10 Case Studies that
Demonstrate the Benefits of DuroMaxx SRPE
www.ContechES.com/duromaxx2
Multiple jointing options are available for DuroMaxx
to meet your specific project requirements from Soil
Tight (ST) joints to high performance (HP) bell and
spigot joints capable of 15 psi to ElectroFusion (EF)
or Welded Coupler (WC) joints capable of 30 psi.
STEEL REINFORCED PE TECHNOLOGY
DuroMaxx is far more than JUST a pipe! Take a moment to flip
through these key case studies outlining the benefits of DuroMaxx in
the following applications:
•	 Sanitary Sewers
•	 Irrigation
•	 Watertight Detention
•	 Storm Sewers
•	 Culverts
•	 Storage Vaults » CSO/SSO, Glycol Containment and
Rainwater Harvesting
•	 Yard Piping
•	 Reline » DuroMaxx®
Liner Pipe and further use of steel
reinforced technology through SPR™ PE
www.ContechES.com/duromaxx 3
DuroMaxx®
Steel Reinforced Polyethylene
DuroMaxx steel reinforced polyethylene (SRPE) represents a revolution in pipe construction that was pioneered in Australia and
recognized by Contech Engineered Solutions as a having all of the strength of steel, with the durability of plastic. In 2010,
Contech retained the exclusive rights to manufacture Steel Reinforced Polyethylene pipe, and we have never looked back. By
encapsulating structural steel within polyethylene, DuroMaxx sets the standard in durability, flexibility and hydraulic capacity.
Joints are fitted easily and achieve a level of watertight performance that sets DuroMaxx apart from more convention pipes.
DuroMaxx consumes 35% less of the natural resources required to produce AASHTO M294 pipe. Steel reinforcing ribs in the
profile wall provide the structural integrity for the pipe. These ribs are made out of steel with recycled content levels ranging from
55-80%. DuroMaxx pipe is eligible for LEED credits in a variety of the U.S. Green Building Council’s categories for sustainable
sites, water efficiency and landscaping, and materials and resources.
Contech Engineered
Solutions pioneered
the way with this
revolutionary
product »
DuroMaxx®
SRPE
Technology.
The basic idea behind
DuroMaxx is to
construct a pipe
that enhances
the best qualities
of two proven
pipe construction
materials;
polyethylene and
steel.
Manufactured in
accordance with ASTM
F2562 and AASHTO MP-20.
STEEL REINFORCED PE TECHNOLOGY
www.ContechES.com/duromaxx4
Sanitary Sewer Solutions
Eastern Idaho Sanitary Interceptor
Shelley, Idaho
Owner: Eastern Idaho Regional Wastewater Authority (EIRWWA)
Engineer: Forsgren Associates
Contractor: DePatco (Pilot), Bonniford (Phase I)
Technical Description: DuroMaxx®
SRPE
4 miles of 36-in. dia., 2.5 miles of 42-in. dia. & 7 miles of 48-in. dia
The first phase of the Eastern Idaho Regional Wastewater Authority’s
(EIRWWA) Regional Wastewater Treatment Plant, with a price tag of
approximately $21 million, was completed during 2009. The facility,
located in Shelley, ID, was designed to handle up to 2 million gallons
of sewage per day with the possibility of expanding to 8 million
gallons per day. A large diameter sanitary interceptor line was run
from Bingham to Bonneville counties, connecting Shelley with the City of
Ammon.
During their search for the appropriate sanitary sewer pipe, the EIRWWA and
the engineer on the project, Forsgren Associates, allowed DuroMaxx to perform a
pilot installation to fully test the product before being considered. Upon the successful
pilot evaluation, DuroMaxx was then included in the evaluation process for the 14-
mile interceptor.
After the comprehensive material evaluation, which included seven technologies,
DuroMaxx steel reinforced polyethylene pipe was chosen. Because of the high
strength and exceptional joint tightness, DuroMaxx provides outstanding value.
Not only did it meet the initial testing requirements, but it was able to provide the
long-term infiltration and exfiltration needs. DuroMaxx is also extremely resistant to
corrosive effluent and met the hydraulic efficiencies to allow for the minimum slope
and longer runs.
The pilot project installation included 600 LF of 42-in. diameter and 600 LF of 48-
in. diameter DuroMaxx sanitary sewer pipe at depths ranging from 12 to 20 feet.
In-situ sieved materials were used for bedding and backfill. The pipe was inspected
for shape control, and the joints were subjected to a low-pressure air test.
The entire project consisted of 4 Miles of 36-in. diameter, 2.25 Miles of 42-in.
diameter and 7 Miles of 48-in. diameter DuroMaxx steel reinforced polyethylene
pipe. Phase I construction began in fall of 2009 with a projected completion by
spring 2011. This project will provide for economic development by protecting
precious groundwater resources within the region and allow for community growth
along the interceptor line. Partnering with neighboring communities on projects
like these improves public health and safety, protects natural resources and infuses
funds into the local economy.
DuroMaxx Results:
•	 Joints subjected to
low-pressure air test for
successful pilot evaluation.
www.ContechES.com/duromaxx 5
Irrigation Solutions
Barker Ranch Irrigation Canal Piping
West Richland, Washington
Owner: Barker Ranch Ltd
Engineer: J-U-B ENGINEERS, Inc.
Contractor: Apollo Inc.
Technical Description: DuroMaxx®
SRPE
3 miles of 54-in. and 60-in.
1,500 LF of 30-in. dia.
The Barker Ranch Irrigation Canal Piping is part of the Columbia
River Basin Water Management Program and replaced three miles of
an open-earth irrigation canal with a closed pipe system. Funded with
a $5.6 million grant by the Washington State Department of Ecology
Office of Columbia River, the pipe system increases water delivery
efficiency with leak and evaporation reductions.
Barker Ranch Ltd worked with J-U-B ENGINEERS, Inc. to find a pipe product
that could handle 9 psi of seasonal pressure for the new pipe system. It also had
to maintain the existing footprint of the canal – which runs along the banks of the
Yakima River – with joint deflection, elbows and have access risers every 500 LF.
DuroMaxx steel reinforced polyethylene (SRPE) pipe from Contech Engineered
Solution was chosen because it met these needs and also increased the installation
production rate inherent with a bell and spigot pipe versus a solid wall welded pipe.
“Barker Ranch Ltd elected to use DuroMaxx pipe to reduce project costs and meet
their budget, realizing the pipe was a new product,” said Gary Weatherly, P.E.,
with J-U-B ENGINEERS, Inc. “The project also had a very aggressive completion
schedule.”
Apollo Inc. installed over 3 miles of 54 -in. and 60 -in. diameter DuroMaxx
pipe with HDB pressure rated polyethylene resins. An additional 1,500 LF of 30
-in. diameter DuroMaxx was installed to provide additional water to the ranch.
DuroMaxx provided superior performance and proved an effective and economical
solution for low head water transmission.
The increased efficiency of the closed pipe system allowed Barker Ranch to divert
less water from the Yakima River, adding 6,436 ac-ft of water to stream flows,
benefiting local fish and wildlife. The new pipeline also delivers water to restored
wetlands at Barker Ranch to support 175 different bird species and other animals.
“The Barker Ranch project represents the kind of conservation we need in the
Greater Columbia Basin to best make use of a finite resource,” explained Tom
Tebb, Ecology’s regional director for Central Washington.
DuroMaxx Results:
•	 Able to handle 9 psi
of seasonal pressure while
maintaining the existing
footprint.
www.ContechES.com/duromaxx6
Detention Solutions
Kent County Waste-to-Energy
Grand Rapids, Michigan
Owner: Covanta Energy
Engineer: AECOM
Contractor: Diversco Construction
Technical Description: DuroMaxx®
SRPE
475 ft. of 96-in. dia.
Covanta Energy is one of the world’s largest owners and operators
of infrastructure for the conversion of waste-to- energy. Covanta
operates and/or has ownership positions in 44 energy-from-waste
facilities, primarily located in North America, and 20 additional
energy generation facilities, including other renewable energy
production facilities in North America. Covanta-operated facilities
convert 20 million tons of trash annually into 9 million megawatt-hours
of clean, renewable energy and more than 9 billion pounds of steam sold
to a variety of industries.
Covanta Energy’s Grand Rapids location has a unique situation where
waste haul trucks entering and leaving the site spread contaminated
stormwater during wet periods. Contaminated stormwater is collected in
an open basin and slowly released into the adjacent Grand River. Since
2006, the Michigan Department of Environmental Quality (MDEQ) has
targeted specific outfalls to the Grand River monitoring the Total Maximum
Daily Loads (TMDLs) for pathogens, metals and other pollutants. The
site’s stormwater would often exceed the maximum allowable TMDLs
creating a risk to the river and greater watershed. The MDEQ and the Kent
County Department of Public Works requested Covanta develop a long-
term solution to protect the river and meet the established water quality
standards.
Engineering firm AECOM and Covanta proposed a long-term solution
of creating an underground storage system for a 25-year event. AECOM
designed a new stormwater system for the entire 2 acre site directing all
stormwater into a 96-inch diameter electrofused DuroMaxx steel-reinforced
polyethylene detention system providing 22,844 CF of storage. The final
piece of the puzzle involved the Kent County DPW and the City of Grand
