SlideShare una empresa de Scribd logo
1 de 22
Descargar para leer sin conexión
November 9, 2020
Eglinton Crosstown LRT
Leaside-Laird CLC
Leaside Station
LEASIDE STATION UPDATE
3INSERT FOOTER
Activity Location Approx. Date & Duration
Final lining and permanent works
Waterproofing, rebar, steel, conduit installations,
formwork, and concrete pours
Underneath Eglinton Avenue within the Station Box Underway through to early 2021
Main Entrance Construction
Waterproofing, rebar, steel, conduit installations,
formwork, and concrete pours
South east corner of Bayview Ave and Eglinton Ave Underway through to early 2021
Secondary Entrance Construction
Waterproofing, rebar, steel, conduit installations,
formwork, and concrete pours
North west corner of Bayview Ave and Eglinton Ave Underway through to early 2021
LEASIDE STATION LOOK-AHEAD
4INSERT FOOTER
Year What to Expect
2020
• Extended construction hours will continue through 2020.
• Periodic lane closures may be required to facilitate deliveries, dewatering and concrete
works.
• Permanent works are underway at the station box and entrances, and will continue into
early 2021, including waterproofing, formwork, rebar installation and concrete works
• Construction of the entrances will progress upwards from the station to street level.
• Architectural works, including tile installations, masonry work, and glazing, is expected to
begin at the Main Entrance in approximately one (1) month.
CURRENT TRAFFIC CONFIGURATION
5
Through early 2021
CONSTRUCTION PROGRESS PHOTOS
6CENTRAL WEST WORKS MONTHLY MEETING
CONCOURSE LEVEL –
STATION BOX
CONSTRUCTION PROGRESS PHOTOS
7CENTRAL WEST WORKS MONTHLY MEETING
MAIN ENTRANCE
OVERVIEW
Laird Station
LAIRD STATION UPDATE
9
Activity Location Approx. Date & Duration
• Installation of cable trays, conduits,
drainpipes, fire dampers, sheet metal
and drainpipes.
• Shaft build back: North street level slab
formwork installation. Conduit and rebar
installation for south street slabs.
Main Entrance Ongoing through to late 2020
• Shaft build back: Rebar installation on
north concourse wall and formwork at
arch.
Secondary Entrance
Ongoing through to late 2020
• OCS signage installation on east side,
conduit rebar installation on east
emergency walkways.
• Waterproofing of grouting, OCS support
installation.
Tunnels
Ongoing through to late 2020
CURRENT TRAFFIC CONFIGURATION
10
Through to late 2020
LAIRD STATION
EXTENDED HOURS
11
• As early as September 14, 2020, construction activities at the both entrance shafts and tunnels will take place between the hours of 6:00
a.m. and 1:00 a.m., Monday to Saturday, through to the end of the year.
• Work may occasionally take place on Sundays as required.
WHAT TO EXPECT
• Occasional overnight noise from construction equipment including trucks, machinery and crews may occur at the Main and Secondary
entrances for concrete works.
• Work within the tunnels is not expected to impact nearby residents as these activities will take place below grade.
• Site lighting is required and will be positioned away from residential properties.
• Crews will endeavor to schedule noisier activities during the day where possible.
• Site-based mitigation measures will be implemented.
CONSTRUCTION PROGRESS PHOTOS
12
SECONDARY ENTRANCE
NORTH CONCOURSE WALL
REBAR INSTALLATION
MAIN ENTRANCE
FALSEWORK INSTALLATION
Section One At-Grade:
Brentcliffe Portal to Sunnybrook Park Stop
SECTION ONE AT-GRADE UPDATE
14
Activity Location
Approx. Date &
Duration
Boulevard works, final
curbs and sidewalks.
West of Brentcliffe
Road – South Side
September 30, 2020 to
Mid-November
Work is currently on hold
Retaining Wall (East of
Brentcliffe Road)
Early August – December
2020
Multi-use path
construction: backfill
and compaction
ongoing.
Serena Gundy Park –
West of Leslie St.
Mid-July – December
2020
Construction of duct
bank under bridge
West Don River Bridge October 5 for six weeks
Pedestrian staircase
installation
Eglinton and Leslie St. –
South side
October 30 for four
weeks
Bridge Rehabilitation
CP Bridge, east of
Leslie St.
August 24 for 13 weeks
CP BRIDGE REHABILITATION
BRENTCLIFFE PORTAL TO LESLIE STREET
15
September 30, 2020 through to mid-November
• The pedestrian sidewalk will remain on the south
side of Eglington Avenue East only.
• The traffic configuration will accommodate road
works on the south side of Eglinton Avenue East
west of Brencliffe Road and in the centre of Eglinton
Avenue, east of Brentcliffe Road.
• Construction activities include:
• Concrete removals
• Construction of new sidewalk and curbs
• Installation of new pavers
• Installation of new traffic lighting elements
• Asphalt and final paving
RETAINING WALL CONSTRUCTION
NORTH SIDE OF EGLINTON
EAST OF BRENTCLIFFE ROAD
16
• This retaining wall is required to hold and stabilize the
embankment created from the newly widened road.
• Construction commenced early August 2020.
• Due to an unplanned movement of earth at the retaining
wall construction site, construction has been paused.
• CTS has followed all recommendations from the design
and engineering teams to stabilize the area.
• The area has been backfilled to further stabilize the
embankment and tarped to prevent soil erosion.
• Plans are being reviewed for the continued construction of
the retaining wall.
• Final landscaping and restoration plans are in review with
Metrolinx and the City of Toronto.
DUCT BANK INSTALLATION
WEST DON RIVER BRIDGE
17
• Crews will be installing duct banks under the
bridge using a manlift and an excavator to lift
the materials into place.
• An alternating lane closure under the West
Don River Bridge will be in place to facilitate
bridge works.
• Access to the E.T Seaton Park parking lot,
south of Eglinton Avenue East will be
maintained
• There will be no changes to the current traffic
configuration on Eglinton Avenue East.
October 5, 2020 for six weeks
RAMP CONSTRUCTION, WEST OF LESLIE STREET
MULTI-USE PATH CONNECTING EGLINTON AVE E TO SERENA GUNDY PARK
18
• Construction activities for path construction include: Excavation, backfill and installation of topsoil
• Landscaping will take place in 2021 as part of the final restoration plan.
Mid-July 2020 through to December 2020
PARKING LOT CLOSURE FOR NEW PEDESTRIAN STAIRCASE INSTALLATION
EGLINTON AVENUE EAST AT LESLIE STREET – SOUTH SIDE
19
• Crews will be installing structural steel to form the new pedestrian staircase. A crane will be installed at the work zone
to lift materials into place.
• To accommodate these activities, a section of the E.T Seton Park north parking lot will be closed. Access for
pedestrian, cyclists and vehicles will be maintained.
• No changes to traffic on Eglinton Avenue East.
October 30, 2020 for four weeks
CP BRIDGE REHABILITATION
EAST OF LESLIE STREET
20
• A working platform will be set up at the
bridge in advance of the activities.
• Crews will be removing rust, painting,
replacing structural steel elements and
performing concrete repairs.
• Noise can be expected from concrete
chipping and other rehabilitation works.
August 24, 2020 for 13 weeks
CONSTRUCTION PROGRESS PHOTOS
21
SUNNYBROOK PARK STOP
WEST DON RIVER BRIDGE DUCT BANK
INSTALLATION
Leaside laird clc - november 9, 2020

