Koshi Dam
Name :- Dipesh kumar sah
Enrollment no :-190303104066
Introduction of koshi river
• Koshi river is also called as Saptakosi whose
tributaries river are Sunkosi, Arun, Tamor,
Dudhkosi, Likhu, Tamakosi, and Indrawati.
• Total catchment area 92,538 km2.
• Travels 729 km before joining the Ganges at
Kurusela
• Avg. annual yield 50 billion m3
• Signed in 25th April 1954 between the
government of India and Nepal. The main
objective of that is hydropower , irrigation ,
flood control and navigation.
• Agreed to construct a Dam 3 miles upstream
of Hanuman nagar town.
• Build big concrete dam from Baraha chhetra
to Hanuman nagar of Nepal to control the
floods.
Introduction of koshi Barrage
• The koshi barrage is across the koshi river.
• It was build between 1958 to 1962.
• It has 56 gate to control the water.
• Total length of dam is 1150m and width is
10m.
• Height of dam is 269m (883 ft).
Introduction of koshi Barrage
Purpose of Dam
generation of Hydroelectric power(3000 MW).
Irrigation :- Kosi project irrigation of 87,000
hectares of Nepali Land, Indian land 2 million
hectares.
Flood control :-
• Initial agreements 783 feet high dam, 6.9
million acre feet of water, Dam at Chatara and,
desilation and improved drainage, 90,000 kw
of hydroelectricity
Kosi Terms
• Construction of Dam, Headworks and other
appurtenant works about 3 miles upstream of
Hanuman Nagar town on Kosi with afflux and
flood banks and canals within territories of
Nepal.
• Purpose: Flood control, irrigation, generation
of Hydroelectric power and prevention of
erosion of Nepal.
Hydropower potential 22,000 MW
Two peculiar characteristics
Carries huge amount of silt, sand and debris
Westward moving i.e. in last 250 years moved
westward 112 km
• 16 Clauses and sub-clauses of Kosi treaty
• Many unequal arrangements which caused many hues and cries against it.
• Clause 4(i) has not mentioned Nepal’s right to withdraw water from Kosi for
irrigation or for any other purposes or from its tributaries
• Clause 5(i) spelt for indefinite period of ownership of Nepalese project land by
India
• Clause 9(ii) of the treaty states that threatened condition of Dam or erosion of the
structure on account of the river, the officer of the project may restrict public
traffic under intimation of government of Nepal
• Nepal has to provide land, timber, sand, stone and other construction materials
free of cost
• It also clearly mentions in the treaty clause 7 that no charges of custom duty of
any kind during construction and subsequent maintenance of the project
• In fact, Nepal has contributed the same amount as much as India i.e land and
other necessary facilites to construct the Dam whereas India agreed to construct
the Dam, headwork and other connected works at the cost of India
• “Bandh Bannu purwa Kosi bharat ko dukha thiyo, yojana pachi nepal ko
dukha bhaeko cha” Shastra Dutta Panta
• The malasies is all the more unmistakable where India exercise control
over water supply as say in the Kosi and Gandak project, the water supply
becomes irregular because the structures geared to Nepal are not
properly maintained. The priority always goes to supplying water to the
Indian Canal System particularly in the lean season the Nepalese farmers
are very much left high and dry” Aditya Man Shrestha
• Fear of India: India wants to control the floods of Kosi river and other way
India wants to provide little water to Nepalese people
• Expected to irrigate 740,000 hectare and 312,000 hectare area by the
eastern and western canals
• A hydropower unit to generate 20 MW utilizing a drop was constructed in
the eastern main canal
• Inundation canal was also built at chatara to irrigate a gross area of 86,000
hectare in Nepal.
• Nepal provided 225 square km of fertile land of Terai, 10 lakhs cubic feet of timber,
uncountable stones and sands, elephants, communication facilities, fuel energy of
wood up to the project to 30,000 labourers free of cost
• More than that Nepal does not have any rights to levy any custom duty during
construction, future maintenance of the Dam and other related work according to
the Clause 7 of the treaty.
• More benefitial to India in terms of flood control, irrigation facilities, navigation
uses and domestic and drinking water
• Less advantageous to Nepal: Acknowledged by Indian academics also very late.
• Disadvantageous situation of Nepal: Nepalese expert did not study the project
properly, hasty decisions were taken, treaty was signed in an unstable government
of Matrika Prasad Koirala, Zero sum outcome to Nepal
• Nepalese see these agreements as an instance of loss of sovereignty as the
clauses in the original agreement gave Indian exclusive control over the project
installation and over the water allocation.
• Rishikesh Shah said,” Nepal and India have been at fault as they had been at the
time of Kosi and Gandak project.
• Nepali Congress govt. was called seller of country.
• Nepal’s critical situation is equally responsible
for the least benefits of the Kosi project.
• 42.5 crores cash contribution from India,
however Nepal contributed more than 42.5
crore in the form of land, stone, sand, timber,
labourers etc.
• India offered Devighat hydropower for
appeasing Nepal as a compensation of Kosi
project
• “ Kosi agreement turned out to be a one sided
collaboration at the cost of poor Nepal. …………
does not at all give the impression that two
sovereign states had signed it. ………… as if a
provincial authority was signing an agreement
with the central authority”. Aditya Man
Shrestha
• Kosi project irrigation of 87,000 hectares of
Nepali Land, Indian land 2 million hectares
• Control of the Dam bridge was given to India.
• The bridge connects vital link between eastern
and other parts of Nepal.
• Construction and properties of the Project belong
to India
• Communication facilities used freely by India
whereas these were not open to the Nepalese
side.
• Administrative power also taken by India
• Fishing rights up to two miles
• Positive aspect article 10 of the treaty.
• Free and unrestricted navigation in the Kosi
river.
• Has not been implemented on the grounds of
technical problems.
• Amendments to the treaty in Article 4,5
and16.
• Article 4(i) HMG has the right to withdraw
water for irrigation and power generation
from Kosi or its tributaries.
• Article 5 (i) Leasing of the land for 199 years
instead of unlimited at a nominal rate.
• Reiterated in Article 16.
• Eastern Canal 612,500 hectare and Western Canal 356,610 ha of
land of India
• Nepal irrigated land is negligible.
• 50% of electricity from any power house located 10 mile radius
• Cost involved (need to pay)
• Very unreliable and poor quality electricity supply.
• Irrigation project handed over to Nepal.
• Frequent repair and maintenance of the project through the World
Bank three time using loan and one time grant to correct the
mistakes
• Chatra Irrigation project- More irrigation facility
• Not effective, seepage due to poor quality, hampers the irrigation
• 13,800 ha of land in Saptri district, 11.4 cumecs of water from Kosi
• Solely dependent on the whims of the Indian
authority.
• Lean season, it is not available
• Get enough water at the time of rainy season.
• What a treaty!!!

