Stig Bengtsson SAR/MSA AIA RIBA LEED AP - BIM Manager at BAU Architects Stockholm
Reference models inside a BIM-authoring program
BIM-show live 2014
A CASE STUDY
!
!
!
!
!
project: Mall of Scandinavia
!
Bim program: ArchiCAD
!
reference format: IFC
www.bau.se
!
70 people
!
The office was founded in 1991 by
!
Hans Birkholz
Per-Eric Sundby
Peter Walker
!
BIM authoring program: ArchiCAD (55 licenses)
THE PROJECT:
- redevelopment started in 2005
!
- client: Råsta Projektutveckling
!
- contractor: PEAB
!
- focused around Friends Arena
!
- the largest shopping centre i Scandinavia
!
- also includes hotel, offices and housing
ARENASTADEN (the arena city)
SOLNA
Friends Arena
FIFA Goal of the Year 2013
THE INITIAL CONCEPT IN 2005
GOOGLE EARTH COORDINATES...
...TRANSFERED TO AERIAL PHOTOS...
...HAND DRAWINGS...
... AND PRESENTATIONS
2007 : THE FIRST SCHEME WITH
A SHOPPING CENTER
2008 : MALL OF SCANDINAVIA!
UNIBAIL-RODAMCO CAME ON BOARD
+9
+6
LOKVÄGEN
ARENAPLATSEN
PYRAMIDVÄGEN
DALVÄGEN
MAGASINSVÄGEN
VINTERVÄGEN
SWEDBANK ARENA
BOSTÄDER
BOSTÄDER
KOLONNVÄGEN
IDROTTSPLATS
BILBRO
GÅNGBRO
BACKVÄGEN
GUSTAV III:s BOULEVARD
+12.5
+2.6
+13.5
+3
+13.5
+18
ZONförfripassage+12
MALL OF SCANDINAVIA
HOTELL
KONTOR
KONTOR
BOSTÄDER
SOLNA STATION
RÅSTASJÖN
+9
+6
LOKVÄGEN
ARENAPLATSEN
PYRAMIDVÄGEN
DALVÄGEN
MAGASINSVÄGEN
VINTERVÄGEN
SWEDBANK ARENA
BOSTÄDER
BOSTÄDER
KOLONNVÄGEN
IDROTTSPLATS
BILBRO
GÅNGBRO
BACKVÄGEN
GUSTAV III:s BOULEVARD
+12.5
+2.6
+13.5
+3
+13.5
+18
ÄDEDE
ZONförfripassage+12
MALL OF SCANDINAVIA
HOTELL
KONTOR
KONTOR
BOSTÄDER
SOLNA STATION
THE ARENA CITYOLD TOWN STOCKHOLM
Friends Arena
Apartments
Hotel
Mall of Scandinavia
Residences
Offices
Office Buildings
client:
!
total area:
!
!
architects:
unibail-rodamco
!
300 000 m²
(100 000 m² retail)
!
BAU, Stockholm
Benoy, London
Wingårdhs, Göteborg
BAU ArchiCAD
SketchUp
Cinema4D
Benoy and
Wingårdhs
AutoCAD
3D Studio
the project started in january 2008
currently under construction
planned opening autumn 2015
MALL OF SCANDINAVIA
CONCEPTUAL DESIGN
!
2008-2010 Commercial master plan: Benoy
!
2009-2010 Exterior: BAU
!
2010-2011 Interior: Wingårdhs
!
BIM AND DOCUMENTATION
!
2011-2015 BAU
MALL OF SCANDINAVIA
Mall  of  Scandinavia  •  General  Sections  Option  A  •  Section  A2-­A2  Mall  A  •  Skala  1:100,  1:4000  (A1)  •  JB
B9 B10 B11 B12 B13 B14B8
8 100 8 100 8 100 8 100 8 100 8 100
+12,50
+9,70
+15,20
+6,60
+3,50
+20,70
Origo
±0
+3 Parkering
+3 500
+6,6 Parkering
+6 600
+9,7 Handel
+9 700
+15,2 Handel
+15 200
+20,7 Handel/parkering
+20 700
+23,8 Parkering
+23 800
+26,9 Parkering
+26 900
+30,45 Kontor
+30 450
+34,25 Kontor
+34 250
+38,05 Kontor
+38 050
A4-A
6
A6-A
6
A6-A7
873 m
2
Utrymn.
A2
A2
Text
parking
parking
shopping
shopping
shopping
INITIALLY 3 LEVELS OF RETAIL OVER 2 LEVELS OF PARKING
Text
.
Ny situation för tak över Mall B.
8,1 8,1 16,2
RBYGGNAD
D4 D5 D6 D7 D8
Mall B
GARAGE
GARAGE
GARAGE
Fläktrum
"Mall D"
A12
A12
A12
A12
A13
A13
A13
A13
A14
A14
A14
A14
A15
A15
A15
A15
A16
A16
A16
A16
A17
A17
A17
A17
A18
A18
A18
A18
A19
A19
A19
A19
A19
A19
A20
A20
A20
A20
8 100 8 100 8 100 8 100 8 100 8 100 8 100 8 100
Mall C
parking
shopping
parking
parking
shopping
shopping
parking
parking
shopping
shopping
parking
parking
PARKING BELOW AND ABOVE RETAIL
A27
A26
A25 A25
A24 A24
A23 A23
A22 A22
A21 A21
A20
A19
A18
A17
A16
A15
A14
A13
A12
A11
A10
A9
A8
A7
A6
A5
A4
A3
A2
A1
B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23 B24 B25 B26 B27 B28
B29 B30 B31 B32 B33 B34 B35 B36 B37 B38 B39 B40 B41 B42 B43 B44 B45 B46
D8
D7
D6
D5
D4
D3
D2
D1
E0
E1
E2
E3
E4
E5
E6
E7
E8
E9
E10
E11
E12
E13
E14
E15
E16
E17
E18
E19
E20
E21
E22
E23
E24
E25
E26
E27
E28
E29
E30
E31
E32
E33
E34
E35
E36
E37
E38
E39
E40
E41
E42
E43
E44
E45
E46
E47
E48
E49
E50
C1
GH1
GH2
GH3
GH6
GH7
GH8
GH9
GH10
GH11
GH12
PH4
PH1
PH2
PH3
PH5
PH6
GH13
GH14
PH9
PH10
GH16
GH15
GH17
GH18
PH12
PH11
PH13
PH14
VS3VS3
TRADE UP
5 072 m²
TRADE UP
987 m²
TRADE UP
130 m²
TRADE UP
1 735 m²
TRADE UP
1 350 m²
FOOD STORE
6 001 m²
TRADE UP
2 232 m²
TRADE UP
2 363 m²
TRADE UP
1 842 m²
TRADE UP
4 266 m²
VS2
VS2
VS4
VS4
3
23
EXTERIOR
Joined or Separate?NERAL
Joined or Separate?GENERAL
concept study
Byrån f
ALL OF SCANDINAVIA • ARENASTADEN • 2009 06 23
Reliefed concrete panels together with
strips of light create a large pattern that
ties the building into one volume
H&M,
Herzog &
1 2 3
concept development
Option:A “Ice-flows”
concept development