Más contenido relacionado

La actualidad más candente

Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingCrosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingCrosstown TO
 
Pharmacy to Kennedy Construction Liaison Meeting - July 2020
Pharmacy to Kennedy Construction Liaison Meeting - July 2020Pharmacy to Kennedy Construction Liaison Meeting - July 2020
Pharmacy to Kennedy Construction Liaison Meeting - July 2020Crosstown TO
 
Western works final
Western works final Western works final
Western works final Crosstown TO
 
Pharmacy to Kennedy Construction Liaision Committee Meeting - Sep 2020
Pharmacy to Kennedy Construction Liaision Committee Meeting - Sep 2020Pharmacy to Kennedy Construction Liaision Committee Meeting - Sep 2020
Pharmacy to Kennedy Construction Liaision Committee Meeting - Sep 2020Crosstown TO
 
Leaside Laird CLC November 2019 Presentation
Leaside Laird CLC November 2019 PresentationLeaside Laird CLC November 2019 Presentation
Leaside Laird CLC November 2019 PresentationCrosstown TO
 
Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020
Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020
Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020Crosstown TO
 
Cedarvale & Forest Hill Construction Update (September 29, 2021)
Cedarvale & Forest Hill Construction Update (September 29, 2021)Cedarvale & Forest Hill Construction Update (September 29, 2021)
Cedarvale & Forest Hill Construction Update (September 29, 2021)Crosstown TO
 
CLC Pharmacy to Kennedy January
CLC Pharmacy to Kennedy JanuaryCLC Pharmacy to Kennedy January
CLC Pharmacy to Kennedy JanuaryCrosstown TO
 
Leaside and Laird CLC - 10 May 2021
Leaside and Laird CLC - 10 May 2021 Leaside and Laird CLC - 10 May 2021
Leaside and Laird CLC - 10 May 2021 Crosstown TO
 
Avenue & Chaplin CLC - Construction Update: September 1, 2021
Avenue & Chaplin CLC - Construction Update: September 1, 2021Avenue & Chaplin CLC - Construction Update: September 1, 2021
Avenue & Chaplin CLC - Construction Update: September 1, 2021Crosstown TO
 
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting - ...
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting  - ...Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting  - ...
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting - ...Crosstown TO
 
Chaplin Avenue CLC Presentation Deck - Jan 8 2020
  Chaplin Avenue CLC Presentation Deck - Jan 8 2020  Chaplin Avenue CLC Presentation Deck - Jan 8 2020
Chaplin Avenue CLC Presentation Deck - Jan 8 2020Crosstown TO
 