More Related Content

What's hot

North Indian weddings
North Indian weddingsNorth Indian weddings
North Indian weddingsBeena Edward
 
Training PPT on DVC Maithon
Training PPT on DVC MaithonTraining PPT on DVC Maithon
Training PPT on DVC MaithonQamre Alam
 
Hydro power policies and guidelines
Hydro power policies and guidelinesHydro power policies and guidelines
Hydro power policies and guidelinesProbodh Mallick
 
Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.Nikul Gopani
 
Industrial visit report on Ujjani dam on 22 August 2017.
Industrial visit report on Ujjani dam on 22 August 2017.Industrial visit report on Ujjani dam on 22 August 2017.
Industrial visit report on Ujjani dam on 22 August 2017.Ganesh Raut
 
Egovernance Initiatives Of Karnataka
Egovernance Initiatives Of KarnatakaEgovernance Initiatives Of Karnataka
Egovernance Initiatives Of KarnatakaAnirban Mukerji
 
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandShadab Khan
 
Headworks and barrages in pakistan
Headworks and barrages in pakistan Headworks and barrages in pakistan
Headworks and barrages in pakistan Abdul Mannan
 
Hydropower projects in Nepal_Country Report
Hydropower projects in Nepal_Country ReportHydropower projects in Nepal_Country Report
Hydropower projects in Nepal_Country ReportHari Shrestha
 
