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Gangtok [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Gangtok [ 7014168258 ] Call Me For Genuine Models W...
gajnagarg
 
怎样办理宾夕法尼亚大学毕业证(UPenn毕业证书)成绩单学校原版复制
怎样办理宾夕法尼亚大学毕业证(UPenn毕业证书)成绩单学校原版复制怎样办理宾夕法尼亚大学毕业证(UPenn毕业证书)成绩单学校原版复制
怎样办理宾夕法尼亚大学毕业证(UPenn毕业证书)成绩单学校原版复制
yynod
 
如何办理堪培拉大学毕业证(UC毕业证书)成绩单原版一比一
如何办理堪培拉大学毕业证(UC毕业证书)成绩单原版一比一如何办理堪培拉大学毕业证(UC毕业证书)成绩单原版一比一
如何办理堪培拉大学毕业证(UC毕业证书)成绩单原版一比一
ozave
 
K Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CVK Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CV
K VENKAT NAVEEN KUMAR
 
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
gynedubai
 
Simple, 3-Step Strategy to Improve Your Executive Presence (Even if You Don't...
Simple, 3-Step Strategy to Improve Your Executive Presence (Even if You Don't...Simple, 3-Step Strategy to Improve Your Executive Presence (Even if You Don't...
Simple, 3-Step Strategy to Improve Your Executive Presence (Even if You Don't...
Angela Justice, PhD
 
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Menggugurkan Kandungan 087776558899
 
Top profile Call Girls In bhubaneswar [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In bhubaneswar [ 7014168258 ] Call Me For Genuine Mode...Top profile Call Girls In bhubaneswar [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In bhubaneswar [ 7014168258 ] Call Me For Genuine Mode...
gajnagarg
 
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制
yynod
 
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...
gajnagarg
 
怎样办理加利福尼亚大学伯克利分校毕业证(UC Berkeley毕业证书)成绩单学校原版复制
怎样办理加利福尼亚大学伯克利分校毕业证(UC Berkeley毕业证书)成绩单学校原版复制怎样办理加利福尼亚大学伯克利分校毕业证(UC Berkeley毕业证书)成绩单学校原版复制
怎样办理加利福尼亚大学伯克利分校毕业证(UC Berkeley毕业证书)成绩单学校原版复制
yynod
 
一比一定(购)堪培拉大学毕业证(UC毕业证)成绩单学位证
一比一定(购)堪培拉大学毕业证(UC毕业证)成绩单学位证一比一定(购)堪培拉大学毕业证(UC毕业证)成绩单学位证
一比一定(购)堪培拉大学毕业证(UC毕业证)成绩单学位证
eqaqen
 

Recently uploaded (20)

Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In Hubli [ 7014168258 ] Call Me For Genuine Models We ...
 
Complete Curriculum Vita for Paul Warshauer
Complete Curriculum Vita for Paul WarshauerComplete Curriculum Vita for Paul Warshauer
Complete Curriculum Vita for Paul Warshauer
 
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...
Top profile Call Girls In Shivamogga [ 7014168258 ] Call Me For Genuine Model...
 
Top profile Call Girls In Gangtok [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Gangtok [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Gangtok [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Gangtok [ 7014168258 ] Call Me For Genuine Models W...
 
怎样办理宾夕法尼亚大学毕业证(UPenn毕业证书)成绩单学校原版复制
怎样办理宾夕法尼亚大学毕业证(UPenn毕业证书)成绩单学校原版复制怎样办理宾夕法尼亚大学毕业证(UPenn毕业证书)成绩单学校原版复制
怎样办理宾夕法尼亚大学毕业证(UPenn毕业证书)成绩单学校原版复制
 
drug book file on obs. and gynae clinical pstings
drug book file on obs. and gynae clinical pstingsdrug book file on obs. and gynae clinical pstings
drug book file on obs. and gynae clinical pstings
 
