1. Arc
Pers
Full
Gend
Mari
Natio
E-ma
Cell
Edu
Com
Lan
Exp
chitect/D
sonal Informa
name
der
ital Status
onality
ail Address
phone
ucation:
B.sc Arch
graduatio
PMP Pre
PSP Prep
mputer Skills:
Revit
AutoCAD
Internet
Adobe Ph
Microsof
Microsof
Microsof
Microsof
O/S: Win
guages:
Arabic
English
French
Hebrew
erience:
Current Jo
Proje
Tasks inclu
- P
b
- F
a
- P
- F
- P
- P
it
m
C
Dalia Mah
ation:
: Da
: Fem
: Sin
: Egy
: frie
: 002
hitecture Dep
on project. (Al
eparation Cour
paration Cours
:
D (2D)
hotoshop
ft office word
ft office excel
ft office acces
ft office powe
ndows (1998,M
(Exce
(Very
(Fair)
(good
Saudi Bin
ob Title:
ect Manager
ude but not li
Plan, Organize
be delivered w
Follow up with
accordance of
Provide Techn
Follow up with
Preparing and
Plan, Organize
tems in order
meeting.
Curriculu
hmoud Ro
lia Mahmoud
male
ngle
yptian
endleb_21@ya
2 0122 3320 7
artment, Facu
lexandria Uni
rse on Decemb
se on Septemb
s
er point
Me,Xp and 7)
ellent)
y good)
)
d)
n Laden G
Assistant/Ch
imited to the
e, and Monitor
within agreed t
h Designer, ID
site needs.
nical Architect
h consultant to
follow up sho
e & monitor th
to proceed an
um Vitae
oushdy
d Roushdy Ahm
ahoo.com
731
ulty of fine art
iversity).
mber 2014.
ber 2015.
(goo
(Exc
(Exc
(goo
(Exc
(Exc
(goo
(goo
)
Group (SBG
hef Coordinat
following :
r the assigned
time, quality,
D Designer, su
tural solutions
o get shop dra
op drawings sc
he meetings w
nd avoid any d
e
med
ts June 2004, w
od)
cellent)
cellent)
od)
cellent)
cellent)
od)
od)
G) Cairo O
tor and deput
d project to en
specification a
ub-contractors
s.
awings approv
chedule.
when need to s
delay and prep
with Grade "v
Office
ty of Projects
sure that the p
and cost.
s and Consulta
val as per site p
olve problems
paring the min
very good" in
s manager
project will
ant in
priorities.
ms or pending
nuets of
2. 2
3
- P
r
- R
- R
fo
- C
- M
is
- P
- R
- P
1. Nov. 201
Project D
T
than US$
614.800
mosque a
can acco
800.000
minarets
zone surr
area with
security t
2. Jul. 2013
Project D
Manafia
with 12
housing
conventio
The proj
with app
60.000 m
Ma
Clie
Con
VT
3. Jul. 2009
Area
Project D
Mosque’
covers 40
comprise
around th
for air co
than 80 b
around th
Prepare propos
equirement.
Review the arc
Review/comm
for monthly/m
Check random
Making all doc
ssuance dates
Project’s serve
Review contra
Prepare month
13 till date:
Project: Mad
Mosque)
Description:
The expansion
$ 6billion). Th
m² (1060*58
and plazas wi
ommodate 1
worshippers
in addition t
rounding the m
h greater room
to surround th
3 till date:
Project: Ku
Description:
The Abraj
area in Centra
towers accom
a bus station,
on center and
ect is expecte
proximately 3
m² and total bu
ain Contractor
ent : Sau
nsultant
TS Contractor
9 till date:
Project: Thi
a (King Abdu
Description:
The large
s capacity to
00.00 square
e these parts:
he mosque, in
onditioning, e
billion SR. Th
he Holy Ka’ab
sals for consu
chitectural RF
ment on Consul
management re
mly that all RFI
cuments log fo
as per site ne
er update.
act via Sub-con
hly invoices &
dina Haram E
) – Saudia Ara
n project is se
he mosque bui
80 meters) wh
ill be 1.020,50
million wors
in the plaza
to smaller min
mosque will tr
m for residen
he new ring ro
dai Towers P
j Kudai is a
al Makkah an
mmodating se
, a shopping m
car parks.
ed to be comp
billion SR w
uilt-up area of
: Saudi Bin L
udi Arabian go
: Dar Al Han
: KONE
ird Saudi Exp
ul Aziz Projec
st expansion
more than 2.5
meters in the
construction
ncluding walkw
electricity and
he project als
ba) and provid
ultant approval
FI's to designe
ultant/Contract
eporting.