Final central east open house oct282020
Final central east open house oct282020Final central east open house oct282020
Final central east open house oct282020Crosstown TO
 
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2020
Eglinton and Mount Pleasant Construction Liaison Committee Meeting  - Jan 2020Eglinton and Mount Pleasant Construction Liaison Committee Meeting  - Jan 2020
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2020Crosstown TO
 
Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019Crosstown TO
 
Fairbank-Oakwood Construction Update - September 2021
Fairbank-Oakwood Construction Update - September 2021Fairbank-Oakwood Construction Update - September 2021
Fairbank-Oakwood Construction Update - September 2021Crosstown TO
 
Eastern Virtual Open House Deck
Eastern Virtual Open House DeckEastern Virtual Open House Deck
Eastern Virtual Open House DeckCrosstown TO
 
Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Crosstown TO
 
Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020
Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020
Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020Crosstown TO
 

La actualidad más candente (20)

Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee Meeting
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
 
Pharmacy to Kennedy Construction Liaison Meeting - July 2020
Pharmacy to Kennedy Construction Liaison Meeting - July 2020Pharmacy to Kennedy Construction Liaison Meeting - July 2020
Pharmacy to Kennedy Construction Liaison Meeting - July 2020
 
Western works final
Western works final Western works final
Western works final
 
Pharmacy to Kennedy Construction Liaision Committee Meeting - Sep 2020
Pharmacy to Kennedy Construction Liaision Committee Meeting - Sep 2020Pharmacy to Kennedy Construction Liaision Committee Meeting - Sep 2020
Pharmacy to Kennedy Construction Liaision Committee Meeting - Sep 2020
 
Leaside Laird CLC November 2019 Presentation
Leaside Laird CLC November 2019 PresentationLeaside Laird CLC November 2019 Presentation
Leaside Laird CLC November 2019 Presentation
 
Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020
Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020
Leaside - Laird Construction Liaison Committee (CLC) Meeting - May 2020
 
Cedarvale & Forest Hill Construction Update (September 29, 2021)
Cedarvale & Forest Hill Construction Update (September 29, 2021)Cedarvale & Forest Hill Construction Update (September 29, 2021)
Cedarvale & Forest Hill Construction Update (September 29, 2021)
 
CLC Pharmacy to Kennedy January
CLC Pharmacy to Kennedy JanuaryCLC Pharmacy to Kennedy January
CLC Pharmacy to Kennedy January
 
Leaside and Laird CLC - 10 May 2021
Leaside and Laird CLC - 10 May 2021 Leaside and Laird CLC - 10 May 2021
Leaside and Laird CLC - 10 May 2021
 
Avenue & Chaplin CLC - Construction Update: September 1, 2021
Avenue & Chaplin CLC - Construction Update: September 1, 2021Avenue & Chaplin CLC - Construction Update: September 1, 2021
Avenue & Chaplin CLC - Construction Update: September 1, 2021
 
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting - ...
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting  - ...Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting  - ...
Brentcliffe to Victoria Park Construction Liaison Committee (CLC) Meeting - ...
 
Chaplin Avenue CLC Presentation Deck - Jan 8 2020
  Chaplin Avenue CLC Presentation Deck - Jan 8 2020  Chaplin Avenue CLC Presentation Deck - Jan 8 2020
Chaplin Avenue CLC Presentation Deck - Jan 8 2020
 
Final central east open house oct282020
Final central east open house oct282020Final central east open house oct282020
Final central east open house oct282020
 
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2020
Eglinton and Mount Pleasant Construction Liaison Committee Meeting  - Jan 2020Eglinton and Mount Pleasant Construction Liaison Committee Meeting  - Jan 2020
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - Jan 2020
 
Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019Central Eastern Works Open House - October 2019
Central Eastern Works Open House - October 2019
 
Fairbank-Oakwood Construction Update - September 2021
Fairbank-Oakwood Construction Update - September 2021Fairbank-Oakwood Construction Update - September 2021
Fairbank-Oakwood Construction Update - September 2021
 
Eastern Virtual Open House Deck
Eastern Virtual Open House DeckEastern Virtual Open House Deck
Eastern Virtual Open House Deck
 
Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021
 
Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020
Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020
Eglinton & Mt Pleasant Construction Liaison Committee - September 9 2020
 

Similar a Leaside laird clc - november 9, 2020

CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)Crosstown TO
 
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...Crosstown TO
 
Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingCrosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingCrosstown TO
 
Avenue & Chaplin CLC - Construction Update: September 9, 2020
Avenue & Chaplin CLC - Construction Update: September 9, 2020Avenue & Chaplin CLC - Construction Update: September 9, 2020
Avenue & Chaplin CLC - Construction Update: September 9, 2020Crosstown TO
 
Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)Crosstown TO
 
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxChaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxCrosstown TO
 
