Agenda
 Discussion of the Asset Management Before the Purchase - Testing
Landscape
− KEMA Laboratories
− Testing capabilities
− Failure rates
− Testing versus certification
− Discussion of utility needs
 Discussion of the Future of Asset Management – New Challenges
− Traditional Asset Management best practices (e.g., Asset Management in
Smart Grid)
− Growing Issues with variability of renewable resources (e.g., Smart Grid in
Asset Management)
− Discussion of utility needs
2
DNV GL © 2014 SAFER, SMARTER, GREENERDNV GL © 2013
Asset Management Before the Purchase
– Testing Landscape
3
DNV GL © 2014
KEMA Laboratories
 Independent
 Have enough power and voltage to test
everything
 Covers high-power and high-voltage:
- switchgear
- transformers
- metering and protection
4
NetherlandsCzech RepublicPennsylvania
 Certificates recognized and accepted world
wide
 80 years in business
 $100 M current expansion
DNV GL © 2014
KEMA Laboratories at Chalfont, PA
 KEMA is a major force in testing electric utility equipment in the United States for
every major equipment supplier.
 Our KEMA Laboratories perform $60 million in tests annually, including:
– Arresters
– Bus duct/bus bar
– Cable & Accessories
– Breakers
– DC equipment
– Fuses
– Insulators
– Substation automation
– Switches and switchgear
– Transformers
5
DNV GL © 2014
Scope of Testing
Testing methods
 Laboratory testing
 Onsite testing
 Witness testing
 Remote testing
Documents
 Type test certificates
 Test reports
 Calibration certificates
 Inspection reports
 Investigation reports
6
Tests
 KEMA type test certificate
 KEMA report of performance
 KEMA test report
 Power electronics tests
 Calibration of systems
 Diagnostics
 Low voltage AC testing
 Thermal testing continuous current
 Low voltage DC testing
 Capacitor switching
 High Voltage testing
DNV GL © 2014
Reasons for Testing
KEMA Test Report
 Performed at
independent lab
according to user’s
specifications
 Ordered by equipment
user
 Verify a specific product
meets user-defined
requirements
 Must be read carefully
7
Type tests Certificate
 Verify that an example
product meets the
requirements of a
specific standard
 Ordered by manufacturer
 Performed at independent
lab according to IEEE and
ANSI standards
 Certified by testing
laboratory
 Complete peace of mind
KEMA Report of
Performance
 Verify that an example
product meets a subset
of the requirements of a
specific standard
 Ordered by
manufacturer
 Performed at
independent lab
according to a subset of
IEEE and ANSI
standards
DNV GL © 2014
Reasons for Testing - Increased HSE focus
 Fault arc management, internal arc detection and handling
 Reducing fire risks
 Low magnetic field equipment design
 Controlling sound levels, RI and EM emissions
 Biodegradable transformer oil
8
DNV GL © 2014
Results - Around 25% of test-objects initially fail tests
9
Broken
bushing
Oil spill with fire
Line trap
oil spill
Disconnector
Trafo
winding
DNV GL © 2014
Results - Around 25% of test-objects initially fail tests
10
Switchgear panel Distribution
transformer
Oil spill
DNV GL © 2014
Transformer Testing Statistics By Rating
11
Higher rated transformers have higher failure rates
0
10
20
30
40
50
60
25-50 50-100 100-200 >200
numberoftransformers
MVA (rated)
initially not OK initially OK
0
10
20
30
40
50
60
20-100 100-200 200-300 300-400 >400
numberoftransformers
kV (rated)
initially not OK initially OK
DNV GL © 2014
KEMA Power Transformer Test Statistics By Year
12
0
10
20
30
40
50
60
0
5
10
15
20
25
30
35
40
1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
failureratetopassshort-circuittest[%]
totalnumberoftestedtransformers
total
failure rate %
DNV GL © 2014
Cables – Type Testing
Failure rates per voltage class
 HV: 22%
 MV: 22%
13
Our experience
between 1993 and 2013
550 components over 20
years
Source: DNV GL
DNV GL © 2014
DNV GL HV cable / accessories test statistics by component
14
Failure rate 1993 - 2008
0
10
20
30
40
50
cable termination straight joint crossbonding joint transition joint
Faulireratetopasstest(%)
DNV GL © 201415
In Service Equipment and Material Failures Continue to Be An Issue
Did you know?
In the United States,
approximately 25% of
outages are due to
equipment and material
failures.
DNV GL © 2014
In Service Equipment and Material Failures Continue to Be An Issue
 Europe requires certification of equipment that guarantees a minimum quality
level and a level playing field which facilitate purchase decisions.
 Suppliers certainly use the testing done at Chalfont to understand possible defect
however it is entirely at their discretion.
 Present third party testing only covers a portion of the standard in most cases as
opposed to the entire standard
 Present third party investigation of material and equipment failures is the
exception rather than the rule.
16
DNV GL © 2014
Discussion - How Can KEMA Test Labs Further Help Utilities?
 ARC Flash testing and risk assessment?
 Testing of smart grid equipment?
 Remaining life assessments?
