SlideShare una empresa de Scribd logo
1 de 13
Descargar para leer sin conexión
RESUME
Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 1
Chetana Charoenbibhop
Current position: Senior Manager
Email:Chetana@ksc.th.com
Mobile: +66 81 867 2573
Executive Summary
Chetana has over 20 years of business in the SAP consulting as well as long experience in business
process improvement, client management and project management. Chetana has involved in projects
for a wide range of different industries, with key engagements in Oil & Gas, Chemical,
Telecommunication, Food, Real Estate, Consumer product, Airport, Electricity, Medical Product and
Microchip. He has strong expertise in logistics and financial SAP processes, balanced by good
interpersonal skills.
Ares of Specialization
• SAP Project Management
• SAP Sales & Distribution (SD)
• SAP Material Management (MM)
• SAP Financial (FI)
• SAP Controlling (CO)
• SAP Plant Maintenance (PM)
• SAP Project system (PS)
• SAP Integration
• SAP Data migration
Qualifications & Training
1992 Master Degree of Business Administration (MIS)
De Paul University, Chicaco, Illinois, the United States
1990 Master Degree of Business Administration (Finance)
Dallas Baptist University, Texas, the United States
1987 Bachelor Degree of Economy
Thammasart University, Bangkok, Thailand
Training:
1997 ISO001IS-Oil Downstream Training
RESUME
Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 2
1996 LO620 Pricing
1996 LO615 Billing
1996 LO610 Shipping
1996 LO605 Sales
1994 AC410 Cost center accounting
1993 AC040 Cost Management and Controlling
1993 AC200 Account receivable and Account payable processing
1993 AC205 Financial closing
1993 AC 010 Financial accounting
Expertise & Skills:
• SAP-IS OIL Oil General
• SAP-IS PS Public Sector General
• SAP-BC-SAP Programming General
• SAP-BC Basis Components General
• SAP-CO Controlling General
• SAP-FI Financial Accounting General
• SAP-MM Materials Management General
• SAP-PP Production Planning and Control General
• SAP-PS Project System General
• SAP-SD Sales and Distribution General
• Consulting Methods and Techniques
• Conversation and negotiation technique
Roles and Responsibilities
• Presales
• Define project scope, man-days and project cost for prospects
• Assign and allocate resources for all the projects
• Confirm and verify all the compliance/requirement from the prospects
Certificate:
• mySAP SCM, mySAP SCM - SD (2000), 2000
• mySAP Financials, mySAP Financials - FI (2000), 2000
• mySAP Financials, mySAP Financials - CO (2000), 2000
RESUME
Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 3
Relevant Project Experience
Project: Ananda Development
Industry:
Period: October 2014 to Present
Position: Project Manager
Project Details
Modules in scope are FI, CO, MM and PS
Project: Honda
Industry: Dealer Business
Period: January 2014 to September 2014
Position: Project Manager
Project Details
Implemented SAP DBM (Dealer Management System) for all Honda’s Dealer, also CRM
Project: Musashi Auto Part
Industry: Manufacturer
Period: July 2013 to December 2013
Position: Project Manager
Project Details
Roll out project from Musashi Japan. Project scope includes FI, CO, MM and SD
Project: ETA (The Swatch Group)
Industry: Manufacturing
Period: February 2013 to March 2013
Position: Project Manager
Project Details
Feasibility Study
Project: Toshiba Carrier
Industry: Manufacturing
Period: September 2012 to November 2012
Position: Project Manager, FI consultant
Project Details
Upgrade project from 4.6C to ECC6 (Technical Upgrade)
Project: Central Pattana Public Company Limited
RESUME
Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 4
Industry: Real Estate, Shopping Complex
Period: June 2012 to August
Position: Project Manager
Central Pattana Public Company Limited (CPN) is Thailand's largest retail developer with over 30 years
of experience. CPN is currently managing 18 shopping centers, 6 office buildings, one hotel and two
residential projects all these projects span over 2 million square metres. The company is the leader in
the retail development and management sector with the biggest share of Bangkok’s retail market at
24%.
Project Details:
As part of an effort to increase the efficiency and control processes within CPN it desired to adopt best
property management business processes and implement SAP to achieve truly integrated business
processes captured in one single source of information. The SAP Scope of Work consisted of the
implementation of SAP ECC 6.0 FI, CO, MM, PM, PS, BPC, BPM , Workflow, Web Dynpro, BOBJ,
Crystal Report and Adobe Form.
Responsibilities:
• Managed project based on Schedule
• Manages the project, including change requests and escalation, where required
• Includes budget, scope, planning control and project staff related manners
• Ensure knowledge to be transferred to CPN
Project: Laemtong Group
Industry: Real Estate, Whole Sales
Period: May 2011 to present
Position: Project Manager, Project Auditor
Project Detail:
Laemtong Group (16 companies) is implementing FI, CO, MM, SD, CS, PS and FM. It is also
developing WEB application to interface with SAP.
Responsibilities:
• Review all the Business blueprints including with Key Data Structure and Process flows
• Review all interface designs
• Design the Inter-company process based on SAP Functionalities
• Advice project team to test the system to verify the designed functionalities by consultant team
• Review all the interfaces with WEB application and Front ends
• Recommend all the Best Practice functionalities
• Support data preparation for Go-live
Project: Olympus Singapore Industry:
Medical System Business
Period: September 2010 – April 2011
Position: Data Migration Lead
Project Detail:
Olympus implemented CRM, SD, MM, FI and CO.
RESUME
Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 5
Responsibilities:
• Prepared all the templates for Data Migration
• Setup the meeting with the client to clarify the SAP data structure and required information for Data
Migration
• Prepared functional specification for developers regarding to Data Migration
• Prepared data for Data Migration testing
• Supported data cleansing
• Supported data validation
Project: Fujitsu Philippine
Industry: Consultant
Period: July 2010 -August
Position: Project Manager
Project Detail:
Designed, adapted and standardized documents and implemented methodology for Fujitsu Enterprise
Solution.
Project: B Change - Laemtong
Industry: Real Estate
Project: Electricity Generating Authority of Thailand
Industry: Electricity Generation
Period: January 2008 – October 2009
Position: SD Team Lead
Electricity Generating Authority of Thailand (EGAT) was established on May 1, 1969 by the
promulgation of the Electricity Generating Authority of Thailand Act B.E. 2511 which merged assets
and operations of the three previous state enterprises, namely Yanhee Electricity Authority, Lignite
Authority and the Northeast Electricity Authority. It presently is the state enterprise under the Ministry of
Energy
Project Details:
EGAT ERP is one of the tremendous SAP implementation in Thailand which is over 900 million Bath.
The scopes of implementation include FI, CO, MM, SD, PP, HR and EIS.
Responsibilities:
• Coordinated integration part between CO and SD (Using Sales order as cost object controlling)
• Recommended new workflow and/or concepts to increase daily data processing capacity
• Collected all the requirement from the key users
• Verified the mapping between SAP functionality and business processes
• Reviewed GAPs defined and provide alternatives for defined GAPs
• Checked the configuration on SAP R/3 system according to the new business process designed
performed by project team
• Controlled the quality of prototyping the system configured to ensure the required outcomes
• Ensured consistency among other SAP R/3 functional modules