CANDINAVIA | SOLNA STADSBYGGNADSNÄMND | 2011 05 18
Byrån för Arkitektur & Ur
INTERIOR
+9.3
+9.3
RAMPTILL+6,65
Trapphus/Kontor
Schakt/Kontor
TAKH
ÖJD
UND
ER
RAM
P H=2
300
EVAKUERINGSGÅNG
LÖPER PARALLELLT MED BILRAMP
H=23
80
BOSTÄ
DER
BOSTÄ
DER
BOST.
KO
NT
OR
T1
6
GH1:1
GH1:2
GH1:3
GH2:1
GH1:9
GH
1:1
4
GH
2:3
GH1:12 GH1:13
GH1:10
GH1:11
PH3:1
PH3:2
GH2:4 GH2:5
GH
1:1
5
GH2:2
EARTH
WIND
WATER
FIRE
T2
2
T10
T10
T10
T10
T3
T3
T2
T2
T15
T15
T14
T2
0
T2
0
T12
T12
T2
1
T1
T1
T2
0
T2
2
UKSCHAKTBOTTEN+13,1
SE
RV
ICEK
ORR
ID
OR
Godshissar
SE
RV
ICEK
ORR
ID
OR
0604
0604
06
04
06
05
We
lco
me
Ha
ll
Vent H
TL/FL
Servicekorridor
Servicekorridor
0604
06
04
11
02
06
04
10
09
PO
ST
03
07
Vent G FL
RÖR
Elschaktgarage
0604 Elschakt
Elschaktgarage
0201 Miljorum
08
10
Frd
/nä
tbu
rar
0604 El typ1
07
02
,07
03
,07
04
07
06
07
05
07
08
Servicekorridor
0604 El typ1
0307Städ
0702,0704,0710
0703
0708
0703
0705 0705
0706
0702,0704
0706
Uthyrbaraförråd/omklädningsrum
Loge
Eventförråd (låg takhöjd)
Servicekorridor
Uth
yrb
ara
för
råd
Uthyrbaraförråd/omklädningsrum
GH1:4
GH1:5
HH7:1
T9
T9T9
T1
7
T1
7
T1
8
T1
8
RT
39
RT
40
RT26
RT25
T1
8
T4
T11
T11
+9,9
0806 Kid cars
0805 Automatytor
0807 Aktivitetsplats
0811 Bankomat
ZON MED REDUCERAD FRI HÖJD
PASSERANDE VENTILATIONSSTRÅK
UK +14,3
UK+13,7
ZO
N MED
RE
DU
CE
RA
D FR
I HÖ
JD
PA
SS
ER
AN
DE
VE
NT
ILA
TIO
NS
ST
RÅ
K
UK
+1
4,3
08
11
Ba
nk
om
at
ZONBAKOMFACKVERK
ZONMEDREDUCERADFRI
HÖJD
UK+13,1
ZONMEDREDUCERADFRI
HÖJD
UK+13,1
ZONMEDREDUCERADFRI
HÖJD
UK+13,1
GH1:8GH1:7
PH
3:
4
PH
3:
3
PH3:7PH3:8
PH3:5
PH3:6
GH1:6
PH
6:1
PH
6:2
BOSTÄ
DER
BOSTÄ
DER
ÖPPETNED
ÖP
PETNE
D
KONTOR
KO
NT
OR
0307 Städ
0201 Miljörum
1104 Servicestation
0201 Miljorum
0604 El typ1
Godshissar
Godshissar
06
04
0605
Servicekorridor
Servicekorridor
0307 Städ
SE
RV
ICEK
ORR
ID
OR
10
06
PA
US
RU
M
04
04
RW
C
10
08
VIL
RU
M
10
07
KP
R
10
02
FÖ
RR
ÅD
/KO
P.
Frd (uthyrbart)
02
01
10
01
10
01
10
01
10
01
10
01
0306 Städ
Hiss
0605 El typ2
0605 El typ2
08
08
RM
U
10
05
GÄ
STA
RB
.PL
.
SERVICEKORRIDOR
Utrym
ning
Servicekorridor
HISSH
ALL
Rör
Hisshall
Servicekorridor
Servicekorridor
Hisshall
Servicekorridor
Servicekorridor
Hisshall
Servicekorridor
PA
SS
AGE
El typ1 garage
Fläktrum
Fläktrum Garage
Ve
nt
Fläktrum0412 Vilrum
Vent HFrd (uthyrbart)
0201 Miljörum
03
07
SE
RV
ICEK
ORR
ID
OR
11
02
11
08
Tag
s
06
05
SE
RV
ICEK
ORR
ID
OR
05
02
Ark
iv
05
01
DR
IFT
LED
.
Vent G FL
Sluss
04
03
04
09
11
09
PE
NT
RY
10
04
KO
NF
.RU
M
11
06
VA
KT
RU
M
04
03
10
03
KO
NF
.RU
M
11
04
SER
VIC
EST
AT
ION
11
07
El typ1 garage
Sluss
11
09
10
02
08
10
FR
D/
NÄ
TB
UR
AR
SER
VIC
EK
OR
RID
OR
Frd
(ut
hy
rba
rt)
07
02
,07
03
,07
04
,07
10
04
13
AN
DA
KT
02
01
MI
LJÖ
RU
M
Servicekorridor
SLU
SS
FÖ
RR
ÅD
(UT
HY
RB
AR
T)
Sluss
Sluss
Sluss
FÖ
RR
UM
Rör
LEVEL 30
SCOPE 4
VY FRÅN MÅLBR
VY FRÅN SIGNALBRON
DESIGN TOOLS
!
ArchiCAD
FormZ
Cinema4D
SketchUp
Photoshop
!
3D-MODELS
!
ArchiCAD
FormZ
Cinema4D
SketchUp
!
DOCUMENTATION
!
ArchiCAD
MODELING AND DOCUMENTATION
8 linked files:
!
site model
exterior
structure
stairs and core
interior walls
ceilings
interiors
shop layouts
!
10-12 users
ArchiCad 13 & 14 (TW2)
!
4 linked files:
!
site model
!
exterior
!
interior
!
!
shop layouts
!
6-8 users
ArchiCad 12 (TW1)
exclusively linked .mod-files - no linked .pln-files and no ”nested” modules
leads to quicker updates and better control over file content
Jan. 2008 - Aug. 2009: Sep. 2009 - Dec. 2011:
ArchiCAD versions och file structure
ArchiCad 15, 16 & 17 (TW2)
!
11 linked files:
!
site model
!
!
8 block models
!
a combined model
!
shop layouts
!
15-18 users
Jan. 2012 and on:
ArchiCAD-model + ”Ice flows” from Cinema4D
!
Cinema4D + Photoshop
construction studies in SketchUp
... with the roof tool and saved as multi-story
”facade objects”...
ArchiCAD 14
ArchiCAD 16
... morph
REFERENCE MODELS INSIDE OF ARCHICAD
SOURCES
!
Tekla
!
PILINGS, FOUNDATIONS AND GROUND FLOOR SLAB
!
PRECAST CONCRETE
!
PRIMARY STEEL STRUCTURE
!
SECONDARY STRUCTURE
MAGICAD
!
MECHANICAL
FILTER UNNECESSARY DETAILS
TRANSLATORS FOR IMPORT AND EXPORT
FILTERING THE PREFAB CONCRETE AFTER IMPORT
FILTERING THE STEEL FRAME AFTER IMPORT
CHANGING PROPERTIES AFTER IMPORT
COORDINATION SECTIONS
COORDINATION VIEW SETTINGS
A BEAM IS A BEAM AND NOT JUST ANOTHER OBJECT
BOOLEAN OPERATOR LAYER
BOOLEAN OPERATOR LAYER TURNED OFF
LIGHT FIXTURES
CABLE TRAYS
SPRINKLERS
SECONDARY STRUCTURE
IFC IS NOT PERFECT
VY FRÅN SIGNALBRON