 Testing variability of solar on power systems and mitigation
techniques/equipment?
 Failure investigation?
 Audit of utility internal repair shops or certification?
 Testing material and equipment beyond manufacturer’s acceptance testing (ANSI,
IEEE, etc.) to look at endurance (how long it will last)?
 Helping to develop better targeted maintenance programs based on our testing
experience of the same equipment?
 Others?
17
DNV GL © 2014 SAFER, SMARTER, GREENERDNV GL © 2013
Asset Management After the Purchase –
New Challenges
18
DNV GL © 2014
From Asset Management to Asset Optimization
DNV GL © 2014
Traditional Asset Management Best Practices – The Present
Situation
Transmission and Stations
 Well established approaches and disciplines due in part to NERC compliance
 Risk & Condition based asset management
 Assessment tools
 Benefit versus cost analysis
 Optimized spending plan that is defensible to CFO and utility commissions
20
DNV GL © 2014
Traditional Asset Management Best Practices – The Present
Situation
Distribution
 Tends towards accepted programs that are prioritized locally but funded centrally
 Improving asset base for many utilities but lack of clarity about how to use it
 Emerging tendency to view each feeder as a complete asset with risks and health
considerations – a more sophisticated and defensible approach to worst
performing feeders
 Struggles to prioritize new technology versus asset health spending
21
DNV GL © 2014
Including Smart Grid in Asset Management Business Case
 Asset management principals applied to Smart Grid
– Across replacement, system expansion, technology projects
– Disciplined approach that avoids generalizations and builds cost and benefits
from specific assets and circuits/lines
– Agreed metrics
 More regulatory scrutiny
– Defensible spending plan
– Environmental emphasis
– How to transition to grid of future (e.g. accommodate distributed generation)
22
DNV GL © 2014
Including Smart Grid in Asset Management – Optimal Spend
 Asset management principals applied to Smart Grid
 An approach that
– navigates the changing environments impacting the electrical system
– optimizes spend by applying proven, new and emerging options to meet system
and equipment performance objectives.
Technology Investment Planning
23
10/6/2015
DNV GL © 2014
Including Smart Grid in Asset Management - Optimal Spend
 Replacements, refurbishment or new technology implementations should be
prioritized to achieve corporate goals (reliability, safety, financial performance,
etc.)
 Prioritized list of spending across and within projects.
 Understand the relationship between dollar spend and benefit.
24
DNV GL © 2014
Growing Issues with Variability of Renewable Resources/DER
Renewables are becoming game changers
25
Decentralised
renewable
power
generation
sources are
changing the
utility model
Renewable
technology has
relied on
government
incentives and
policy
mechanisms to
date, but the
price curves
are coming
down
Lower Production Cost + Increased Efficiency = Growing Market
DNV GL © 2014
Growing Issues with Variability of Renewable Resources/DER
Renewables are becoming game changers
Implications
 Different operational approaches and equipment to handle variability
 Different asset life both positive and negative due to solar energy concentration
increasing
 Distribution planning will require dynamic models instead of steady state
 Independent laboratory testing will likely be required to determine the impact on
traditional assets and new assets developed for mitigation to find what models
miss
26
DNV GL © 2014
Including Smart Grid in Asset Management
 Using historical near real time information from AMI, SCADA, Distribution
Automation, etc. to create a planning sandbox for consideration of new
technology investments and capacity additions.
 Using information from AMI, SCADA, Distribution Automation, etc. in rapid load
flow models to identify operational issues and opportunities to optimize
dynamically
– Reduce system losses through VAR control
– Reduce system losses through dynamic circuit reconfiguration
– Reduce demand through voltage control
– Implement short term system oriented 30 second demand response to deal
with variability of distributed resources
– Self healing
– Use near real time information to identify asset management needs and
reprioritize spending
27
DNV GL © 2014
Discussion - How Can DNV GL (KEMA) Help Utilities?
 Traditional Asset Management?
 Including asset management perspectives in Smart Grid business case?
 Distribution planning with increasing levels of distributed resources such as solar?
 Using Smart Grid data for asset management?
 Asset database or asset management IT platform?
 Independent certification of equipment performance to industry standards (IEEE,
IEC, ANSI)
 Others?
28
DNV GL © 2014
SAFER, SMARTER, GREENER
www.dnvgl.com
Asset Management Before and After the
Equipment Purchase
29
Larry Dickerman
Larry.dickerman@dnvgl.com
919-931-9068