Rapids which allowed Covanta to tap into an adjacent city sewer trunk
line. Once the DuroMaxx system is near capacity, Covanta can release the
contaminated stormwater for treatment at the local wastewater treatment
plant. DuroMaxx was the ideal solution for the site because it provided the
required storage capacity in limited space with long-term durability and
significantly low leakage; less than 88 gallons over 24 hours.
DuroMaxx Results:
•	 The ideal solution for
the site because it provided
the required storage
capacity in limited space
with long-term durability and
significantly low leakage;
less than 88 gallons over 24
hours.
www.ContechES.com/duromaxx 7
Storm Sewer Solutions
Zachary High School
Zachary, Louisiana
Owner: Zachary School Board
Engineer: Watson Ricks Engineering Group LLC
Contractor: Bendale Farms
Technical Description: DuroMaxx®
SRPE
1600 LF total including 42, 48, 54 and 60-in. dia.
A-2000™ PVC Pipe
The Zachary School Board was in search of a drainage pipe product
to help drain the football field at Zachary High School in Louisiana.
Reinforced concrete pipe was originally considered for the project
but DuroMaxx steel reinforced polyethylene pipe was a suggested
alternative. DuroMaxx offers the strength of steel reinforcing ribs and the
durability of High-Density Polyethylene Resin HDPE. This, coupled with
watertight (WT) joint performance tested up to 15 psi and long available
lay lengths, set DuroMaxx apart from conventional pipe products. It is also
lightweight, ensuring easy handling and a quick installation.
Because of these advantages, Watson Ricks Engineering Group LLC and the School
Board decided to use approximately 1600 LF of DuroMaxx polyethylene pipe in 42,
48, 54 and 60-in. diameters for the football field. A-2000 PVC pipe was also used
in smaller diameters.
The installation went smoothly and the School Board was happy with the drainage
solution for the football field.
DuroMaxx Results:
•	 Watertight joint
performance tested up to 15
psi and long lay lengths.
www.ContechES.com/duromaxx8
Culvert Solutions
Sunshine Road Emergency Repair
Fort Benning, Georgia
Owner: Fort Benning Directorate of Public Works
Engineer: Fort Benning Directorate of Public Works
Contractor: Circle S Industries
Technical Description: DuroMaxx®
SRPE
Triple barrel 300 ft of 48-in. dia.
At Fort Benning, Georgia, severe rains and flooding washed out
several roadways. Sunshine Road was in need of an emergency
repair and the Fort Benning Directorate of Public Works (DPW)
searched for a culvert solution that could accommodate the swampy
area and 28 feet of cover.
DuroMaxx steel reinforced polyethylene (SRPE) pipe and reinforced
concrete pipe (RCP) were the only two options that could accommodate
the site requirements and DuroMaxx was chosen over RCP due to
installation cost and time savings.
Circle S Industries - the contractor on the project - could only work during
certain hours on certain days of the week as there were periodic live fire
exercises that closed the roadway, making a fast installation crucial. The
DuroMaxx pipe was precut at the plant and arrived on site ready for a
speedy installation.
A triple barreled 48-in. diameter DuroMaxx system - each 100 feet in length
- was installed on the site. Crushed stone was used to the spring-line due
to the poor subgrade and the pipe was buried under 30 feet of cover. Most
of the material on base was sand or sandy clay and jumping jack tampers
were utilized to pack the clay.
DuroMaxx in 24-in. and 36-in. diameters was also used on storm drain
applications in several additional Fort Benning locations where native soil
was used for bedding and backfill.
DuroMaxx Results:
•	 Beat out the
competition due to
installation cost and time-
savings!
www.ContechES.com/duromaxx 9
Storage Vault Solutions » CSO/SSO
Bryan’s Lift Station Improvements
Monticello, Indiana
Owner: City of Monticello, Indiana
Engineer: Wessler Engineering
Contractor: F&K Construction
Technical Description: DuroMaxx®
SRPE
CSO detention system with 395,000 gallons of storage
After a combined sewer overflow detention system was installed
for the City of Monticello, Indiana, innovation was the only thing
overflowing. Evidence of this is that this project is a recipient of the
Indiana ACEC 2012 Engineering Excellence Honor Award.
Nestled between Lake Shafer and Lake Freeman in north central
Indiana, the city of Monticello is a Midwest summer vacation
destination. The City has 5,400 year-round residents and operates a
combined sewer collection system and Class II wastewater treatment plant
with a design average flow of 1.1 MGD and peak capacity of 2.4 MGD. This
system has six combined sewer overflow (CSO) outfalls that discharge to the
Tippecanoe River and the downstream Lake Freeman. To comply with the federal
Clean Water Act, the City’s long-term control plan (LTCP) included the reduction
and elimination of CSOs. The Bryan’s Lift Station Improvements project was created
to increase the lift station’s pumping capacity to 2.5 MGD and provide 500,000
gallons of detention.
Bryan’s Lift Station originally was constructed in the 1950s and served combined
sanitary and storm sewers. During peak water events, the lift station was
overwhelmed and unable to handle the full flow resulting combined sewer overflow
events.
The site location presented unique challenges of limited space, a high water table
and tight hydraulic limitations on the existing sewer systems. With the site layout
challenges and its visible public location, traditional storage structure options
quickly were eliminated. Open-concrete tanks would be difficult and expensive to
build onsite. Steel tanks would have required an additional pump station to convey
the incoming wet weather flows to the storage structures. A large-diameter tunnel
did not appear financially or geographically practical.
With sewer pipe technology innovations, creation of a steel reinforced polyethylene
(SRPE) CSO storage system was economical and practical. This optimal solution
modeled an underground, high-performance detention system by using a grid of
buried pipe to store combined sewage below grade. Contech’s DuroMaxx® SRPE
technology was engineered into a CSO detention and drainage system that met the
challenges of having a small footprint, watertight joint performance and long-term
durability.
DuroMaxx Results:
•	 Met the challenges of
a small footprint, watertight
joint performance and long-
term durability.
www.ContechES.com/duromaxx10
Storage Vault Solutions » Glycol Containment
MacArthur Airport Glycol Containment
Long Island, New York
Owner: Fort Benning Directorate of Public Works
Engineer: Fort Benning Directorate of Public Works
Contractor: Circle S Industries
Technical Description: DuroMaxx®
SRPE
432 LF of 96-in. dia. and 384 LF of 84-in. dia.
The “clean-airplane” concept was derived by the U.S. Federal Aviation
Administration (FAA) Federal Aviation Regulation (FAR) 121.629, which
states “No person may take off an aircraft when frost, ice or snow is
adhering to the wings, control surfaces, propellers, engine inlets, or
other critical surfaces of the aircraft or when the takeoff would not be in
compliance with paragraph ( c ) of this section.”
Safe winter operations require special procedures by airline maintenance,
engineering and flight operations. As part of those procedures, a deicing
solution is often used that will remove accumulated frost, ice or snow from an
airplane. These fluids must be transported, stored and handled properly to be
effective. While airplane deicing requirements have made air travel in winter
months safer, there are new regulations arising as the environmental impacts
of the practice have come under regulatory scrutiny. One of the key chemicals
used in the deicing process is glycol – a potentially harmful chemical if left
untreated or improperly stored. Therefore, it is critical that the resulting,
contaminated runoff from the tarmac also be properly stored and treated.
In response to these concerns, the MacArthur Airport in Long Island, New
York, was in need of an efficient and cost-effective solution to properly store
stormwater contaminated with deicing fluid prior to being treated. MacArthur
Airport worked closely with L. K. McLean Associates to select an ideal glycol
pre-treatment and collection system. They wanted a solution that would
have a smaller footprint and allow them to maximize their available land
space for continued use as runway and taxiways. Ultimately, they selected
a solution by Contech Engineered Solutions LLC which utilized DuroMaxx®
steel reinforced polyethylene (SRPE) tanks. This system would serve as an
underground storage chamber from which the runoff would be pumped to a
treatment system constructed above. The complete system consisted of 384
LF of 84-in. diameter pipe and 432 LF of 96-inch diameter pipe resulting in
35,739 CF storage volume. DuroMaxx is a reinforced polyethylene pipe with a
smooth waterway wall and exterior profile that is reinforced with high strength
galvanized steel ribs. While DuroMaxx provides a completely structural
solution, it is also lightweight and installation was quick, which meant less
expense and fewer dewatering issues – a pleasant surprise to both the airport
and the contractor. Given the sensitivity of the chemicals being stored here,
it was also crucial that the joints be leak-free. The DuroMaxx system was