Más contenido relacionado

Destacado

BIM SHOW LIVE 14 - BIM for manufacturers
BIM SHOW LIVE 14 - BIM for manufacturersBIM SHOW LIVE 14 - BIM for manufacturers
BIM SHOW LIVE 14 - BIM for manufacturersBuiltEnvironmentUBM
 
BIM Show Live 2015: BIM for SMEs #BSLSME
BIM Show Live 2015: BIM for SMEs #BSLSMEBIM Show Live 2015: BIM for SMEs #BSLSME
BIM Show Live 2015: BIM for SMEs #BSLSMEBuiltEnvironmentUBM
 
BIM SHOW LIVE 14 - SME architectural BIM journey
BIM SHOW LIVE 14 - SME architectural BIM journeyBIM SHOW LIVE 14 - SME architectural BIM journey
BIM SHOW LIVE 14 - SME architectural BIM journeyBuiltEnvironmentUBM
 
ワイルドサービス部のご紹介
ワイルドサービス部のご紹介ワイルドサービス部のご紹介
ワイルドサービス部のご紹介osaka_wild
 
起業体験役割別説明会2014(社長&マネージャー)
起業体験役割別説明会2014(社長&マネージャー)起業体験役割別説明会2014(社長&マネージャー)
起業体験役割別説明会2014(社長&マネージャー)ShinagawaJ
 
BIM SHOW LIVE 14 - Attempting to comply Level 2 BIM as an SME QS working on s...
BIM SHOW LIVE 14 - Attempting to comply Level 2 BIM as an SME QS working on s...BIM SHOW LIVE 14 - Attempting to comply Level 2 BIM as an SME QS working on s...
BIM SHOW LIVE 14 - Attempting to comply Level 2 BIM as an SME QS working on s...BuiltEnvironmentUBM
 
BIM SHOW LIVE 14 - BIM for residential
BIM SHOW LIVE 14 -  BIM for residentialBIM SHOW LIVE 14 -  BIM for residential
BIM SHOW LIVE 14 - BIM for residentialBuiltEnvironmentUBM
 
BIM Show Live 2015: Single or Multiple Models
BIM Show Live 2015: Single or Multiple ModelsBIM Show Live 2015: Single or Multiple Models
BIM Show Live 2015: Single or Multiple ModelsBuiltEnvironmentUBM
 
