A REPORT ON INDUSTRIAL VISIT TO
Ri-Bhoi District,Meghalaya
ON
2TH
April 2015
UNDER THE AEGIS OF
UNIVERSITY OF TECHNOLOGY & MANAGEMENT
SHILLONG,MEGHALAYA(793001)
Submitted To : Submitted By :
MS. Pronami Bora Chakresh Tiwari
B-tech ECE 4th sem.
Roll No. : R020113004
2
CONTENTS
Sr. No. Title Page No.
1. Acknowledgement 3
2. Overveiw of The Company 4
3. Technical Data 6
4. Mission & Vision 7
5. Technology & Certification 8
6. Methadology 9
7. Water Level 10
8. Plant Details 11
9. Conclusion 16
10. Bibliography 17
3
ACKNOWLEDGEMENT
I have gained a lot of knowledge during industrial visit at Meghalaya
Energy Corporation Limited. I would like to express my gratitude to all those who
gave me the possibility to complete this project. I want to thank UTM Shillong for
giving me the great opportunity to commence this industrial visit .
I am grateful to Mr. Laari (Working as a counselor in MEECL). Under
guidance, I have completed this Industrial Visit . I have no words to acknowledge
the valuable time & support that I have received from him.
4
Overview Of The Company
Brief Overview Of MEECL.
Meghalaya Energy Corporation Limited, a young, vibrant power utility endowed with a
potential for power surplus. This website aims to bridge the gap and bring closer interface between
the Meghalaya Energy Corporation Limited and its Valued Consumers. The hydro power stations
in Meghalaya is one of the main sources of producing electricity. These power stations are
operated or governed by Meghalaya Energy Corporation Limited (MeECL).
MeSEB Then and MeECL Now
5
Availability of Power in MePDCL
Year Unrestricted Peak
Demand (MW)*
State Generation
(MU)
Power Purchase
(MU)
Total
Availability
(MU)
2004-05 220 635.35 757.96 1393.31
2005-06 280 514.44 871.66 1386.10
2006-07 350 389.09 929.30 1318.39
2007-08 385 663.06 924.15 1587.21
2008-09 352 552.84 968.92 1521.76
2009-10 339 534.79 947.29 1482.08
2010-11 289 507.90 1129.15 1637.05
2011-12 373 517.54 1170.54 1688.08
2012-13 381 704.55 1056.78 1761.33
2013-14 396 861.79 1028.76 1890.55
Note: * Unrestricted Peak Demand is based on the (Connected Load *0.85 * 0.6)
The development of the Power Sector in the state of Meghalaya is presently moving in the right
direction so that the availability of affordable, reliable and quality power is ensured to the people
of the state in the near future.
Understanding the importance of Power as a prime mover for the development of the State, the
Government had initiated a number of measures to develop the state power sector to its fullest
potential for the prosperity of Meghalaya and its people.
In the past, there has not been any proper power development planning and this has resulted in
making Meghalaya a power deficit state.
The government feels that the vast hydro potential of about 3000 MW needs to be harnessed at the
earliest. Thrust has been made in the development of infrastructure of the transmission network, so
that the state can evacuate its future generation surplus and also to eventually draw its share of
power from the Central Power sector in the North East region. There is an intention to explore and
possibly tap the power potential of up to 400MW from small hydropower generation alone.
It is hoped that in the near future the state of Meghalaya will once again regain its status of a
power surplus state.
6
Technical Data.
Feederwise Distribution Transformers as on 31.10.2009
Name of the 33/11KV Sub-station:- Ampati
No. 33/11KV Transformer:- 2.5MVA X 1
No. of Outgoing Feeder:- 4
 Ampati feeder-I
1. 100KVA X 3
2. 63KVA X 14
3. 25KVA X 64
4. 16KVA X 6
5. 10KVA X1
6. 5KVA X1
 Ampati feeder-II
1. 100KVA X 1
2. 25KVA X 5
 Kalaichar feeder
1. 100 KVA X 1
2. 25 KVA X 18
3. 63 KVA X 4
4. 16 KVA X 1
 Jangnapara feeder
1. 63 KVA X 1
2. 25 KVA X 7
Name of feeders 5KV
A
10KV
A
16KV
A
25KV
A
63KV
A
100KV
A
200KV
A
1) Ampati 1 1 6 64 14 3
2) Ampati DC Office
Complex
5 1
3) Kalaichar 1 18 4 1
4) Jangnapara 7 1
Total 1 1 7 94 19 5
7
Vision & Mission
Vision Statement
Respect for the individual. The Three Joys (Production, selling and creating), increase
power and energy production as well as to improve power generation efficiency in the state of
Meghalaya
Mission Statement
Maintaining a global viewpoint, want to see whole Area in Light with customer
satisfaction. It is hoped that in the near future the state of Meghalaya will once again regain its
status of a power surplus state.
Existing Power Stations of Meghalaya Power Generation
Corporation Limited
Sl. No Station Type No of Units/
Capacity
COD Capacity
(MW)
1 Umiam Stage-I
Storage/
Pondage
4*9 MW FY 1966 36
2 Umiam Stage-II 2*10 MW FY 1971 20
3 Umiam Stage-III 2*30 MW Unit 1: FY 1979
Unit 2: FY 1979
60
4 Umiam Stage-IV 2*30 MW FY 1993 60
5 Umtru Power Station
Run of River
(ROR)
4*2.8 MW Unit 1-3: FY 1958
Unit 4: FY 1969
11.2
6 Sonapani HEP 1.5 MW FY 2010 1.5
7 Leshka HEP 3*42 MW Unit 1& 2:FY 2013
Unit 3: FY 2014
126
314.7
8
TECHNOLOGY
HSPP benefits from the rich experience of Honda Motors, Japan, the second
largest engine manufacturer in the world, because of their strong emphasis on
R&D and in-house technical innovation. India’s first LPG based Generator along
with the Super Silent Key Start Generator portable kerosene generators are some
of the products which exemplify Honda’s pursuit of technological excellence. The
product range of Generators conforms to the most stringent phase II Noise &
Emission norms as laid down by the Central Pollution Control Board (CPCB),
Government of India.
CERTIFICATION
Govt. of Meghalaya (GoMe) decided to reform and restructure its power sector with the
objective of creating the conditions for the sustainable development of the electricity supply
industry and improving the efficiency and quality of services in Meghalaya. The ultimate goal of
reform process is to ensure that
a)Electricity is supplied under the most efficient conditions in term of quality and cost to support
the economic development of the State; and
b)The power sector ceases to be, through its Electricity Board, a burden on the State’s budget, and
eventually become a net generator of financial resources.
Govt. of Meghalaya after deciding to reform and restructure its power sector intends to
corporatize its power sector and has also to establish an appropriate Electricity Regulatory
Commission.
9
METHODOLOGY
Stage I (Sumer) hydro power station capacity 4 x 9 = 36 MW :
(1)Operation of the power station