designed with connections that would be ElectorFusion (EF) welded and
banded joints for a true symbiotic connection. The system can be put through
either an air test or vacuum test to ensure that joints are properly sealed.
DuroMaxx Results:
•	 Provided a completely
structural solution that was
lightweight and installation
was quick.
www.ContechES.com/duromaxx 11
Storage Vault Solutions » Rainwater Harvesting
South Transfer Station
Seattle, Washington
Owner: Seattle Public Utilities
Engineer: URS Corp, Inc.
Contractor: M.A. Mortenson Construction , KLB Construction
Technical Description: DuroMaxx®
SRPE
UrbanGreen®
Rainwater Harvesting system
150 LF of 84-in dia.
Seattle Public Utilities (SPU) is building a new $50 million waste transfer
station in South Seattle. The two-story, 140,500 sq. foot building
with 84 parking spots is projected to be finished in July 2012 and will
eventually replace the old South transfer station located across the street.
“The new facility will allow the city to maintain reliable solid waste
services in an economical and environmentally sound manner,” said Henry
Friedman, project manager for SPU.
SPU’s goal was to build this project to the standards of the U.S. Green Building
Council’s Leadership in Energy and Environmental Design (LEED) certification
program and to achieve LEED Gold status. The LEED rating system measures
a proposal’s impact on the environment through various categories such as
climate change (carbon emissions), indoor air quality, resource depletion,
human health, water efficiency and habitat alteration, among others.
To achieve credit for water efficiency, SPU wanted to harvest rainwater to
reuse onsite. Throughout the year, the water will be used in many ways such
as, irrigation, to wash the transfer station floor, as washdown water for the
tipping floor and for the wheel wash which trucks can utilize as they leave the
tipping floor. With limited available space on the site, they needed to utilize an
underground system.
SPU worked with URS Corp Inc. to find a rainwater harvesting cistern to meet
their needs and chose an UrbanGreen steel reinforced polyethylene (SRPE)
rainwater harvesting cistern from Contech Engineered Solutions for the project.
The cistern utilized the DuroMaxx technology and was comprised of two 84”
diameter cistern sections that are each 75 feet long. The SRPE cistern was
chosen because it was available in such a large diameter and provided water
tight joints welded using ElectroFusion (EF) couplers. It was also an economical
solution.
The cistern features include a 12” rain leader for runoff collection, valve
control outlets to drain the tanks for maintenance, four 36” access risers with
integral ladders and internal pumps connected to the irrigation system. The
irrigation will be used for the new landscaping around the facility, including
123 on-site trees, 32,000 sq. feet of ground cover and 81,000 sq. feet of
grass cover. The system was installed below grade by KLB Construction and
was backfilled in just three days.
DuroMaxx Results:
•	 Met standards of the
U.S. Green Building Council’s
Leadership in Energy and
Environmental Design (LEED).
www.ContechES.com/duromaxx12
Reline » DuroMaxx®
Liner Pipe
Mobile Regional Airport - Runway 14/32
Mobile, Alabama
Owner: Mobile Regional Airport
Engineer: Volkert & Associates, Inc.
Contractor: John G. Walton Construction Co., Inc. & Indiana Reline, Inc.
Technical Description: DuroMaxx®
SRPE
1500 LF of 120-in. dia.
Locally owned and operated, the Mobile Regional Airport is located
in southern Alabama and boasts over ten years of operations. It is the
second airport in the country to have a federalized screening workforce.
The airport is also home to the U.S. Coast Guard Aviation Training
Center where advanced training is provided to U.S. Coast Guard pilots
and aircrew.
In February 2013, the Mobile Airport Authority filed an application with
the Federal Aviation Administration to garner a small stipend intended for
continued development and rehabilitation for the airport. Part of that involved
the rehabilitation of a single 1,740’ long, 132” diameter culvert that ran under
Runway 14/32.
Given the location, replacement was completely out of the question. The
Airport did not want to have to shut down operations while construction was
underway.
Ultimately, they turned to a 120” diameter DuroMaxx® steel reinforced
polyethylene (SRPE) liner pipe supplied by Contech Engineered Solutions to
slipline into the existing culvert.
There were several things that had to be considered during the structural and
hydraulic design. One of the most important considerations was the varying
heights of cover (some areas carrying almost 35 feet of cover). The design also
incorporated an existing junction box with a grade change of 0.2% to 1.04%.
The entire installed length was 1,740 linear feet – the reline segments totaled
1,500 linear feet while an additional 240 linear feet were direct buried.
Owner of Indiana Reline, Inc., Chris Wisehart stated, “Our company has
installed a wide variety of both small and large diameter liner pipe products
over the years. This was our first time installing DuroMaxx steel reinforced
polyethylene pipe for large diameter pipeline rehabilitation and we were
pleased with the pipe’s performance and ease of handling. DuroMaxx was
strong enough to maintain its shape against flotation forces, while also
providing necessary buckling resistance to the grouting operation. The
special 40 foot lengths reduced the number of pieces we had to handle and
minimized the amount of joint welding we had to perform. We will gladly use
DuroMaxx again.”
DuroMaxx Results:
•	 Large diameter reline
for a fully structural solution
that was cost-effective and
time-efficient.
www.ContechES.com/duromaxx 13
Reline » SPR™ PE Structural Liner
Lakehurst Naval Air Station - Reline
Lakehurst, New Jersey
Owner: Lakehurst Naval Air Station
Engineer: USAF AMC 87 CS/CEPM
Contractor: Sequoia Construction & Heitkamp Inc. (SC)
Technical Description: SPR™ PE Structural Lining
Structural lining for 786 LF of 48-in. dia. RCP and 703 LF of 54-in.
dia. RCP
Naval Air Engineering Station Lakehurst, the former name of the
Lakehurst part of Joint Base McGuire-Dix-Lakehurst, is a United
States Air Force-managed Joint Base located nearby Trenton, New
Jersey. It is the northeast’s largest naval aviation center.
It is most renowned for being the site of the Hindenburg disaster on 6
May 1937 in which the German passenger airship LZ 129 Hindenburg
caught fire and was destroyed during its attempt to dock at the base,
ending the airship era. NAS Lakehurst is truly a veritable nugget of historical
wealth. The dirigible hangars from 80 years ago are still there.
During a routine inspection at the base, it was discovered that a number of
reinforced concrete pipe (RCP) runs used to carry stormwater had deteriorated
and were no longer hydraulically or structurally sufficient. The pipes needed to
be replaced or repaired. The main challenges for this particular project were the
extremely tight constraints and the narrow construction activity windows.
The failing RCP runs were accessible only through the manhole structures unless the
typical and costly open trench replacement method was used.
After a discussion with Contech Engineered Solutions, the facilities engineer decided
to reline the existing RCP with SPR™ PE, a polyethylene structural liner reinforced
with steel. This would enable them to access the RCP through the manholes directly
whereby they could then wind the structural liner directly into the host pipe.
Using SPR™ PE negated the normal logistical and space requirements of open cut
methods, and it kept an important area of the base functional.
SPR™ PE Results:
•	 Structural internal
steel reinforced
HDPE liner method for
closed system storm &
sanitary sewers and culverts
with limited access.
www.ContechES.com/duromaxx14
Looking for a better pipe that is Strong,
Flexible, Easy to Install?
The difference is DuroMaxx®
.
STEEL REINFORCED PE TECHNOLOGY
www.ContechES.com/duromaxx 15
We print our brochures entirely on Forest
Stewardship Council certified paper. FSC
certification ensures that the paper in
our brochures contain fiber from well-
managed and responsibly harvested
forests that meet strict environmental and
socioeconomic standards.
FSC
Dig Deeper
Find all the information you need at www.ContechES.com, including
field and laboratory test results, approvals, brochures, design
guides, standard details, and specifications within the product
section of our site.
Connect with Us
We're here to make your job easier – and that includes
being able to get in touch with us when you need to.
Go to www.ContechES.com/ConnectWithContech.
While you’re there, be sure to check out our upcoming seminar
schedule or request an in-house technical presentation.
Start a Project
If you are ready to begin a project, contact your local
representative to get started. Or you can check out
our design toolbox for all our online resources at
www.ContechES.com/designtoolbox.
DuroMaxx eBook PDF 10/14
©2014 Contech Engineered Solutions LLC
Toll Free: 1-800-338-1122
www.ContechES.com
All Rights Reserved. Printed in the USA.
NOTHING IN THIS CATALOG SHOULD BE CONSTRUED AS AN EXPRESSED WARRANTY
OR AN IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR
PURPOSE. SEE THE CONTECH STANDARD CONDITION OF SALES (VIEWABLE AT
WWW.CONTECHES.COM/COS) FOR MORE INFORMATION.
Get Social With Us!
ENGINEERED SOLUTIONS