BIM Show Live 2015: BIM HEALTH & SAFETY FOR VIRTUALLY SORTED
BIM Show Live 2015: BIM HEALTH & SAFETY FOR VIRTUALLY SORTEDBIM Show Live 2015: BIM HEALTH & SAFETY FOR VIRTUALLY SORTED
BIM Show Live 2015: BIM HEALTH & SAFETY FOR VIRTUALLY SORTEDBuiltEnvironmentUBM
 
BIM Show Live 2015: The challenges and the wins of Information Management on...
 BIM Show Live 2015: The challenges and the wins of Information Management on... BIM Show Live 2015: The challenges and the wins of Information Management on...
BIM Show Live 2015: The challenges and the wins of Information Management on...BuiltEnvironmentUBM
 
BIM SHOW LIVE 14 - IFC: the developers perspective
BIM SHOW LIVE 14 - IFC: the developers perspectiveBIM SHOW LIVE 14 - IFC: the developers perspective
BIM SHOW LIVE 14 - IFC: the developers perspectiveBuiltEnvironmentUBM
 
BIM Show Live 2015: Link between BIM and Energy Simulation
BIM Show Live 2015: Link between BIM and Energy SimulationBIM Show Live 2015: Link between BIM and Energy Simulation
BIM Show Live 2015: Link between BIM and Energy SimulationBuiltEnvironmentUBM
 
BIM SHOW LIVE 14: Big BIM Theory
BIM SHOW LIVE 14: Big BIM TheoryBIM SHOW LIVE 14: Big BIM Theory
BIM SHOW LIVE 14: Big BIM TheoryBuiltEnvironmentUBM
 
BIM SHOW LIVE 14 - 4D BIM: successful implementation at Gravesened Railway St...
BIM SHOW LIVE 14 - 4D BIM: successful implementation at Gravesened Railway St...BIM SHOW LIVE 14 - 4D BIM: successful implementation at Gravesened Railway St...
BIM SHOW LIVE 14 - 4D BIM: successful implementation at Gravesened Railway St...BuiltEnvironmentUBM
 
Nagari wisata Sumatera barat
Nagari wisata Sumatera baratNagari wisata Sumatera barat
Nagari wisata Sumatera baratIbeng Photowork
 
BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM
BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIMBIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM
BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIMBuiltEnvironmentUBM
 

Destacado (19)

July 13, 2014 zopar
July 13, 2014 zoparJuly 13, 2014 zopar
July 13, 2014 zopar
 
BIM SHOW LIVE 14 - BIM for manufacturers
BIM SHOW LIVE 14 - BIM for manufacturersBIM SHOW LIVE 14 - BIM for manufacturers
BIM SHOW LIVE 14 - BIM for manufacturers
 
BIM Show Live 2015: BIM for SMEs #BSLSME
BIM Show Live 2015: BIM for SMEs #BSLSMEBIM Show Live 2015: BIM for SMEs #BSLSME
BIM Show Live 2015: BIM for SMEs #BSLSME
 
BIM SHOW LIVE 14 - SME architectural BIM journey
BIM SHOW LIVE 14 - SME architectural BIM journeyBIM SHOW LIVE 14 - SME architectural BIM journey
BIM SHOW LIVE 14 - SME architectural BIM journey
 
July 6, 2014 zopar
July 6, 2014 zoparJuly 6, 2014 zopar
July 6, 2014 zopar
 
ワイルドサービス部のご紹介
ワイルドサービス部のご紹介ワイルドサービス部のご紹介
ワイルドサービス部のご紹介
 
起業体験役割別説明会2014(社長&マネージャー)
起業体験役割別説明会2014(社長&マネージャー)起業体験役割別説明会2014(社長&マネージャー)
起業体験役割別説明会2014(社長&マネージャー)
 
BIM SHOW LIVE 14 - Attempting to comply Level 2 BIM as an SME QS working on s...
BIM SHOW LIVE 14 - Attempting to comply Level 2 BIM as an SME QS working on s...BIM SHOW LIVE 14 - Attempting to comply Level 2 BIM as an SME QS working on s...
BIM SHOW LIVE 14 - Attempting to comply Level 2 BIM as an SME QS working on s...
 
BIM SHOW LIVE 14 - BIM for residential
BIM SHOW LIVE 14 -  BIM for residentialBIM SHOW LIVE 14 -  BIM for residential
BIM SHOW LIVE 14 - BIM for residential
 
BIM Show Live 2015: Single or Multiple Models
BIM Show Live 2015: Single or Multiple ModelsBIM Show Live 2015: Single or Multiple Models
BIM Show Live 2015: Single or Multiple Models
 
BIM Show Live 2015: BIM HEALTH & SAFETY FOR VIRTUALLY SORTED
BIM Show Live 2015: BIM HEALTH & SAFETY FOR VIRTUALLY SORTEDBIM Show Live 2015: BIM HEALTH & SAFETY FOR VIRTUALLY SORTED
BIM Show Live 2015: BIM HEALTH & SAFETY FOR VIRTUALLY SORTED
 
BIM Show Live 2015: The challenges and the wins of Information Management on...
 BIM Show Live 2015: The challenges and the wins of Information Management on... BIM Show Live 2015: The challenges and the wins of Information Management on...
BIM Show Live 2015: The challenges and the wins of Information Management on...
 