Training report on DVC
Training report on DVCTraining report on DVC
Training report on DVCLinkon Khan
 
Jal manthan 16 april 2016
Jal manthan  16 april 2016Jal manthan  16 april 2016
Jal manthan 16 april 2016Jaspreet Aulakh
 
environmental movements in india and kerala
environmental movements in  india and keralaenvironmental movements in  india and kerala
environmental movements in india and keralasana sana
 
Water crisis in pakistan A presentation By Mr Allah Dad Khan
Water crisis in pakistan  A presentation By Mr Allah Dad KhanWater crisis in pakistan  A presentation By Mr Allah Dad Khan
Water crisis in pakistan A presentation By Mr Allah Dad KhanMr.Allah Dad Khan
 
Nepal east west rail project-feasibility study draft report presentation
Nepal east west rail project-feasibility study draft report presentationNepal east west rail project-feasibility study draft report presentation
Nepal east west rail project-feasibility study draft report presentationBhim Upadhyaya
 
Nepal Introduction
Nepal IntroductionNepal Introduction
Nepal Introductionrkmahajan
 

What's hot (20)

Bishnoi movement
Bishnoi movementBishnoi movement
Bishnoi movement
 
North Indian weddings
North Indian weddingsNorth Indian weddings
North Indian weddings
 
Training PPT on DVC Maithon
Training PPT on DVC MaithonTraining PPT on DVC Maithon
Training PPT on DVC Maithon
 
Hydro power policies and guidelines
Hydro power policies and guidelinesHydro power policies and guidelines
Hydro power policies and guidelines
 
Mumbai Local
Mumbai LocalMumbai Local
Mumbai Local
 
Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.Sardar Sarovar Dam, Gujarat, India.
Sardar Sarovar Dam, Gujarat, India.
 
mangla dam
mangla dammangla dam
mangla dam
 
Industrial visit report on Ujjani dam on 22 August 2017.
Industrial visit report on Ujjani dam on 22 August 2017.Industrial visit report on Ujjani dam on 22 August 2017.
Industrial visit report on Ujjani dam on 22 August 2017.
 
Egovernance Initiatives Of Karnataka
Egovernance Initiatives Of KarnatakaEgovernance Initiatives Of Karnataka
Egovernance Initiatives Of Karnataka
 
Vocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR UttarakhandVocational training report NHPC TANAKPUR Uttarakhand
Vocational training report NHPC TANAKPUR Uttarakhand
 
Headworks and barrages in pakistan
Headworks and barrages in pakistan Headworks and barrages in pakistan
Headworks and barrages in pakistan
 
Hydropower projects in Nepal_Country Report
Hydropower projects in Nepal_Country ReportHydropower projects in Nepal_Country Report
Hydropower projects in Nepal_Country Report
 
Training report on DVC
Training report on DVCTraining report on DVC
Training report on DVC
 
Jal manthan 16 april 2016
Jal manthan  16 april 2016Jal manthan  16 april 2016
Jal manthan 16 april 2016
 
environmental movements in india and kerala
environmental movements in  india and keralaenvironmental movements in  india and kerala
environmental movements in india and kerala
 
Water crisis in pakistan A presentation By Mr Allah Dad Khan
Water crisis in pakistan  A presentation By Mr Allah Dad KhanWater crisis in pakistan  A presentation By Mr Allah Dad Khan
Water crisis in pakistan A presentation By Mr Allah Dad Khan
 
Final Suli Report
Final Suli ReportFinal Suli Report
Final Suli Report
 
Mullaperiyar dam
Mullaperiyar damMullaperiyar dam
Mullaperiyar dam
 
Nepal east west rail project-feasibility study draft report presentation
Nepal east west rail project-feasibility study draft report presentationNepal east west rail project-feasibility study draft report presentation
Nepal east west rail project-feasibility study draft report presentation
 
Nepal Introduction
Nepal IntroductionNepal Introduction
Nepal Introduction
 

Similar to kosi-barrage.pptx

Indusriverbasinpaper hasrat-130119064313-phpapp02
Indusriverbasinpaper hasrat-130119064313-phpapp02Indusriverbasinpaper hasrat-130119064313-phpapp02
Indusriverbasinpaper hasrat-130119064313-phpapp02Abhyuday Raj Sinha
 