• Provided recommendation & advice as well as solve any problem incurred during the
implementation and post-implementation period
RESUME
Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 6
• Transferred knowledge to client staff
• Adhered to project documentation standards.
Project: New Bangkok International Airport (Suwannabhumi International Airport)
Industry: Airport
Period: October 2006 – December 2007
Position: SD Team Lead
New Bangkok International Airport, also known as Suvarnabhumi Airport is an international airport
serving Bangkok, Thailand. It was officially opened for limited domestic flight service on 15 September
2006, and opened for most domestic and all international commercial flights on 28 September.
Project Details:
Project scope covered modules FI, CO, MM, SD-Sky billing, PM and RE.
Responsibilities:
• Implemented additional add-on on SAP standard for Airport business (SD Module – Sky billing)
• Gathered all the required information from sub-systems for billing purpose
• Conducted workshop for PM, MM and SD during business blueprint
• Key-user training
• User-Acceptance Test
• End-user training
• Go-live support
Project: UTAC, Thailand Industry:
Electronics & High Tech
Period: February 2007 - April 2007
Position: Project Manager
UTAC is one of the world's leading independent provider of test and assembly services for a wide
range of semiconductor devices including memory, mixed-signal/RF and logic ICs. We have major
manufacturing operations in Shanghai, Singapore, Taiwan and Thailand and our sales offices dot the
rest of the globe.
Project Details:
New Plant Implementation involving MM, CO, PP Modules and interfaces with Oracle System
Responsibilities:
• In charge of Interface & Integration part
• Managed project based on Schedule
• Controlled cost and budget
Project: New Bangkok International Airport
Industry: Airports
Period: July 2004 – September 2006
Position: SD, MM Consultant
RESUME
Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 7
New Bangkok International Airport, also known as Suvarnabhumi Airport is an international airport
serving Bangkok, Thailand. It was officially opened for limited domestic flight service on 15 September
2006, and opened for most domestic and all international commercial flights on 28 September.
[3]
Project Details:
Project scope covered modules FI, CO, MM, SD-Sky billing, PM and RE
Responsibilities:
• User requirement analysis
• Workshop & business blueprint design in SD, PM and MM
• System design
• Key-user training
• User-Acceptance Test
• End-user training.
Project: SAP
Industry: IT Services
Period: December 2003 – January 2004
Position: SAP Trainer
Responsibilities:
• Conduct several FI and SD Training for SAP Thailand.
Project: Bio Consumer, Thailand
Industry: Consumer Package Goods
Period: May 2003 – December 2003
Position: SD, CO-PA Lead Consultant
Bio Consumer is one of the business affiliates of BIO Group which was established in 1989. The Bio
Group has divided business affiliates as follows:
BIO Lab – Medical products
BIO Consumer – Distributor of consumer products
BIO Manufacturing – Manufacturer of consumer product
BIO Land & Development – Real estate development
Project Details:
SAP implementation included FI, CO, MM and SD.
Responsibilities:
• Fully in charge of SD and CO-PA implementation
• Recommended new workflow and/or concepts to increase daily data processing capacity
• Collected all the requirement from the key users
• Verified the mapping between SAP functionality and business processes
• Reviewed GAPs defined and provide alternatives for defined GAPs
Project: Petrolium of Thailand - PTT
Industry: Oil & Gas
Period: June 2002 – December 2002
RESUME
Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 8
Position: FI - CO Consultant
PTT markets its oil products through the largest network in Thailand, or over 1,140 stations nationwide
(excluding 146 stations under management of PTT Retail Management Co.,Ltd). To best satisfy its
customers, PTT has developed new image of PTT’s station-PTT Park, providing full services in
addition increased more retail businesses at the gas stations. PTT still maintains its leading role in
researching and developing alternative fuel and marketed them as the first brand in Thailand. PTT’s
green products cover gasohol, purified palm diesel, biodiesel.
Project Details:
SAP was implemented by using IS-OIL functionalities and all SAP main modules including with FI, CO,
MM and PP
Responsibilities:
• In charge of FI-FM and CO-CCA, CO-PA and CO-PCA implementation
• Performed conceptual design
• Recommended new workflow and/or concepts to increase daily data processing capacity
• Collected all the requirement from the key users
• Verified the mapping between SAP functionality and business processes
• Reviewed GAPs defined and provide alternatives for defined GAPs
• Checked the configuration on SAP R/3 system according to the new business process designed
performed by project team
• Controlled the quality of prototyping the system configured to ensure the required outcomes
• Ensured consistency among other SAP R/3 functional modules
• Provided recommendation & advice as well as solve any problem incurred during the
implementation and post-implementation period
• Adhered to project documentation standards.
Project: CPF, Thailand
Industry: Food & Beverages
Period: January 2002 – April 2002
Position: SD Lead Consultant
Founded in 1978 under the name “Charoen Pokphand Feedmill Co., Ltd.” to produce and distribute
animal feed in southern Thailand.
Project Details:
Project implementation included FI, CO, MM, SD and PP
Responsibilities:
• Fully in charge of SD implementation
• Performed conceptual design
• Recommended new workflow and/or concepts to increase daily data processing capacity
• Collected all the requirement from the key users
• Adjusted all the requirements to suite with SAP system
• System testing
Project: Bank of Thailand
Industry: Banking
Period: May 2001 – December 2001
RESUME
Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 9
Position: SAP Trainer
The Bank of Thailand (BOT) was first set up as the Thai National Banking Bureau. The Bank of
Thailand Act was promulgated on 28 April 1942 vesting upon the Bank of Thailand the responsibility
for all central banking functions. The Bank of Thailand started operations on 10 December 1942.
The Bank of Thailand Act, B.E.2485 was later amended in order to put emphasis on BOT’s social
responsibility, to create a mechanism to guard against economic crisis, as well as to set up BOT’s
decision making process to ensure good governance and transparency in the organization. Moreover,
members of the public will be able to audit and increase the understanding of the BOT’s operations.
The Bank of Thailand Act, B.E.2551 came into force with effect from 4 March 2008.
Project Details
Project implementation included FI, CO, MM, and PP
Responsibilities:
• Instructor for CO, MM Module and SAP Overview
• Workshop leader mapping SAP functionality with current business processes. The responsible
modules including with FI, CO, FM and MM.
• Assistant Instructor for PP and PM Module
Project: S & J International Enterprise
Industry: Consumer Packaged Goods
Period: January 2000 – January 2001
Position: Project Manager
SJI is a large corporate of Sahapat Group focusing on cosmetics manufacturing for leading brand in
Thailand such as Mistine, Watson, Colgate, Absorba, Enfant, etc. SJI is considered one of major
manufacturers of cosmetics market.
Project Details:
Implementation of the SAP was focused on the FI-AM, FI-AR, FI-AP, FI-GL, Thai Localization, CO-
CCA, CO-PCA, CO-PC, MM, PP, and SD.
Responsibilities:
• Managed project based on Schedule
• Controlled cost and budget
• Managed man days
• Solved all the integration issues
• Found out SAP new functions to increase daily operation efficiency