Más contenido relacionado

La actualidad más candente

Risk Solutions for the Manager
Risk Solutions for the ManagerRisk Solutions for the Manager
Risk Solutions for the ManagerEdwin A Merrick
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assetsAdvisian
 
Smart Integrated Infrastructure and Controlling Water Loss
Smart Integrated Infrastructure and Controlling Water LossSmart Integrated Infrastructure and Controlling Water Loss
Smart Integrated Infrastructure and Controlling Water LossBlack & Veatch
 
Extending the Life of Existing Switchgear
Extending the Life of Existing SwitchgearExtending the Life of Existing Switchgear
Extending the Life of Existing SwitchgearSchneider Electric
 
Stream D_John Ahmet Erkoyuncu
Stream D_John Ahmet ErkoyuncuStream D_John Ahmet Erkoyuncu
Stream D_John Ahmet ErkoyuncuBecarAsset
 
Solving the maintain vs. modernization equation
Solving the maintain vs. modernization equationSolving the maintain vs. modernization equation
Solving the maintain vs. modernization equationSchneider Electric
 
Overcoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsOvercoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsScottMadden, Inc.
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operationsSchneider Electric
 
Energy Management Impact on Distributed Control Systems (DCS) in Industrial E...
Energy Management Impact on Distributed Control Systems (DCS) in Industrial E...Energy Management Impact on Distributed Control Systems (DCS) in Industrial E...
Energy Management Impact on Distributed Control Systems (DCS) in Industrial E...Schneider Electric
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionBlack & Veatch
 
Fusing Material and Data Science
Fusing Material and Data ScienceFusing Material and Data Science
Fusing Material and Data ScienceSentient Science
 
Stream D_Richard Longman, Chris Pickford, Mike Niblett
Stream D_Richard Longman, Chris Pickford, Mike NiblettStream D_Richard Longman, Chris Pickford, Mike Niblett
Stream D_Richard Longman, Chris Pickford, Mike NiblettBecarAsset
 
Stream D_Richard Hawkins, Patrick Reniers
Stream D_Richard Hawkins, Patrick ReniersStream D_Richard Hawkins, Patrick Reniers
Stream D_Richard Hawkins, Patrick ReniersBecarAsset
 
Deif profile
Deif profileDeif profile
Deif profileTuan Anh
 
Yokogawa's GC8000 Process Analyzer Product Introduction
Yokogawa's GC8000 Process Analyzer Product IntroductionYokogawa's GC8000 Process Analyzer Product Introduction
Yokogawa's GC8000 Process Analyzer Product IntroductionYokogawa1
 
The smart grid - Supply and demand side equivalent solutions
The smart grid - Supply and demand side equivalent solutionsThe smart grid - Supply and demand side equivalent solutions
The smart grid - Supply and demand side equivalent solutionsSchneider Electric
 

La actualidad más candente (20)

Risk Solutions for the Manager
Risk Solutions for the ManagerRisk Solutions for the Manager
Risk Solutions for the Manager
 
Decommissioning your offshore assets
Decommissioning your offshore assetsDecommissioning your offshore assets
Decommissioning your offshore assets
 
Smart Integrated Infrastructure and Controlling Water Loss
Smart Integrated Infrastructure and Controlling Water LossSmart Integrated Infrastructure and Controlling Water Loss
Smart Integrated Infrastructure and Controlling Water Loss
 
Extending the Life of Existing Switchgear
Extending the Life of Existing SwitchgearExtending the Life of Existing Switchgear
Extending the Life of Existing Switchgear
 
Stream D_John Ahmet Erkoyuncu
Stream D_John Ahmet ErkoyuncuStream D_John Ahmet Erkoyuncu
Stream D_John Ahmet Erkoyuncu
 
Solving the maintain vs. modernization equation
Solving the maintain vs. modernization equationSolving the maintain vs. modernization equation
Solving the maintain vs. modernization equation
 
Overcoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/ProjectsOvercoming the Challenges of Large Capital Programs/Projects
Overcoming the Challenges of Large Capital Programs/Projects
 
Keeping Bowties Alive
Keeping Bowties AliveKeeping Bowties Alive
Keeping Bowties Alive
 
Duke Energy - Case Study
Duke Energy - Case StudyDuke Energy - Case Study
Duke Energy - Case Study
 
KBC scheduling hydrocarbon supply chain
KBC scheduling hydrocarbon supply chainKBC scheduling hydrocarbon supply chain
KBC scheduling hydrocarbon supply chain
 
How green standards are changing data center design and operations
How green standards are changing data center design and operationsHow green standards are changing data center design and operations
How green standards are changing data center design and operations
 
Energy Management Impact on Distributed Control Systems (DCS) in Industrial E...
Energy Management Impact on Distributed Control Systems (DCS) in Industrial E...Energy Management Impact on Distributed Control Systems (DCS) in Industrial E...
Energy Management Impact on Distributed Control Systems (DCS) in Industrial E...
 