India Pakistan Relation International Relation for UPSC IR
India Pakistan Relation International Relation for UPSC IRIndia Pakistan Relation International Relation for UPSC IR
India Pakistan Relation International Relation for UPSC IRIas Toss
 
Indus river system
Indus river systemIndus river system
Indus river systemMehro6
 
Indus water treaty : Media & Current Affairs : Student Collaboration
Indus water treaty : Media & Current Affairs : Student CollaborationIndus water treaty : Media & Current Affairs : Student Collaboration
Indus water treaty : Media & Current Affairs : Student CollaborationAli Haider Saeed
 
Indus water treaty and its Aftermath - The complete Story
Indus water treaty and its Aftermath - The complete Story Indus water treaty and its Aftermath - The complete Story
Indus water treaty and its Aftermath - The complete Story Asma Akbar
 
Indus Water Treaty
Indus Water TreatyIndus Water Treaty
Indus Water Treatybabak danyal
 
Kala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehmanKala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehmansabir rehman
 
Indus water treaty by Dr. Zafar Iqbal
Indus water treaty by Dr. Zafar IqbalIndus water treaty by Dr. Zafar Iqbal
Indus water treaty by Dr. Zafar IqbalFreelanced
 
INDUS WATER TREATY.
INDUS WATER TREATY.INDUS WATER TREATY.
INDUS WATER TREATY.Komal Tiwari
 
Undala Alam - India and Pakistan's truculent co-operation - is 50 years enough?
Undala Alam - India and Pakistan's truculent co-operation - is 50 years enough?Undala Alam - India and Pakistan's truculent co-operation - is 50 years enough?
Undala Alam - India and Pakistan's truculent co-operation - is 50 years enough?STEPS Centre
 
indus water treaty
indus water treatyindus water treaty
indus water treatyAxix Khan
 
Enablers - Indus Water Treaty.pptx
Enablers - Indus Water Treaty.pptxEnablers - Indus Water Treaty.pptx
Enablers - Indus Water Treaty.pptxAhsanBashir38
 
Inter-StateWaterDispute.pptx
Inter-StateWaterDispute.pptxInter-StateWaterDispute.pptx
Inter-StateWaterDispute.pptxPapuKumarNaik1
 
pakistan indus basin irrigation system
pakistan indus basin irrigation system pakistan indus basin irrigation system
pakistan indus basin irrigation system Usman Khawaja
 
Uri hydel power project
Uri hydel power projectUri hydel power project
Uri hydel power projectlonez
 

Similar to kosi-barrage.pptx (20)

Pak india water issue
Pak   india water issuePak   india water issue
Pak india water issue
 
Indusriverbasinpaper hasrat-130119064313-phpapp02
Indusriverbasinpaper hasrat-130119064313-phpapp02Indusriverbasinpaper hasrat-130119064313-phpapp02
Indusriverbasinpaper hasrat-130119064313-phpapp02
 
India Pakistan Relation International Relation for UPSC IR
India Pakistan Relation International Relation for UPSC IRIndia Pakistan Relation International Relation for UPSC IR
India Pakistan Relation International Relation for UPSC IR
 
Indus river system
Indus river systemIndus river system
Indus river system
 
Indus water treaty : Media & Current Affairs : Student Collaboration
Indus water treaty : Media & Current Affairs : Student CollaborationIndus water treaty : Media & Current Affairs : Student Collaboration
Indus water treaty : Media & Current Affairs : Student Collaboration
 
Indus water treaty
Indus water treatyIndus water treaty
Indus water treaty
 
Indus water treaty and its Aftermath - The complete Story
Indus water treaty and its Aftermath - The complete Story Indus water treaty and its Aftermath - The complete Story
Indus water treaty and its Aftermath - The complete Story
 
Indus water Treaty for 0 level
Indus water Treaty for 0 levelIndus water Treaty for 0 level
Indus water Treaty for 0 level
 
Indus Water Treaty
Indus Water TreatyIndus Water Treaty
Indus Water Treaty
 
Kala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehmanKala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehman
 
Indus water treaty by Dr. Zafar Iqbal
Indus water treaty by Dr. Zafar IqbalIndus water treaty by Dr. Zafar Iqbal
Indus water treaty by Dr. Zafar Iqbal
 
INDUS WATER TREATY.
INDUS WATER TREATY.INDUS WATER TREATY.
INDUS WATER TREATY.
 