I’s responses
for each trade
eeds.
ntractors, Mai
& Payment cert
Expansion (M
rabia
et to cost 25
ilding will spr
hile the comb
00 m² (1300*
shippers insid
a. The mosq
narets at four
triple in size c
nces, shopping
oad.
Project in Ma
mixed-use d
nd consists of
everal elemen
mall, restaura
pleted by the
with total site
f around 1.6 m
Laden Group
overnment - C
ndasah.
pansion of H
ct) – Saudia A
of the Gran
5 million wor
e northwest an
of a new bui
ways, tunnels
d drinking wa
so includes ex
ding air –cond
l to achieve si
r and receivin
tors reports to
were impleme
& preparing s
in contractor a
tificates.
Madina’s Hol
billion SAR
rawl over an a
bined space o
*785 meters) w
de the mosqu
que will have
r sides. The c
compared to p
g areas, utilit
akkah – Saudi
evelopment l
a large podiu
nts such as a
ants and food
fourth quarter
area of appro
million m².
Capital Market
oly Haram –
Arabia.
nd Mosque in
rshippers and
nd northeast o
ilding, expans
s and toilets; a
ter. The new
xpanding the M
ditioning for a
te and owner
ng their respon
ensure timely
ented on shop
status for requ
and Consultan
ly Masjid - an
(more
area of
of the
which
e and
e two
central
resent
ty and
ia Arabia.
ocated at
m topped
a podium
courts, a
r of 2018
oximately
t Authority
Makkah & S
n history, wh
cost 80 billion
of the mosque
sion and deve
and developme
expansion pr
Mataf (The ci
all parts of the
nses.
y completion
p drawings.
uired
nt.
n-Nabawi
Surrounding
hich will inc
n SR. The ne
e. The new pr
elopment of c
ment of service
roject would c
ircumambulat
e Grand Mosqu
rease the
ew project
roject will
courtyards
e facilities
cost more
tion areas
ue.
3. 4
Project c
Har
Har
Ser
Ho
Sec
Cen
Ma
Main Co
Client
Consulta
Designer
4. Sep. 2013
Project D
K
billion).
approxim
Kingdom
The proje
T
o
A
S
fa
A
F
Owner: K
Abdulrah
Managem
Architec
Structura
Lifts/elev
speed mo
5. Oct. 201
Project D
T
Qatari In
package
area.
The proje
C
C
C
C
C
w
C
onsists of the
ram Building.
ram Piazza. (1
rvice Building
spital (500 Be
curity Building
ntral Utility C
ataf Expansion
ntractor :
:
ant : D
r :
3 till date:
Project: The
Description:
Known previou
It will be t
mately SR 75
m Tower will b
Over V
ect constructio
Type: Mixed
observation, re
Architectural S
Structural Sys
façade.
Architectural H
Floor area: 319
Kingdom Hold
hman Hassan
ment: CBRE G
: Adrian D. S
al Design: Tho
vators: 59 (54
ore than 12.5 m
1 till date:
Project: Dev
Description:
The project co
nternal Securit
constitutes a p
Over V
ect constructio
Constructing 1
Constructing 5
Constructing 4
Constructing 1
Constructing a
with its gates.
Constructing th
following:
18000 Toilets)
gs.
eds).
g (4 Plots).
Complex. (CUC
n.
Saudi Bin Lad
Saudi Arabian
Dar Al Handa
Dar Al Handa
e Kingdom T
usly as Mile-H
the centerpie
billion (US4
be 568 feet tal
View:
on duration is
d-use: office
etail.
Style: Super ta
stem: Reinfor
Height: 1001 m
9.000 m² - 530
ding Company
n Sharbatly &
Group.