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020Crosstown TO
 
Avenue & Chaplin CLC - Construction Update: January 5, 2022
Avenue & Chaplin CLC - Construction Update: January 5, 2022Avenue & Chaplin CLC - Construction Update: January 5, 2022
Avenue & Chaplin CLC - Construction Update: January 5, 2022Crosstown TO
 
Eglinton and Mount Pleasant CLC - March 10, 2021
Eglinton and Mount Pleasant CLC - March 10, 2021Eglinton and Mount Pleasant CLC - March 10, 2021
Eglinton and Mount Pleasant CLC - March 10, 2021Crosstown TO
 
Avenue & Chaplin CLC - Construction Update: November 4, 2020
Avenue & Chaplin CLC - Construction Update: November 4, 2020Avenue & Chaplin CLC - Construction Update: November 4, 2020
Avenue & Chaplin CLC - Construction Update: November 4, 2020Crosstown TO
 
Central West Open House
Central West Open HouseCentral West Open House
Central West Open HouseCrosstown TO
 
Leaside - Laird Construction Liaison Committee (CLC) Meeting Presentation
Leaside - Laird Construction Liaison Committee (CLC) Meeting PresentationLeaside - Laird Construction Liaison Committee (CLC) Meeting Presentation
Leaside - Laird Construction Liaison Committee (CLC) Meeting PresentationCrosstown TO
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - May 2020, 2020
Pharmacy to Kennedy Construction Liaison Committee Meeting - May 2020, 2020Pharmacy to Kennedy Construction Liaison Committee Meeting - May 2020, 2020
Pharmacy to Kennedy Construction Liaison Committee Meeting - May 2020, 2020Crosstown TO
 
Central open house - oct 2019
Central open house - oct 2019Central open house - oct 2019
Central open house - oct 2019Crosstown TO
 
CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021 CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021 Crosstown TO
 
Central West Spring Open House Presentation Deck - March 3, 2020
Central West Spring Open House Presentation Deck - March 3, 2020 Central West Spring Open House Presentation Deck - March 3, 2020
Central West Spring Open House Presentation Deck - March 3, 2020 Crosstown TO
 
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020Crosstown TO
 
Chaplin-Avenue CLC - May 4 2022-compressed.pptx
Chaplin-Avenue CLC - May 4 2022-compressed.pptxChaplin-Avenue CLC - May 4 2022-compressed.pptx
Chaplin-Avenue CLC - May 4 2022-compressed.pptxCrosstown TO
 

Similar a Leaside laird clc - november 9, 2020 (20)

CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
CLC Deck Brentcliffe Road to Victoria Park Avenue (Sept 3, 2020)
 
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
Brentcliffe-Victoria Park Construction Liaison Committee (CLC) Meeting - May ...
 
Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020
 
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) MeetingBrentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
Brentcliffe - Victoria Park Construction Liaison Committee (CLC) Meeting
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
Avenue & Chaplin CLC - Construction Update: September 9, 2020
Avenue & Chaplin CLC - Construction Update: September 9, 2020Avenue & Chaplin CLC - Construction Update: September 9, 2020
Avenue & Chaplin CLC - Construction Update: September 9, 2020
 
Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)Cedarvale- Forest Hill Construction Update (July 29, 2020)
Cedarvale- Forest Hill Construction Update (July 29, 2020)
 
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptxChaplin-Avenue CLC - March 2, 2022-compressed.pptx
Chaplin-Avenue CLC - March 2, 2022-compressed.pptx
 
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
Eglinton-Mt Pleasant Construction Liaison Committee - November 202011 2020
 
Avenue & Chaplin CLC - Construction Update: January 5, 2022
Avenue & Chaplin CLC - Construction Update: January 5, 2022Avenue & Chaplin CLC - Construction Update: January 5, 2022
Avenue & Chaplin CLC - Construction Update: January 5, 2022
 
Eglinton and Mount Pleasant CLC - March 10, 2021
Eglinton and Mount Pleasant CLC - March 10, 2021Eglinton and Mount Pleasant CLC - March 10, 2021
Eglinton and Mount Pleasant CLC - March 10, 2021
 
Avenue & Chaplin CLC - Construction Update: November 4, 2020
Avenue & Chaplin CLC - Construction Update: November 4, 2020Avenue & Chaplin CLC - Construction Update: November 4, 2020
Avenue & Chaplin CLC - Construction Update: November 4, 2020
 
Central West Open House
Central West Open HouseCentral West Open House
Central West Open House
 
Leaside - Laird Construction Liaison Committee (CLC) Meeting Presentation
Leaside - Laird Construction Liaison Committee (CLC) Meeting PresentationLeaside - Laird Construction Liaison Committee (CLC) Meeting Presentation
Leaside - Laird Construction Liaison Committee (CLC) Meeting Presentation
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - May 2020, 2020
Pharmacy to Kennedy Construction Liaison Committee Meeting - May 2020, 2020Pharmacy to Kennedy Construction Liaison Committee Meeting - May 2020, 2020
Pharmacy to Kennedy Construction Liaison Committee Meeting - May 2020, 2020
 
