Here's to another year, partnering with you to provide civil and site solutions through innovation, speed, quality, and technical expertise! Contact your Contech Representative today and get ready for 2018! 800-338-1122 | www.conteches.com
SEO Trends in 2024: What You Need to Know to Succeed
2018 Contech Calendar
1. 2018
CONTECH CALENDAR
SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31
DECEMBER 2017
Here’s to another year, partnering with you to provide civil and site solutions
through innovation, speed, quality, and technical expertise!
2. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
P I P E
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
BNSF RAILWAY ALLIANCE
IMF EXPANSION
PIPE SOLUTIONS
NEW YEAR’S DAY
MARTIN LUTHER
KING DAY
Haslet, Texas
ULTRA FLO® CSP (7,000 LF)
Smooth Cor™ Double Wall CSP (350 LF)
Installation Date: February 2017
The BNSF Railway Alliance Intermodal
Facility (IMF) was in need of an expansion.
The engineer of record worked directly with
Contech to identify the best solution for the
storm sewer systems that would be needed.
Given the complexity of the site and the high
fill in one particular area, two different storm
sewer systems were specified.
JANUARY 2018
DECEMBER 2017
SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24/31 25 26 27 28 29 30
FEBRUARY 2018
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28
3. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
STRUCTURES
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28
RICHLAND CREEK
RESERVOIR AND DAM
PRESIDENTS’ DAY
VALENTINE’S DAY
Paulding County, Georgia
MULTI-PLATE® Single Radius Arch
26’ span x 13’ rise x 185’ length
Installation Date: August 2016
An independent water supply was critically
needed in Paulding County. Access to the
new reservoir required the installation of
an environmentally-friendly structure that
could follow the alignment changes of the
stream without impacting the waterway –
saving both time and money. The County
selected a 184’ long MULTI-PLATE
structure as the best solution.
FEBRUARY 2018
JANUARY 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
MARCH 2018
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
4. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
STORMWATER
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
ARIZONA BEVERAGE
Filter
GOOD FRIDAY
ST. PATRICK’S DAYDAYLIGHT SAVING TIME
Woodbridge, New Jersey
JellyFish® Filter 12’ dia. units (6) & The
Stormwater Management StormFilter®
8’x24’ vaults (3) to treat over 25 CF
Installation Date: September 2017
Arizona Beverage Company constructed
a new filling facility in Woodbridge, New
Jersey. Jellyfish and StormFilter treatment
systems were chosen to meet 80%
reduction of TSS due to their ability to treat
high flows in a compact footprint. Moreover,
their configuration flexibility allowed
the engineer to eliminate unnecessary
structures, thus reducing costs.
MARCH 2018
FEBRUARY 2018
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28
APRIL 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
5. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
RETAININGWALLS
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
THE PARK AT OWA
EASTER
EARTH DAY
TAX DAY
Foley, Alabama
Keystone Retaining Wall Systems® with
Stonegate® Country Manor - 3,642 SF
BEBO® Precast Bridge System, Triple Cell
20’ span x 9’-2” rise x 14’ length
Installation Date: Spring of 2017
Keystone’s segmental retaining wall system
was employed to wrap concrete pillars rising
from the arch footing to form 30-inch square
columns and the headwalls for this triple cell
BEBO® precast bridge. Keystone engineered
the bridge wall design which provides both
reinforcing structural support needed for the
sandy soils, as well as a charming Old World
appearance for the new park gateway.
APRIL 2018
MAY 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
MARCH 2018
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
6. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
P I P E
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
DFW AIRCRAFT HARDSTAND
RAMP EXPANSION
PIPE SOLUTIONS
STEEL REINFORCED PE TECHNOLOGY
MEMORIAL DAY
MOTHER’S DAY
Dallas, Texas
DuroMaxx® SRPE Pipe with WC Joints
Two runs of 134 LF of 96” dia.
13,053 CF of volume storage
Installation Date: August 2017
The Dallas/Fort Worth (DFW) International
Airport needed a cost-effective solution to
properly store stormwater contaminated
with deicing fluid prior to being treated
as part of the aircraft hardstand ramp
expansions. A DuroMaxx SRPE glycol
storage tank was selected.