Smith, Adrian
ornton Tomase
single deck &
meter per seco
velopment of
onsist of cons
ty Forces – Le
part of the ent
View:
on duration is
16 Barracks Bu
5 Headquarter
4 Unit General
1 Unit Force O
an Internal D
he Entire Infra
).
C).
den Group
n government
asah.
asah.
ower (1036 M
(Borj El
High Tower w
ece and first
420 billion) p
ller than Khal
36 months.
e, hotel, res
all Skyscraper
rced concrete
m (3.281ft).
0.000 m²
y, Abraar Hol
& Saudi Binla
Smith + Gord
etti.
& 5 double dec
ond).
f ISF Camp in
Q
structing a 30
ekhwiya, to be
tire ISF Camp
31 months.
uildings with
r Buildings wi
l Stores Build
Offices Buildin
Decorative Bo
astructure wit
t – Ministry of
Meter Height) –
lmamlakaa)
with prelimina
phase of Je
proposed deve
ifa Tower.
sidential, ap
r.
e and steel,
lding Compan
aden Group.
don Gill Archi
ck) by KONE
n Duhail for I
Qatar
6.000 m2 (bu
e erected on a
p developmen
total built up
th total built u
dings with tota
ng with total b
oundary Wall
thin the packa
f Transport
– Jeddah – Sa
ary cost of SR
eddah Econo
elopment kno
artment,
all-glass
ny,
itecture.
(with
nternal Secur
uilt-up area) c
a 220.000 m2
nt, built on a 4
area of 286.97
up area of 9.64
al built up area
built up area 2
(H=2.5m; L=
ge.
audia Arabia
R4.6 billion (U
omic Compan
own as Kingd
rity Force -
camp for the
parcel. SBG
4.090.000 m2
76 m2.
40 m2.
a 8.624 m2.
217 m2.
=1.105.33m)
US$ 1.23
ny’s with
dom City.
4.
P
w
D
e
b
D
C
Contract
Consulta
Designer
Client
Actual V
Job Title
Tasks inclu
-
-
-
-
-
-
-
-
-
-
-
-
-
-
6. Oct. 201
Project D
T
high spe
link the
Rabigh,
national
transport
March 20
many Ha
April 20
Jeddah an
Partners
awarded
King Abd
Contract
Consulta
Client
Preparing the
with the releva
Demolishing/r
elevated wate
boundary.
Dismantling 3
Coordinating w
or : Saudi B
ant : Arab En
r : Foster +
: State of Q
Value: Estimat
e:
Project Coor
ude but not li
Coordinate be
Conducting a
(Str., MEP, P
Organize & a
meeting.
Monitor & co
according to t
Preparing pro
Organizing fo
Reviewing Si
Project’s serv
Making a com
Check shop d
Study shop dr
modifications
Study and mo
modifications
Preparing Req
Preparing the
to update sho
1 till date:
Project: Har
Description:
The project kn
ed inter-city R
Muslim holy
Jeddah and K
network at Je
t in 320 kilom
009. The railw
ajj and Umra
009, $38m wo
nd King Abdu
and Buro Ha
to Saudi Bin
dullah Econom
or : Saudi
ant : Dar A
: Kingdom
Diversion sch
ant Authorities
removal of al
er tanks, pav
water pressur
with Kahraam
Bin Laden Gro
ngineering Bu
+ Partners – B
Qatar – Interna
ed cost 14.000
rdinator/Proj
imited to the
etween consul
all necessary te
Precast ...etc.).
attending coor
ontrol the work
the approved p
oduction shop
or re- issue pro
ite’s Technica
ver update.
mmunication b
drawing qualit
rawings back
s.
odification esp
s.
quest for Info
e letters for con
p drawings w
ramain High S
nown as the "
Rail transport
cities of Med
King Abdul-A
eddah. The ra
meters per hou
way is expecte
h pilgrims, h
orth of desig
ul Aziz Airpo
appold. In Feb
Laden Group
mic City).