BIM SHOW LIVE 14 - IFC: the developers perspective
BIM SHOW LIVE 14 - IFC: the developers perspectiveBIM SHOW LIVE 14 - IFC: the developers perspective
BIM SHOW LIVE 14 - IFC: the developers perspective
 
BIM Show Live 2015: Link between BIM and Energy Simulation
BIM Show Live 2015: Link between BIM and Energy SimulationBIM Show Live 2015: Link between BIM and Energy Simulation
BIM Show Live 2015: Link between BIM and Energy Simulation
 
BIM SHOW LIVE 14: Big BIM Theory
BIM SHOW LIVE 14: Big BIM TheoryBIM SHOW LIVE 14: Big BIM Theory
BIM SHOW LIVE 14: Big BIM Theory
 
BIM SHOW LIVE 14 - 4D BIM: successful implementation at Gravesened Railway St...
BIM SHOW LIVE 14 - 4D BIM: successful implementation at Gravesened Railway St...BIM SHOW LIVE 14 - 4D BIM: successful implementation at Gravesened Railway St...
BIM SHOW LIVE 14 - 4D BIM: successful implementation at Gravesened Railway St...
 
Nagari wisata Sumatera barat
Nagari wisata Sumatera baratNagari wisata Sumatera barat
Nagari wisata Sumatera barat
 
BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM
BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIMBIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM
BIM SHOW LIVE 14 - Lego to Minecraft: from 3D CAD to BIM
 
Seerwan's CV
Seerwan's  CVSeerwan's  CV
Seerwan's CV
 

Similar a BIM SHOW LIVE 14 - Reference models inside a BIM-authoring program

Portfolio of Projects: Retail, Shopping Malls, Offices done by Etem Systems
Portfolio of Projects: Retail, Shopping Malls, Offices done by Etem SystemsPortfolio of Projects: Retail, Shopping Malls, Offices done by Etem Systems
Portfolio of Projects: Retail, Shopping Malls, Offices done by Etem SystemsAndreas Laspadakis
 
Red Design Group - Commercial Credentials
Red Design Group - Commercial CredentialsRed Design Group - Commercial Credentials
Red Design Group - Commercial CredentialsRhys Mullarvey
 
Leicester riders
Leicester ridersLeicester riders
Leicester ridersDavid Eeles
 
OVALLE roberto - portfolio English
OVALLE roberto - portfolio EnglishOVALLE roberto - portfolio English
OVALLE roberto - portfolio EnglishRoberto Ovalle
 
198-200 THE ENTRANCE ERINA s
198-200 THE ENTRANCE ERINA s198-200 THE ENTRANCE ERINA s
198-200 THE ENTRANCE ERINA sMike Darwich
 
OBP_Broch_9200_UpdateOct2020_WEB_AMEND.pdf
OBP_Broch_9200_UpdateOct2020_WEB_AMEND.pdfOBP_Broch_9200_UpdateOct2020_WEB_AMEND.pdf
OBP_Broch_9200_UpdateOct2020_WEB_AMEND.pdfRobert Tannoury
 
Focus On Zinc n° 11 - VMZINC - 2009
Focus On Zinc n° 11 - VMZINC - 2009Focus On Zinc n° 11 - VMZINC - 2009
Focus On Zinc n° 11 - VMZINC - 2009VMZINC
 
Showcase Hire Binder 02
Showcase Hire Binder 02Showcase Hire Binder 02
Showcase Hire Binder 02Nattz Zing
 
Olav De Boer Projecten Tot 2010
Olav De Boer Projecten Tot 2010Olav De Boer Projecten Tot 2010
Olav De Boer Projecten Tot 2010semraenolav
 
Focus On Zinc, special issue n° 4: ARCHIZINC TROPHY
Focus On Zinc, special issue n° 4: ARCHIZINC TROPHYFocus On Zinc, special issue n° 4: ARCHIZINC TROPHY
Focus On Zinc, special issue n° 4: ARCHIZINC TROPHYVMZINC
 
Cecilia comper portfolio
Cecilia comper portfolioCecilia comper portfolio
Cecilia comper portfolioCecilia Comper
 
The New KAUP Double Pallet Handler on Show at IMHX
The New KAUP Double Pallet Handler on Show at IMHXThe New KAUP Double Pallet Handler on Show at IMHX
The New KAUP Double Pallet Handler on Show at IMHXMJDelaMasa
 
Portfolio ismaiel alkadi - interior design
Portfolio   ismaiel alkadi - interior designPortfolio   ismaiel alkadi - interior design
Portfolio ismaiel alkadi - interior designISMAIELAlkadi
 
Societe Fonciere Lyonnaise - 2013 Annual Results Presentation
Societe Fonciere Lyonnaise - 2013 Annual Results Presentation Societe Fonciere Lyonnaise - 2013 Annual Results Presentation
Societe Fonciere Lyonnaise - 2013 Annual Results Presentation Company Spotlight
 
UK Group at OTC brochure 2017
UK Group at OTC brochure 2017UK Group at OTC brochure 2017
UK Group at OTC brochure 2017Raelene Rifkind
 
Final year Revit project
Final year Revit projectFinal year Revit project
Final year Revit projectMark Thornton
 
Investfinans ab Erfahrungen 200 Million Euro Investment
Investfinans ab Erfahrungen 200 Million Euro InvestmentInvestfinans ab Erfahrungen 200 Million Euro Investment
Investfinans ab Erfahrungen 200 Million Euro InvestmentPerAnders1
 

Similar a BIM SHOW LIVE 14 - Reference models inside a BIM-authoring program (20)

Portfolio of Projects: Retail, Shopping Malls, Offices done by Etem Systems
Portfolio of Projects: Retail, Shopping Malls, Offices done by Etem SystemsPortfolio of Projects: Retail, Shopping Malls, Offices done by Etem Systems
Portfolio of Projects: Retail, Shopping Malls, Offices done by Etem Systems
 
Red Design Group - Commercial Credentials
Red Design Group - Commercial CredentialsRed Design Group - Commercial Credentials
Red Design Group - Commercial Credentials
 
Leicester riders
Leicester ridersLeicester riders
Leicester riders
 
OVALLE roberto - portfolio English
OVALLE roberto - portfolio EnglishOVALLE roberto - portfolio English
OVALLE roberto - portfolio English
 