More Related Content

What's hot

Energy Savings Through Pump Refurbishment and Coatings
Energy Savings Through Pump Refurbishment and CoatingsEnergy Savings Through Pump Refurbishment and Coatings
Energy Savings Through Pump Refurbishment and CoatingsHenkel Adhesives Australia
 
Pilot Tube Guided Boring Solutions Meet Project Challenges
Pilot Tube Guided Boring Solutions Meet Project ChallengesPilot Tube Guided Boring Solutions Meet Project Challenges
Pilot Tube Guided Boring Solutions Meet Project ChallengesLaura Anderson
 
Water dam versus Tailing Dam
Water dam versus Tailing DamWater dam versus Tailing Dam
Water dam versus Tailing Damfrank huangfu
 
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGSEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGDEEPAK MALLICK
 
Exploring Tight Gas Reservoir Using Intelligent Well Technology
Exploring Tight Gas Reservoir Using Intelligent Well TechnologyExploring Tight Gas Reservoir Using Intelligent Well Technology
Exploring Tight Gas Reservoir Using Intelligent Well TechnologyAbhinav Bisht
 
Hydraulic Fracturing: Importance to the Industry
Hydraulic Fracturing: Importance to the IndustryHydraulic Fracturing: Importance to the Industry
Hydraulic Fracturing: Importance to the IndustryPorts-To-Plains Blog
 
Guidelines For Construction of Pipe Distribution Network (PDN) For Irrigation
Guidelines For Construction of Pipe Distribution Network (PDN) For IrrigationGuidelines For Construction of Pipe Distribution Network (PDN) For Irrigation
Guidelines For Construction of Pipe Distribution Network (PDN) For IrrigationIRJET Journal
 
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...Michael Hewitt, GISP
 
Max Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History DetailsMax Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History DetailsMax Simnitt
 
Design of an Export Pipeline
Design of an Export Pipeline Design of an Export Pipeline
Design of an Export Pipeline Sarah Busef
 
Climax Nomination for 2014 Hardrock Mining Reclamation Awards
Climax Nomination for 2014 Hardrock Mining Reclamation AwardsClimax Nomination for 2014 Hardrock Mining Reclamation Awards
Climax Nomination for 2014 Hardrock Mining Reclamation AwardsKathy Remias
 
Donnie Belloit_Reume
Donnie Belloit_ReumeDonnie Belloit_Reume
Donnie Belloit_ReumeDonnie Belloit
 
PLANNING AND DESIGN OF PIPE DISTRIBUTION NETWORK (PDN).
PLANNING AND DESIGN OF PIPE DISTRIBUTION NETWORK (PDN).PLANNING AND DESIGN OF PIPE DISTRIBUTION NETWORK (PDN).
PLANNING AND DESIGN OF PIPE DISTRIBUTION NETWORK (PDN).Yatiraj Battul
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15John Grover
 
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...
Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...Michael Hewitt, GISP
 
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...Michael Hewitt, GISP
 
Mining Operations Optimize Dewatering Processes
Mining Operations Optimize Dewatering ProcessesMining Operations Optimize Dewatering Processes
Mining Operations Optimize Dewatering ProcessesInstrument Specialties, Inc.
 
Sparrows Point Country Club Irrigation System Evaluation
Sparrows Point Country Club Irrigation System EvaluationSparrows Point Country Club Irrigation System Evaluation
Sparrows Point Country Club Irrigation System Evaluationtbloom_golf
 

What's hot (20)

Energy Savings Through Pump Refurbishment and Coatings
Energy Savings Through Pump Refurbishment and CoatingsEnergy Savings Through Pump Refurbishment and Coatings
Energy Savings Through Pump Refurbishment and Coatings
 
Aoil profile 2016
Aoil  profile  2016 Aoil  profile  2016
Aoil profile 2016
 
Pilot Tube Guided Boring Solutions Meet Project Challenges
Pilot Tube Guided Boring Solutions Meet Project ChallengesPilot Tube Guided Boring Solutions Meet Project Challenges
Pilot Tube Guided Boring Solutions Meet Project Challenges
 
Water dam versus Tailing Dam
Water dam versus Tailing DamWater dam versus Tailing Dam
Water dam versus Tailing Dam
 
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LININGSEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
SEWER REHABILITATION / REPLACEMENT FOR RCC PIPES WITH INTERNAL LINING
 
Exploring Tight Gas Reservoir Using Intelligent Well Technology
Exploring Tight Gas Reservoir Using Intelligent Well TechnologyExploring Tight Gas Reservoir Using Intelligent Well Technology
Exploring Tight Gas Reservoir Using Intelligent Well Technology
 
Hydraulic Fracturing: Importance to the Industry
Hydraulic Fracturing: Importance to the IndustryHydraulic Fracturing: Importance to the Industry
Hydraulic Fracturing: Importance to the Industry
 
Guidelines For Construction of Pipe Distribution Network (PDN) For Irrigation
Guidelines For Construction of Pipe Distribution Network (PDN) For IrrigationGuidelines For Construction of Pipe Distribution Network (PDN) For Irrigation
Guidelines For Construction of Pipe Distribution Network (PDN) For Irrigation
 
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
Brad Shultz, OSMRE, “Effective Aerobic Wetland Design for Metals Polishing in...
 
Max Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History DetailsMax Simnitt_03-2016_Work History Details
Max Simnitt_03-2016_Work History Details
 
Design of an Export Pipeline
Design of an Export Pipeline Design of an Export Pipeline
Design of an Export Pipeline
 
Climax Nomination for 2014 Hardrock Mining Reclamation Awards
Climax Nomination for 2014 Hardrock Mining Reclamation AwardsClimax Nomination for 2014 Hardrock Mining Reclamation Awards
Climax Nomination for 2014 Hardrock Mining Reclamation Awards
 
Donnie Belloit_Reume
Donnie Belloit_ReumeDonnie Belloit_Reume
Donnie Belloit_Reume
 
PLANNING AND DESIGN OF PIPE DISTRIBUTION NETWORK (PDN).
PLANNING AND DESIGN OF PIPE DISTRIBUTION NETWORK (PDN).PLANNING AND DESIGN OF PIPE DISTRIBUTION NETWORK (PDN).
PLANNING AND DESIGN OF PIPE DISTRIBUTION NETWORK (PDN).
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15
 
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...
Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...Cliff  Denholm, Stream Restoration Incorporated,  "Passive Treatment of Acidi...
Cliff Denholm, Stream Restoration Incorporated, "Passive Treatment of Acidi...
 
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
Bob Hedin, Hedin Environmental, “Two Passive Treatment Systems that are Regio...
 
