Introduction
In late 2018, G-CON began working with a global
pharmaceutical company whose goal was to scale up their
manufacturing operations in the US and Europe for an
approved CAR-T product. Specifically, the client was
establishing internal lentivirus production capabilities, starting
with a fast-track clinical facility at the one of their existing sites.
In addition to the demand for clinical capabilities, a 200L
commercial operation was also required. Both projects were
schedule driven. The client chose G-CON’s POD technology for
the clinical portion due to its higher probability of success in
schedule driven projects.
Project Execution
To ensure project success in this new market, G-CON enlisted the
help of the Asgard Cleanroom Solutions (Asgard) and McElroy
Associates (MEA). Asgard, G-CON’s European supplier, is the
leading installer of architectural cleanroom components in
Europe. MEA is an engineering firm located in Dublin, has over 28
years’ experience supporting the pharmaceutical cleanroom
industry in Europe.
Asgard’s main objective/role was organizing the manufacturing
support to fabricate PODs for the European market. Their
expertise in architectural cleanroom systems and relationships
with other MEP installers ensured that G-CON provided their
customer with the highest quality components without
increasing the overall project cost.
MEA’s long standing knowledge of structural and MEP systems
allowed G-CON to quickly drive the design forward to POD
fabrication and fit out. As customer specifications and
requirements expanded during the project, MEA was able to
quickly adapt and update critical design elements without
delaying POD progress.
Project Challenges
In addition to being the first POD system G-CON has successfully
manufactured and installed at a client’s site in Europe, this project
presented several challenges that G-CON had not previously
faced:
This was the first POD system to be installed on the 5th floor of a
customer facility (with no additional landing) requiring the use of
multiple cranes to lift the PODs in place. The use of a second crane
provided stabilization so that the rigging points of the first crane
could be safely removed as the PODs entered the opening.
The truck staging area where PODs were lifted by cranes was on a
severe and unavoidable slope. In addition, there was only single
lane access where the PODs were rigged and lifted off the trailers.
After each trailer was set in place, an engineered ramp had to be
assembled so that the trucks could back on to it. Utilizing the ramps
and by making adjustments to the trucks air suspension, the PODs
were able to be leveled prior to their removal from the trailers.
The balcony at the POD entrance was unable to take on additional
loading. Working with the onsite construction team, arrangements
were made to add the final finished surface to the balcony once
the PODs were in place. This offset height was calculated with an
understanding of how far the PODs could enter the building prior to
removing their first rigging point in conjunction with the POD
overhead clearance.
The clearance dimensions around the PODs totaled 125 mm
(approximately 5 inches) both vertically and horizontally (75mm on
each side of the final SubPOD).
The local work force spoke German.
The overall clearance between the host facilities floors limited
access to the top of the PODs requiring a different approach to
plenum access.
Meeting Customer Needs
Through diligent planning and precision execution, G-CON was
able to deliver this POD system on time and within budget without
sacrificing any of G-CON’s stringent quality and safety
requirements. Once again, G-CON’s met its true measurement of
success, meeting customer needs so that all parties can focus on
what really matters, the patient.
www.gconbio.com

More Related Content

What's hot

Procon Systems Presentation.2007.Eng
Procon Systems Presentation.2007.EngProcon Systems Presentation.2007.Eng
Procon Systems Presentation.2007.Eng
aaupcfira
 
Paul Jeffery CV - FH 2016
Paul Jeffery CV - FH 2016Paul Jeffery CV - FH 2016
Paul Jeffery CV - FH 2016
Paul Jeffery
 
Eric_Nager_-resume_Dec 2015
Eric_Nager_-resume_Dec 2015Eric_Nager_-resume_Dec 2015
Eric_Nager_-resume_Dec 2015
Eric Nager
 
hemant kadam 6.3yrs exp
hemant kadam 6.3yrs exp hemant kadam 6.3yrs exp
hemant kadam 6.3yrs exp
Hemant Kadam
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14
briansrobert
 
anil kumar .B1
anil kumar .B1anil kumar .B1
anil kumar .B1
Anil Kumar
 
Owais Khan - NED cv
Owais Khan - NED cvOwais Khan - NED cv
Owais Khan - NED cv
Owais Khan
 