198-200 THE ENTRANCE ERINA s
198-200 THE ENTRANCE ERINA s198-200 THE ENTRANCE ERINA s
198-200 THE ENTRANCE ERINA s
 
OBP_Broch_9200_UpdateOct2020_WEB_AMEND.pdf
OBP_Broch_9200_UpdateOct2020_WEB_AMEND.pdfOBP_Broch_9200_UpdateOct2020_WEB_AMEND.pdf
OBP_Broch_9200_UpdateOct2020_WEB_AMEND.pdf
 
Smm hamburg 2014 olaf
Smm hamburg 2014 olafSmm hamburg 2014 olaf
Smm hamburg 2014 olaf
 
ARROW - PFEIL
ARROW - PFEILARROW - PFEIL
ARROW - PFEIL
 
Focus On Zinc n° 11 - VMZINC - 2009
Focus On Zinc n° 11 - VMZINC - 2009Focus On Zinc n° 11 - VMZINC - 2009
Focus On Zinc n° 11 - VMZINC - 2009
 
Showcase Hire Binder 02
Showcase Hire Binder 02Showcase Hire Binder 02
Showcase Hire Binder 02
 
Olav De Boer Projecten Tot 2010
Olav De Boer Projecten Tot 2010Olav De Boer Projecten Tot 2010
Olav De Boer Projecten Tot 2010
 
Focus On Zinc, special issue n° 4: ARCHIZINC TROPHY
Focus On Zinc, special issue n° 4: ARCHIZINC TROPHYFocus On Zinc, special issue n° 4: ARCHIZINC TROPHY
Focus On Zinc, special issue n° 4: ARCHIZINC TROPHY
 
Cecilia comper portfolio
Cecilia comper portfolioCecilia comper portfolio
Cecilia comper portfolio
 
The New KAUP Double Pallet Handler on Show at IMHX
The New KAUP Double Pallet Handler on Show at IMHXThe New KAUP Double Pallet Handler on Show at IMHX
The New KAUP Double Pallet Handler on Show at IMHX
 
Portfolio ismaiel alkadi - interior design
Portfolio   ismaiel alkadi - interior designPortfolio   ismaiel alkadi - interior design
Portfolio ismaiel alkadi - interior design
 
Societe Fonciere Lyonnaise - 2013 Annual Results Presentation
Societe Fonciere Lyonnaise - 2013 Annual Results Presentation Societe Fonciere Lyonnaise - 2013 Annual Results Presentation
Societe Fonciere Lyonnaise - 2013 Annual Results Presentation
 
Look Ahead
Look AheadLook Ahead
Look Ahead
 
UK Group at OTC brochure 2017
UK Group at OTC brochure 2017UK Group at OTC brochure 2017
UK Group at OTC brochure 2017
 
Final year Revit project
Final year Revit projectFinal year Revit project
Final year Revit project
 
Investfinans ab Erfahrungen 200 Million Euro Investment
Investfinans ab Erfahrungen 200 Million Euro InvestmentInvestfinans ab Erfahrungen 200 Million Euro Investment
Investfinans ab Erfahrungen 200 Million Euro Investment
 

Último

High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Forming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptForming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptNoman khan
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsResearcher Researcher
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organizationchnrketan
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptxmohitesoham12
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmDeepika Walanjkar
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTSneha Padhiar
 

Último (20)

High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Forming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptForming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).ppt
 
Novel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending ActuatorsNovel 3D-Printed Soft Linear and Bending Actuators
Novel 3D-Printed Soft Linear and Bending Actuators
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptxTriangulation survey (Basic Mine Surveying)_MI10412MI.pptx
Triangulation survey (Basic Mine Surveying)_MI10412MI.pptx
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
priority interrupt computer organization
priority interrupt computer organizationpriority interrupt computer organization
priority interrupt computer organization
 
Python Programming for basic beginners.pptx
Python Programming for basic beginners.pptxPython Programming for basic beginners.pptx
Python Programming for basic beginners.pptx
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithmComputer Graphics Introduction, Open GL, Line and Circle drawing algorithm
Computer Graphics Introduction, Open GL, Line and Circle drawing algorithm
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENTFUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
FUNCTIONAL AND NON FUNCTIONAL REQUIREMENT
 

