River Linking Project in Jalgaon District.pptx

  1. 1. River Linking Project in Jalgaon District Presented by: Vineet B. Chavan 22070146002 1
  2. 2. River Linking  Basic Concept ● India is moving forward with a gigantic civil engineering project to link 44 rivers via a vast network of canals. ● RLP will hold and circulate water in order to decrease both time and space. 2
  3. 3. Jalgaon District Rainfall- 27% to 57% Drought condition in district while neighbours having overflowing dams. Proposed RLP in Jalgaon. 3
  4. 4. AOI 4
  5. 5. Objectives 1. Divert water from water-scarce areas to the district's dry and semiarid regions. 2. Analyze the soils and morphology of the region to determine how to recharge areas interact with geology and geomorphic methods. 3. Provide appropriate locations and artificial recharge techniques to help the local groundwater recharge. 5
  6. 6. Drought conditions Scarcity of water for agriculture Environmental Issues Land Acquisition Problems faced? 6
  7. 7. • Records keeping would be much easier • Using GIS technologies for better result • Agriculture land will get more amount of water supply • • Most of the lands in Jalgaon will be under in water catchment post-monsoon Drought Agriculture Land Acquisition Survey 7
  8. 8. Sr.no Description Amount 1 Research Staff 11,30,000.00 2 Equipment & Study Material 2,52,000.00 3 Field Work Consultation 68,000.00 4 Establishment Charges 70,000.00 5 Software Charges 5,20,000.00 20,40,000.00 1,02,000.00 1,02,000.00 3,67,200.00 26,11,200.00 Price Escalation cost 5%@ (a) GST 18%@ (a) Grand Total Abstract for Estimated Cost Total (a) Contengencies 5%@ (a) "C:SIG SEM IRMEstimation (1).xlsx" 8
  9. 9. Weeek > 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Total Weeks 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 1 Reconnaissance Survey 1-Nov-2022 30-Nov-2022 4 2 Selection the area where to do drone mapping with it ensure safety majors 15-Nov-2022 6-Dec-2022 3 3 Site Selection for sample collection 6-Dec-2022 21-Dec-2022 2 4 Drone Survey across the study area 12-Dec-2022 27-Mar-2023 15 5 Water, Soil Samples Collection 22-Dec-2022 16-Mar-2023 12 6 Water, Soil sample Laboratory Analysis 23-Dec-2022 17-Mar-2023 12 7 Preperation of Questionnaire for Opinion Survey 1-Nov-2022 16-Nov-2022 2 8 Public Openion Survey by on field survey and Google Form 21-Nov-2022 8-May-2023 24 9 Secondary Data Collection 1-Nov-2022 11-Jul-2023 36 10 Drone Processing on Drone 2 map Software 1-Mar-2023 10-May-2023 10 11 Digitization of Complete project area with exact geolocation 1-May-2023 10-Jul-2023 10 12 Digitization and Georeferencing of collected secondery data 12-Jul-2023 16-Aug-2023 5 13 Study and Analysis the data and Draft DPR preperation 21-Aug-2023 13-Nov-2023 12 14 Taking Experts openion & revaluate the report and Final Report Preperation & Submission 14-Nov-2023 19-Dec-2023 5 No of Weeks 2022 Sr.no Activities Planned Start Date Planned Finish Date 2023 Detailed Scheduling of an Project Aug Sept Oct Nov Dec Feb March Apr May June July Nov Dec Jan "C:SIG SEM IRMScheduling (1).xlsx" 9
  10. 10. Thank You 10