• Reviewed Configurations made by team members
• 1 month fully support in FI, CO, QM and MM
Project: Siam Cement Group
Industry: SCG Chemicals
Period: August 2000 – November 2000
Position: SD Lead Consultant
SCG comprises over 100 companies under 5 business groups, employing approximately 24,000
employees, and handling more than 64,000 product items. The products are marketed domestically
and exported to all regions of the world. Most companies in the Group have been accredited with ISO
9002 certification for quality management, ISO 14001 certification for environmental management, and
RESUME
Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 10
TIS 18001 certification for occupation health and safety management, often the first in their respective
industries. SCG has also received national and international prestigious awards recognition in various
areas. This enhances SCG’s competitiveness in the global marketplace.
Project Details:
Siam Cement Group – Chemicals has implemented SAP in SD module with full range integration of
FI/CO and Data Warehouse in Thai Localization environment.
Responsibilities:
• Reviewed Configurations made by Siam Cement Group team;
• Tested System to verify the completeness of the configurations;
• Found solutions for any problems incurred;
• Wrote User Exit to serve the specific requirements;
• Prepared and modify program specifications for interface programs;
• Recommended on changing the inappropriate configurations; and
• Documented test problems, configuration changes, and program spec.
Project: Siam Cement Group
Industry: SCG Paper
Period: January 2000 – March 2000
Position: SD Lead Consultant
SCG comprises over 100 companies under 5 business groups, employing approximately 24,000
employees, and handling more than 64,000 product items. The products are marketed domestically
and exported to all regions of the world. Most companies in the Group have been accredited with ISO
9002 certification for quality management, ISO 14001 certification for environmental management, and
TIS 18001 certification for occupation health and safety management, often the first in their respective
industries. SCG has also received national and international prestigious awards recognition in various
areas. This enhances SCG’s competitiveness in the global marketplace.
Project Details:
Siam Cement Group – Paper has implemented SAP in SD module with full range integration of FI/CO
and Data Warehouse in Thai Localization environment.
Responsibilities:
• Reviewed Configurations made by Siam Cement Group team;
• Tested System to verify the completeness of the configurations;
• Found solutions for any problems incurred;
• Prepared and modify program specifications for interface programs;
• Wrote User Exit to serve specific requirements
Project: RMI Titanium Ohio, USA
Industry: Aerospace
Period: July 1998 – November 1998
Position: MM Lead Consultant
The Titanium Group is comprised of RMI Titanium Company and its subsidiaries. RMI produces
titanium ingot, billet, bar, plate, sheet, strip, welded pipe and welded tubing. Its products are certified
and approved for use by major domestic and international manufacturers of commercial and military
aircraft and jet engines. Other applications are chemical processing equipment, pulp and paper
production facilities, medical implants and consumer goods
RESUME
Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 11
Project Details:
SAP was implemented base on main modules including with FI, CO, MM, SD and PP.
Responsibilities:
• Fully in charge of MM implementation
• Performed conceptual design
• Recommended new workflow and/or concepts to increase daily data processing capacity
• Collected all the requirement from the key users
• Adjusted all the requirements to suite with SAP system
• System testing
Project: Shell Company, Thailand
Industry: Oil & Gas
Period: SD Lead Consultant
Position: June 1997 – May 1998
Oil Products in Shell is a big organization. They have almost 50,000 service stations. They produce in
almost 50 refineries. They service customers in over 125 countries with assets worth over US$20
billion. But much more important for them to bear in mind is that their annual sales of US$100 billion
mostly come from millions of small transactions a day. It is a huge business but only because of the
huge number of customers.
Project Details:
SAP was implemented by using IS-OIL functionalities and all SAP main modules including with FI, CO,
MM and PP
Responsibilities:
• Fully in charge of local implementation team (IS-Oil)
• Conducted basic SAP training for all Shell team member including A/R, G/L, SD and MM
• Performed a post project support in areas of data analyzing, trouble shooting, and advance source
code correction
Project: Alphatel & AlphaSource Manufacturing, Thailand
Industry: Electronics & High Tech
Period: January 1996 – May 1997
Position: CO-SD - Lead Consultant
Alphatel and AlphaSource are member firms of Alpha Group, an electronic conglomerate. Alphatel
product portfolio consists of feature, memory, and speaker and Led speaker phone. AlphaSource
product consists of microchip and memory products. The modules in this project implementation are
FI, CO, MM, SD, and PP.
Project Details:
The project included main SAP modules including with FI, CO, SD and MM.
Responsibilities:
• Performed conceptual design
• Recommended new workflow and/or concepts to increase daily data processing capacity
• Collected all the requirement from the key users
• Adjust all the requirements to suite with SAP system
RESUME
Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 12
• Customized and modified ABAP/4 and SAPscript for specific requirements
• Coordinated and supervised on data entry and processing
• Provided SAP R/3 documentation for training and customization
• Conducted MIS training in responsible areas
• Analyzed and supervised user on daily data operation
• Post-implementation support including of FI, CO, SD
Project: Henkel Thai Ltd.
Industry: Chemicals
Period: May 1995 – June 1996
Position: System Analyst
Henkel Thai was founded in 1972 as a manufacturer of surfactants, raw materials, intermediates,
additives, and process chemicals. The Henkel Thai product portfolio consists of adhesives, metal
chemicals and chemical specialties for various industries e.g. cosmetics, detergents, fibre and textiles,
paper plastic and paints.
Project Details:
The modules in this project implementation were FI, CO, MM, SD, and PP.
Responsibilities:
• General Ledger
• Account Receivable
• Account Payable
• Financial Information System
• Cost Center Accounting
• Profitability Analysis
• Coordinate and supervise on data entry and processing
• Provided SAP R/3 documentation for training
• Conducted user training in responsible areas
• Supervised user on daily data operation
• Customized and modified ABAP/4 for specific requirements
• Supported Henkel Affiliated within Asia Pacific
Project: TelecomAsia Public Co.
Industry: Telecommunications
Period: January 1993 – April 1995
Position: System Analyst
TelecomAsia operates a 2.6 million-line fiber optic network in Bangkok. With total investment 47.5
billion baht, TelecomAsia provides full spectrum of telecommunications services in the Asia Pacific
region and strategically expanding into other telecommunications services through Telecom Holding
and subsidiaries
Project Details:
TelecomAsia and subsidiaries had implemented SAP since 1992. The odules in productive system are
FI, CO, AM, PS, MM, SD, and HR.
Responsibilities:
• Capital Project Accounting (RKP)
RESUME
Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 13
• Fixed Asset (RA)
• Account Receivable (RF)
• Budgeting System
• Coordinate and supervise on data entry and processing
• Provided SAP R/2 documentation for training
• Conducted user training in responsible areas
• Supervised user on daily data operation