Resume2016
Resume2016Resume2016
Resume2016
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization Solution
 
Fusing Material and Data Science
Fusing Material and Data ScienceFusing Material and Data Science
Fusing Material and Data Science
 
Stream D_Richard Longman, Chris Pickford, Mike Niblett
Stream D_Richard Longman, Chris Pickford, Mike NiblettStream D_Richard Longman, Chris Pickford, Mike Niblett
Stream D_Richard Longman, Chris Pickford, Mike Niblett
 
Stream D_Richard Hawkins, Patrick Reniers
Stream D_Richard Hawkins, Patrick ReniersStream D_Richard Hawkins, Patrick Reniers
Stream D_Richard Hawkins, Patrick Reniers
 
Deif profile
Deif profileDeif profile
Deif profile
 
Yokogawa's GC8000 Process Analyzer Product Introduction
Yokogawa's GC8000 Process Analyzer Product IntroductionYokogawa's GC8000 Process Analyzer Product Introduction
Yokogawa's GC8000 Process Analyzer Product Introduction
 
The smart grid - Supply and demand side equivalent solutions
The smart grid - Supply and demand side equivalent solutionsThe smart grid - Supply and demand side equivalent solutions
The smart grid - Supply and demand side equivalent solutions
 

Destacado

Best Practices for Early Stage Product Development
Best Practices for Early Stage Product DevelopmentBest Practices for Early Stage Product Development
Best Practices for Early Stage Product DevelopmentAmr Basha
 
Al Jazeera at Nokia Press Conference
Al Jazeera at Nokia Press ConferenceAl Jazeera at Nokia Press Conference
Al Jazeera at Nokia Press ConferenceDerrick Fountain
 
Prioritizing Product Ideas
Prioritizing Product IdeasPrioritizing Product Ideas
Prioritizing Product IdeasDerrick Fountain
 
Product management at early stage of company lifecycle
Product management at early stage of company lifecycleProduct management at early stage of company lifecycle
Product management at early stage of company lifecycleAliaksandr Astapenka
 
A Practical Guide to Early Product Development (AccelerateAB 2014)
A Practical Guide to Early Product Development (AccelerateAB 2014)A Practical Guide to Early Product Development (AccelerateAB 2014)
A Practical Guide to Early Product Development (AccelerateAB 2014)Satish Kanwar
 
The New Rules of Early-Stage Product Development (MassChallenge / Skolkovo)
The New Rules of Early-Stage Product Development (MassChallenge / Skolkovo)The New Rules of Early-Stage Product Development (MassChallenge / Skolkovo)
The New Rules of Early-Stage Product Development (MassChallenge / Skolkovo)Rishi Dean
 
Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Achuthan Rajagopal
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive MaintenanceMahendra K SHUKLA
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive MaintenanceAnand Subramaniam
 

Destacado (11)

Best Practices for Early Stage Product Development
Best Practices for Early Stage Product DevelopmentBest Practices for Early Stage Product Development
Best Practices for Early Stage Product Development
 
Al Jazeera at Nokia Press Conference
Al Jazeera at Nokia Press ConferenceAl Jazeera at Nokia Press Conference
Al Jazeera at Nokia Press Conference
 
Prioritizing Product Ideas
Prioritizing Product IdeasPrioritizing Product Ideas
Prioritizing Product Ideas
 
Product management at early stage of company lifecycle
Product management at early stage of company lifecycleProduct management at early stage of company lifecycle
Product management at early stage of company lifecycle
 
A Practical Guide to Early Product Development (AccelerateAB 2014)
A Practical Guide to Early Product Development (AccelerateAB 2014)A Practical Guide to Early Product Development (AccelerateAB 2014)
A Practical Guide to Early Product Development (AccelerateAB 2014)
 
Early Equipment Management
Early Equipment ManagementEarly Equipment Management
Early Equipment Management
 
The New Rules of Early-Stage Product Development (MassChallenge / Skolkovo)
The New Rules of Early-Stage Product Development (MassChallenge / Skolkovo)The New Rules of Early-Stage Product Development (MassChallenge / Skolkovo)
The New Rules of Early-Stage Product Development (MassChallenge / Skolkovo)
 
Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM
 
TPM. DR. K. BARANIDHARAN
TPM. DR. K. BARANIDHARANTPM. DR. K. BARANIDHARAN
TPM. DR. K. BARANIDHARAN
 
Presentation on Total Productive Maintenance
Presentation on Total Productive MaintenancePresentation on Total Productive Maintenance
Presentation on Total Productive Maintenance
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 

Similar a Asset Management Before and After the Equipment Purchase

Asset Management - Replacement Criteria for Distribution Transformers
Asset Management - Replacement Criteria for Distribution TransformersAsset Management - Replacement Criteria for Distribution Transformers
Asset Management - Replacement Criteria for Distribution TransformersLeonardo ENERGY
 
Asset Management - Replacement Criteria for Distribution Transformers
Asset Management - Replacement Criteria for Distribution TransformersAsset Management - Replacement Criteria for Distribution Transformers
Asset Management - Replacement Criteria for Distribution TransformersLeonardo ENERGY
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...ARC Advisory Group
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedEECO2
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionKeith Beattie
 