Central open house - oct 2019
Central open house - oct 2019Central open house - oct 2019
Central open house - oct 2019
 
CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021 CLC: Leaside and Laird - Sept 13 2021
CLC: Leaside and Laird - Sept 13 2021
 
Central West Spring Open House Presentation Deck - March 3, 2020
Central West Spring Open House Presentation Deck - March 3, 2020 Central West Spring Open House Presentation Deck - March 3, 2020
Central West Spring Open House Presentation Deck - March 3, 2020
 
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020
Eglinton-Mt Pleasant Construction Liaison Committee July 8, 2020
 
Chaplin-Avenue CLC - May 4 2022-compressed.pptx
Chaplin-Avenue CLC - May 4 2022-compressed.pptxChaplin-Avenue CLC - May 4 2022-compressed.pptx
Chaplin-Avenue CLC - May 4 2022-compressed.pptx
 

Más de Crosstown TO

Western Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdfWestern Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdfCrosstown TO
 
Western Works CLC - May 16, 2023
 Western Works CLC - May 16, 2023 Western Works CLC - May 16, 2023
Western Works CLC - May 16, 2023Crosstown TO
 
Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023 Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023 Crosstown TO
 
Leaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfLeaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfCrosstown TO
 
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfEglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfCrosstown TO
 
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptxChaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptxCrosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCrosstown TO
 
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxPharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxCrosstown TO
 
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCrosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCrosstown TO
 
Chaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxChaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxCrosstown TO
 
Leaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfLeaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfCrosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCrosstown TO
 
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfEglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfCrosstown TO
 
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxChaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxCrosstown TO
 
Chaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxChaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxCrosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCrosstown TO
 
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfEglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfCrosstown TO
 
Leaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdfLeaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdfCrosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCrosstown TO
 

Más de Crosstown TO (20)

Western Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdfWestern Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdf
 
Western Works CLC - May 16, 2023
 Western Works CLC - May 16, 2023 Western Works CLC - May 16, 2023
Western Works CLC - May 16, 2023
 
Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023 Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023
 
Leaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfLeaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdf
 
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfEglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
 
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptxChaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
 
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
 
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxPharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
 
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
 
Chaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxChaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptx
 
Leaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfLeaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdf
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
 
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfEglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
 
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxChaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
 
Chaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxChaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptx
 
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
 
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfEglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
 
Leaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdfLeaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdf
 
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
 

Último

Hub Design Inspiration Graphics for inspiration
Hub Design Inspiration Graphics for inspirationHub Design Inspiration Graphics for inspiration
Hub Design Inspiration Graphics for inspirationStephen Abram
 
What Teenagers Have to Say about the Grandparents
What Teenagers Have to Say about the GrandparentsWhat Teenagers Have to Say about the Grandparents
What Teenagers Have to Say about the GrandparentsSERUDS INDIA
 
The Federal Perspective on Coverage of Medications to Treat Obesity: Consider...
The Federal Perspective on Coverage of Medications to Treat Obesity: Consider...The Federal Perspective on Coverage of Medications to Treat Obesity: Consider...
The Federal Perspective on Coverage of Medications to Treat Obesity: Consider...Congressional Budget Office
 
Leveraging Water for Peace - World Water Day 2024
Leveraging Water for Peace - World Water Day 2024Leveraging Water for Peace - World Water Day 2024
Leveraging Water for Peace - World Water Day 2024Christina Parmionova
 
O Conselho Estadual de Cultura e o Incentivo à Cultura no RS: relato de expe...
O Conselho Estadual de Cultura e o Incentivo à Cultura no RS:  relato de expe...O Conselho Estadual de Cultura e o Incentivo à Cultura no RS:  relato de expe...
O Conselho Estadual de Cultura e o Incentivo à Cultura no RS: relato de expe...Alvaro Santi
 
Yes!? We can end TB - World Tuberculosis Day 2024.
Yes!? We can end TB - World Tuberculosis Day 2024.Yes!? We can end TB - World Tuberculosis Day 2024.
Yes!? We can end TB - World Tuberculosis Day 2024.Christina Parmionova
 
2024: The FAR, Federal Acquisition Regulations - Part 17
2024: The FAR, Federal Acquisition Regulations - Part 172024: The FAR, Federal Acquisition Regulations - Part 17
2024: The FAR, Federal Acquisition Regulations - Part 17JSchaus & Associates
 
War in Ukraine and problematics of the Ukrainian refugees in USA
War in Ukraine and problematics of the Ukrainian refugees in USAWar in Ukraine and problematics of the Ukrainian refugees in USA
War in Ukraine and problematics of the Ukrainian refugees in USAival6
 
CBO’s Work on Health Care and a Call for New Research
CBO’s Work on Health Care and a Call for New ResearchCBO’s Work on Health Care and a Call for New Research
CBO’s Work on Health Care and a Call for New ResearchCongressional Budget Office
 