Más contenido relacionado

La actualidad más candente (20)

Saravanan - Profile (2015-16)
Saravanan - Profile (2015-16)Saravanan - Profile (2015-16)
Saravanan - Profile (2015-16)
 
SUBHA18092016
SUBHA18092016SUBHA18092016
SUBHA18092016
 
Kamtala
KamtalaKamtala
Kamtala
 
Cv Dab 2009a
Cv Dab 2009aCv Dab 2009a
Cv Dab 2009a
 
SBK_CV
SBK_CVSBK_CV
SBK_CV
 
VINOTH MURUGESAN(Process SPPID Designer)
VINOTH MURUGESAN(Process  SPPID Designer)VINOTH MURUGESAN(Process  SPPID Designer)
VINOTH MURUGESAN(Process SPPID Designer)
 
Pranathi_SAP_BO
Pranathi_SAP_BOPranathi_SAP_BO
Pranathi_SAP_BO
 
My cv
My cvMy cv
My cv
 
Nana_Rajaram_Karande
Nana_Rajaram_KarandeNana_Rajaram_Karande
Nana_Rajaram_Karande
 
Nana_Rajaram_Karande
Nana_Rajaram_KarandeNana_Rajaram_Karande
Nana_Rajaram_Karande
 
Bhaskara_OTM Techno-functional Consultant
Bhaskara_OTM Techno-functional ConsultantBhaskara_OTM Techno-functional Consultant
Bhaskara_OTM Techno-functional Consultant
 
CV_Sitthikorn P-(20-Jun-15)
CV_Sitthikorn P-(20-Jun-15)CV_Sitthikorn P-(20-Jun-15)
CV_Sitthikorn P-(20-Jun-15)
 
Madhu Profile _MDG
Madhu Profile _MDGMadhu Profile _MDG
Madhu Profile _MDG
 
PRR-RESUME-Project_New
PRR-RESUME-Project_NewPRR-RESUME-Project_New
PRR-RESUME-Project_New
 
Resume
ResumeResume
Resume
 
Resumefinal1
Resumefinal1Resumefinal1
Resumefinal1
 
Pdms, autocad designer cv-_t_gunalan
Pdms, autocad designer cv-_t_gunalanPdms, autocad designer cv-_t_gunalan
Pdms, autocad designer cv-_t_gunalan
 
Pdms, autocad designer- resume-_t_gunalan
Pdms, autocad designer- resume-_t_gunalanPdms, autocad designer- resume-_t_gunalan
Pdms, autocad designer- resume-_t_gunalan
 
Resume
ResumeResume
Resume
 
CV Julien Daveloose
CV Julien DavelooseCV Julien Daveloose
CV Julien Daveloose
 

Similar a Chetana Charoenbibhop CV July 2015

Piti Prasertsuksean-CV 201501
Piti Prasertsuksean-CV 201501Piti Prasertsuksean-CV 201501
Piti Prasertsuksean-CV 201501petemail2k
 
Sahar Kamal's CV _2016
Sahar Kamal's CV _2016Sahar Kamal's CV _2016
Sahar Kamal's CV _2016Sahar Kamal
 
Adinath Resume 2019
Adinath Resume 2019Adinath Resume 2019
Adinath Resume 2019Adinath Kale
 
Abhishek bhatt cv_v1.1
Abhishek bhatt cv_v1.1Abhishek bhatt cv_v1.1
Abhishek bhatt cv_v1.1Abhishek Bhatt
 