Mining Operations Optimize Dewatering Processes
Mining Operations Optimize Dewatering ProcessesMining Operations Optimize Dewatering Processes
Mining Operations Optimize Dewatering Processes
 
Trenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water NetworksTrenchless Rehabilitation of Sewer & Water Networks
Trenchless Rehabilitation of Sewer & Water Networks
 
Sparrows Point Country Club Irrigation System Evaluation
Sparrows Point Country Club Irrigation System EvaluationSparrows Point Country Club Irrigation System Evaluation
Sparrows Point Country Club Irrigation System Evaluation
 

Similar to Contech DuroMaxx Steel Reinforced Polyethylene

Flexsteel - The Next Generation
Flexsteel - The Next GenerationFlexsteel - The Next Generation
Flexsteel - The Next GenerationCindyTrahan
 
SCOTT RESUME
SCOTT RESUMESCOTT RESUME
SCOTT RESUMEScott Loewen
 
Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2016
Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2016Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2016
Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2016Fairfax County
 
05_WP-3M_1011_LR
05_WP-3M_1011_LR05_WP-3M_1011_LR
05_WP-3M_1011_LRCraig Thomas
 
2018 general frc_2018_12
2018 general frc_2018_122018 general frc_2018_12
2018 general frc_2018_12AsuSSEBENA
 
Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2017
Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2017Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2017
Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2017Fairfax County
 
ge_dp_scp_brochure
ge_dp_scp_brochurege_dp_scp_brochure
ge_dp_scp_brochureYanyan Wu
 
Internal Coatings on the Rise - World Pipelines September 2016
Internal Coatings on the Rise - World Pipelines September 2016Internal Coatings on the Rise - World Pipelines September 2016
Internal Coatings on the Rise - World Pipelines September 2016Craig Thomas
 
Berkmar Article 2012 copy
Berkmar Article 2012 copyBerkmar Article 2012 copy
Berkmar Article 2012 copyFrank Sisk
 
Mf design guidelines
Mf design guidelinesMf design guidelines
Mf design guidelinesAverill Cook
 
ASCE PL Div 2001 40574-017-002
ASCE PL Div 2001 40574-017-002ASCE PL Div 2001 40574-017-002
ASCE PL Div 2001 40574-017-002William Godwin
 
Radius Systems pipe brings gas to Wexford Town
Radius Systems pipe brings gas to Wexford TownRadius Systems pipe brings gas to Wexford Town
Radius Systems pipe brings gas to Wexford TownTom Berry
 
Pipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & CatchpitsPipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & Catchpitseddiebradbrook
 
Rapid Deployment Inflatable Dam PPT
Rapid Deployment Inflatable Dam  PPTRapid Deployment Inflatable Dam  PPT
Rapid Deployment Inflatable Dam PPTCherylwitmer
 
Flood Barrier US inflated for water restriction
Flood Barrier US inflated for water restrictionFlood Barrier US inflated for water restriction
Flood Barrier US inflated for water restrictionPRANTIKSINHA2
 
IPANEX LIQUID CRYSTALLINE WATERPROOFING ADMIX
IPANEX LIQUID CRYSTALLINE WATERPROOFING ADMIX IPANEX LIQUID CRYSTALLINE WATERPROOFING ADMIX
IPANEX LIQUID CRYSTALLINE WATERPROOFING ADMIX Yogesh Parmar
 

Similar to Contech DuroMaxx Steel Reinforced Polyethylene (20)

Flexsteel - The Next Generation
Flexsteel - The Next GenerationFlexsteel - The Next Generation
Flexsteel - The Next Generation
 
SCOTT RESUME
SCOTT RESUMESCOTT RESUME
SCOTT RESUME
 
Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2016
Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2016Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2016
Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2016
 
05_WP-3M_1011_LR
05_WP-3M_1011_LR05_WP-3M_1011_LR
05_WP-3M_1011_LR
 
Rehab Solutions for Today's Infrastructure
Rehab Solutions for Today's InfrastructureRehab Solutions for Today's Infrastructure
Rehab Solutions for Today's Infrastructure
 
2018 general frc_2018_12
2018 general frc_2018_122018 general frc_2018_12
2018 general frc_2018_12
 
Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2017
Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2017Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2017
Storm Pipe Relining (Cured-in-Place Pipe Lining) FY 2017
 
ge_dp_scp_brochure
ge_dp_scp_brochurege_dp_scp_brochure
ge_dp_scp_brochure
 
Acf environmental 2016 apwa fl expo - integrated infrastructure-an innovati...
Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovati...Acf environmental   2016 apwa fl expo - integrated infrastructure-an innovati...
Acf environmental 2016 apwa fl expo - integrated infrastructure-an innovati...
 
Breath of fresh
Breath of freshBreath of fresh
Breath of fresh
 
Internal Coatings on the Rise - World Pipelines September 2016
Internal Coatings on the Rise - World Pipelines September 2016Internal Coatings on the Rise - World Pipelines September 2016
Internal Coatings on the Rise - World Pipelines September 2016
 
Berkmar Article 2012 copy
Berkmar Article 2012 copyBerkmar Article 2012 copy
Berkmar Article 2012 copy
 
Mf design guidelines
Mf design guidelinesMf design guidelines
Mf design guidelines
 
ASCE PL Div 2001 40574-017-002
ASCE PL Div 2001 40574-017-002ASCE PL Div 2001 40574-017-002
ASCE PL Div 2001 40574-017-002
 
Radius Systems pipe brings gas to Wexford Town
Radius Systems pipe brings gas to Wexford TownRadius Systems pipe brings gas to Wexford Town
Radius Systems pipe brings gas to Wexford Town
 
Pipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & CatchpitsPipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & Catchpits
 
Rapid Deployment Inflatable Dam PPT
Rapid Deployment Inflatable Dam  PPTRapid Deployment Inflatable Dam  PPT
Rapid Deployment Inflatable Dam PPT
 
PipeAssure_A4
PipeAssure_A4PipeAssure_A4
PipeAssure_A4
 
Flood Barrier US inflated for water restriction
Flood Barrier US inflated for water restrictionFlood Barrier US inflated for water restriction
Flood Barrier US inflated for water restriction
 
IPANEX LIQUID CRYSTALLINE WATERPROOFING ADMIX
IPANEX LIQUID CRYSTALLINE WATERPROOFING ADMIX IPANEX LIQUID CRYSTALLINE WATERPROOFING ADMIX
IPANEX LIQUID CRYSTALLINE WATERPROOFING ADMIX
 

More from Contech Engineered Solutions

Contech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial MarketsContech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial MarketsContech Engineered Solutions
 
Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...
Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...
Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...Contech Engineered Solutions
 
Taking out the Trash: Setting achievable trash discharge reduction goals and ...
Taking out the Trash:Setting achievable trash discharge reduction goals and ...Taking out the Trash:Setting achievable trash discharge reduction goals and ...
Taking out the Trash: Setting achievable trash discharge reduction goals and ...Contech Engineered Solutions
 
Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution Contech Engineered Solutions
 
Underground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinUnderground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinContech Engineered Solutions
 
Enhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP'sEnhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP'sContech Engineered Solutions
 

More from Contech Engineered Solutions (17)

Site Solutions by Contech
Site Solutions by ContechSite Solutions by Contech
Site Solutions by Contech
 
CMP Solutions by Contech
CMP Solutions by ContechCMP Solutions by Contech
CMP Solutions by Contech
 
2018 Contech Calendar
2018 Contech Calendar2018 Contech Calendar
2018 Contech Calendar
 
Contech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial MarketsContech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial Markets
 
2017 Contech Calendar
2017 Contech Calendar2017 Contech Calendar
2017 Contech Calendar
 
2016 Contech Calendar
2016 Contech Calendar2016 Contech Calendar
2016 Contech Calendar
 
How Stormwater Treatment Trains Work
How Stormwater Treatment Trains WorkHow Stormwater Treatment Trains Work
How Stormwater Treatment Trains Work
 
Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...
Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...
Raising the Bar North of the Border: The Ins and Outs of Canada’s New Evaluat...
 
Taking out the Trash: Setting achievable trash discharge reduction goals and ...
Taking out the Trash:Setting achievable trash discharge reduction goals and ...Taking out the Trash:Setting achievable trash discharge reduction goals and ...
Taking out the Trash: Setting achievable trash discharge reduction goals and ...
 