Electricity Distribution Changes by Innovari
Electricity Distribution Changes by InnovariElectricity Distribution Changes by Innovari
Electricity Distribution Changes by InnovariIPPAI
 
Company profile Felidae Systems
Company profile Felidae SystemsCompany profile Felidae Systems
Company profile Felidae SystemsManish Jain
 
Automated Network Management Solution
Automated Network Management SolutionAutomated Network Management Solution
Automated Network Management SolutionLandis+Gyr
 
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...Sergey Mishin
 
Demand Response workshop - Powering Sydney
Demand Response workshop - Powering SydneyDemand Response workshop - Powering Sydney
Demand Response workshop - Powering SydneyTransGrid AU
 
Field Services overview for Marine applications
Field Services overview for Marine applicationsField Services overview for Marine applications
Field Services overview for Marine applicationsAnton Svinenkov
 
Aspectos Técnicos para financiación de Proyectos Solares
Aspectos Técnicos para financiación de Proyectos SolaresAspectos Técnicos para financiación de Proyectos Solares
Aspectos Técnicos para financiación de Proyectos SolaresCCEnergía Todos con energía
 
Peter Vaessen - Waarom is meten en testen belangrijk
Peter Vaessen - Waarom is meten en testen belangrijkPeter Vaessen - Waarom is meten en testen belangrijk
Peter Vaessen - Waarom is meten en testen belangrijkDutch Power
 
Integrating renewables and grids
Integrating renewables and gridsIntegrating renewables and grids
Integrating renewables and gridsDanny De Schutter
 

Similar a Asset Management Before and After the Equipment Purchase (20)

Asset Management - Replacement Criteria for Distribution Transformers
Asset Management - Replacement Criteria for Distribution TransformersAsset Management - Replacement Criteria for Distribution Transformers
Asset Management - Replacement Criteria for Distribution Transformers
 
Asset Management - Replacement Criteria for Distribution Transformers
Asset Management - Replacement Criteria for Distribution TransformersAsset Management - Replacement Criteria for Distribution Transformers
Asset Management - Replacement Criteria for Distribution Transformers
 
Sandia 2014 Wind Turbine Blade Workshop- Malkin
Sandia 2014 Wind Turbine Blade Workshop- MalkinSandia 2014 Wind Turbine Blade Workshop- Malkin
Sandia 2014 Wind Turbine Blade Workshop- Malkin
 
2014 PV Distribution System Modeling Workshop: Pro-active, high penetration P...
2014 PV Distribution System Modeling Workshop: Pro-active, high penetration P...2014 PV Distribution System Modeling Workshop: Pro-active, high penetration P...
2014 PV Distribution System Modeling Workshop: Pro-active, high penetration P...
 
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...Energy Management and the Evolution of Intelligent Motor Control and Drives @...
Energy Management and the Evolution of Intelligent Motor Control and Drives @...
 
Power Generation: Coal-Fired
Power Generation: Coal-FiredPower Generation: Coal-Fired
Power Generation: Coal-Fired
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy Limited
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reduction
 
Electricity Distribution Changes by Innovari
Electricity Distribution Changes by InnovariElectricity Distribution Changes by Innovari
Electricity Distribution Changes by Innovari
 
Solutions for LNG facilities
Solutions for LNG facilitiesSolutions for LNG facilities
Solutions for LNG facilities
 
Company profile Felidae Systems
Company profile Felidae SystemsCompany profile Felidae Systems
Company profile Felidae Systems
 
Automated Network Management Solution
Automated Network Management SolutionAutomated Network Management Solution
Automated Network Management Solution
 
12 dessai epri sandia - pge vvo pilot
12 dessai epri sandia - pge vvo pilot12 dessai epri sandia - pge vvo pilot
12 dessai epri sandia - pge vvo pilot
 
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
Operational Efficiency Based on Innovative Automation, Industry Expertise, En...
 
Vijayaraj CV
Vijayaraj CVVijayaraj CV
Vijayaraj CV
 
Demand Response workshop - Powering Sydney
Demand Response workshop - Powering SydneyDemand Response workshop - Powering Sydney
Demand Response workshop - Powering Sydney
 
Field Services overview for Marine applications
Field Services overview for Marine applicationsField Services overview for Marine applications
Field Services overview for Marine applications
 
Aspectos Técnicos para financiación de Proyectos Solares
Aspectos Técnicos para financiación de Proyectos SolaresAspectos Técnicos para financiación de Proyectos Solares
Aspectos Técnicos para financiación de Proyectos Solares
 
Peter Vaessen - Waarom is meten en testen belangrijk
Peter Vaessen - Waarom is meten en testen belangrijkPeter Vaessen - Waarom is meten en testen belangrijk
Peter Vaessen - Waarom is meten en testen belangrijk
 