如何办理堪培拉大学毕业证(UC毕业证书)成绩单原版一比一
如何办理堪培拉大学毕业证(UC毕业证书)成绩单原版一比一如何办理堪培拉大学毕业证(UC毕业证书)成绩单原版一比一
如何办理堪培拉大学毕业证(UC毕业证书)成绩单原版一比一
 
K Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CVK Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CV
 
B.tech Civil Engineering Major Project by Deepak Kumar ppt.pdf
B.tech Civil Engineering Major Project by Deepak Kumar ppt.pdfB.tech Civil Engineering Major Project by Deepak Kumar ppt.pdf
B.tech Civil Engineering Major Project by Deepak Kumar ppt.pdf
 
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
<DUBAI>Abortion pills IN UAE {{+971561686603*^Mifepristone & Misoprostol in D...
 
Joshua Minker Brand Exploration Sports Broadcaster .pptx
Joshua Minker Brand Exploration Sports Broadcaster .pptxJoshua Minker Brand Exploration Sports Broadcaster .pptx
Joshua Minker Brand Exploration Sports Broadcaster .pptx
 
Simple, 3-Step Strategy to Improve Your Executive Presence (Even if You Don't...
Simple, 3-Step Strategy to Improve Your Executive Presence (Even if You Don't...Simple, 3-Step Strategy to Improve Your Executive Presence (Even if You Don't...
Simple, 3-Step Strategy to Improve Your Executive Presence (Even if You Don't...
 
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
 
Top profile Call Girls In bhubaneswar [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In bhubaneswar [ 7014168258 ] Call Me For Genuine Mode...Top profile Call Girls In bhubaneswar [ 7014168258 ] Call Me For Genuine Mode...
Top profile Call Girls In bhubaneswar [ 7014168258 ] Call Me For Genuine Mode...
 
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制
怎样办理哥伦比亚大学毕业证(Columbia毕业证书)成绩单学校原版复制
 
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...
Top profile Call Girls In Shillong [ 7014168258 ] Call Me For Genuine Models ...
 
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
 
Personal Brand Exploration - Fernando Negron
Personal Brand Exploration - Fernando NegronPersonal Brand Exploration - Fernando Negron
Personal Brand Exploration - Fernando Negron
 
怎样办理加利福尼亚大学伯克利分校毕业证(UC Berkeley毕业证书)成绩单学校原版复制
怎样办理加利福尼亚大学伯克利分校毕业证(UC Berkeley毕业证书)成绩单学校原版复制怎样办理加利福尼亚大学伯克利分校毕业证(UC Berkeley毕业证书)成绩单学校原版复制
怎样办理加利福尼亚大学伯克利分校毕业证(UC Berkeley毕业证书)成绩单学校原版复制
 
一比一定(购)堪培拉大学毕业证(UC毕业证)成绩单学位证
一比一定(购)堪培拉大学毕业证(UC毕业证)成绩单学位证一比一定(购)堪培拉大学毕业证(UC毕业证)成绩单学位证
一比一定(购)堪培拉大学毕业证(UC毕业证)成绩单学位证
 