Mani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_ConsultantMani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_ConsultantMani Shekhar
 
Cv bi short_gillet_guillaume_virtuoz_it_072015
Cv bi short_gillet_guillaume_virtuoz_it_072015Cv bi short_gillet_guillaume_virtuoz_it_072015
Cv bi short_gillet_guillaume_virtuoz_it_072015Guillaume Gillet
 
Suresh SAP Project Manager-Resume
Suresh SAP Project Manager-ResumeSuresh SAP Project Manager-Resume
Suresh SAP Project Manager-ResumeSuresh Nayak
 
Stephen Vo _Senior ERP Consultant
Stephen Vo _Senior ERP ConsultantStephen Vo _Senior ERP Consultant
Stephen Vo _Senior ERP Consultant.Vo .Phuc
 
SreenivasaReddy_Pocha_BOA
SreenivasaReddy_Pocha_BOASreenivasaReddy_Pocha_BOA
SreenivasaReddy_Pocha_BOASrinu Reddy
 
Jayakailash menon 01_sept_2016
Jayakailash menon 01_sept_2016Jayakailash menon 01_sept_2016
Jayakailash menon 01_sept_2016Jayakailash Menon
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resumeRajib Paul
 
Rajib paul Resume
Rajib paul   ResumeRajib paul   Resume
Rajib paul ResumeRajib Paul
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resumeRajib Paul
 

Similar a Chetana Charoenbibhop CV July 2015 (20)

Piti Prasertsuksean-CV 201501
Piti Prasertsuksean-CV 201501Piti Prasertsuksean-CV 201501
Piti Prasertsuksean-CV 201501
 
Mahendra Gopu
Mahendra GopuMahendra Gopu
Mahendra Gopu
 
Sahar Kamal's CV _2016
Sahar Kamal's CV _2016Sahar Kamal's CV _2016
Sahar Kamal's CV _2016
 
Adinath Resume 2019
Adinath Resume 2019Adinath Resume 2019
Adinath Resume 2019
 
Resume - Anil Kumar Krishna
Resume - Anil Kumar KrishnaResume - Anil Kumar Krishna
Resume - Anil Kumar Krishna
 
Abhishek bhatt cv_v1.1
Abhishek bhatt cv_v1.1Abhishek bhatt cv_v1.1
Abhishek bhatt cv_v1.1
 
Mani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_ConsultantMani_Shekhar_CRM_C4C_Functional_Consultant
Mani_Shekhar_CRM_C4C_Functional_Consultant
 
Cv bi short_gillet_guillaume_virtuoz_it_072015
Cv bi short_gillet_guillaume_virtuoz_it_072015Cv bi short_gillet_guillaume_virtuoz_it_072015
Cv bi short_gillet_guillaume_virtuoz_it_072015
 
Suresh SAP Project Manager-Resume
Suresh SAP Project Manager-ResumeSuresh SAP Project Manager-Resume
Suresh SAP Project Manager-Resume
 
Rajendra shankarappa
Rajendra shankarappaRajendra shankarappa
Rajendra shankarappa
 
Andrew_Thomas
Andrew_ThomasAndrew_Thomas
Andrew_Thomas
 
Stephen Vo _Senior ERP Consultant
Stephen Vo _Senior ERP ConsultantStephen Vo _Senior ERP Consultant
Stephen Vo _Senior ERP Consultant
 
Resume
ResumeResume
Resume
 
SreenivasaReddy_Pocha_BOA
SreenivasaReddy_Pocha_BOASreenivasaReddy_Pocha_BOA
SreenivasaReddy_Pocha_BOA
 
Jayakailash menon 01_sept_2016
Jayakailash menon 01_sept_2016Jayakailash menon 01_sept_2016
Jayakailash menon 01_sept_2016
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resume
 
Rajib paul Resume
Rajib paul   ResumeRajib paul   Resume
Rajib paul Resume
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resume
 
Senthilvasan CV Ver 3.1 1509 Auto
Senthilvasan CV Ver 3.1 1509 AutoSenthilvasan CV Ver 3.1 1509 Auto
Senthilvasan CV Ver 3.1 1509 Auto
 
Sheldon cousino resume
Sheldon cousino resumeSheldon cousino resume
Sheldon cousino resume
 