Integrating renewables and grids
Integrating renewables and gridsIntegrating renewables and grids
Integrating renewables and grids
 

Último

Hi-Fi Call Girls Valsad Ahmedabad 7397865700
Hi-Fi Call Girls Valsad Ahmedabad 7397865700Hi-Fi Call Girls Valsad Ahmedabad 7397865700
Hi-Fi Call Girls Valsad Ahmedabad 7397865700Call Girls Mumbai
 
Science, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxScience, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxgrandmarshall132
 
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girlsssuser7cb4ff
 
global trend Chapter 1.presentation power point
global trend Chapter 1.presentation power pointglobal trend Chapter 1.presentation power point
global trend Chapter 1.presentation power pointyohannisyohannis54
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量sehgh15heh
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"syalehistoricalreview
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Educationz xss
 
BIODIVERSITY QUIZ ELIMINATION ROUND.pptx
BIODIVERSITY QUIZ ELIMINATION ROUND.pptxBIODIVERSITY QUIZ ELIMINATION ROUND.pptx
BIODIVERSITY QUIZ ELIMINATION ROUND.pptxROLANARIBATO3
 
Delivering nature-based solution outcomes by addressing policy, institutiona...
Delivering nature-based solution outcomes by addressing  policy, institutiona...Delivering nature-based solution outcomes by addressing  policy, institutiona...
Delivering nature-based solution outcomes by addressing policy, institutiona...CIFOR-ICRAF
 
WindEurope - Wind energy in Europe - 2023.pdf
WindEurope - Wind energy in Europe - 2023.pdfWindEurope - Wind energy in Europe - 2023.pdf
WindEurope - Wind energy in Europe - 2023.pdfShingoAramaki
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一F dds
 
Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Open Access Research Paper
 
Available to Promise Oracle R12 ATP.pptx
Available to Promise Oracle R12 ATP.pptxAvailable to Promise Oracle R12 ATP.pptx
Available to Promise Oracle R12 ATP.pptxbskumar_slideshare
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作f3774p8b
 
Slide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian ParliamentariansSlide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian Parliamentariansipcc-media
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170simranguptaxx69
 

Último (20)

Hi-Fi Call Girls Valsad Ahmedabad 7397865700
Hi-Fi Call Girls Valsad Ahmedabad 7397865700Hi-Fi Call Girls Valsad Ahmedabad 7397865700
Hi-Fi Call Girls Valsad Ahmedabad 7397865700
 
Science, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxScience, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptx
 
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call GirlsHi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
Hi FI Call Girl Ahmedabad 7397865700 Independent Call Girls
 
global trend Chapter 1.presentation power point
global trend Chapter 1.presentation power pointglobal trend Chapter 1.presentation power point
global trend Chapter 1.presentation power point
 
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
Call Girls In { Delhi } South Extension Whatsup 9873940964 Enjoy Unlimited Pl...
 
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
原版定制copy澳洲詹姆斯库克大学毕业证JCU毕业证成绩单留信学历认证保障质量
 
Along the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"sAlong the Lakefront, "Menacing Unknown"s
Along the Lakefront, "Menacing Unknown"s
 
885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education885MTAMount DMU University Bachelor's Diploma in Education
885MTAMount DMU University Bachelor's Diploma in Education
 
BIODIVERSITY QUIZ ELIMINATION ROUND.pptx
BIODIVERSITY QUIZ ELIMINATION ROUND.pptxBIODIVERSITY QUIZ ELIMINATION ROUND.pptx
BIODIVERSITY QUIZ ELIMINATION ROUND.pptx
 
Delivering nature-based solution outcomes by addressing policy, institutiona...
Delivering nature-based solution outcomes by addressing  policy, institutiona...Delivering nature-based solution outcomes by addressing  policy, institutiona...
Delivering nature-based solution outcomes by addressing policy, institutiona...
 
WindEurope - Wind energy in Europe - 2023.pdf
WindEurope - Wind energy in Europe - 2023.pdfWindEurope - Wind energy in Europe - 2023.pdf
WindEurope - Wind energy in Europe - 2023.pdf
 
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
办理学位证(KU证书)堪萨斯大学毕业证成绩单原版一比一
 
Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...
 