DB9_BTR_Webinar_Slidedeck_20230320 (1).pptx
DB9_BTR_Webinar_Slidedeck_20230320 (1).pptxDB9_BTR_Webinar_Slidedeck_20230320 (1).pptx
DB9_BTR_Webinar_Slidedeck_20230320 (1).pptxNAP Global Network
 
World Happiness Report 2024- Full Report
World Happiness Report 2024- Full ReportWorld Happiness Report 2024- Full Report
World Happiness Report 2024- Full ReportEnergy for One World
 
B-SAN Annual Report July 2022 - June 2023
B-SAN Annual Report July 2022 - June 2023B-SAN Annual Report July 2022 - June 2023
B-SAN Annual Report July 2022 - June 2023B-SCAN
 
My Burning Issue: "War in Ukraine" Cycle 54
My Burning Issue: "War in Ukraine" Cycle 54My Burning Issue: "War in Ukraine" Cycle 54
My Burning Issue: "War in Ukraine" Cycle 54mmazurak
 
For World Water Day 2024, we promote the vital link between water and peace.
For World Water Day 2024, we promote the vital link between water and peace.For World Water Day 2024, we promote the vital link between water and peace.
For World Water Day 2024, we promote the vital link between water and peace.Christina Parmionova
 
Passive Interactive Programming and Surveys 2.pptx
Passive Interactive Programming and Surveys 2.pptxPassive Interactive Programming and Surveys 2.pptx
Passive Interactive Programming and Surveys 2.pptxStephen Abram
 
The wealth of a nation: What the changing size and shape of household wealth ...
The wealth of a nation: What the changing size and shape of household wealth ...The wealth of a nation: What the changing size and shape of household wealth ...
The wealth of a nation: What the changing size and shape of household wealth ...ResolutionFoundation
 
Water for Prosperity and peace - United Nations World Water Development Repo...
Water for Prosperity and peace -  United Nations World Water Development Repo...Water for Prosperity and peace -  United Nations World Water Development Repo...
Water for Prosperity and peace - United Nations World Water Development Repo...Christina Parmionova
 
Children who live with Grandparents are really lucky
Children who live with Grandparents are really luckyChildren who live with Grandparents are really lucky
Children who live with Grandparents are really luckySERUDS INDIA
 
Item # 1a - March 18, 2024 Special CCM Minutes
Item # 1a - March 18, 2024 Special CCM MinutesItem # 1a - March 18, 2024 Special CCM Minutes
Item # 1a - March 18, 2024 Special CCM Minutesahcitycouncil
 
PPT Item # 5-6 218 Canyon Drive replat prop.
PPT Item # 5-6 218 Canyon Drive replat prop.PPT Item # 5-6 218 Canyon Drive replat prop.
PPT Item # 5-6 218 Canyon Drive replat prop.ahcitycouncil
 

Último (20)

Hub Design Inspiration Graphics for inspiration
Hub Design Inspiration Graphics for inspirationHub Design Inspiration Graphics for inspiration
Hub Design Inspiration Graphics for inspiration
 
What Teenagers Have to Say about the Grandparents
What Teenagers Have to Say about the GrandparentsWhat Teenagers Have to Say about the Grandparents
What Teenagers Have to Say about the Grandparents
 
The Federal Perspective on Coverage of Medications to Treat Obesity: Consider...
The Federal Perspective on Coverage of Medications to Treat Obesity: Consider...The Federal Perspective on Coverage of Medications to Treat Obesity: Consider...
The Federal Perspective on Coverage of Medications to Treat Obesity: Consider...
 
Leveraging Water for Peace - World Water Day 2024
Leveraging Water for Peace - World Water Day 2024Leveraging Water for Peace - World Water Day 2024
Leveraging Water for Peace - World Water Day 2024
 
O Conselho Estadual de Cultura e o Incentivo à Cultura no RS: relato de expe...
O Conselho Estadual de Cultura e o Incentivo à Cultura no RS:  relato de expe...O Conselho Estadual de Cultura e o Incentivo à Cultura no RS:  relato de expe...
O Conselho Estadual de Cultura e o Incentivo à Cultura no RS: relato de expe...
 
Yes!? We can end TB - World Tuberculosis Day 2024.
Yes!? We can end TB - World Tuberculosis Day 2024.Yes!? We can end TB - World Tuberculosis Day 2024.
Yes!? We can end TB - World Tuberculosis Day 2024.
 