Cutover strategy in sap fico

  • 1. Cutover Strategy In SAP FICO Here we try to comprehensively cover the SAP Go live strategy as a reference guide as every business are unique and as a SAP FICO Consultant, you need to adjust accordingly. The Go Live strategy comprises of the following:- 1) Cut off procedure 2) Pre-Go live checks. What is meant by cut off date? SAP system is configured as per the requirement of the client. The system is ready for the client to use. The client now needs to migrate from the Old system (Legacy system) to the new SAP system. The migration from the old system to the new system is known as cut off date. The old system is switched off and the new SAP system is switched on. The data will be migrated from the old system to SAP. The data will henceforth be entered in the new SAP system. To have a smooth switch over from the Legacy system to the new SAP systems are devised the cut off procedure. What is meant by Pre Go live check? It is ensuring that SAP Production system is ready to go live smoothly. Let proceed then. Scenario A Ltd. is a company implementing SAP system. The company follows a January - December period for preparing financial accounts. Therefore the go live data decided for A Ltd is 2nd January 2096. The Trial balance will be uploaded with date as on 31st December 2095. The Trial balance will consist only of balance sheet items since all the expense items are already
  • 2. transferred to the retained earnings account in the old system. The activities are divided as follows:- 1) Pre Go live activities A Ltd will upload the GL codes, cost elements in the production system on 1st December 2095. A Ltd will complete upload of all the material masters with all the views in the production system by 2nd December 2095. All Bill of Material, Routings will be uploaded in the production system by 4th December 2095. The material masters for raw and packing material will be uploaded with the moving average prices on 4th December 2095. The cost center Plan will be uploaded, allocation cycles and activity price calculation will be done by 6th December 2095. Product cost calculation will be conducted from 7th Dec 2095 to 20th December 2095 to get the correct cost calculation from system. All other masters will be uploaded into the production system from 5th December 2095 and completed by 18th December 2095. 2) Cut off activities The company closes it sales on 26th December 2095. The company stops all its stock movement on 26th December 2095 up to 1st January 2096. All open purchase orders will be uploaded on 28th December 2095. The provision for stock received and invoice not received will be accounted in a separate GL code (different than the GR/IR). The stocks will be finalized by 29th December 2095. The company closes it old (legacy) system on 30th December 2095. The stocks will be uploaded on 31st December 2095 and 1st Jan 2096. The standard cost estimate will be marked and released on 2nd January 2096. The system is available for data entry and operation to the users from 2nd January 2096.
  • 3. Accounts Receivable open items will be uploaded from 1st January 2096 to 3rd January 2096. Thus Accounts Receivable is available from 4th January 2096 to account for customer incoming payment. Accounts Payable open items will be uploaded from 3rd January 2096 to 4th January 2096. Accounts Payable is available for payment from 5th January 2096. Fixed assets are uploaded on 5th January 2096. The Remaining GL Balances are uploaded on 7th January 2096. Thus entire data take over activities are to be completed by 7th January 2096. We will divide the activities as follows:- A) Pre-Go Live activities B) Pre-Go Live checks C) Upload transaction data into the system A) Pre-Go Live activities 1. Master data Load into Production system Ensure all the master data is loaded into the production system. We will broadly cover the master data which needs to be loaded and the module responsible. Material Master (SAP Material Management) Basic responsibility MM: All the respective views of the material masters the other modules responsible . Ensure that all the required views are uploaded. GL codes - FI Customer Master - FI (accounting view) and SD (sales view) Vendor Master - FI (accounting view) and MM (purchasing view) Cost elements - CO
  • 4. Secondary cost elements - CO Profit centers - CO Cost center - CO Activity type - CO Bill of Material - PP Work Center/ Resource - PP Routing / Master Recipe - PP Purchasing Info Record - MM Service Master - MM Bank Master - FI Quality Info Record - QM Quality Inspection plan 2. Upload Cost center plan Cost center plan must be updated through transaction code KP06 or using excel upload. 3. Execute the allocation cycles within cost center accounting The plan allocation cycles (distribution, assessment) must be executed within the cost center accounting module. This will allocate the costs from the service cost center to the receiver cost center. 4. Update planned activity After executing of the plan allocation cycles, the production cost centers are now ready with the planned costs. You can now calculate the activity prices through the system or manually update the planned prices by calculating it outside. The planned activity must be updated through transaction code KP26. 5. Calculate Activity prices