Kala bag
Kala bagKala bag
Kala bag
 
Undala Alam - India and Pakistan's truculent co-operation - is 50 years enough?
Undala Alam - India and Pakistan's truculent co-operation - is 50 years enough?Undala Alam - India and Pakistan's truculent co-operation - is 50 years enough?
Undala Alam - India and Pakistan's truculent co-operation - is 50 years enough?
 
indus water treaty
indus water treatyindus water treaty
indus water treaty
 
Enablers - Indus Water Treaty.pptx
Enablers - Indus Water Treaty.pptxEnablers - Indus Water Treaty.pptx
Enablers - Indus Water Treaty.pptx
 
Inter-StateWaterDispute.pptx
Inter-StateWaterDispute.pptxInter-StateWaterDispute.pptx
Inter-StateWaterDispute.pptx
 
Water scenario
Water scenarioWater scenario
Water scenario
 
pakistan indus basin irrigation system
pakistan indus basin irrigation system pakistan indus basin irrigation system
pakistan indus basin irrigation system
 
Uri hydel power project
Uri hydel power projectUri hydel power project
Uri hydel power project
 

Recently uploaded

Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 

Recently uploaded (20)

Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 

kosi-barrage.pptx

  • 1. Koshi Dam Name :- Dipesh kumar sah Enrollment no :-190303104066
  • 2. Introduction of koshi river • Koshi river is also called as Saptakosi whose tributaries river are Sunkosi, Arun, Tamor, Dudhkosi, Likhu, Tamakosi, and Indrawati. • Total catchment area 92,538 km2. • Travels 729 km before joining the Ganges at Kurusela • Avg. annual yield 50 billion m3
  • 3. • Signed in 25th April 1954 between the government of India and Nepal. The main objective of that is hydropower , irrigation , flood control and navigation. • Agreed to construct a Dam 3 miles upstream of Hanuman nagar town. • Build big concrete dam from Baraha chhetra to Hanuman nagar of Nepal to control the floods. Introduction of koshi Barrage
  • 4. • The koshi barrage is across the koshi river. • It was build between 1958 to 1962. • It has 56 gate to control the water. • Total length of dam is 1150m and width is 10m. • Height of dam is 269m (883 ft). Introduction of koshi Barrage
  • 5. Purpose of Dam generation of Hydroelectric power(3000 MW). Irrigation :- Kosi project irrigation of 87,000 hectares of Nepali Land, Indian land 2 million hectares. Flood control :-
  • 6. • Initial agreements 783 feet high dam, 6.9 million acre feet of water, Dam at Chatara and, desilation and improved drainage, 90,000 kw of hydroelectricity
  • 7. Kosi Terms • Construction of Dam, Headworks and other appurtenant works about 3 miles upstream of Hanuman Nagar town on Kosi with afflux and flood banks and canals within territories of Nepal. • Purpose: Flood control, irrigation, generation of Hydroelectric power and prevention of erosion of Nepal.
  • 8. Hydropower potential 22,000 MW Two peculiar characteristics Carries huge amount of silt, sand and debris Westward moving i.e. in last 250 years moved westward 112 km
  • 9. • 16 Clauses and sub-clauses of Kosi treaty • Many unequal arrangements which caused many hues and cries against it. • Clause 4(i) has not mentioned Nepal’s right to withdraw water from Kosi for irrigation or for any other purposes or from its tributaries • Clause 5(i) spelt for indefinite period of ownership of Nepalese project land by India • Clause 9(ii) of the treaty states that threatened condition of Dam or erosion of the structure on account of the river, the officer of the project may restrict public traffic under intimation of government of Nepal • Nepal has to provide land, timber, sand, stone and other construction materials free of cost • It also clearly mentions in the treaty clause 7 that no charges of custom duty of any kind during construction and subsequent maintenance of the project • In fact, Nepal has contributed the same amount as much as India i.e land and other necessary facilites to construct the Dam whereas India agreed to construct the Dam, headwork and other connected works at the cost of India