4 AE + 4 JE + 4 control room operation + 12 technician.
However in stage I control room is two stories above the turbine floor. In-between control room
and turbine floor an intermediate floor where 11 KV switch panel are housed block the free
passage. Therefore one JE per shift is at present necessary to coordinate between turbine floor and
control room. Apart from that communication from all the power station toload despatch center is
now through the stage I power station since the direct link toload despatch center from other power
stations have been disconnected, hence communication is also an added
responsibility of this power station which is borne by the special manning. As such operation
manning at stage – I should be 4 AE + 8 JE + 4 control room operator + 12 technician.
(2)Maintenance of stage I
1 JE + 1 Electrician + 1 fitter + 6 technician + 1 crane driver
Therefore proposed manpower
4 AE + 9 JE + 4 control room operator + 1 electrician + 1 fitter + 1 crane
driver + 18 technician. Total 38.
Existing manpower 5 AE + 8 JE + 25 technician. Total 38.
Stage II (Umsumer) hydro power station capacity 2 x 9 = 18 MW.
(1)Operation of power station:
Same manning :
4 AE + 4 JE + 4 control room operator + 12 technician.
(2)Maintenance of stage 2:
Maintenance also should have the standard m
anning of 1 JE + 1 Electrician + 1 fitter
+ 18technician + 1 crane driver.
.
10
Water Level at Umiam Reservoir upto 1st.April. 2015
11
About Plant
There are two big pipes are coming from a height ,they are full of water contain they are divided
into four parts due to which four motor connected for more electricity production then the water
falls on the turbine due to which turbine rotates so due to rotation of turbine Electricity produces.
Light is depends on the rotation of turbine and rotation of turbine is depends on the pressure of
water falls .
Main components of Power Plant
1. Power Plant Room
2. Switching room
Power plant
The power is the main source of any organization. That is the first requirement of any
organization is the input. The main source of this exchange is the AC supply. This act as the
feeding point of power to all other sections. To start every machine the first supply is from a dc
source, but it is not the main source of power supply. It is used only for the excitation needed by
the machine to start and then it is converted into ac power supply.
The equipments used in the power plant are :-
 Sump tank
 Emergency cooling machine
 Immersing machine
 Air compresser pump
 Automatic voltage regulator
 Service station transformer
 Induction motor
 Turbine
 Generator unit
 Power line communication carrier
12
Sump tank
It has two different coloured pipes connected to it. They are yellow and green pipes. The
yellow pipe contains oil and the green pipe contains water. When the machine starts it
pushesthe water further. It is automatically control.
Emergency cooling machine
This machine is used to cool down the temperature within the machine when it gets heated up. It is
handled manually. When the temperature inside the machine rises, the steer is rotated and cool
water is supplied around the part which becomes heated.
13
Immersing machine
This machine is used to maintain the water level to push it further. When the water is below the
level needed, then some weights are immersed to raise the water level to make it function. When
the water is above the level needed, like at times of rain or flood, the weights are taken out to
decrease the level of water.
Air compressor pump
It is used to maintain the pressure inside the container containing 10 kgs of air/vaccum and 20 kgs
of oil.
14
Automatic voltage regulator
The AVR (automatic voltage regulator) as the name suggests it regulates the voltage. It is set so to
reduce the work load the workers i.e. they don’t need to check the voltage on which the machine
works. It will automatically regulate as per the requirement.
Induction motor and turbine
The motor used was a 3 – phase induction motor. It consists of a stator and a rotor. It works on the
principle of electro-magnetic induction. The stator is made by joining many copper rings which
behaves like a hollow sphere. The wires are wounded in such a way that when the current passes
one part behaves as the north pole and the other as the south pole.
The rotor is the rotating electrical components, it consists of group of electromagnets arranged
around the cylinder with the poles facing the stator poles. It is located inside the stator. As the
magnetic field of the stator alternates due to the effect of ac power supply, the induced field of the
rotor gets attracted in.
15
The turbine is rotated only when water hits it with a pressure, it is connected to the generator
where the power is generated.
Generator room
There are many units of generators. Since a large amount of power is generated from the power
plant, therefore, a no. of units are there to keep a record of the power generated.
Power line communication carrier
They show the arrangement of line networks to supply power to various cities. The lining on the
top is for the main bus. The one below it is for the auxillary bus. Bus couplers are there which are
used in operating the machine from the power station if the machine has been transported
somewhere.
16
Conclusion
Engineering student will have to serve in the public and private sector industries and workshop
based training and teaching in classroom has its own limitation. The lack of exposure to real life,
material express and functioning of industrial organization is the measure hindrance in the student
employment.
In the open economy era of fast modernization and tough competition, technical industries should
procedure pass out as near to job function as possible.Practical training is one of the major steps in
this direction. I attended the industrial visit at Meghalaya Electrical Corporation Limited, Shillong
which is one of the best known power generating companies of India. The training helps me in
gaining in depth knowledge of the working of various machines and equipments in power
generation.
In the end, I hereby conclude that I have successfully completed my industrial training on the
above topics.
17
Bibliography:
http://meecl.nic.in/notifications.htm
http://meecl.nic.in/default.htm
http://meecl.nic.in/progressreports.htm
http://meecl.nic.in/history.htm
http://meecl.nic.in/network.htm
http://meecl.nic.in/waterlevel.htm