MAY 2018
APRIL 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30
JUNE 2018
SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
7. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
STRUCTURES
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
LOUDOUN COUNTY PARKWAY
FATHER’S DAY
Loudoun County, Virginia
CON/SPAN® O-Series®
Triple Cell
65’ span x 13.5’ rise x 128’ length
Installation Date: Summer 2016
When access was needed for a new high-
end development, a triple cell CON/SPAN
O-Series was selected in lieu of a
conventional bridge. The prefabricated arch
system choice resulted in faster installation
time, substantial savings, and efficiently
allowed critical fiber optic lines to remain
untouched during the installation process.
JUNE 2018
MAY 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31
JULY 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
8. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
STORMWATER
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
PORT OF GULFPORT
PIPE SOLUTIONS
INDEPENDENCE DAY
Gulfport, Mississippi
Vortechs® Model 1522 (6) & Model 1421 (2)
Contech Slotted Drain™ - 6,000 LF,
variable height, 18” - 36” diameters
Installation Date: Summer 2016
The Port of Gulfport expansion brought
challenges of additional rainfall to the site. The
water had to be collected as well as treated before
it was discharged into the Gulf of Mexico. The
local engineer worked with Contech to design a
solution which utilized Slotted Drain for collection
and conveyance of the stormwater and Vortechs
hydrodynamic separators to treat the stormwater
before flowing into the Gulf of Mexico.
JULY 2018
JUNE 2018
SUN MON TUES WED THUR FRI SAT
1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
AUGUST 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
9. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
P I P E
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
LAKEHURST NAVAL AIR
STATION RELINE
PIPE SOLUTIONS
Lakehurst, New Jersey
SPR™ PE structural lining for 786 LF of
48” dia. RCP & 703 LF of 54” dia. RCP
Installation Date: March 2014
During a routine inspection at the Lakehurst
Naval Air Station, it was discovered that
a number of reinforced concrete pipe
(RCP) runs used to carry stormwater had
deteriorated and were no longer hydraulically
or structurally sufficient. The facilities
engineer decided to reline the existing RCP
with SPR™ PE through the manholes directly.
AUGUST 2018
JULY 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31
SEPTEMBER 2018
SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
10. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
STRUCTURES
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
CLARK COUNTY - SALEM
NOBLE ROAD
LABOR DAY
Charleston, Indiana
Steadfast® Vehicular Truss
Keystone® Style
120’ span x 34’ width
Installation Date: March 2017
In order to improve the roadway conditions
along Salem Noble Road and avoid the
regular flooding that occurred at the
Pleasant Run crossing, Clark County chose
a 120’ clear span Steadfast truss structure
as the replacement. The new bridge can
accommodate the rapid growth in the area
and increased traffic volume.
SEPTEMBER 2018
AUGUST 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
OCTOBER 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
11. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
STORMWATER
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
UPPER NORTH PARKING LOT
COLUMBUS DAY
HALLOWEEN
Red Rocks, Colorado
120” Aluminized CMP Detention
CDS® Hydrodynamic Separators -
CDS2025-5 (2)
Installation Date: March 2017
A detention system was needed that would have
minimal impact to the breathtaking mountains
that provide the unequaled acoustics for which
the 640 acre Red Rocks open air amphitheater
is famous. The solution? A stormwater system
consisting of a CMP detention system pretreated
with a CDS hydrodynamic separator, to meet
water quality and quantity requirements.
OCTOBER 2018
SEPTEMBER 2018
SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24 25 26 27 28 29
NOVEMBER 2018
SUN MON TUES WED THUR FRI SAT
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
12. w w w . C o n t e c h E S . c o m | 8 0 0 - 3 3 8 - 1 1 2 2
HARD ARMOR
S O L U T I O N S
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30
BOARDMAN DAM REMOVAL &
RIVER RESTORATION
THANKSGIVING DAY
VETERANS DAY
Boardman, Michigan
ArmorFlex® Articulating Concrete Blocks
11,068 sq. ft. of ArmorFlex Class 40T
Installation Date: July 2017
When fully implemented, the Boardman Dam
Removal & River Restoration Project will reconnect
over 160 miles of river and tributary streams while
restoring wetlands and upland habitats. It is the most
comprehensive dam removal and restoration projects
in Michigan’s history and one of the largest such
projects in the Great Lakes Basin. Contech provided
ArmorFlex erosion control mats as an advanced
protective measure during the drawdown stages of
the Boardman Dam.
NOVEMBER 2018
OCTOBER 2018
SUN MON TUES WED THUR FRI SAT
1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31
DECEMBER 2018
SUN MON TUES WED THUR FRI SAT
1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23/30 24/31 25 26 27 28 29