Bin Laden Gr
l-Riyadh cons
m of Saudi Ara
heme of all ex
s requirement
ll unnecessary
vements, curb
re towers.
ma, Q-tel and o
oup.
ureau (AEB)
Buro Happold
al Security For
0 million QAR
ject Manager
following :
ltant, site & su
echnical coord
rdination meet
rk progress &
project time s
drawings log
oduction to av
al Queries.
between site a
ty before subm
from consulta
pecially in arc
ormation subm
nfirmation to
with official ref
Speed Rail – S
"Western Rail
t system unde
dina and Mec
Aziz Internati
ail line is plan
ur (200 mph)
ed to carry thr
elping to reli
gn contracts f
ort were award
bruary 2011 t
(Makkah and
roup.
sultants engine
abia – Saudi R
xisting servic
t.
y existing und
bs and sidew
other contracto
- London.
rce (Lekhwiy
R.
r Assistant.
ub-contractors
dination betw
tings then prep
deliverables d
schedule.
& time sched
void delay wit
and consultant
mit it to consu
ant and evalua
chitecture to ev
mission.
Consultant fo
ference.
Saudia Arabi
lway” is a 44
er construction
cca via King
ional Airport.
nned to provid
electric train
ree million pa
eve traffic co
for the statio
ded to a joint
the station co
d Madinah) an
eering and arc
Railways Orga
es as required
derground uti
walks within
ors
ya)
s.
een all departm
pare the minut
dates of all dep
dule for all tra
th main schedu
t to solve site p
ltant.
ate the percent
valuate the pe
or as build cas
ia (HHR)
49.2 kilometer
n in Saudi Ar
Abdullah Eco
It will conn
de a safe and
ns. Constructio
assengers a ye
ongestion on t
ns in Makka
venture betwe
onstruction co
nd Saudi Oger
chitectures.
anization
d and in line
ilities, 2semi
the project
tments
utes of
partments
ades.
dule
problems.
tage of
ercentage of
ses in order
rs (279.1 mi)
Arabia. It will
onomic City,
nect with the
comfortable
on started in
ear, including
the roads. In
ah, Madinah,
een Foster &
ontracts were
r (Jeddah and
5. Designer
Actual V
7. Feb. 201
Project
organ
has fi
Prime
makin
devel
regula
tower
larges
projec
follow
of ste
was e
Main Co
Client
Consulta
Project M
8. May 201
Project D
Pro
holy city
invest the
Islamic p
project w
approxim
developm
An
the Grand
days to th
mega dev
Wh
plazas fo
and a car
r : Foster + P
Value : Establi
Over V
Type:
Daily r
Opera
o
o
Techn
o
o
o
o
1 till Novemb
Project: Cap
Description:
The Capital
nization respon
inancial, legal
e Minister. Its
ng sure they a
oping the cap
ating the Saud
r in Saudi Ara
st concrete po
ct consists of 4
ws a deep exca
eel reinforcem
executed by th
ntractor
ant
Manager
10 till April 20
Project: Jab
Description:
oject was set u
y of Makkah w
e capital in 40
pilgrims, and a
with a land are
mately 2 millio
ment (1,500 pe
n electronic sig
d Mosque in M
he developme
velopment pro
hen finished, t
or 100,000 wo
r park that can
Partners – Bur
ished cost 6.5b
View:
High Speed R
ridership: 38
ation:
Opened Plan
Operator(s):
nical:
Line Length
No. Of Trac
Operating Sp
Route(s): Be
Rabigh.
ber 2013 :
pital Market A
Market Autho
nsible for regu
and administr
responsibiliti
are followed, o
ital markets in
di Stock Excha
abia currently u
ur recorded in
4 level basem
avation of ove
ents. Working
he Saudi Bin L
: Saudi B
: Saudi A
: Omrani
: Cyril S
011:
bal Omar Dev
up to invest $3
where it is head
0 residential to
a prayer area f
a of 230,000 m
on m2 in inten
ersons/10,000
gn board that
Makkah has b
ent’s opening.
ojects in Makk
the developm
rshippers, ope
n accommodat
ro Happold - L
bn SR
Rail.
8,000
nned: 2014.
: Saudi Railwa
h: 449.2 Kilom
cks: 2.
peed: Up to 3
etween Makka
Authority - R
ority (CMA) i
ulating the Sau
trative indepen
ies include set
operating a co
n Saudi Arabi
ange (Tadawu
under constru
n the history o
ment and tower
er 30m and bo
g under the dir
Laden Group.