More Related Content

What's hot

rajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportrajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportRaj Sharma
 
Regenerative Braking System Report
Regenerative Braking System ReportRegenerative Braking System Report
Regenerative Braking System Reportsangeetkhule
 
Generation of Electricity through Speed Breaker Mechanism
Generation of Electricity through Speed Breaker MechanismGeneration of Electricity through Speed Breaker Mechanism
Generation of Electricity through Speed Breaker Mechanismtheijes
 
Seminar report format (1)
Seminar report format (1)Seminar report format (1)
Seminar report format (1)Abhinavbh1
 
Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal ComplexKumar Saurabh
 
Hindustan zinc report
Hindustan zinc reportHindustan zinc report
Hindustan zinc reportravi kant
 
DCC Training Report Final
DCC Training Report FinalDCC Training Report Final
DCC Training Report FinalSOUPARNO ROY
 
Design of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV SystemDesign of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV Systemsangeetkhule
 
Gas turbine Power Station Internship Report
Gas turbine Power Station Internship ReportGas turbine Power Station Internship Report
Gas turbine Power Station Internship ReportAsad Hussain
 
Module 3 electric propulsion electric vehicle technology ppt
Module 3 electric propulsion   electric vehicle technology pptModule 3 electric propulsion   electric vehicle technology ppt
Module 3 electric propulsion electric vehicle technology pptDrCVMOHAN
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPPAmit Bansal
 
Electric Vehicle: A Power Engineer's Perspective
Electric Vehicle: A Power Engineer's PerspectiveElectric Vehicle: A Power Engineer's Perspective
Electric Vehicle: A Power Engineer's PerspectiveKrishnakumar R. Vasudevan
 
Abstract review of energy harvesting REGENERATIVE BRAKING
Abstract review of energy harvesting REGENERATIVE BRAKINGAbstract review of energy harvesting REGENERATIVE BRAKING
Abstract review of energy harvesting REGENERATIVE BRAKINGMAHESH294
 