Chetana Charoenbibhop CV July 2015

  • 1. RESUME Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 1 Chetana Charoenbibhop Current position: Senior Manager Email:Chetana@ksc.th.com Mobile: +66 81 867 2573 Executive Summary Chetana has over 20 years of business in the SAP consulting as well as long experience in business process improvement, client management and project management. Chetana has involved in projects for a wide range of different industries, with key engagements in Oil & Gas, Chemical, Telecommunication, Food, Real Estate, Consumer product, Airport, Electricity, Medical Product and Microchip. He has strong expertise in logistics and financial SAP processes, balanced by good interpersonal skills. Ares of Specialization • SAP Project Management • SAP Sales & Distribution (SD) • SAP Material Management (MM) • SAP Financial (FI) • SAP Controlling (CO) • SAP Plant Maintenance (PM) • SAP Project system (PS) • SAP Integration • SAP Data migration Qualifications & Training 1992 Master Degree of Business Administration (MIS) De Paul University, Chicaco, Illinois, the United States 1990 Master Degree of Business Administration (Finance) Dallas Baptist University, Texas, the United States 1987 Bachelor Degree of Economy Thammasart University, Bangkok, Thailand Training: 1997 ISO001IS-Oil Downstream Training
  • 2. RESUME Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 2 1996 LO620 Pricing 1996 LO615 Billing 1996 LO610 Shipping 1996 LO605 Sales 1994 AC410 Cost center accounting 1993 AC040 Cost Management and Controlling 1993 AC200 Account receivable and Account payable processing 1993 AC205 Financial closing 1993 AC 010 Financial accounting Expertise & Skills: • SAP-IS OIL Oil General • SAP-IS PS Public Sector General • SAP-BC-SAP Programming General • SAP-BC Basis Components General • SAP-CO Controlling General • SAP-FI Financial Accounting General • SAP-MM Materials Management General • SAP-PP Production Planning and Control General • SAP-PS Project System General • SAP-SD Sales and Distribution General • Consulting Methods and Techniques • Conversation and negotiation technique Roles and Responsibilities • Presales • Define project scope, man-days and project cost for prospects • Assign and allocate resources for all the projects • Confirm and verify all the compliance/requirement from the prospects Certificate: • mySAP SCM, mySAP SCM - SD (2000), 2000 • mySAP Financials, mySAP Financials - FI (2000), 2000 • mySAP Financials, mySAP Financials - CO (2000), 2000
  • 3. RESUME Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 3 Relevant Project Experience Project: Ananda Development Industry: Period: October 2014 to Present Position: Project Manager Project Details Modules in scope are FI, CO, MM and PS Project: Honda Industry: Dealer Business Period: January 2014 to September 2014 Position: Project Manager Project Details Implemented SAP DBM (Dealer Management System) for all Honda’s Dealer, also CRM Project: Musashi Auto Part Industry: Manufacturer Period: July 2013 to December 2013 Position: Project Manager Project Details Roll out project from Musashi Japan. Project scope includes FI, CO, MM and SD Project: ETA (The Swatch Group) Industry: Manufacturing Period: February 2013 to March 2013 Position: Project Manager Project Details Feasibility Study Project: Toshiba Carrier Industry: Manufacturing Period: September 2012 to November 2012 Position: Project Manager, FI consultant Project Details Upgrade project from 4.6C to ECC6 (Technical Upgrade) Project: Central Pattana Public Company Limited
  • 4. RESUME Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 4 Industry: Real Estate, Shopping Complex Period: June 2012 to August Position: Project Manager Central Pattana Public Company Limited (CPN) is Thailand's largest retail developer with over 30 years of experience. CPN is currently managing 18 shopping centers, 6 office buildings, one hotel and two residential projects all these projects span over 2 million square metres. The company is the leader in the retail development and management sector with the biggest share of Bangkok’s retail market at 24%. Project Details: As part of an effort to increase the efficiency and control processes within CPN it desired to adopt best property management business processes and implement SAP to achieve truly integrated business processes captured in one single source of information. The SAP Scope of Work consisted of the implementation of SAP ECC 6.0 FI, CO, MM, PM, PS, BPC, BPM , Workflow, Web Dynpro, BOBJ, Crystal Report and Adobe Form. Responsibilities: • Managed project based on Schedule • Manages the project, including change requests and escalation, where required • Includes budget, scope, planning control and project staff related manners • Ensure knowledge to be transferred to CPN Project: Laemtong Group Industry: Real Estate, Whole Sales Period: May 2011 to present Position: Project Manager, Project Auditor Project Detail: Laemtong Group (16 companies) is implementing FI, CO, MM, SD, CS, PS and FM. It is also developing WEB application to interface with SAP. Responsibilities: • Review all the Business blueprints including with Key Data Structure and Process flows • Review all interface designs • Design the Inter-company process based on SAP Functionalities • Advice project team to test the system to verify the designed functionalities by consultant team • Review all the interfaces with WEB application and Front ends • Recommend all the Best Practice functionalities • Support data preparation for Go-live Project: Olympus Singapore Industry: Medical System Business Period: September 2010 – April 2011 Position: Data Migration Lead Project Detail: Olympus implemented CRM, SD, MM, FI and CO.
  • 5. RESUME Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 5 Responsibilities: • Prepared all the templates for Data Migration • Setup the meeting with the client to clarify the SAP data structure and required information for Data Migration • Prepared functional specification for developers regarding to Data Migration • Prepared data for Data Migration testing • Supported data cleansing • Supported data validation Project: Fujitsu Philippine Industry: Consultant Period: July 2010 -August Position: Project Manager Project Detail: Designed, adapted and standardized documents and implemented methodology for Fujitsu Enterprise Solution. Project: B Change - Laemtong Industry: Real Estate Project: Electricity Generating Authority of Thailand Industry: Electricity Generation Period: January 2008 – October 2009 Position: SD Team Lead Electricity Generating Authority of Thailand (EGAT) was established on May 1, 1969 by the promulgation of the Electricity Generating Authority of Thailand Act B.E. 2511 which merged assets and operations of the three previous state enterprises, namely Yanhee Electricity Authority, Lignite Authority and the Northeast Electricity Authority. It presently is the state enterprise under the Ministry of Energy Project Details: EGAT ERP is one of the tremendous SAP implementation in Thailand which is over 900 million Bath. The scopes of implementation include FI, CO, MM, SD, PP, HR and EIS. Responsibilities: • Coordinated integration part between CO and SD (Using Sales order as cost object controlling) • Recommended new workflow and/or concepts to increase daily data processing capacity • Collected all the requirement from the key users • Verified the mapping between SAP functionality and business processes • Reviewed GAPs defined and provide alternatives for defined GAPs • Checked the configuration on SAP R/3 system according to the new business process designed performed by project team • Controlled the quality of prototyping the system configured to ensure the required outcomes • Ensured consistency among other SAP R/3 functional modules • Provided recommendation & advice as well as solve any problem incurred during the implementation and post-implementation period