How Rainwater Harvesting Works
How Rainwater Harvesting WorksHow Rainwater Harvesting Works
How Rainwater Harvesting Works
 
2015 Contech Calendar
2015 Contech Calendar2015 Contech Calendar
2015 Contech Calendar
 
Maximizing Phosphorus Load Reduction
Maximizing Phosphorus Load ReductionMaximizing Phosphorus Load Reduction
Maximizing Phosphorus Load Reduction
 
Low Impact Developement Site Planner
Low Impact Developement Site Planner Low Impact Developement Site Planner
Low Impact Developement Site Planner
 
Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution Stormwater Products Slideshow - Contech Engineered Solution
Stormwater Products Slideshow - Contech Engineered Solution
 
Underground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in WisconsinUnderground Wet Ponds for Stormwater Management in Wisconsin
Underground Wet Ponds for Stormwater Management in Wisconsin
 
Enhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP'sEnhancing Low Impact Development Designs Using Manufactrured BMP's
Enhancing Low Impact Development Designs Using Manufactrured BMP's
 
Rainwater Harvesting Answer Book
Rainwater Harvesting Answer BookRainwater Harvesting Answer Book
Rainwater Harvesting Answer Book
 

Recently uploaded

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringJuanCarlosMorales19600
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 

Recently uploaded (20)

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Piping Basic stress analysis by engineering
Piping Basic stress analysis by engineeringPiping Basic stress analysis by engineering
Piping Basic stress analysis by engineering
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 