Hybrid two wheeler2
Hybrid two wheeler2Hybrid two wheeler2
Hybrid two wheeler2Rajesh Sl
 
Electric hybrid vehicle Seminar Report
Electric hybrid vehicle Seminar ReportElectric hybrid vehicle Seminar Report
Electric hybrid vehicle Seminar ReportLakshminarayan Solanki
 
IRJET- Design Optimisation and Fabrication of Hybrid Two-Wheel Drive Motorcycle
IRJET- Design Optimisation and Fabrication of Hybrid Two-Wheel Drive MotorcycleIRJET- Design Optimisation and Fabrication of Hybrid Two-Wheel Drive Motorcycle
IRJET- Design Optimisation and Fabrication of Hybrid Two-Wheel Drive MotorcycleIRJET Journal
 

What's hot (19)

rajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-reportrajghat-power-house-new-delhi-training-report
rajghat-power-house-new-delhi-training-report
 
Regenerative Braking System Report
Regenerative Braking System ReportRegenerative Braking System Report
Regenerative Braking System Report
 
Suspensioncontrollerdesignproject
SuspensioncontrollerdesignprojectSuspensioncontrollerdesignproject
Suspensioncontrollerdesignproject
 
Generation of Electricity through Speed Breaker Mechanism
Generation of Electricity through Speed Breaker MechanismGeneration of Electricity through Speed Breaker Mechanism
Generation of Electricity through Speed Breaker Mechanism
 
Seminar report format (1)
Seminar report format (1)Seminar report format (1)
Seminar report format (1)
 
Dankuni Coal Complex
Dankuni Coal ComplexDankuni Coal Complex
Dankuni Coal Complex
 
Hindustan zinc report
Hindustan zinc reportHindustan zinc report
Hindustan zinc report
 
Loss minimization DTC electric motor drive system based on adaptive ANN strategy
Loss minimization DTC electric motor drive system based on adaptive ANN strategyLoss minimization DTC electric motor drive system based on adaptive ANN strategy
Loss minimization DTC electric motor drive system based on adaptive ANN strategy
 
DCC Training Report Final
DCC Training Report FinalDCC Training Report Final
DCC Training Report Final
 
Design of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV SystemDesign of Stand-Alone Solar PV System
Design of Stand-Alone Solar PV System
 
Gas turbine Power Station Internship Report
Gas turbine Power Station Internship ReportGas turbine Power Station Internship Report
Gas turbine Power Station Internship Report
 
Module 3 electric propulsion electric vehicle technology ppt
Module 3 electric propulsion   electric vehicle technology pptModule 3 electric propulsion   electric vehicle technology ppt
Module 3 electric propulsion electric vehicle technology ppt
 
6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP6 weeks summer Training report on thermal power plant in DCPP
6 weeks summer Training report on thermal power plant in DCPP
 
Electric Vehicle: A Power Engineer's Perspective
Electric Vehicle: A Power Engineer's PerspectiveElectric Vehicle: A Power Engineer's Perspective
Electric Vehicle: A Power Engineer's Perspective
 
Tariff determination for hydro power plant
Tariff determination for hydro power plantTariff determination for hydro power plant
Tariff determination for hydro power plant
 
Abstract review of energy harvesting REGENERATIVE BRAKING
Abstract review of energy harvesting REGENERATIVE BRAKINGAbstract review of energy harvesting REGENERATIVE BRAKING
Abstract review of energy harvesting REGENERATIVE BRAKING
 
Hybrid two wheeler2
Hybrid two wheeler2Hybrid two wheeler2
Hybrid two wheeler2
 
Electric hybrid vehicle Seminar Report
Electric hybrid vehicle Seminar ReportElectric hybrid vehicle Seminar Report
Electric hybrid vehicle Seminar Report
 
IRJET- Design Optimisation and Fabrication of Hybrid Two-Wheel Drive Motorcycle
IRJET- Design Optimisation and Fabrication of Hybrid Two-Wheel Drive MotorcycleIRJET- Design Optimisation and Fabrication of Hybrid Two-Wheel Drive Motorcycle
IRJET- Design Optimisation and Fabrication of Hybrid Two-Wheel Drive Motorcycle
 

Viewers also liked

Viewers also liked (6)

Slide deck Capital Nurse programme - Feb 2016
Slide deck Capital Nurse programme - Feb 2016Slide deck Capital Nurse programme - Feb 2016
Slide deck Capital Nurse programme - Feb 2016
 
June 2016 Capital Nurse programme update
June 2016 Capital Nurse programme updateJune 2016 Capital Nurse programme update
June 2016 Capital Nurse programme update
 