BIM SHOW LIVE 14 - Reference models inside a BIM-authoring program

  • 1. Stig Bengtsson SAR/MSA AIA RIBA LEED AP - BIM Manager at BAU Architects Stockholm Reference models inside a BIM-authoring program BIM-show live 2014
  • 2. A CASE STUDY ! ! ! ! ! project: Mall of Scandinavia ! Bim program: ArchiCAD ! reference format: IFC
  • 3. www.bau.se ! 70 people ! The office was founded in 1991 by ! Hans Birkholz Per-Eric Sundby Peter Walker ! BIM authoring program: ArchiCAD (55 licenses)
  • 4. THE PROJECT: - redevelopment started in 2005 ! - client: Råsta Projektutveckling ! - contractor: PEAB ! - focused around Friends Arena ! - the largest shopping centre i Scandinavia ! - also includes hotel, offices and housing ARENASTADEN (the arena city) SOLNA
  • 5. Friends Arena FIFA Goal of the Year 2013
  • 6.
  • 7.
  • 13. 2007 : THE FIRST SCHEME WITH A SHOPPING CENTER
  • 14.
  • 15.
  • 16. 2008 : MALL OF SCANDINAVIA! UNIBAIL-RODAMCO CAME ON BOARD
  • 17.
  • 18. +9 +6 LOKVÄGEN ARENAPLATSEN PYRAMIDVÄGEN DALVÄGEN MAGASINSVÄGEN VINTERVÄGEN SWEDBANK ARENA BOSTÄDER BOSTÄDER KOLONNVÄGEN IDROTTSPLATS BILBRO GÅNGBRO BACKVÄGEN GUSTAV III:s BOULEVARD +12.5 +2.6 +13.5 +3 +13.5 +18 ZONförfripassage+12 MALL OF SCANDINAVIA HOTELL KONTOR KONTOR BOSTÄDER SOLNA STATION RÅSTASJÖN +9 +6 LOKVÄGEN ARENAPLATSEN PYRAMIDVÄGEN DALVÄGEN MAGASINSVÄGEN VINTERVÄGEN SWEDBANK ARENA BOSTÄDER BOSTÄDER KOLONNVÄGEN IDROTTSPLATS BILBRO GÅNGBRO BACKVÄGEN GUSTAV III:s BOULEVARD +12.5 +2.6 +13.5 +3 +13.5 +18 ÄDEDE ZONförfripassage+12 MALL OF SCANDINAVIA HOTELL KONTOR KONTOR BOSTÄDER SOLNA STATION
  • 19. THE ARENA CITYOLD TOWN STOCKHOLM
  • 20.
  • 21. Friends Arena Apartments Hotel Mall of Scandinavia Residences Offices Office Buildings
  • 22. client: ! total area: ! ! architects: unibail-rodamco ! 300 000 m² (100 000 m² retail) ! BAU, Stockholm Benoy, London Wingårdhs, Göteborg BAU ArchiCAD SketchUp Cinema4D Benoy and Wingårdhs AutoCAD 3D Studio the project started in january 2008 currently under construction planned opening autumn 2015 MALL OF SCANDINAVIA
  • 23. CONCEPTUAL DESIGN ! 2008-2010 Commercial master plan: Benoy ! 2009-2010 Exterior: BAU ! 2010-2011 Interior: Wingårdhs ! BIM AND DOCUMENTATION ! 2011-2015 BAU MALL OF SCANDINAVIA
  • 24. Mall  of  Scandinavia  •  General  Sections  Option  A  •  Section  A2-­A2  Mall  A  •  Skala  1:100,  1:4000  (A1)  •  JB B9 B10 B11 B12 B13 B14B8 8 100 8 100 8 100 8 100 8 100 8 100 +12,50 +9,70 +15,20 +6,60 +3,50 +20,70 Origo ±0 +3 Parkering +3 500 +6,6 Parkering +6 600 +9,7 Handel +9 700 +15,2 Handel +15 200 +20,7 Handel/parkering +20 700 +23,8 Parkering +23 800 +26,9 Parkering +26 900 +30,45 Kontor +30 450 +34,25 Kontor +34 250 +38,05 Kontor +38 050 A4-A 6 A6-A 6 A6-A7 873 m 2 Utrymn. A2 A2 Text parking parking shopping shopping shopping INITIALLY 3 LEVELS OF RETAIL OVER 2 LEVELS OF PARKING
  • 25. Text
  • 26. . Ny situation för tak över Mall B. 8,1 8,1 16,2 RBYGGNAD D4 D5 D6 D7 D8 Mall B GARAGE GARAGE GARAGE Fläktrum "Mall D" A12 A12 A12 A12 A13 A13 A13 A13 A14 A14 A14 A14 A15 A15 A15 A15 A16 A16 A16 A16 A17 A17 A17 A17 A18 A18 A18 A18 A19 A19 A19 A19 A19 A19 A20 A20 A20 A20 8 100 8 100 8 100 8 100 8 100 8 100 8 100 8 100 Mall C parking shopping parking parking shopping shopping parking parking shopping shopping parking parking PARKING BELOW AND ABOVE RETAIL
  • 27. A27 A26 A25 A25 A24 A24 A23 A23 A22 A22 A21 A21 A20 A19 A18 A17 A16 A15 A14 A13 A12 A11 A10 A9 A8 A7 A6 A5 A4 A3 A2 A1 B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17 B18 B19 B20 B21 B22 B23 B24 B25 B26 B27 B28 B29 B30 B31 B32 B33 B34 B35 B36 B37 B38 B39 B40 B41 B42 B43 B44 B45 B46 D8 D7 D6 D5 D4 D3 D2 D1 E0 E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 E35 E36 E37 E38 E39 E40 E41 E42 E43 E44 E45 E46 E47 E48 E49 E50 C1 GH1 GH2 GH3 GH6 GH7 GH8 GH9 GH10 GH11 GH12 PH4 PH1 PH2 PH3 PH5 PH6 GH13 GH14 PH9 PH10 GH16 GH15 GH17 GH18 PH12 PH11 PH13 PH14 VS3VS3 TRADE UP 5 072 m² TRADE UP 987 m² TRADE UP 130 m² TRADE UP 1 735 m² TRADE UP 1 350 m² FOOD STORE 6 001 m² TRADE UP 2 232 m² TRADE UP 2 363 m² TRADE UP 1 842 m² TRADE UP 4 266 m² VS2 VS2 VS4 VS4
  • 29.
  • 31.