Resume_Inthiyaz_02AUG2016
Resume_Inthiyaz_02AUG2016Resume_Inthiyaz_02AUG2016
Resume_Inthiyaz_02AUG2016
Inthiyaz SM
 

What's hot (19)

Procon Systems Presentation.2007.Eng
Procon Systems Presentation.2007.EngProcon Systems Presentation.2007.Eng
Procon Systems Presentation.2007.Eng
 
Professional Presentation
Professional PresentationProfessional Presentation
Professional Presentation
 
Cv srinivasan
Cv srinivasanCv srinivasan
Cv srinivasan
 
CV_bioche_17_1_en
CV_bioche_17_1_enCV_bioche_17_1_en
CV_bioche_17_1_en
 
Cv vinaya
Cv vinayaCv vinaya
Cv vinaya
 
Resume uttam r
Resume uttam rResume uttam r
Resume uttam r
 
Paul Jeffery CV - FH 2016
Paul Jeffery CV - FH 2016Paul Jeffery CV - FH 2016
Paul Jeffery CV - FH 2016
 
Eric_Nager_-resume_Dec 2015
Eric_Nager_-resume_Dec 2015Eric_Nager_-resume_Dec 2015
Eric_Nager_-resume_Dec 2015
 
hemant kadam 6.3yrs exp
hemant kadam 6.3yrs exp hemant kadam 6.3yrs exp
hemant kadam 6.3yrs exp
 
Resume dharmendrakumar
Resume dharmendrakumarResume dharmendrakumar
Resume dharmendrakumar
 
Resume 2018
Resume 2018Resume 2018
Resume 2018
 
Brian teague resume10.29.14
Brian teague    resume10.29.14Brian teague    resume10.29.14
Brian teague resume10.29.14
 
anil kumar .B1
anil kumar .B1anil kumar .B1
anil kumar .B1
 
Portfolio_2014
Portfolio_2014Portfolio_2014
Portfolio_2014
 
Sandeep B_resume
Sandeep B_resumeSandeep B_resume
Sandeep B_resume
 
Paul Krynski
Paul KrynskiPaul Krynski
Paul Krynski
 
Owais Khan - NED cv
Owais Khan - NED cvOwais Khan - NED cv
Owais Khan - NED cv
 
resume_dharmendrakumar
resume_dharmendrakumarresume_dharmendrakumar
resume_dharmendrakumar
 
Resume_Inthiyaz_02AUG2016
Resume_Inthiyaz_02AUG2016Resume_Inthiyaz_02AUG2016
Resume_Inthiyaz_02AUG2016
 

Similar to Delivery of the First POD to Europe... Achieved with Flying Colors

HMAF Company Brochure
HMAF Company BrochureHMAF Company Brochure
HMAF Company Brochure
Patrick Ralph
 
Airport Capacity Solutions
Airport Capacity SolutionsAirport Capacity Solutions
Airport Capacity Solutions
Matthew Bates
 
Resource partnership case study
Resource partnership   case studyResource partnership   case study
Resource partnership case study
Zubin Poonawalla
 
Siemens.move up 2010-1-en
Siemens.move up 2010-1-enSiemens.move up 2010-1-en
Siemens.move up 2010-1-en
Intenta
 
MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)
mohamed atef
 
1 s2.0-s2351978920320436-main
1 s2.0-s2351978920320436-main1 s2.0-s2351978920320436-main
1 s2.0-s2351978920320436-main
BelalKAIBA
 
Company Profile 24 - 2 -2015
Company Profile 24 - 2 -2015Company Profile 24 - 2 -2015
Company Profile 24 - 2 -2015
Yousef H. Odeh
 

Similar to Delivery of the First POD to Europe... Achieved with Flying Colors (20)

Portfolio
PortfolioPortfolio
Portfolio
 
HMAF Company Brochure
HMAF Company BrochureHMAF Company Brochure
HMAF Company Brochure
 
Building utility scale projects in MENA. The mounting systems perspective.
Building utility scale projects in MENA. The mounting systems perspective. Building utility scale projects in MENA. The mounting systems perspective.
Building utility scale projects in MENA. The mounting systems perspective.
 