2024: The FAR, Federal Acquisition Regulations - Part 17
2024: The FAR, Federal Acquisition Regulations - Part 172024: The FAR, Federal Acquisition Regulations - Part 17
2024: The FAR, Federal Acquisition Regulations - Part 17
 
War in Ukraine and problematics of the Ukrainian refugees in USA
War in Ukraine and problematics of the Ukrainian refugees in USAWar in Ukraine and problematics of the Ukrainian refugees in USA
War in Ukraine and problematics of the Ukrainian refugees in USA
 
CBO’s Work on Health Care and a Call for New Research
CBO’s Work on Health Care and a Call for New ResearchCBO’s Work on Health Care and a Call for New Research
CBO’s Work on Health Care and a Call for New Research
 
DB9_BTR_Webinar_Slidedeck_20230320 (1).pptx
DB9_BTR_Webinar_Slidedeck_20230320 (1).pptxDB9_BTR_Webinar_Slidedeck_20230320 (1).pptx
DB9_BTR_Webinar_Slidedeck_20230320 (1).pptx
 
World Happiness Report 2024- Full Report
World Happiness Report 2024- Full ReportWorld Happiness Report 2024- Full Report
World Happiness Report 2024- Full Report
 
B-SAN Annual Report July 2022 - June 2023
B-SAN Annual Report July 2022 - June 2023B-SAN Annual Report July 2022 - June 2023
B-SAN Annual Report July 2022 - June 2023
 
My Burning Issue: "War in Ukraine" Cycle 54
My Burning Issue: "War in Ukraine" Cycle 54My Burning Issue: "War in Ukraine" Cycle 54
My Burning Issue: "War in Ukraine" Cycle 54
 
For World Water Day 2024, we promote the vital link between water and peace.
For World Water Day 2024, we promote the vital link between water and peace.For World Water Day 2024, we promote the vital link between water and peace.
For World Water Day 2024, we promote the vital link between water and peace.
 
Passive Interactive Programming and Surveys 2.pptx
Passive Interactive Programming and Surveys 2.pptxPassive Interactive Programming and Surveys 2.pptx
Passive Interactive Programming and Surveys 2.pptx
 
The wealth of a nation: What the changing size and shape of household wealth ...
The wealth of a nation: What the changing size and shape of household wealth ...The wealth of a nation: What the changing size and shape of household wealth ...
The wealth of a nation: What the changing size and shape of household wealth ...
 
Water for Prosperity and peace - United Nations World Water Development Repo...
Water for Prosperity and peace -  United Nations World Water Development Repo...Water for Prosperity and peace -  United Nations World Water Development Repo...
Water for Prosperity and peace - United Nations World Water Development Repo...
 
Children who live with Grandparents are really lucky
Children who live with Grandparents are really luckyChildren who live with Grandparents are really lucky
Children who live with Grandparents are really lucky
 
Item # 1a - March 18, 2024 Special CCM Minutes
Item # 1a - March 18, 2024 Special CCM MinutesItem # 1a - March 18, 2024 Special CCM Minutes
Item # 1a - March 18, 2024 Special CCM Minutes
 
PPT Item # 5-6 218 Canyon Drive replat prop.
PPT Item # 5-6 218 Canyon Drive replat prop.PPT Item # 5-6 218 Canyon Drive replat prop.
PPT Item # 5-6 218 Canyon Drive replat prop.
 