Available to Promise Oracle R12 ATP.pptx
Available to Promise Oracle R12 ATP.pptxAvailable to Promise Oracle R12 ATP.pptx
Available to Promise Oracle R12 ATP.pptx
 
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Nehru Place, 🔝 9953056974 🔝 escort Service
 
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Rajiv Chowk Delhi reach out to us at 🔝9953056974🔝
 
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full NightCall Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
Call Girls Ahmedabad 7397865700 Ridhima Hire Me Full Night
 
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
 
Slide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian ParliamentariansSlide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian Parliamentarians
 
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
 

Asset Management Before and After the Equipment Purchase

  • 1. DNV GL © 2014 SAFER, SMARTER, GREENERDNV GL © 2014 Asset Management Before and After the Equipment Purchase 1 Industry Input on How to Improve Asset Performance Larry Dickerman September 2015
  • 2. DNV GL © 2014 Agenda  Discussion of the Asset Management Before the Purchase - Testing Landscape − KEMA Laboratories − Testing capabilities − Failure rates − Testing versus certification − Discussion of utility needs  Discussion of the Future of Asset Management – New Challenges − Traditional Asset Management best practices (e.g., Asset Management in Smart Grid) − Growing Issues with variability of renewable resources (e.g., Smart Grid in Asset Management) − Discussion of utility needs 2
  • 3. DNV GL © 2014 SAFER, SMARTER, GREENERDNV GL © 2013 Asset Management Before the Purchase – Testing Landscape 3
  • 4. DNV GL © 2014 KEMA Laboratories  Independent  Have enough power and voltage to test everything  Covers high-power and high-voltage: - switchgear - transformers - metering and protection 4 NetherlandsCzech RepublicPennsylvania  Certificates recognized and accepted world wide  80 years in business  $100 M current expansion
  • 5. DNV GL © 2014 KEMA Laboratories at Chalfont, PA  KEMA is a major force in testing electric utility equipment in the United States for every major equipment supplier.  Our KEMA Laboratories perform $60 million in tests annually, including: – Arresters – Bus duct/bus bar – Cable & Accessories – Breakers – DC equipment – Fuses – Insulators – Substation automation – Switches and switchgear – Transformers 5
  • 6. DNV GL © 2014 Scope of Testing Testing methods  Laboratory testing  Onsite testing  Witness testing  Remote testing Documents  Type test certificates  Test reports  Calibration certificates  Inspection reports  Investigation reports 6 Tests  KEMA type test certificate  KEMA report of performance  KEMA test report  Power electronics tests  Calibration of systems  Diagnostics  Low voltage AC testing  Thermal testing continuous current  Low voltage DC testing  Capacitor switching  High Voltage testing
  • 7. DNV GL © 2014 Reasons for Testing KEMA Test Report  Performed at independent lab according to user’s specifications  Ordered by equipment user  Verify a specific product meets user-defined requirements  Must be read carefully 7 Type tests Certificate  Verify that an example product meets the requirements of a specific standard  Ordered by manufacturer  Performed at independent lab according to IEEE and ANSI standards  Certified by testing laboratory  Complete peace of mind KEMA Report of Performance  Verify that an example product meets a subset of the requirements of a specific standard  Ordered by manufacturer  Performed at independent lab according to a subset of IEEE and ANSI standards
  • 8. DNV GL © 2014 Reasons for Testing - Increased HSE focus  Fault arc management, internal arc detection and handling  Reducing fire risks  Low magnetic field equipment design  Controlling sound levels, RI and EM emissions  Biodegradable transformer oil 8
  • 9. DNV GL © 2014 Results - Around 25% of test-objects initially fail tests 9 Broken bushing Oil spill with fire Line trap oil spill Disconnector Trafo winding
  • 10. DNV GL © 2014 Results - Around 25% of test-objects initially fail tests 10 Switchgear panel Distribution transformer Oil spill
  • 11. DNV GL © 2014 Transformer Testing Statistics By Rating 11 Higher rated transformers have higher failure rates 0 10 20 30 40 50 60 25-50 50-100 100-200 >200 numberoftransformers MVA (rated) initially not OK initially OK 0 10 20 30 40 50 60 20-100 100-200 200-300 300-400 >400 numberoftransformers kV (rated) initially not OK initially OK
  • 12. DNV GL © 2014 KEMA Power Transformer Test Statistics By Year 12 0 10 20 30 40 50 60 0 5 10 15 20 25 30 35 40 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 failureratetopassshort-circuittest[%] totalnumberoftestedtransformers total failure rate %
  • 13. DNV GL © 2014 Cables – Type Testing Failure rates per voltage class  HV: 22%  MV: 22% 13 Our experience between 1993 and 2013 550 components over 20 years Source: DNV GL
  • 14. DNV GL © 2014 DNV GL HV cable / accessories test statistics by component 14 Failure rate 1993 - 2008 0 10 20 30 40 50 cable termination straight joint crossbonding joint transition joint Faulireratetopasstest(%)
  • 15. DNV GL © 201415 In Service Equipment and Material Failures Continue to Be An Issue Did you know? In the United States, approximately 25% of outages are due to equipment and material failures.
  • 16. DNV GL © 2014 In Service Equipment and Material Failures Continue to Be An Issue  Europe requires certification of equipment that guarantees a minimum quality level and a level playing field which facilitate purchase decisions.  Suppliers certainly use the testing done at Chalfont to understand possible defect however it is entirely at their discretion.  Present third party testing only covers a portion of the standard in most cases as opposed to the entire standard  Present third party investigation of material and equipment failures is the exception rather than the rule. 16