Slide share presentation
Slide share presentationSlide share presentation
Slide share presentation
 
Directi Case Study Contest 2010- IIM Shillong Ajax
Directi Case Study Contest 2010- IIM Shillong Ajax Directi Case Study Contest 2010- IIM Shillong Ajax
Directi Case Study Contest 2010- IIM Shillong Ajax
 
Master Plan by GNDU Amritsar
Master Plan by GNDU AmritsarMaster Plan by GNDU Amritsar
Master Plan by GNDU Amritsar
 
Network attached storage using raspberry pi
Network attached storage using raspberry piNetwork attached storage using raspberry pi
Network attached storage using raspberry pi
 

Similar to MEECL Chakresh report UTM Shillong

Nikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTINikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTINikhil Singh
 
Power System Protection -Plant visiting report
Power System Protection -Plant visiting report Power System Protection -Plant visiting report
Power System Protection -Plant visiting report AB Amit
 
A summer training report on NTPC
A summer training report on NTPCA summer training report on NTPC
A summer training report on NTPCRanjeet1501
 
A summer traning report on ntpc
A summer traning report on ntpcA summer traning report on ntpc
A summer traning report on ntpcRanjeet1501
 
Training reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorTraining reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorNAVAL KISHOR
 
Rajghat power house ppt
Rajghat power house pptRajghat power house ppt
Rajghat power house pptEr Sagar
 
Maintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINEMaintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINESAI SHARATH GAMPA
 
DADRI GAS POWER PLANT report
DADRI GAS POWER PLANT reportDADRI GAS POWER PLANT report
DADRI GAS POWER PLANT report94600banti
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar Dilip kumar
 
KALISINDH THARMAL POWER PLANT report by Neeraj Patidar
 KALISINDH THARMAL POWER PLANT report by Neeraj Patidar KALISINDH THARMAL POWER PLANT report by Neeraj Patidar
KALISINDH THARMAL POWER PLANT report by Neeraj PatidarNeeraj Patidar
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC KantiTarun Kumar
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...haxxo24
 
Indian wind energy status
Indian wind energy statusIndian wind energy status
Indian wind energy statusbazgha khan
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT94600banti
 
Hindustan zinc report
Hindustan zinc reportHindustan zinc report
Hindustan zinc reportravi kant
 

Similar to MEECL Chakresh report UTM Shillong (20)

Nikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTINikhil kumar project report ON NTPC KANTI
Nikhil kumar project report ON NTPC KANTI
 
Report ON NTPC DADRI .BY ....EMAM
Report ON NTPC DADRI  .BY ....EMAMReport ON NTPC DADRI  .BY ....EMAM
Report ON NTPC DADRI .BY ....EMAM
 
Power System Protection -Plant visiting report
Power System Protection -Plant visiting report Power System Protection -Plant visiting report
Power System Protection -Plant visiting report
 
A summer training report on NTPC
A summer training report on NTPCA summer training report on NTPC
A summer training report on NTPC
 
A summer traning report on ntpc
A summer traning report on ntpcA summer traning report on ntpc
A summer traning report on ntpc
 
Training reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishorTraining reporton ka tpp by naval kishor
Training reporton ka tpp by naval kishor
 
Rajghat power house ppt
Rajghat power house pptRajghat power house ppt
Rajghat power house ppt
 
Maintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINEMaintainence OF STEAM TURBINE
Maintainence OF STEAM TURBINE
 
DADRI GAS POWER PLANT report
DADRI GAS POWER PLANT reportDADRI GAS POWER PLANT report
DADRI GAS POWER PLANT report
 
Ntpc report
Ntpc reportNtpc report
Ntpc report
 
training report NTPC Muzaffarpur Bihar
training report  NTPC Muzaffarpur Bihar training report  NTPC Muzaffarpur Bihar
training report NTPC Muzaffarpur Bihar
 
KALISINDH THARMAL POWER PLANT report by Neeraj Patidar
 KALISINDH THARMAL POWER PLANT report by Neeraj Patidar KALISINDH THARMAL POWER PLANT report by Neeraj Patidar
KALISINDH THARMAL POWER PLANT report by Neeraj Patidar
 
Tarun Project Report On NTPC Kanti
Tarun  Project Report On NTPC KantiTarun  Project Report On NTPC Kanti
Tarun Project Report On NTPC Kanti
 
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
Ntpc (national thermal power corporation) sipat mechanical vocational trainin...
 