  • 33. Byrån f ALL OF SCANDINAVIA • ARENASTADEN • 2009 06 23 Reliefed concrete panels together with strips of light create a large pattern that ties the building into one volume H&M, Herzog &
  • 34.
  • 35. 1 2 3 concept development
  • 37.
  • 38.
  • 39.
  • 40. CANDINAVIA | SOLNA STADSBYGGNADSNÄMND | 2011 05 18 Byrån för Arkitektur & Ur
  • 42. +9.3 +9.3 RAMPTILL+6,65 Trapphus/Kontor Schakt/Kontor TAKH ÖJD UND ER RAM P H=2 300 EVAKUERINGSGÅNG LÖPER PARALLELLT MED BILRAMP H=23 80 BOSTÄ DER BOSTÄ DER BOST. KO NT OR T1 6 GH1:1 GH1:2 GH1:3 GH2:1 GH1:9 GH 1:1 4 GH 2:3 GH1:12 GH1:13 GH1:10 GH1:11 PH3:1 PH3:2 GH2:4 GH2:5 GH 1:1 5 GH2:2 EARTH WIND WATER FIRE T2 2 T10 T10 T10 T10 T3 T3 T2 T2 T15 T15 T14 T2 0 T2 0 T12 T12 T2 1 T1 T1 T2 0 T2 2 UKSCHAKTBOTTEN+13,1 SE RV ICEK ORR ID OR Godshissar SE RV ICEK ORR ID OR 0604 0604 06 04 06 05 We lco me Ha ll Vent H TL/FL Servicekorridor Servicekorridor 0604 06 04 11 02 06 04 10 09 PO ST 03 07 Vent G FL RÖR Elschaktgarage 0604 Elschakt Elschaktgarage 0201 Miljorum 08 10 Frd /nä tbu rar 0604 El typ1 07 02 ,07 03 ,07 04 07 06 07 05 07 08 Servicekorridor 0604 El typ1 0307Städ 0702,0704,0710 0703 0708 0703 0705 0705 0706 0702,0704 0706 Uthyrbaraförråd/omklädningsrum Loge Eventförråd (låg takhöjd) Servicekorridor Uth yrb ara för råd Uthyrbaraförråd/omklädningsrum GH1:4 GH1:5 HH7:1 T9 T9T9 T1 7 T1 7 T1 8 T1 8 RT 39 RT 40 RT26 RT25 T1 8 T4 T11 T11 +9,9 0806 Kid cars 0805 Automatytor 0807 Aktivitetsplats 0811 Bankomat ZON MED REDUCERAD FRI HÖJD PASSERANDE VENTILATIONSSTRÅK UK +14,3 UK+13,7 ZO N MED RE DU CE RA D FR I HÖ JD PA SS ER AN DE VE NT ILA TIO NS ST RÅ K UK +1 4,3 08 11 Ba nk om at ZONBAKOMFACKVERK ZONMEDREDUCERADFRI HÖJD UK+13,1 ZONMEDREDUCERADFRI HÖJD UK+13,1 ZONMEDREDUCERADFRI HÖJD UK+13,1 GH1:8GH1:7 PH 3: 4 PH 3: 3 PH3:7PH3:8 PH3:5 PH3:6 GH1:6 PH 6:1 PH 6:2 BOSTÄ DER BOSTÄ DER ÖPPETNED ÖP PETNE D KONTOR KO NT OR 0307 Städ 0201 Miljörum 1104 Servicestation 0201 Miljorum 0604 El typ1 Godshissar Godshissar 06 04 0605 Servicekorridor Servicekorridor 0307 Städ SE RV ICEK ORR ID OR 10 06 PA US RU M 04 04 RW C 10 08 VIL RU M 10 07 KP R 10 02 FÖ RR ÅD /KO P. Frd (uthyrbart) 02 01 10 01 10 01 10 01 10 01 10 01 0306 Städ Hiss 0605 El typ2 0605 El typ2 08 08 RM U 10 05 GÄ STA RB .PL . SERVICEKORRIDOR Utrym ning Servicekorridor HISSH ALL Rör Hisshall Servicekorridor Servicekorridor Hisshall Servicekorridor Servicekorridor Hisshall Servicekorridor PA SS AGE El typ1 garage Fläktrum Fläktrum Garage Ve nt Fläktrum0412 Vilrum Vent HFrd (uthyrbart) 0201 Miljörum 03 07 SE RV ICEK ORR ID OR 11 02 11 08 Tag s 06 05 SE RV ICEK ORR ID OR 05 02 Ark iv 05 01 DR IFT LED . Vent G FL Sluss 04 03 04 09 11 09 PE NT RY 10 04 KO NF .RU M 11 06 VA KT RU M 04 03 10 03 KO NF .RU M 11 04 SER VIC EST AT ION 11 07 El typ1 garage Sluss 11 09 10 02 08 10 FR D/ NÄ TB UR AR SER VIC EK OR RID OR Frd (ut hy rba rt) 07 02 ,07 03 ,07 04 ,07 10 04 13 AN DA KT 02 01 MI LJÖ RU M Servicekorridor SLU SS FÖ RR ÅD (UT HY RB AR T) Sluss Sluss Sluss FÖ RR UM Rör LEVEL 30
  • 44.
  • 48. 8 linked files: ! site model exterior structure stairs and core interior walls ceilings interiors shop layouts ! 10-12 users ArchiCad 13 & 14 (TW2) ! 4 linked files: ! site model ! exterior ! interior ! ! shop layouts ! 6-8 users ArchiCad 12 (TW1) exclusively linked .mod-files - no linked .pln-files and no ”nested” modules leads to quicker updates and better control over file content Jan. 2008 - Aug. 2009: Sep. 2009 - Dec. 2011: ArchiCAD versions och file structure ArchiCad 15, 16 & 17 (TW2) ! 11 linked files: ! site model ! ! 8 block models ! a combined model ! shop layouts ! 15-18 users Jan. 2012 and on:
  • 49. ArchiCAD-model + ”Ice flows” from Cinema4D
  • 52. ... with the roof tool and saved as multi-story ”facade objects”... ArchiCAD 14 ArchiCAD 16 ... morph
  • 53. REFERENCE MODELS INSIDE OF ARCHICAD
  • 54. SOURCES ! Tekla ! PILINGS, FOUNDATIONS AND GROUND FLOOR SLAB ! PRECAST CONCRETE ! PRIMARY STEEL STRUCTURE ! SECONDARY STRUCTURE
  • 58.
  • 59. FILTERING THE PREFAB CONCRETE AFTER IMPORT
  • 60. FILTERING THE STEEL FRAME AFTER IMPORT
  • 64. A BEAM IS A BEAM AND NOT JUST ANOTHER OBJECT
  • 71. IFC IS NOT PERFECT