  • 10. • “Bandh Bannu purwa Kosi bharat ko dukha thiyo, yojana pachi nepal ko dukha bhaeko cha” Shastra Dutta Panta • The malasies is all the more unmistakable where India exercise control over water supply as say in the Kosi and Gandak project, the water supply becomes irregular because the structures geared to Nepal are not properly maintained. The priority always goes to supplying water to the Indian Canal System particularly in the lean season the Nepalese farmers are very much left high and dry” Aditya Man Shrestha • Fear of India: India wants to control the floods of Kosi river and other way India wants to provide little water to Nepalese people • Expected to irrigate 740,000 hectare and 312,000 hectare area by the eastern and western canals • A hydropower unit to generate 20 MW utilizing a drop was constructed in the eastern main canal • Inundation canal was also built at chatara to irrigate a gross area of 86,000 hectare in Nepal.
  • 11. • Nepal provided 225 square km of fertile land of Terai, 10 lakhs cubic feet of timber, uncountable stones and sands, elephants, communication facilities, fuel energy of wood up to the project to 30,000 labourers free of cost • More than that Nepal does not have any rights to levy any custom duty during construction, future maintenance of the Dam and other related work according to the Clause 7 of the treaty. • More benefitial to India in terms of flood control, irrigation facilities, navigation uses and domestic and drinking water • Less advantageous to Nepal: Acknowledged by Indian academics also very late. • Disadvantageous situation of Nepal: Nepalese expert did not study the project properly, hasty decisions were taken, treaty was signed in an unstable government of Matrika Prasad Koirala, Zero sum outcome to Nepal • Nepalese see these agreements as an instance of loss of sovereignty as the clauses in the original agreement gave Indian exclusive control over the project installation and over the water allocation. • Rishikesh Shah said,” Nepal and India have been at fault as they had been at the time of Kosi and Gandak project. • Nepali Congress govt. was called seller of country.
  • 12. • Nepal’s critical situation is equally responsible for the least benefits of the Kosi project. • 42.5 crores cash contribution from India, however Nepal contributed more than 42.5 crore in the form of land, stone, sand, timber, labourers etc. • India offered Devighat hydropower for appeasing Nepal as a compensation of Kosi project
  • 13. • “ Kosi agreement turned out to be a one sided collaboration at the cost of poor Nepal. ………… does not at all give the impression that two sovereign states had signed it. ………… as if a provincial authority was signing an agreement with the central authority”. Aditya Man Shrestha • Kosi project irrigation of 87,000 hectares of Nepali Land, Indian land 2 million hectares
  • 14. • Control of the Dam bridge was given to India. • The bridge connects vital link between eastern and other parts of Nepal. • Construction and properties of the Project belong to India • Communication facilities used freely by India whereas these were not open to the Nepalese side. • Administrative power also taken by India • Fishing rights up to two miles
  • 15. • Positive aspect article 10 of the treaty. • Free and unrestricted navigation in the Kosi river. • Has not been implemented on the grounds of technical problems.
  • 16. • Amendments to the treaty in Article 4,5 and16. • Article 4(i) HMG has the right to withdraw water for irrigation and power generation from Kosi or its tributaries. • Article 5 (i) Leasing of the land for 199 years instead of unlimited at a nominal rate. • Reiterated in Article 16.
  • 17. • Eastern Canal 612,500 hectare and Western Canal 356,610 ha of land of India • Nepal irrigated land is negligible. • 50% of electricity from any power house located 10 mile radius • Cost involved (need to pay) • Very unreliable and poor quality electricity supply. • Irrigation project handed over to Nepal. • Frequent repair and maintenance of the project through the World Bank three time using loan and one time grant to correct the mistakes • Chatra Irrigation project- More irrigation facility • Not effective, seepage due to poor quality, hampers the irrigation • 13,800 ha of land in Saptri district, 11.4 cumecs of water from Kosi
  • 18. • Solely dependent on the whims of the Indian authority. • Lean season, it is not available • Get enough water at the time of rainy season. • What a treaty!!!