Leaside laird clc - november 9, 2020

  • 1. November 9, 2020 Eglinton Crosstown LRT Leaside-Laird CLC
  • 3. LEASIDE STATION UPDATE 3INSERT FOOTER Activity Location Approx. Date & Duration Final lining and permanent works Waterproofing, rebar, steel, conduit installations, formwork, and concrete pours Underneath Eglinton Avenue within the Station Box Underway through to early 2021 Main Entrance Construction Waterproofing, rebar, steel, conduit installations, formwork, and concrete pours South east corner of Bayview Ave and Eglinton Ave Underway through to early 2021 Secondary Entrance Construction Waterproofing, rebar, steel, conduit installations, formwork, and concrete pours North west corner of Bayview Ave and Eglinton Ave Underway through to early 2021
  • 4. LEASIDE STATION LOOK-AHEAD 4INSERT FOOTER Year What to Expect 2020 • Extended construction hours will continue through 2020. • Periodic lane closures may be required to facilitate deliveries, dewatering and concrete works. • Permanent works are underway at the station box and entrances, and will continue into early 2021, including waterproofing, formwork, rebar installation and concrete works • Construction of the entrances will progress upwards from the station to street level. • Architectural works, including tile installations, masonry work, and glazing, is expected to begin at the Main Entrance in approximately one (1) month.
  • 6. CONSTRUCTION PROGRESS PHOTOS 6CENTRAL WEST WORKS MONTHLY MEETING CONCOURSE LEVEL – STATION BOX
  • 7. CONSTRUCTION PROGRESS PHOTOS 7CENTRAL WEST WORKS MONTHLY MEETING MAIN ENTRANCE OVERVIEW
  • 9. LAIRD STATION UPDATE 9 Activity Location Approx. Date & Duration • Installation of cable trays, conduits, drainpipes, fire dampers, sheet metal and drainpipes. • Shaft build back: North street level slab formwork installation. Conduit and rebar installation for south street slabs. Main Entrance Ongoing through to late 2020 • Shaft build back: Rebar installation on north concourse wall and formwork at arch. Secondary Entrance Ongoing through to late 2020 • OCS signage installation on east side, conduit rebar installation on east emergency walkways. • Waterproofing of grouting, OCS support installation. Tunnels Ongoing through to late 2020
  • 11. LAIRD STATION EXTENDED HOURS 11 • As early as September 14, 2020, construction activities at the both entrance shafts and tunnels will take place between the hours of 6:00 a.m. and 1:00 a.m., Monday to Saturday, through to the end of the year. • Work may occasionally take place on Sundays as required. WHAT TO EXPECT • Occasional overnight noise from construction equipment including trucks, machinery and crews may occur at the Main and Secondary entrances for concrete works. • Work within the tunnels is not expected to impact nearby residents as these activities will take place below grade. • Site lighting is required and will be positioned away from residential properties. • Crews will endeavor to schedule noisier activities during the day where possible. • Site-based mitigation measures will be implemented.
  • 12. CONSTRUCTION PROGRESS PHOTOS 12 SECONDARY ENTRANCE NORTH CONCOURSE WALL REBAR INSTALLATION MAIN ENTRANCE FALSEWORK INSTALLATION
  • 13. Section One At-Grade: Brentcliffe Portal to Sunnybrook Park Stop
  • 14. SECTION ONE AT-GRADE UPDATE 14 Activity Location Approx. Date & Duration Boulevard works, final curbs and sidewalks. West of Brentcliffe Road – South Side September 30, 2020 to Mid-November Work is currently on hold Retaining Wall (East of Brentcliffe Road) Early August – December 2020 Multi-use path construction: backfill and compaction ongoing. Serena Gundy Park – West of Leslie St. Mid-July – December 2020 Construction of duct bank under bridge West Don River Bridge October 5 for six weeks Pedestrian staircase installation Eglinton and Leslie St. – South side October 30 for four weeks Bridge Rehabilitation CP Bridge, east of Leslie St. August 24 for 13 weeks CP BRIDGE REHABILITATION
  • 15. BRENTCLIFFE PORTAL TO LESLIE STREET 15 September 30, 2020 through to mid-November • The pedestrian sidewalk will remain on the south side of Eglington Avenue East only. • The traffic configuration will accommodate road works on the south side of Eglinton Avenue East west of Brencliffe Road and in the centre of Eglinton Avenue, east of Brentcliffe Road. • Construction activities include: • Concrete removals • Construction of new sidewalk and curbs • Installation of new pavers • Installation of new traffic lighting elements • Asphalt and final paving
  • 16. RETAINING WALL CONSTRUCTION NORTH SIDE OF EGLINTON EAST OF BRENTCLIFFE ROAD 16 • This retaining wall is required to hold and stabilize the embankment created from the newly widened road. • Construction commenced early August 2020. • Due to an unplanned movement of earth at the retaining wall construction site, construction has been paused. • CTS has followed all recommendations from the design and engineering teams to stabilize the area. • The area has been backfilled to further stabilize the embankment and tarped to prevent soil erosion. • Plans are being reviewed for the continued construction of the retaining wall. • Final landscaping and restoration plans are in review with Metrolinx and the City of Toronto.
  • 17. DUCT BANK INSTALLATION WEST DON RIVER BRIDGE 17 • Crews will be installing duct banks under the bridge using a manlift and an excavator to lift the materials into place. • An alternating lane closure under the West Don River Bridge will be in place to facilitate bridge works. • Access to the E.T Seaton Park parking lot, south of Eglinton Avenue East will be maintained • There will be no changes to the current traffic configuration on Eglinton Avenue East. October 5, 2020 for six weeks
  • 18. RAMP CONSTRUCTION, WEST OF LESLIE STREET MULTI-USE PATH CONNECTING EGLINTON AVE E TO SERENA GUNDY PARK 18 • Construction activities for path construction include: Excavation, backfill and installation of topsoil • Landscaping will take place in 2021 as part of the final restoration plan. Mid-July 2020 through to December 2020
  • 19. PARKING LOT CLOSURE FOR NEW PEDESTRIAN STAIRCASE INSTALLATION EGLINTON AVENUE EAST AT LESLIE STREET – SOUTH SIDE 19 • Crews will be installing structural steel to form the new pedestrian staircase. A crane will be installed at the work zone to lift materials into place. • To accommodate these activities, a section of the E.T Seton Park north parking lot will be closed. Access for pedestrian, cyclists and vehicles will be maintained. • No changes to traffic on Eglinton Avenue East. October 30, 2020 for four weeks
  • 20. CP BRIDGE REHABILITATION EAST OF LESLIE STREET 20 • A working platform will be set up at the bridge in advance of the activities. • Crews will be removing rust, painting, replacing structural steel elements and performing concrete repairs. • Noise can be expected from concrete chipping and other rehabilitation works. August 24, 2020 for 13 weeks
  • 21. CONSTRUCTION PROGRESS PHOTOS 21 SUNNYBROOK PARK STOP WEST DON RIVER BRIDGE DUCT BANK INSTALLATION