  • 5. Calculate the activity prices using transaction code KSPI. 6. Execute product costing run The product costing run will be executed for all semi-finished and finished materials in the system using transaction code CK40N. This should be run after all the BOM and Master recipe are uploaded. The product cost finalization takes a long time and should begin well in advance before the go live date. Normally the product costing run has to be executed again and again (3-4 times) since data needs to be corrected and costs have to be compared with the existing legacy cost. The possible errors in the product costing run are:- 1) Moving average prices or planned prices are not correctly maintained in the material masters. 2) Incorrect quantities in the Bill of Materials, incorrect base unit quantity in the Bill of Material. 3) Incorrect quantities (hours, KWH etc.) for activities in the Routing or Master recipe. 4) Incorrect alternate unit of Measure The product costing is calculated and made ready. The actual Mark and release will happen on after the stocks are uploaded into the system. B) Pre-Go Live activities 1. Ensure all the customizing request are in the production system. Check that all the customizing request are gone in the system and no major requests are pending. Request relating to reports being developed can be transported as and when the reports are ready. 2. Ensure all the number ranges for all the modules have been maintained in the production system. 3. Ensure that Operating concern has been generated. 4. Ensure that all the Customer Master data is loaded. 5. Ensure all material masters (all material types) have been loaded. 6. Ensure that all the Vendor Master data is loaded. C) Upload transaction data into system 1. Upload Open purchase orders
  • 6. Open purchase orders can well be uploaded into the system in advance before the cut off date if no invoices are expected. 2. Stock upload Stock upload happens in 2 steps:- 1) Finished goods: The standard prices are first uploaded through MR21 or through an ABAP program which also uses MR21. The stock quantities are uploaded using movement type 561 through an ABAP program which calls transaction MB1C. 2) Raw Material, packing Material, stores and spare parts: The quantities and values are uploaded at the same time using an ABAP program which calls transaction MB1C. The stock upload will generate the following entry in the system:- Finished goods stock a/c Debit Semi-Finished goods stock a/c Debit Raw Material stock a/c Debit Packing Material stock a/c Debit Stores and spares a/c Debit Data take over Credit 3. Mark and Release the cost estimate After the stock is uploaded into the system, the standard cost estimate will be marked and released into the material master using transaction code CK40N. 4. Upload Accounts Receivable and Accounts Payable open items The Accounts Receivable and Accounts Payable open items are uploaded through LSMW which calls transaction code F-02 GL Account posting. The profit center is captured in the data take over account. Baseline date must be captured, which will determine aging based on number of days mentioned in the payment terms. The accounting entry for Accounts Receivable open item upload is:- Customer a/c (not GL) Debit Data takeover a/c Credit
  • 7. The accounting entry for Accounts Payable open item upload is:- Data takeover a/c Debit Vendor a/c (not GL) Credit 5. Asset Master and value upload Asset Master is a special case of upload where in you upload not only the master data but also the values. The total cost and accumulated depreciation are also uploaded at the same time. This is done through transaction code AS91. We will explain how it is done. 5.1 The upload of asset master and values through AS91 This upload of asset masters along with the values will not update the FI General Ledger. The FI - GL entry balance update will be passed through another transaction. 5.2 Transfer Asset balance into profit center Once the asset master along with the values is uploaded, the opening balance for the asset needs to be transferred to profit center. The asset balances opening balances are transferred into profit center accounting through transaction code 1KEI. 5.3 Remove the GL codes for asset from 3KEH table Remove the Asset reconciliation codes from the transaction code 3KEH. This is required because a manual FI entry will be passed in the next step, which will duplicate posting into PCA for the assets. 5.4 Update the FI entry for asset through transaction OASV. We give an example of how a GL entry passed for Fixed asset upload:- Let us take Plant and Machinery Plant and Machinery a/c Dr 100,000 Accumulated depreciation a/c Cr 30,000 Data takeover a/c Cr 70,000
  • 8. 5.5 Reinstate the GL codes for asset in 3KEH After passing the entry for asset upload update the asset reconciliation accounts in transaction code 3KEH. 6. Upload General Ledger account balances Finally we upload the remaining General Ledger account balances other than Fixed Assets, Stock, Accounts Receivable and Accounts Payable. This is again uploaded through an LSMW program which calls transaction code F-02 GL. Posting. Let us take an example for the accounting entry passed:- Data takeover a/c Debit 550,000 (Balancing figure) Cash a/c Debit 10,000 Bank a/c Debit 50,000 Advances Debit 90,000 Share capital a/c Credit 100,000 Short term Loan a/c Credit 200,000 Long term loan a/c Credit 400,000 The Data takeover will become zero on upload of this entry.