Contech DuroMaxx Steel Reinforced Polyethylene

  • 1. DuroMaxx® SRPE Technology ENGINEERED SOLUTIONS STEEL REINFORCED PE TECHNOLOGY 10 Case Studies that Demonstrate the Benefits of DuroMaxx SRPE
  • 2. www.ContechES.com/duromaxx2 Multiple jointing options are available for DuroMaxx to meet your specific project requirements from Soil Tight (ST) joints to high performance (HP) bell and spigot joints capable of 15 psi to ElectroFusion (EF) or Welded Coupler (WC) joints capable of 30 psi. STEEL REINFORCED PE TECHNOLOGY DuroMaxx is far more than JUST a pipe! Take a moment to flip through these key case studies outlining the benefits of DuroMaxx in the following applications: • Sanitary Sewers • Irrigation • Watertight Detention • Storm Sewers • Culverts • Storage Vaults » CSO/SSO, Glycol Containment and Rainwater Harvesting • Yard Piping • Reline » DuroMaxx® Liner Pipe and further use of steel reinforced technology through SPR™ PE
  • 3. www.ContechES.com/duromaxx 3 DuroMaxx® Steel Reinforced Polyethylene DuroMaxx steel reinforced polyethylene (SRPE) represents a revolution in pipe construction that was pioneered in Australia and recognized by Contech Engineered Solutions as a having all of the strength of steel, with the durability of plastic. In 2010, Contech retained the exclusive rights to manufacture Steel Reinforced Polyethylene pipe, and we have never looked back. By encapsulating structural steel within polyethylene, DuroMaxx sets the standard in durability, flexibility and hydraulic capacity. Joints are fitted easily and achieve a level of watertight performance that sets DuroMaxx apart from more convention pipes. DuroMaxx consumes 35% less of the natural resources required to produce AASHTO M294 pipe. Steel reinforcing ribs in the profile wall provide the structural integrity for the pipe. These ribs are made out of steel with recycled content levels ranging from 55-80%. DuroMaxx pipe is eligible for LEED credits in a variety of the U.S. Green Building Council’s categories for sustainable sites, water efficiency and landscaping, and materials and resources. Contech Engineered Solutions pioneered the way with this revolutionary product » DuroMaxx® SRPE Technology. The basic idea behind DuroMaxx is to construct a pipe that enhances the best qualities of two proven pipe construction materials; polyethylene and steel. Manufactured in accordance with ASTM F2562 and AASHTO MP-20. STEEL REINFORCED PE TECHNOLOGY
  • 4. www.ContechES.com/duromaxx4 Sanitary Sewer Solutions Eastern Idaho Sanitary Interceptor Shelley, Idaho Owner: Eastern Idaho Regional Wastewater Authority (EIRWWA) Engineer: Forsgren Associates Contractor: DePatco (Pilot), Bonniford (Phase I) Technical Description: DuroMaxx® SRPE 4 miles of 36-in. dia., 2.5 miles of 42-in. dia. & 7 miles of 48-in. dia The first phase of the Eastern Idaho Regional Wastewater Authority’s (EIRWWA) Regional Wastewater Treatment Plant, with a price tag of approximately $21 million, was completed during 2009. The facility, located in Shelley, ID, was designed to handle up to 2 million gallons of sewage per day with the possibility of expanding to 8 million gallons per day. A large diameter sanitary interceptor line was run from Bingham to Bonneville counties, connecting Shelley with the City of Ammon. During their search for the appropriate sanitary sewer pipe, the EIRWWA and the engineer on the project, Forsgren Associates, allowed DuroMaxx to perform a pilot installation to fully test the product before being considered. Upon the successful pilot evaluation, DuroMaxx was then included in the evaluation process for the 14- mile interceptor. After the comprehensive material evaluation, which included seven technologies, DuroMaxx steel reinforced polyethylene pipe was chosen. Because of the high strength and exceptional joint tightness, DuroMaxx provides outstanding value. Not only did it meet the initial testing requirements, but it was able to provide the long-term infiltration and exfiltration needs. DuroMaxx is also extremely resistant to corrosive effluent and met the hydraulic efficiencies to allow for the minimum slope and longer runs. The pilot project installation included 600 LF of 42-in. diameter and 600 LF of 48- in. diameter DuroMaxx sanitary sewer pipe at depths ranging from 12 to 20 feet. In-situ sieved materials were used for bedding and backfill. The pipe was inspected for shape control, and the joints were subjected to a low-pressure air test. The entire project consisted of 4 Miles of 36-in. diameter, 2.25 Miles of 42-in. diameter and 7 Miles of 48-in. diameter DuroMaxx steel reinforced polyethylene pipe. Phase I construction began in fall of 2009 with a projected completion by spring 2011. This project will provide for economic development by protecting precious groundwater resources within the region and allow for community growth along the interceptor line. Partnering with neighboring communities on projects like these improves public health and safety, protects natural resources and infuses funds into the local economy. DuroMaxx Results: • Joints subjected to low-pressure air test for successful pilot evaluation.
  • 5. www.ContechES.com/duromaxx 5 Irrigation Solutions Barker Ranch Irrigation Canal Piping West Richland, Washington Owner: Barker Ranch Ltd Engineer: J-U-B ENGINEERS, Inc. Contractor: Apollo Inc. Technical Description: DuroMaxx® SRPE 3 miles of 54-in. and 60-in. 1,500 LF of 30-in. dia. The Barker Ranch Irrigation Canal Piping is part of the Columbia River Basin Water Management Program and replaced three miles of an open-earth irrigation canal with a closed pipe system. Funded with a $5.6 million grant by the Washington State Department of Ecology Office of Columbia River, the pipe system increases water delivery efficiency with leak and evaporation reductions. Barker Ranch Ltd worked with J-U-B ENGINEERS, Inc. to find a pipe product that could handle 9 psi of seasonal pressure for the new pipe system. It also had to maintain the existing footprint of the canal – which runs along the banks of the Yakima River – with joint deflection, elbows and have access risers every 500 LF. DuroMaxx steel reinforced polyethylene (SRPE) pipe from Contech Engineered Solution was chosen because it met these needs and also increased the installation production rate inherent with a bell and spigot pipe versus a solid wall welded pipe. “Barker Ranch Ltd elected to use DuroMaxx pipe to reduce project costs and meet their budget, realizing the pipe was a new product,” said Gary Weatherly, P.E., with J-U-B ENGINEERS, Inc. “The project also had a very aggressive completion schedule.” Apollo Inc. installed over 3 miles of 54 -in. and 60 -in. diameter DuroMaxx pipe with HDB pressure rated polyethylene resins. An additional 1,500 LF of 30 -in. diameter DuroMaxx was installed to provide additional water to the ranch. DuroMaxx provided superior performance and proved an effective and economical solution for low head water transmission. The increased efficiency of the closed pipe system allowed Barker Ranch to divert less water from the Yakima River, adding 6,436 ac-ft of water to stream flows, benefiting local fish and wildlife. The new pipeline also delivers water to restored wetlands at Barker Ranch to support 175 different bird species and other animals. “The Barker Ranch project represents the kind of conservation we need in the Greater Columbia Basin to best make use of a finite resource,” explained Tom Tebb, Ecology’s regional director for Central Washington. DuroMaxx Results: • Able to handle 9 psi of seasonal pressure while maintaining the existing footprint.
  • 6. www.ContechES.com/duromaxx6 Detention Solutions Kent County Waste-to-Energy Grand Rapids, Michigan Owner: Covanta Energy Engineer: AECOM Contractor: Diversco Construction Technical Description: DuroMaxx® SRPE 475 ft. of 96-in. dia. Covanta Energy is one of the world’s largest owners and operators of infrastructure for the conversion of waste-to- energy. Covanta operates and/or has ownership positions in 44 energy-from-waste facilities, primarily located in North America, and 20 additional energy generation facilities, including other renewable energy production facilities in North America. Covanta-operated facilities convert 20 million tons of trash annually into 9 million megawatt-hours of clean, renewable energy and more than 9 billion pounds of steam sold to a variety of industries. Covanta Energy’s Grand Rapids location has a unique situation where waste haul trucks entering and leaving the site spread contaminated stormwater during wet periods. Contaminated stormwater is collected in an open basin and slowly released into the adjacent Grand River. Since 2006, the Michigan Department of Environmental Quality (MDEQ) has targeted specific outfalls to the Grand River monitoring the Total Maximum Daily Loads (TMDLs) for pathogens, metals and other pollutants. The site’s stormwater would often exceed the maximum allowable TMDLs creating a risk to the river and greater watershed. The MDEQ and the Kent County Department of Public Works requested Covanta develop a long- term solution to protect the river and meet the established water quality standards. Engineering firm AECOM and Covanta proposed a long-term solution of creating an underground storage system for a 25-year event. AECOM designed a new stormwater system for the entire 2 acre site directing all stormwater into a 96-inch diameter electrofused DuroMaxx steel-reinforced polyethylene detention system providing 22,844 CF of storage. The final piece of the puzzle involved the Kent County DPW and the City of Grand Rapids which allowed Covanta to tap into an adjacent city sewer trunk line. Once the DuroMaxx system is near capacity, Covanta can release the contaminated stormwater for treatment at the local wastewater treatment plant. DuroMaxx was the ideal solution for the site because it provided the required storage capacity in limited space with long-term durability and significantly low leakage; less than 88 gallons over 24 hours. DuroMaxx Results: • The ideal solution for the site because it provided the required storage capacity in limited space with long-term durability and significantly low leakage; less than 88 gallons over 24 hours.
  • 7. www.ContechES.com/duromaxx 7 Storm Sewer Solutions Zachary High School Zachary, Louisiana Owner: Zachary School Board Engineer: Watson Ricks Engineering Group LLC Contractor: Bendale Farms Technical Description: DuroMaxx® SRPE 1600 LF total including 42, 48, 54 and 60-in. dia. A-2000™ PVC Pipe The Zachary School Board was in search of a drainage pipe product to help drain the football field at Zachary High School in Louisiana. Reinforced concrete pipe was originally considered for the project but DuroMaxx steel reinforced polyethylene pipe was a suggested alternative. DuroMaxx offers the strength of steel reinforcing ribs and the durability of High-Density Polyethylene Resin HDPE. This, coupled with watertight (WT) joint performance tested up to 15 psi and long available lay lengths, set DuroMaxx apart from conventional pipe products. It is also lightweight, ensuring easy handling and a quick installation. Because of these advantages, Watson Ricks Engineering Group LLC and the School Board decided to use approximately 1600 LF of DuroMaxx polyethylene pipe in 42, 48, 54 and 60-in. diameters for the football field. A-2000 PVC pipe was also used in smaller diameters. The installation went smoothly and the School Board was happy with the drainage solution for the football field. DuroMaxx Results: • Watertight joint performance tested up to 15 psi and long lay lengths.
  • 8. www.ContechES.com/duromaxx8 Culvert Solutions Sunshine Road Emergency Repair Fort Benning, Georgia Owner: Fort Benning Directorate of Public Works Engineer: Fort Benning Directorate of Public Works Contractor: Circle S Industries Technical Description: DuroMaxx® SRPE Triple barrel 300 ft of 48-in. dia. At Fort Benning, Georgia, severe rains and flooding washed out several roadways. Sunshine Road was in need of an emergency repair and the Fort Benning Directorate of Public Works (DPW) searched for a culvert solution that could accommodate the swampy area and 28 feet of cover. DuroMaxx steel reinforced polyethylene (SRPE) pipe and reinforced concrete pipe (RCP) were the only two options that could accommodate the site requirements and DuroMaxx was chosen over RCP due to installation cost and time savings. Circle S Industries - the contractor on the project - could only work during certain hours on certain days of the week as there were periodic live fire exercises that closed the roadway, making a fast installation crucial. The DuroMaxx pipe was precut at the plant and arrived on site ready for a speedy installation. A triple barreled 48-in. diameter DuroMaxx system - each 100 feet in length - was installed on the site. Crushed stone was used to the spring-line due to the poor subgrade and the pipe was buried under 30 feet of cover. Most of the material on base was sand or sandy clay and jumping jack tampers were utilized to pack the clay. DuroMaxx in 24-in. and 36-in. diameters was also used on storm drain applications in several additional Fort Benning locations where native soil was used for bedding and backfill. DuroMaxx Results: • Beat out the competition due to installation cost and time- savings!