  • 17. DNV GL © 2014 Discussion - How Can KEMA Test Labs Further Help Utilities?  ARC Flash testing and risk assessment?  Testing of smart grid equipment?  Remaining life assessments?  Testing variability of solar on power systems and mitigation techniques/equipment?  Failure investigation?  Audit of utility internal repair shops or certification?  Testing material and equipment beyond manufacturer’s acceptance testing (ANSI, IEEE, etc.) to look at endurance (how long it will last)?  Helping to develop better targeted maintenance programs based on our testing experience of the same equipment?  Others? 17
  • 18. DNV GL © 2014 SAFER, SMARTER, GREENERDNV GL © 2013 Asset Management After the Purchase – New Challenges 18
  • 19. DNV GL © 2014 From Asset Management to Asset Optimization
  • 20. DNV GL © 2014 Traditional Asset Management Best Practices – The Present Situation Transmission and Stations  Well established approaches and disciplines due in part to NERC compliance  Risk & Condition based asset management  Assessment tools  Benefit versus cost analysis  Optimized spending plan that is defensible to CFO and utility commissions 20
  • 21. DNV GL © 2014 Traditional Asset Management Best Practices – The Present Situation Distribution  Tends towards accepted programs that are prioritized locally but funded centrally  Improving asset base for many utilities but lack of clarity about how to use it  Emerging tendency to view each feeder as a complete asset with risks and health considerations – a more sophisticated and defensible approach to worst performing feeders  Struggles to prioritize new technology versus asset health spending 21
  • 22. DNV GL © 2014 Including Smart Grid in Asset Management Business Case  Asset management principals applied to Smart Grid – Across replacement, system expansion, technology projects – Disciplined approach that avoids generalizations and builds cost and benefits from specific assets and circuits/lines – Agreed metrics  More regulatory scrutiny – Defensible spending plan – Environmental emphasis – How to transition to grid of future (e.g. accommodate distributed generation) 22
  • 23. DNV GL © 2014 Including Smart Grid in Asset Management – Optimal Spend  Asset management principals applied to Smart Grid  An approach that – navigates the changing environments impacting the electrical system – optimizes spend by applying proven, new and emerging options to meet system and equipment performance objectives. Technology Investment Planning 23 10/6/2015
  • 24. DNV GL © 2014 Including Smart Grid in Asset Management - Optimal Spend  Replacements, refurbishment or new technology implementations should be prioritized to achieve corporate goals (reliability, safety, financial performance, etc.)  Prioritized list of spending across and within projects.  Understand the relationship between dollar spend and benefit. 24
  • 25. DNV GL © 2014 Growing Issues with Variability of Renewable Resources/DER Renewables are becoming game changers 25 Decentralised renewable power generation sources are changing the utility model Renewable technology has relied on government incentives and policy mechanisms to date, but the price curves are coming down Lower Production Cost + Increased Efficiency = Growing Market
  • 26. DNV GL © 2014 Growing Issues with Variability of Renewable Resources/DER Renewables are becoming game changers Implications  Different operational approaches and equipment to handle variability  Different asset life both positive and negative due to solar energy concentration increasing  Distribution planning will require dynamic models instead of steady state  Independent laboratory testing will likely be required to determine the impact on traditional assets and new assets developed for mitigation to find what models miss 26
  • 27. DNV GL © 2014 Including Smart Grid in Asset Management  Using historical near real time information from AMI, SCADA, Distribution Automation, etc. to create a planning sandbox for consideration of new technology investments and capacity additions.  Using information from AMI, SCADA, Distribution Automation, etc. in rapid load flow models to identify operational issues and opportunities to optimize dynamically – Reduce system losses through VAR control – Reduce system losses through dynamic circuit reconfiguration – Reduce demand through voltage control – Implement short term system oriented 30 second demand response to deal with variability of distributed resources – Self healing – Use near real time information to identify asset management needs and reprioritize spending 27
  • 28. DNV GL © 2014 Discussion - How Can DNV GL (KEMA) Help Utilities?  Traditional Asset Management?  Including asset management perspectives in Smart Grid business case?  Distribution planning with increasing levels of distributed resources such as solar?  Using Smart Grid data for asset management?  Asset database or asset management IT platform?  Independent certification of equipment performance to industry standards (IEEE, IEC, ANSI)  Others? 28
  • 29. DNV GL © 2014 SAFER, SMARTER, GREENER www.dnvgl.com Asset Management Before and After the Equipment Purchase 29 Larry Dickerman Larry.dickerman@dnvgl.com 919-931-9068

Notas del editor

  1. This graph shows the initial passes and failures for transformers ≥ 25 MVA at DNV KEMA since 1996
  2. This graph shows the failure rates for various cable components among all the cables tested by DNV KEMA between 1993 and 2008. The high failure rates show the importance of cable testing.