Summer Training Report On Kalisindh Thermal Power Plant
Summer Training Report On Kalisindh Thermal Power PlantSummer Training Report On Kalisindh Thermal Power Plant
Summer Training Report On Kalisindh Thermal Power Plant
 
Indian wind energy status
Indian wind energy statusIndian wind energy status
Indian wind energy status
 
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANTBanti industrial training-report-on-ntpc-dadri GAS POWER PLANT
Banti industrial training-report-on-ntpc-dadri GAS POWER PLANT
 
Project report on MTPS
Project report on MTPSProject report on MTPS
Project report on MTPS
 
Hindustan zinc report
Hindustan zinc reportHindustan zinc report
Hindustan zinc report
 
NHPC Training Report
NHPC Training ReportNHPC Training Report
NHPC Training Report
 

More from Chakresh Tiwari

Best model 2018 Chakresh
Best model 2018 ChakreshBest model 2018 Chakresh
Best model 2018 ChakreshChakresh Tiwari
 
Chakresh tiwari,NIMS new delhi
Chakresh tiwari,NIMS new delhiChakresh tiwari,NIMS new delhi
Chakresh tiwari,NIMS new delhiChakresh Tiwari
 
Rajasthan tourism By Chakresh Tiwari UTM Shillong
Rajasthan tourism By Chakresh Tiwari  UTM ShillongRajasthan tourism By Chakresh Tiwari  UTM Shillong
Rajasthan tourism By Chakresh Tiwari UTM ShillongChakresh Tiwari
 
Gsm based home automation ppt
Gsm based home automation pptGsm based home automation ppt
Gsm based home automation pptChakresh Tiwari
 

More from Chakresh Tiwari (6)

Best model 2018 Chakresh
Best model 2018 ChakreshBest model 2018 Chakresh
Best model 2018 Chakresh
 
Chakresh tiwari
Chakresh tiwariChakresh tiwari
Chakresh tiwari
 
Chakresh tiwari,NIMS new delhi
Chakresh tiwari,NIMS new delhiChakresh tiwari,NIMS new delhi
Chakresh tiwari,NIMS new delhi
 
Rajasthan tourism By Chakresh Tiwari UTM Shillong
Rajasthan tourism By Chakresh Tiwari  UTM ShillongRajasthan tourism By Chakresh Tiwari  UTM Shillong
Rajasthan tourism By Chakresh Tiwari UTM Shillong
 
Gsm based home automation ppt
Gsm based home automation pptGsm based home automation ppt
Gsm based home automation ppt
 
Chakresh meecl report
Chakresh meecl reportChakresh meecl report
Chakresh meecl report
 

Recently uploaded

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 

Recently uploaded (20)

ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 

MEECL Chakresh report UTM Shillong

  • 1. 1 A REPORT ON INDUSTRIAL VISIT TO Ri-Bhoi District,Meghalaya ON 2TH April 2015 UNDER THE AEGIS OF UNIVERSITY OF TECHNOLOGY & MANAGEMENT SHILLONG,MEGHALAYA(793001) Submitted To : Submitted By : MS. Pronami Bora Chakresh Tiwari B-tech ECE 4th sem. Roll No. : R020113004
  • 2. 2 CONTENTS Sr. No. Title Page No. 1. Acknowledgement 3 2. Overveiw of The Company 4 3. Technical Data 6 4. Mission & Vision 7 5. Technology & Certification 8 6. Methadology 9 7. Water Level 10 8. Plant Details 11 9. Conclusion 16 10. Bibliography 17
  • 3. 3 ACKNOWLEDGEMENT I have gained a lot of knowledge during industrial visit at Meghalaya Energy Corporation Limited. I would like to express my gratitude to all those who gave me the possibility to complete this project. I want to thank UTM Shillong for giving me the great opportunity to commence this industrial visit . I am grateful to Mr. Laari (Working as a counselor in MEECL). Under guidance, I have completed this Industrial Visit . I have no words to acknowledge the valuable time & support that I have received from him.
  • 4. 4 Overview Of The Company Brief Overview Of MEECL. Meghalaya Energy Corporation Limited, a young, vibrant power utility endowed with a potential for power surplus. This website aims to bridge the gap and bring closer interface between the Meghalaya Energy Corporation Limited and its Valued Consumers. The hydro power stations in Meghalaya is one of the main sources of producing electricity. These power stations are operated or governed by Meghalaya Energy Corporation Limited (MeECL). MeSEB Then and MeECL Now
  • 5. 5 Availability of Power in MePDCL Year Unrestricted Peak Demand (MW)* State Generation (MU) Power Purchase (MU) Total Availability (MU) 2004-05 220 635.35 757.96 1393.31 2005-06 280 514.44 871.66 1386.10 2006-07 350 389.09 929.30 1318.39 2007-08 385 663.06 924.15 1587.21 2008-09 352 552.84 968.92 1521.76 2009-10 339 534.79 947.29 1482.08 2010-11 289 507.90 1129.15 1637.05 2011-12 373 517.54 1170.54 1688.08 2012-13 381 704.55 1056.78 1761.33 2013-14 396 861.79 1028.76 1890.55 Note: * Unrestricted Peak Demand is based on the (Connected Load *0.85 * 0.6) The development of the Power Sector in the state of Meghalaya is presently moving in the right direction so that the availability of affordable, reliable and quality power is ensured to the people of the state in the near future. Understanding the importance of Power as a prime mover for the development of the State, the Government had initiated a number of measures to develop the state power sector to its fullest potential for the prosperity of Meghalaya and its people. In the past, there has not been any proper power development planning and this has resulted in making Meghalaya a power deficit state. The government feels that the vast hydro potential of about 3000 MW needs to be harnessed at the earliest. Thrust has been made in the development of infrastructure of the transmission network, so that the state can evacuate its future generation surplus and also to eventually draw its share of power from the Central Power sector in the North East region. There is an intention to explore and possibly tap the power potential of up to 400MW from small hydropower generation alone. It is hoped that in the near future the state of Meghalaya will once again regain its status of a power surplus state.
  • 6. 6 Technical Data. Feederwise Distribution Transformers as on 31.10.2009 Name of the 33/11KV Sub-station:- Ampati No. 33/11KV Transformer:- 2.5MVA X 1 No. of Outgoing Feeder:- 4  Ampati feeder-I 1. 100KVA X 3 2. 63KVA X 14 3. 25KVA X 64 4. 16KVA X 6 5. 10KVA X1 6. 5KVA X1  Ampati feeder-II 1. 100KVA X 1 2. 25KVA X 5  Kalaichar feeder 1. 100 KVA X 1 2. 25 KVA X 18 3. 63 KVA X 4 4. 16 KVA X 1  Jangnapara feeder 1. 63 KVA X 1 2. 25 KVA X 7 Name of feeders 5KV A 10KV A 16KV A 25KV A 63KV A 100KV A 200KV A 1) Ampati 1 1 6 64 14 3 2) Ampati DC Office Complex 5 1 3) Kalaichar 1 18 4 1 4) Jangnapara 7 1 Total 1 1 7 94 19 5
  • 7. 7 Vision & Mission Vision Statement Respect for the individual. The Three Joys (Production, selling and creating), increase power and energy production as well as to improve power generation efficiency in the state of Meghalaya Mission Statement Maintaining a global viewpoint, want to see whole Area in Light with customer satisfaction. It is hoped that in the near future the state of Meghalaya will once again regain its status of a power surplus state. Existing Power Stations of Meghalaya Power Generation Corporation Limited Sl. No Station Type No of Units/ Capacity COD Capacity (MW) 1 Umiam Stage-I Storage/ Pondage 4*9 MW FY 1966 36 2 Umiam Stage-II 2*10 MW FY 1971 20 3 Umiam Stage-III 2*30 MW Unit 1: FY 1979 Unit 2: FY 1979 60 4 Umiam Stage-IV 2*30 MW FY 1993 60 5 Umtru Power Station Run of River (ROR) 4*2.8 MW Unit 1-3: FY 1958 Unit 4: FY 1969 11.2 6 Sonapani HEP 1.5 MW FY 2010 1.5 7 Leshka HEP 3*42 MW Unit 1& 2:FY 2013 Unit 3: FY 2014 126 314.7
  • 8. 8 TECHNOLOGY HSPP benefits from the rich experience of Honda Motors, Japan, the second largest engine manufacturer in the world, because of their strong emphasis on R&D and in-house technical innovation. India’s first LPG based Generator along with the Super Silent Key Start Generator portable kerosene generators are some of the products which exemplify Honda’s pursuit of technological excellence. The product range of Generators conforms to the most stringent phase II Noise & Emission norms as laid down by the Central Pollution Control Board (CPCB), Government of India. CERTIFICATION Govt. of Meghalaya (GoMe) decided to reform and restructure its power sector with the objective of creating the conditions for the sustainable development of the electricity supply industry and improving the efficiency and quality of services in Meghalaya. The ultimate goal of reform process is to ensure that a)Electricity is supplied under the most efficient conditions in term of quality and cost to support the economic development of the State; and b)The power sector ceases to be, through its Electricity Board, a burden on the State’s budget, and eventually become a net generator of financial resources. Govt. of Meghalaya after deciding to reform and restructure its power sector intends to corporatize its power sector and has also to establish an appropriate Electricity Regulatory Commission.