  • 6. RESUME Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 6 • Transferred knowledge to client staff • Adhered to project documentation standards. Project: New Bangkok International Airport (Suwannabhumi International Airport) Industry: Airport Period: October 2006 – December 2007 Position: SD Team Lead New Bangkok International Airport, also known as Suvarnabhumi Airport is an international airport serving Bangkok, Thailand. It was officially opened for limited domestic flight service on 15 September 2006, and opened for most domestic and all international commercial flights on 28 September. Project Details: Project scope covered modules FI, CO, MM, SD-Sky billing, PM and RE. Responsibilities: • Implemented additional add-on on SAP standard for Airport business (SD Module – Sky billing) • Gathered all the required information from sub-systems for billing purpose • Conducted workshop for PM, MM and SD during business blueprint • Key-user training • User-Acceptance Test • End-user training • Go-live support Project: UTAC, Thailand Industry: Electronics & High Tech Period: February 2007 - April 2007 Position: Project Manager UTAC is one of the world's leading independent provider of test and assembly services for a wide range of semiconductor devices including memory, mixed-signal/RF and logic ICs. We have major manufacturing operations in Shanghai, Singapore, Taiwan and Thailand and our sales offices dot the rest of the globe. Project Details: New Plant Implementation involving MM, CO, PP Modules and interfaces with Oracle System Responsibilities: • In charge of Interface & Integration part • Managed project based on Schedule • Controlled cost and budget Project: New Bangkok International Airport Industry: Airports Period: July 2004 – September 2006 Position: SD, MM Consultant
  • 7. RESUME Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 7 New Bangkok International Airport, also known as Suvarnabhumi Airport is an international airport serving Bangkok, Thailand. It was officially opened for limited domestic flight service on 15 September 2006, and opened for most domestic and all international commercial flights on 28 September. [3] Project Details: Project scope covered modules FI, CO, MM, SD-Sky billing, PM and RE Responsibilities: • User requirement analysis • Workshop & business blueprint design in SD, PM and MM • System design • Key-user training • User-Acceptance Test • End-user training. Project: SAP Industry: IT Services Period: December 2003 – January 2004 Position: SAP Trainer Responsibilities: • Conduct several FI and SD Training for SAP Thailand. Project: Bio Consumer, Thailand Industry: Consumer Package Goods Period: May 2003 – December 2003 Position: SD, CO-PA Lead Consultant Bio Consumer is one of the business affiliates of BIO Group which was established in 1989. The Bio Group has divided business affiliates as follows: BIO Lab – Medical products BIO Consumer – Distributor of consumer products BIO Manufacturing – Manufacturer of consumer product BIO Land & Development – Real estate development Project Details: SAP implementation included FI, CO, MM and SD. Responsibilities: • Fully in charge of SD and CO-PA implementation • Recommended new workflow and/or concepts to increase daily data processing capacity • Collected all the requirement from the key users • Verified the mapping between SAP functionality and business processes • Reviewed GAPs defined and provide alternatives for defined GAPs Project: Petrolium of Thailand - PTT Industry: Oil & Gas Period: June 2002 – December 2002
  • 8. RESUME Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 8 Position: FI - CO Consultant PTT markets its oil products through the largest network in Thailand, or over 1,140 stations nationwide (excluding 146 stations under management of PTT Retail Management Co.,Ltd). To best satisfy its customers, PTT has developed new image of PTT’s station-PTT Park, providing full services in addition increased more retail businesses at the gas stations. PTT still maintains its leading role in researching and developing alternative fuel and marketed them as the first brand in Thailand. PTT’s green products cover gasohol, purified palm diesel, biodiesel. Project Details: SAP was implemented by using IS-OIL functionalities and all SAP main modules including with FI, CO, MM and PP Responsibilities: • In charge of FI-FM and CO-CCA, CO-PA and CO-PCA implementation • Performed conceptual design • Recommended new workflow and/or concepts to increase daily data processing capacity • Collected all the requirement from the key users • Verified the mapping between SAP functionality and business processes • Reviewed GAPs defined and provide alternatives for defined GAPs • Checked the configuration on SAP R/3 system according to the new business process designed performed by project team • Controlled the quality of prototyping the system configured to ensure the required outcomes • Ensured consistency among other SAP R/3 functional modules • Provided recommendation & advice as well as solve any problem incurred during the implementation and post-implementation period • Adhered to project documentation standards. Project: CPF, Thailand Industry: Food & Beverages Period: January 2002 – April 2002 Position: SD Lead Consultant Founded in 1978 under the name “Charoen Pokphand Feedmill Co., Ltd.” to produce and distribute animal feed in southern Thailand. Project Details: Project implementation included FI, CO, MM, SD and PP Responsibilities: • Fully in charge of SD implementation • Performed conceptual design • Recommended new workflow and/or concepts to increase daily data processing capacity • Collected all the requirement from the key users • Adjusted all the requirements to suite with SAP system • System testing Project: Bank of Thailand Industry: Banking Period: May 2001 – December 2001
  • 9. RESUME Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 9 Position: SAP Trainer The Bank of Thailand (BOT) was first set up as the Thai National Banking Bureau. The Bank of Thailand Act was promulgated on 28 April 1942 vesting upon the Bank of Thailand the responsibility for all central banking functions. The Bank of Thailand started operations on 10 December 1942. The Bank of Thailand Act, B.E.2485 was later amended in order to put emphasis on BOT’s social responsibility, to create a mechanism to guard against economic crisis, as well as to set up BOT’s decision making process to ensure good governance and transparency in the organization. Moreover, members of the public will be able to audit and increase the understanding of the BOT’s operations. The Bank of Thailand Act, B.E.2551 came into force with effect from 4 March 2008. Project Details Project implementation included FI, CO, MM, and PP Responsibilities: • Instructor for CO, MM Module and SAP Overview • Workshop leader mapping SAP functionality with current business processes. The responsible modules including with FI, CO, FM and MM. • Assistant Instructor for PP and PM Module Project: S & J International Enterprise Industry: Consumer Packaged Goods Period: January 2000 – January 2001 Position: Project Manager SJI is a large corporate of Sahapat Group focusing on cosmetics manufacturing for leading brand in Thailand such as Mistine, Watson, Colgate, Absorba, Enfant, etc. SJI is considered one of major manufacturers of cosmetics market. Project Details: Implementation of the SAP was focused on the FI-AM, FI-AR, FI-AP, FI-GL, Thai Localization, CO- CCA, CO-PCA, CO-PC, MM, PP, and SD. Responsibilities: • Managed project based on Schedule • Controlled cost and budget • Managed man days • Solved all the integration issues • Found out SAP new functions to increase daily operation efficiency • Reviewed Configurations made by team members • 1 month fully support in FI, CO, QM and MM Project: Siam Cement Group Industry: SCG Chemicals Period: August 2000 – November 2000 Position: SD Lead Consultant SCG comprises over 100 companies under 5 business groups, employing approximately 24,000 employees, and handling more than 64,000 product items. The products are marketed domestically and exported to all regions of the world. Most companies in the Group have been accredited with ISO 9002 certification for quality management, ISO 14001 certification for environmental management, and
