2. LAND ACKNOWLEDGEMENT
2
Let us take a moment to acknowledge we are on lands that have been, and continue to be, home to many
Indigenous Peoples including the Anishnabeg, the Haudenosaunee and the Huron-Wendat peoples.
We are all Treaty people. Many of us have come here as settlers, as immigrants or involuntarily as part of the
trans-Atlantic slave trade, in this generation, or generations past.
We acknowledge the historic and continued impacts of colonization and the need to work towards
meaningful reconciliation with the original caretakers of this land.
We acknowledge that Metrolinx operates on territories and lands covered by many treaties that affirm and
value the rights of Indigenous communities, Nations and Peoples.
We understand the importance of working towards reconciliation with the original caretakers of this land. At
Metrolinx, we will conduct business in a manner that is built on a foundation of trust, respect and
collaboration.
3. APPROXIMATE AREA OF BIKE LANE CONSTRUCTION AT LEASIDE STATION
3
INSERT FOOTER
5. LEASIDE STATION UPDATE
5
Activity Location Approx. Date & Duration
Station Box Construction
Sign band installations, tiling, glazing,
elevator/escalator assembly, mechanical electrical
works, and testing and commissioning
Underneath Eglinton Avenue within the
Station Box
Underway through December 2022
Main Entrance Construction
Architectural works, mechanical electrical
installations, and landscaping
South east corner of Bayview Ave and
Eglinton Ave
Underway through December 2022
Secondary Entrance Construction
Architectural works, mechanical electrical
installations, and landscaping
North west corner of Bayview Ave and
Eglinton Ave
Underway through December 2022
Utility Reinstatement Works, and Road,
Sidewalk, and Bike Lane Construction
Eglinton Ave and Bayview Ave Underway through December 2022
Paving Works and Traffic Line Painting Eglinton Ave and Bayview Ave
As early as Monday, November 21, 2022, for
approximately two (2) weeks
7. UPCOMING TRAFFIC CONFIGURATION
7
Expected in mid-December 2022
• Traffic Control Plan is not finalized and therefore this image is subject to change
• Individual lane closures will be required following the implementation of this traffic stage to facilitate specific activities
• Construction barriers and fencing around the Main and Secondary Entrances will remain in place for security purposes
11. LAIRD STATION UPDATE
11
Activity Location Approx. Date & Duration
Main Entrance Construction
Masonry works, tile installations, painting,
and other architectural finishes. Cable pulls
for electrical installations, sign band
installations, and station cleaning.
South-west corner of Laird Drive and
Eglinton Avenue East
Ongoing through Fall and anticipated to be
completed by approx. late-December 2022
Secondary Entrance Construction
Concrete pours, tile installations, electrical
and architectural finishes, landscaping
restoration works, and station cleaning.
South-east corner of Laird Drive and
Eglinton Avenue East
Ongoing through Fall and anticipated to be
completed by approx. late-December 2022
Station Box Construction
Tile and furniture installations, mechanical,
electrical, and architectural finishes, sign
band installation, station testing and
inspections, and station cleaning.
Beneath Eglinton Avenue East
Ongoing through Fall and anticipated to be
completed by approx. late-December 2022
13. CONSTRUCTION PROGRESS PHOTOS
13
CONDUIT INSTALLATIONS ONGOING AT
THE MAIN ENTRANCE
SIDEWALK RESTORATION COMPLETED ON
THE SOUTH SIDE OF EGLINTON BY THE
SECONDARY ENTRANCE CABLE PULLS ONGOING
THROUGHOUT THE STATION
14. EAST OF LAIRD ONGOING WORKS
14
• Vehicle testing
• Sidewalk restoration
• Landscaping between Brentfliffe Road and Kennedy Road – Resuming late-February
• Brentcliffe retaining wall landscaping restoration works – Resuming late-February
• Multi-use path construction and landscaping restoration works – Resuming late-February
• Watermain restoration work on Eglinton at Gervais Drive
• Soil nail and noise barrier wall removal – resuming late Fall
LESLIE RETAINING WALL
GUARDRAIL INSTALLATION COMPLETED
AT LESLIE STREET (SOUTH SIDE)