  • 9. 9 METHODOLOGY Stage I (Sumer) hydro power station capacity 4 x 9 = 36 MW : (1)Operation of the power station 4 AE + 4 JE + 4 control room operation + 12 technician. However in stage I control room is two stories above the turbine floor. In-between control room and turbine floor an intermediate floor where 11 KV switch panel are housed block the free passage. Therefore one JE per shift is at present necessary to coordinate between turbine floor and control room. Apart from that communication from all the power station toload despatch center is now through the stage I power station since the direct link toload despatch center from other power stations have been disconnected, hence communication is also an added responsibility of this power station which is borne by the special manning. As such operation manning at stage – I should be 4 AE + 8 JE + 4 control room operator + 12 technician. (2)Maintenance of stage I 1 JE + 1 Electrician + 1 fitter + 6 technician + 1 crane driver Therefore proposed manpower 4 AE + 9 JE + 4 control room operator + 1 electrician + 1 fitter + 1 crane driver + 18 technician. Total 38. Existing manpower 5 AE + 8 JE + 25 technician. Total 38. Stage II (Umsumer) hydro power station capacity 2 x 9 = 18 MW. (1)Operation of power station: Same manning : 4 AE + 4 JE + 4 control room operator + 12 technician. (2)Maintenance of stage 2: Maintenance also should have the standard m anning of 1 JE + 1 Electrician + 1 fitter + 18technician + 1 crane driver. .
  • 10. 10 Water Level at Umiam Reservoir upto 1st.April. 2015
  • 11. 11 About Plant There are two big pipes are coming from a height ,they are full of water contain they are divided into four parts due to which four motor connected for more electricity production then the water falls on the turbine due to which turbine rotates so due to rotation of turbine Electricity produces. Light is depends on the rotation of turbine and rotation of turbine is depends on the pressure of water falls . Main components of Power Plant 1. Power Plant Room 2. Switching room Power plant The power is the main source of any organization. That is the first requirement of any organization is the input. The main source of this exchange is the AC supply. This act as the feeding point of power to all other sections. To start every machine the first supply is from a dc source, but it is not the main source of power supply. It is used only for the excitation needed by the machine to start and then it is converted into ac power supply. The equipments used in the power plant are :-  Sump tank  Emergency cooling machine  Immersing machine  Air compresser pump  Automatic voltage regulator  Service station transformer  Induction motor  Turbine  Generator unit  Power line communication carrier
  • 12. 12 Sump tank It has two different coloured pipes connected to it. They are yellow and green pipes. The yellow pipe contains oil and the green pipe contains water. When the machine starts it pushesthe water further. It is automatically control. Emergency cooling machine This machine is used to cool down the temperature within the machine when it gets heated up. It is handled manually. When the temperature inside the machine rises, the steer is rotated and cool water is supplied around the part which becomes heated.
  • 13. 13 Immersing machine This machine is used to maintain the water level to push it further. When the water is below the level needed, then some weights are immersed to raise the water level to make it function. When the water is above the level needed, like at times of rain or flood, the weights are taken out to decrease the level of water. Air compressor pump It is used to maintain the pressure inside the container containing 10 kgs of air/vaccum and 20 kgs of oil.
  • 14. 14 Automatic voltage regulator The AVR (automatic voltage regulator) as the name suggests it regulates the voltage. It is set so to reduce the work load the workers i.e. they don’t need to check the voltage on which the machine works. It will automatically regulate as per the requirement. Induction motor and turbine The motor used was a 3 – phase induction motor. It consists of a stator and a rotor. It works on the principle of electro-magnetic induction. The stator is made by joining many copper rings which behaves like a hollow sphere. The wires are wounded in such a way that when the current passes one part behaves as the north pole and the other as the south pole. The rotor is the rotating electrical components, it consists of group of electromagnets arranged around the cylinder with the poles facing the stator poles. It is located inside the stator. As the magnetic field of the stator alternates due to the effect of ac power supply, the induced field of the rotor gets attracted in.
  • 15. 15 The turbine is rotated only when water hits it with a pressure, it is connected to the generator where the power is generated. Generator room There are many units of generators. Since a large amount of power is generated from the power plant, therefore, a no. of units are there to keep a record of the power generated. Power line communication carrier They show the arrangement of line networks to supply power to various cities. The lining on the top is for the main bus. The one below it is for the auxillary bus. Bus couplers are there which are used in operating the machine from the power station if the machine has been transported somewhere.
  • 16. 16 Conclusion Engineering student will have to serve in the public and private sector industries and workshop based training and teaching in classroom has its own limitation. The lack of exposure to real life, material express and functioning of industrial organization is the measure hindrance in the student employment. In the open economy era of fast modernization and tough competition, technical industries should procedure pass out as near to job function as possible.Practical training is one of the major steps in this direction. I attended the industrial visit at Meghalaya Electrical Corporation Limited, Shillong which is one of the best known power generating companies of India. The training helps me in gaining in depth knowledge of the working of various machines and equipments in power generation. In the end, I hereby conclude that I have successfully completed my industrial training on the above topics.