  • 9. www.ContechES.com/duromaxx 9 Storage Vault Solutions » CSO/SSO Bryan’s Lift Station Improvements Monticello, Indiana Owner: City of Monticello, Indiana Engineer: Wessler Engineering Contractor: F&K Construction Technical Description: DuroMaxx® SRPE CSO detention system with 395,000 gallons of storage After a combined sewer overflow detention system was installed for the City of Monticello, Indiana, innovation was the only thing overflowing. Evidence of this is that this project is a recipient of the Indiana ACEC 2012 Engineering Excellence Honor Award. Nestled between Lake Shafer and Lake Freeman in north central Indiana, the city of Monticello is a Midwest summer vacation destination. The City has 5,400 year-round residents and operates a combined sewer collection system and Class II wastewater treatment plant with a design average flow of 1.1 MGD and peak capacity of 2.4 MGD. This system has six combined sewer overflow (CSO) outfalls that discharge to the Tippecanoe River and the downstream Lake Freeman. To comply with the federal Clean Water Act, the City’s long-term control plan (LTCP) included the reduction and elimination of CSOs. The Bryan’s Lift Station Improvements project was created to increase the lift station’s pumping capacity to 2.5 MGD and provide 500,000 gallons of detention. Bryan’s Lift Station originally was constructed in the 1950s and served combined sanitary and storm sewers. During peak water events, the lift station was overwhelmed and unable to handle the full flow resulting combined sewer overflow events. The site location presented unique challenges of limited space, a high water table and tight hydraulic limitations on the existing sewer systems. With the site layout challenges and its visible public location, traditional storage structure options quickly were eliminated. Open-concrete tanks would be difficult and expensive to build onsite. Steel tanks would have required an additional pump station to convey the incoming wet weather flows to the storage structures. A large-diameter tunnel did not appear financially or geographically practical. With sewer pipe technology innovations, creation of a steel reinforced polyethylene (SRPE) CSO storage system was economical and practical. This optimal solution modeled an underground, high-performance detention system by using a grid of buried pipe to store combined sewage below grade. Contech’s DuroMaxx® SRPE technology was engineered into a CSO detention and drainage system that met the challenges of having a small footprint, watertight joint performance and long-term durability. DuroMaxx Results: • Met the challenges of a small footprint, watertight joint performance and long- term durability.
  • 10. www.ContechES.com/duromaxx10 Storage Vault Solutions » Glycol Containment MacArthur Airport Glycol Containment Long Island, New York Owner: Fort Benning Directorate of Public Works Engineer: Fort Benning Directorate of Public Works Contractor: Circle S Industries Technical Description: DuroMaxx® SRPE 432 LF of 96-in. dia. and 384 LF of 84-in. dia. The “clean-airplane” concept was derived by the U.S. Federal Aviation Administration (FAA) Federal Aviation Regulation (FAR) 121.629, which states “No person may take off an aircraft when frost, ice or snow is adhering to the wings, control surfaces, propellers, engine inlets, or other critical surfaces of the aircraft or when the takeoff would not be in compliance with paragraph ( c ) of this section.” Safe winter operations require special procedures by airline maintenance, engineering and flight operations. As part of those procedures, a deicing solution is often used that will remove accumulated frost, ice or snow from an airplane. These fluids must be transported, stored and handled properly to be effective. While airplane deicing requirements have made air travel in winter months safer, there are new regulations arising as the environmental impacts of the practice have come under regulatory scrutiny. One of the key chemicals used in the deicing process is glycol – a potentially harmful chemical if left untreated or improperly stored. Therefore, it is critical that the resulting, contaminated runoff from the tarmac also be properly stored and treated. In response to these concerns, the MacArthur Airport in Long Island, New York, was in need of an efficient and cost-effective solution to properly store stormwater contaminated with deicing fluid prior to being treated. MacArthur Airport worked closely with L. K. McLean Associates to select an ideal glycol pre-treatment and collection system. They wanted a solution that would have a smaller footprint and allow them to maximize their available land space for continued use as runway and taxiways. Ultimately, they selected a solution by Contech Engineered Solutions LLC which utilized DuroMaxx® steel reinforced polyethylene (SRPE) tanks. This system would serve as an underground storage chamber from which the runoff would be pumped to a treatment system constructed above. The complete system consisted of 384 LF of 84-in. diameter pipe and 432 LF of 96-inch diameter pipe resulting in 35,739 CF storage volume. DuroMaxx is a reinforced polyethylene pipe with a smooth waterway wall and exterior profile that is reinforced with high strength galvanized steel ribs. While DuroMaxx provides a completely structural solution, it is also lightweight and installation was quick, which meant less expense and fewer dewatering issues – a pleasant surprise to both the airport and the contractor. Given the sensitivity of the chemicals being stored here, it was also crucial that the joints be leak-free. The DuroMaxx system was designed with connections that would be ElectorFusion (EF) welded and banded joints for a true symbiotic connection. The system can be put through either an air test or vacuum test to ensure that joints are properly sealed. DuroMaxx Results: • Provided a completely structural solution that was lightweight and installation was quick.
  • 11. www.ContechES.com/duromaxx 11 Storage Vault Solutions » Rainwater Harvesting South Transfer Station Seattle, Washington Owner: Seattle Public Utilities Engineer: URS Corp, Inc. Contractor: M.A. Mortenson Construction , KLB Construction Technical Description: DuroMaxx® SRPE UrbanGreen® Rainwater Harvesting system 150 LF of 84-in dia. Seattle Public Utilities (SPU) is building a new $50 million waste transfer station in South Seattle. The two-story, 140,500 sq. foot building with 84 parking spots is projected to be finished in July 2012 and will eventually replace the old South transfer station located across the street. “The new facility will allow the city to maintain reliable solid waste services in an economical and environmentally sound manner,” said Henry Friedman, project manager for SPU. SPU’s goal was to build this project to the standards of the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) certification program and to achieve LEED Gold status. The LEED rating system measures a proposal’s impact on the environment through various categories such as climate change (carbon emissions), indoor air quality, resource depletion, human health, water efficiency and habitat alteration, among others. To achieve credit for water efficiency, SPU wanted to harvest rainwater to reuse onsite. Throughout the year, the water will be used in many ways such as, irrigation, to wash the transfer station floor, as washdown water for the tipping floor and for the wheel wash which trucks can utilize as they leave the tipping floor. With limited available space on the site, they needed to utilize an underground system. SPU worked with URS Corp Inc. to find a rainwater harvesting cistern to meet their needs and chose an UrbanGreen steel reinforced polyethylene (SRPE) rainwater harvesting cistern from Contech Engineered Solutions for the project. The cistern utilized the DuroMaxx technology and was comprised of two 84” diameter cistern sections that are each 75 feet long. The SRPE cistern was chosen because it was available in such a large diameter and provided water tight joints welded using ElectroFusion (EF) couplers. It was also an economical solution. The cistern features include a 12” rain leader for runoff collection, valve control outlets to drain the tanks for maintenance, four 36” access risers with integral ladders and internal pumps connected to the irrigation system. The irrigation will be used for the new landscaping around the facility, including 123 on-site trees, 32,000 sq. feet of ground cover and 81,000 sq. feet of grass cover. The system was installed below grade by KLB Construction and was backfilled in just three days. DuroMaxx Results: • Met standards of the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED).
  • 12. www.ContechES.com/duromaxx12 Reline » DuroMaxx® Liner Pipe Mobile Regional Airport - Runway 14/32 Mobile, Alabama Owner: Mobile Regional Airport Engineer: Volkert & Associates, Inc. Contractor: John G. Walton Construction Co., Inc. & Indiana Reline, Inc. Technical Description: DuroMaxx® SRPE 1500 LF of 120-in. dia. Locally owned and operated, the Mobile Regional Airport is located in southern Alabama and boasts over ten years of operations. It is the second airport in the country to have a federalized screening workforce. The airport is also home to the U.S. Coast Guard Aviation Training Center where advanced training is provided to U.S. Coast Guard pilots and aircrew. In February 2013, the Mobile Airport Authority filed an application with the Federal Aviation Administration to garner a small stipend intended for continued development and rehabilitation for the airport. Part of that involved the rehabilitation of a single 1,740’ long, 132” diameter culvert that ran under Runway 14/32. Given the location, replacement was completely out of the question. The Airport did not want to have to shut down operations while construction was underway. Ultimately, they turned to a 120” diameter DuroMaxx® steel reinforced polyethylene (SRPE) liner pipe supplied by Contech Engineered Solutions to slipline into the existing culvert. There were several things that had to be considered during the structural and hydraulic design. One of the most important considerations was the varying heights of cover (some areas carrying almost 35 feet of cover). The design also incorporated an existing junction box with a grade change of 0.2% to 1.04%. The entire installed length was 1,740 linear feet – the reline segments totaled 1,500 linear feet while an additional 240 linear feet were direct buried. Owner of Indiana Reline, Inc., Chris Wisehart stated, “Our company has installed a wide variety of both small and large diameter liner pipe products over the years. This was our first time installing DuroMaxx steel reinforced polyethylene pipe for large diameter pipeline rehabilitation and we were pleased with the pipe’s performance and ease of handling. DuroMaxx was strong enough to maintain its shape against flotation forces, while also providing necessary buckling resistance to the grouting operation. The special 40 foot lengths reduced the number of pieces we had to handle and minimized the amount of joint welding we had to perform. We will gladly use DuroMaxx again.” DuroMaxx Results: • Large diameter reline for a fully structural solution that was cost-effective and time-efficient.
  • 13. www.ContechES.com/duromaxx 13 Reline » SPR™ PE Structural Liner Lakehurst Naval Air Station - Reline Lakehurst, New Jersey Owner: Lakehurst Naval Air Station Engineer: USAF AMC 87 CS/CEPM Contractor: Sequoia Construction & Heitkamp Inc. (SC) Technical Description: SPR™ PE Structural Lining Structural lining for 786 LF of 48-in. dia. RCP and 703 LF of 54-in. dia. RCP Naval Air Engineering Station Lakehurst, the former name of the Lakehurst part of Joint Base McGuire-Dix-Lakehurst, is a United States Air Force-managed Joint Base located nearby Trenton, New Jersey. It is the northeast’s largest naval aviation center. It is most renowned for being the site of the Hindenburg disaster on 6 May 1937 in which the German passenger airship LZ 129 Hindenburg caught fire and was destroyed during its attempt to dock at the base, ending the airship era. NAS Lakehurst is truly a veritable nugget of historical wealth. The dirigible hangars from 80 years ago are still there. During a routine inspection at the base, it was discovered that a number of reinforced concrete pipe (RCP) runs used to carry stormwater had deteriorated and were no longer hydraulically or structurally sufficient. The pipes needed to be replaced or repaired. The main challenges for this particular project were the extremely tight constraints and the narrow construction activity windows. The failing RCP runs were accessible only through the manhole structures unless the typical and costly open trench replacement method was used. After a discussion with Contech Engineered Solutions, the facilities engineer decided to reline the existing RCP with SPR™ PE, a polyethylene structural liner reinforced with steel. This would enable them to access the RCP through the manholes directly whereby they could then wind the structural liner directly into the host pipe. Using SPR™ PE negated the normal logistical and space requirements of open cut methods, and it kept an important area of the base functional. SPR™ PE Results: • Structural internal steel reinforced HDPE liner method for closed system storm & sanitary sewers and culverts with limited access.
  • 14. www.ContechES.com/duromaxx14 Looking for a better pipe that is Strong, Flexible, Easy to Install? The difference is DuroMaxx® . STEEL REINFORCED PE TECHNOLOGY
  • 16. We print our brochures entirely on Forest Stewardship Council certified paper. FSC certification ensures that the paper in our brochures contain fiber from well- managed and responsibly harvested forests that meet strict environmental and socioeconomic standards. FSC Dig Deeper Find all the information you need at www.ContechES.com, including field and laboratory test results, approvals, brochures, design guides, standard details, and specifications within the product section of our site. Connect with Us We're here to make your job easier – and that includes being able to get in touch with us when you need to. Go to www.ContechES.com/ConnectWithContech. While you’re there, be sure to check out our upcoming seminar schedule or request an in-house technical presentation. Start a Project If you are ready to begin a project, contact your local representative to get started. Or you can check out our design toolbox for all our online resources at www.ContechES.com/designtoolbox. DuroMaxx eBook PDF 10/14 ©2014 Contech Engineered Solutions LLC Toll Free: 1-800-338-1122 www.ContechES.com All Rights Reserved. Printed in the USA. NOTHING IN THIS CATALOG SHOULD BE CONSTRUED AS AN EXPRESSED WARRANTY OR AN IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE. SEE THE CONTECH STANDARD CONDITION OF SALES (VIEWABLE AT WWW.CONTECHES.COM/COS) FOR MORE INFORMATION. Get Social With Us! ENGINEERED SOLUTIONS