James McCann CV
James McCann CVJames McCann CV
James McCann CV
 
NOORMOHAMED K
NOORMOHAMED KNOORMOHAMED K
NOORMOHAMED K
 
Airport Capacity Solutions
Airport Capacity SolutionsAirport Capacity Solutions
Airport Capacity Solutions
 
Resource partnership case study
Resource partnership   case studyResource partnership   case study
Resource partnership case study
 
Resource partnership case study
Resource partnership   case studyResource partnership   case study
Resource partnership case study
 
How to Get iCON Ready
How to Get iCON ReadyHow to Get iCON Ready
How to Get iCON Ready
 
Siemens.move up 2010-1-en
Siemens.move up 2010-1-enSiemens.move up 2010-1-en
Siemens.move up 2010-1-en
 
MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)
 
1 s2.0-s2351978920320436-main
1 s2.0-s2351978920320436-main1 s2.0-s2351978920320436-main
1 s2.0-s2351978920320436-main
 
general introduction.pdf
general introduction.pdfgeneral introduction.pdf
general introduction.pdf
 
Octink construction product guide 2013
Octink construction product guide 2013Octink construction product guide 2013
Octink construction product guide 2013
 
Cv jason dixon dated 20160124
Cv jason dixon dated 20160124Cv jason dixon dated 20160124
Cv jason dixon dated 20160124
 
BIM professional Portfolio
BIM professional PortfolioBIM professional Portfolio
BIM professional Portfolio
 
MEKA BULLETIN
MEKA BULLETINMEKA BULLETIN
MEKA BULLETIN
 
Customer presentation
Customer presentationCustomer presentation
Customer presentation
 
Company Profile 24 - 2 -2015
Company Profile 24 - 2 -2015Company Profile 24 - 2 -2015
Company Profile 24 - 2 -2015
 
CV.2016
CV.2016CV.2016
CV.2016
 

More from Brittany Berryman

More from Brittany Berryman (8)

Standardized Cleanrooms Give Biopharma the Speed it Needs
Standardized Cleanrooms Give Biopharma the Speed it NeedsStandardized Cleanrooms Give Biopharma the Speed it Needs
Standardized Cleanrooms Give Biopharma the Speed it Needs
 
White paper 2020: G-CON's Transmissible Disease Defense Units
White paper 2020: G-CON's Transmissible Disease Defense UnitsWhite paper 2020: G-CON's Transmissible Disease Defense Units
White paper 2020: G-CON's Transmissible Disease Defense Units
 
The Importance of Reduced and Predictable Project Timelines, By: Dennis Power...
The Importance of Reduced and Predictable Project Timelines, By: Dennis Power...The Importance of Reduced and Predictable Project Timelines, By: Dennis Power...
The Importance of Reduced and Predictable Project Timelines, By: Dennis Power...
 
iCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here TodayiCON: The Turnkey Facility of the Future Here Today
iCON: The Turnkey Facility of the Future Here Today
 
Deployable Facilities Offer Pay As-You-Go Biomanufacturing Says Just
Deployable Facilities Offer Pay As-You-Go Biomanufacturing Says JustDeployable Facilities Offer Pay As-You-Go Biomanufacturing Says Just
Deployable Facilities Offer Pay As-You-Go Biomanufacturing Says Just
 
Cleanroom PODs with LifeAire Systems
Cleanroom PODs with LifeAire SystemsCleanroom PODs with LifeAire Systems
Cleanroom PODs with LifeAire Systems
 
Trends of Modular Mobile Cleanroom Facilities
Trends of Modular Mobile Cleanroom FacilitiesTrends of Modular Mobile Cleanroom Facilities
Trends of Modular Mobile Cleanroom Facilities
 
Cost Comparison of Cleanroom Designs
Cost Comparison of Cleanroom DesignsCost Comparison of Cleanroom Designs
Cost Comparison of Cleanroom Designs
 

Recently uploaded

Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
MaherOthman7
 
Microkernel in Operating System | Operating System
Microkernel in Operating System | Operating SystemMicrokernel in Operating System | Operating System
Microkernel in Operating System | Operating System
Sampad Kar
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
BalamuruganV28
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdf
Kamal Acharya
 

Recently uploaded (20)

Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdfInstruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
Instruct Nirmaana 24-Smart and Lean Construction Through Technology.pdf
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..Maher Othman Interior Design Portfolio..
Maher Othman Interior Design Portfolio..
 