  • 10. RESUME Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 10 TIS 18001 certification for occupation health and safety management, often the first in their respective industries. SCG has also received national and international prestigious awards recognition in various areas. This enhances SCG’s competitiveness in the global marketplace. Project Details: Siam Cement Group – Chemicals has implemented SAP in SD module with full range integration of FI/CO and Data Warehouse in Thai Localization environment. Responsibilities: • Reviewed Configurations made by Siam Cement Group team; • Tested System to verify the completeness of the configurations; • Found solutions for any problems incurred; • Wrote User Exit to serve the specific requirements; • Prepared and modify program specifications for interface programs; • Recommended on changing the inappropriate configurations; and • Documented test problems, configuration changes, and program spec. Project: Siam Cement Group Industry: SCG Paper Period: January 2000 – March 2000 Position: SD Lead Consultant SCG comprises over 100 companies under 5 business groups, employing approximately 24,000 employees, and handling more than 64,000 product items. The products are marketed domestically and exported to all regions of the world. Most companies in the Group have been accredited with ISO 9002 certification for quality management, ISO 14001 certification for environmental management, and TIS 18001 certification for occupation health and safety management, often the first in their respective industries. SCG has also received national and international prestigious awards recognition in various areas. This enhances SCG’s competitiveness in the global marketplace. Project Details: Siam Cement Group – Paper has implemented SAP in SD module with full range integration of FI/CO and Data Warehouse in Thai Localization environment. Responsibilities: • Reviewed Configurations made by Siam Cement Group team; • Tested System to verify the completeness of the configurations; • Found solutions for any problems incurred; • Prepared and modify program specifications for interface programs; • Wrote User Exit to serve specific requirements Project: RMI Titanium Ohio, USA Industry: Aerospace Period: July 1998 – November 1998 Position: MM Lead Consultant The Titanium Group is comprised of RMI Titanium Company and its subsidiaries. RMI produces titanium ingot, billet, bar, plate, sheet, strip, welded pipe and welded tubing. Its products are certified and approved for use by major domestic and international manufacturers of commercial and military aircraft and jet engines. Other applications are chemical processing equipment, pulp and paper production facilities, medical implants and consumer goods
  • 11. RESUME Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 11 Project Details: SAP was implemented base on main modules including with FI, CO, MM, SD and PP. Responsibilities: • Fully in charge of MM implementation • Performed conceptual design • Recommended new workflow and/or concepts to increase daily data processing capacity • Collected all the requirement from the key users • Adjusted all the requirements to suite with SAP system • System testing Project: Shell Company, Thailand Industry: Oil & Gas Period: SD Lead Consultant Position: June 1997 – May 1998 Oil Products in Shell is a big organization. They have almost 50,000 service stations. They produce in almost 50 refineries. They service customers in over 125 countries with assets worth over US$20 billion. But much more important for them to bear in mind is that their annual sales of US$100 billion mostly come from millions of small transactions a day. It is a huge business but only because of the huge number of customers. Project Details: SAP was implemented by using IS-OIL functionalities and all SAP main modules including with FI, CO, MM and PP Responsibilities: • Fully in charge of local implementation team (IS-Oil) • Conducted basic SAP training for all Shell team member including A/R, G/L, SD and MM • Performed a post project support in areas of data analyzing, trouble shooting, and advance source code correction Project: Alphatel & AlphaSource Manufacturing, Thailand Industry: Electronics & High Tech Period: January 1996 – May 1997 Position: CO-SD - Lead Consultant Alphatel and AlphaSource are member firms of Alpha Group, an electronic conglomerate. Alphatel product portfolio consists of feature, memory, and speaker and Led speaker phone. AlphaSource product consists of microchip and memory products. The modules in this project implementation are FI, CO, MM, SD, and PP. Project Details: The project included main SAP modules including with FI, CO, SD and MM. Responsibilities: • Performed conceptual design • Recommended new workflow and/or concepts to increase daily data processing capacity • Collected all the requirement from the key users • Adjust all the requirements to suite with SAP system
  • 12. RESUME Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 12 • Customized and modified ABAP/4 and SAPscript for specific requirements • Coordinated and supervised on data entry and processing • Provided SAP R/3 documentation for training and customization • Conducted MIS training in responsible areas • Analyzed and supervised user on daily data operation • Post-implementation support including of FI, CO, SD Project: Henkel Thai Ltd. Industry: Chemicals Period: May 1995 – June 1996 Position: System Analyst Henkel Thai was founded in 1972 as a manufacturer of surfactants, raw materials, intermediates, additives, and process chemicals. The Henkel Thai product portfolio consists of adhesives, metal chemicals and chemical specialties for various industries e.g. cosmetics, detergents, fibre and textiles, paper plastic and paints. Project Details: The modules in this project implementation were FI, CO, MM, SD, and PP. Responsibilities: • General Ledger • Account Receivable • Account Payable • Financial Information System • Cost Center Accounting • Profitability Analysis • Coordinate and supervise on data entry and processing • Provided SAP R/3 documentation for training • Conducted user training in responsible areas • Supervised user on daily data operation • Customized and modified ABAP/4 for specific requirements • Supported Henkel Affiliated within Asia Pacific Project: TelecomAsia Public Co. Industry: Telecommunications Period: January 1993 – April 1995 Position: System Analyst TelecomAsia operates a 2.6 million-line fiber optic network in Bangkok. With total investment 47.5 billion baht, TelecomAsia provides full spectrum of telecommunications services in the Asia Pacific region and strategically expanding into other telecommunications services through Telecom Holding and subsidiaries Project Details: TelecomAsia and subsidiaries had implemented SAP since 1992. The odules in productive system are FI, CO, AM, PS, MM, SD, and HR. Responsibilities: • Capital Project Accounting (RKP)
  • 13. RESUME Revision 1.0 Confidential to Fujitsu Enterprise Solutions (Thailand) Co., Ltd. Page 13 • Fixed Asset (RA) • Account Receivable (RF) • Budgeting System • Coordinate and supervise on data entry and processing • Provided SAP R/2 documentation for training • Conducted user training in responsible areas • Supervised user on daily data operation