Theory for How to calculation capacitor bank
Theory for How to calculation capacitor bankTheory for How to calculation capacitor bank
Theory for How to calculation capacitor bank
 
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
AI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdfAI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdf
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.
 
Microkernel in Operating System | Operating System
Microkernel in Operating System | Operating SystemMicrokernel in Operating System | Operating System
Microkernel in Operating System | Operating System
 
Introduction to Arduino Programming: Features of Arduino
Introduction to Arduino Programming: Features of ArduinoIntroduction to Arduino Programming: Features of Arduino
Introduction to Arduino Programming: Features of Arduino
 
Multivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxMultivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptx
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdf
 
Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdf
 
Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)Operating System chapter 9 (Virtual Memory)
Operating System chapter 9 (Virtual Memory)
 

Delivery of the First POD to Europe... Achieved with Flying Colors

  • 1. TECHNICALLY SPEAKING G-CON Manufacturing, Inc. | Technically Speaking Mark Taylor Director of Engineering and Project Management G-CON Manufacturing, Inc. Delivery of the First POD to Europe... Achieved with Flying Colors Introduction In late 2018, G-CON began working with a global pharmaceutical company whose goal was to scale up their manufacturing operations in the US and Europe for an approved CAR-T product. Specifically, the client was establishing internal lentivirus production capabilities, starting with a fast-track clinical facility at the one of their existing sites. In addition to the demand for clinical capabilities, a 200L commercial operation was also required. Both projects were schedule driven. The client chose G-CON’s POD technology for the clinical portion due to its higher probability of success in schedule driven projects. Project Execution To ensure project success in this new market, G-CON enlisted the help of the Asgard Cleanroom Solutions (Asgard) and McElroy Associates (MEA). Asgard, G-CON’s European supplier, is the leading installer of architectural cleanroom components in Europe. MEA is an engineering firm located in Dublin, has over 28 years’ experience supporting the pharmaceutical cleanroom industry in Europe. Asgard’s main objective/role was organizing the manufacturing support to fabricate PODs for the European market. Their expertise in architectural cleanroom systems and relationships with other MEP installers ensured that G-CON provided their customer with the highest quality components without increasing the overall project cost. MEA’s long standing knowledge of structural and MEP systems allowed G-CON to quickly drive the design forward to POD fabrication and fit out. As customer specifications and requirements expanded during the project, MEA was able to quickly adapt and update critical design elements without delaying POD progress. Project Challenges In addition to being the first POD system G-CON has successfully manufactured and installed at a client’s site in Europe, this project presented several challenges that G-CON had not previously faced: This was the first POD system to be installed on the 5th floor of a customer facility (with no additional landing) requiring the use of multiple cranes to lift the PODs in place. The use of a second crane provided stabilization so that the rigging points of the first crane could be safely removed as the PODs entered the opening. The truck staging area where PODs were lifted by cranes was on a severe and unavoidable slope. In addition, there was only single lane access where the PODs were rigged and lifted off the trailers. After each trailer was set in place, an engineered ramp had to be assembled so that the trucks could back on to it. Utilizing the ramps and by making adjustments to the trucks air suspension, the PODs were able to be leveled prior to their removal from the trailers. The balcony at the POD entrance was unable to take on additional loading. Working with the onsite construction team, arrangements were made to add the final finished surface to the balcony once the PODs were in place. This offset height was calculated with an understanding of how far the PODs could enter the building prior to removing their first rigging point in conjunction with the POD overhead clearance. The clearance dimensions around the PODs totaled 125 mm (approximately 5 inches) both vertically and horizontally (75mm on each side of the final SubPOD). The local work force spoke German. The overall clearance between the host facilities floors limited access to the top of the PODs requiring a different approach to plenum access. Meeting Customer Needs Through diligent planning and precision execution, G-CON was able to deliver this POD system on time and within budget without sacrificing any of G-CON’s stringent quality and safety requirements. Once again, G-CON’s met its true measurement of success, meeting customer needs so that all parties can focus on what really matters, the patient. www.gconbio.com