Bin Laden Gro
Arabian govern
ia and Associ
Sweett
velopment - M
3.2bn in proje
dquartered. Th
owers to accom
for 200,000 w
m2 and built-u
nded to be a hi
0 m2).
overlooks the
been erected to
The developm
kah.
ment will have
en courtyards
te 10,000 vehi
London.
ay Organizatio
meters (279.1 m
20 km/h (200
ah and Madina
Riyadh – Saud
s the Saudi Ar
udi Arabian c
ndence and rep
tting rules and
ommittee to se
ia. Its role also
ul). The CMA
uction and this
of the Kingdom
r of 76 typical
olstered by mo
rection of Cyr
oup
nment - Capit
ates – KSA an
Makkah – Sau
ects located at
he company w
mmodate 160,
worshippers. T
up floor area o
igh-density
e Central Area
o count down
ment is one of
air conditione
for 120,000 p
icles.
on (with Adif
mi).
mph).
ah via Jeddah
di Arabia (CM
rabian govern
apital markets
ports directly
d regulations,
ttle disputes a
o includes
A tower is the t
s was the singl
m to date. The
l floors. The p
ore than 4,000
ril Sweett, the
tal Market Au
nd HOK
udia Arabia.
the
will
,000
he
of
a of
the
f five
ed
people
f and Renfe).
h and
MA)
nment
s. It
to the
and
tallest
le
e
pour
0 tons
e pour
uthority
6.
Th
towers. T
areas; no
storey pr
towers.
Main Co
Client
Project T
Actual V
Project D
Job Title a
- T
Tasks inclu
- C
A
- R
fl
- P
m
- R
c
- R
d
- P
d
9. March 2
Project D
The
the Mid
headquar
Arabia. I
of the c
Abdulazi
Guard He
The
new build
can accom
10. Jan. 2009
Pr
Project D
T
existing L
meet the
- P
d
(t
- A
c
- C
- T
Main Co
Consulta
he developmen
The area of
orthern area w
rayer building
ntractor : Sau
: Jab
Type : Mi
Value : 2.7
Duration
and Tasks:
Team Leader/
ude but not li
Coordinate all
Arch., Str. & M
Review, Check
flooring).
Prepare a distr
man power bet
Reviewing Site
consultant if n
Review, Check
design materia
Prepare and co
doors schedule
009 till Nov.
Project: Kin
Description:
first public un
ddle East re
rters is in the
It has two othe
campuses are
iz Medical cit
ealth Affairs.
architectural d
dings with the
mmodate up t
9 till July 201
roject: The N
Description:
This project is
Leopold Seda
demand in m
Possibility of b
designed for th
third-generati
An initial capa
could be exten
Capacity of 50
Total cost of th
ntractor: Saud
ant : Stud
nt consists of
the developm
hich includes
g and southe
udi Bin Laden
bal Omar Dev
xed Use
7bn USD
From: Q
To:
Project Coor
imited to the
disciplines sh
MEP drawings
k & Coordinat
ribution plan a
tween projects
e’s Technical
eed.
k & Coordinat
al.
oordinate the F
e and any othe
2009:
g Saud Bin A
niversity in the
egion special
main campus
er campuses b
e located ins
ties, and are o
design of Jedd
e existing com
to 4000 studen
11:
New Internati
s about the bu
ar Senghor air
id-term and lo
building two 4
he existing and
on planes).
acity of 3 milli
nded by modul
0.000 aircraft m
his project is o
di Bin Laden G
di Internationa
f 39 commerc
ment has been
fourteen 6-st
ern area will
n Group and S
velopment Co
Q3 2008 Actu
Q3 2011 Act
rdinator in Ar
following :
hop drawings
s.
ate the interior
according to w
s based on eac
Queries, subm
ate the Door sc
Fire Rated and
er Architectur
Abdul Aziz U
e Kingdom of
lized in hea
s in Riyadh, th
both in Jeddah
side the par
overseen by t
dah Campus h
mplex of KAM
nts.
ional Airport
uilding of a n
rport of Daka
ong-term air tr
4.000 m X 60
d future high-
ion passenger
les by 2020.
movements pe
over (260 mill
Group and Da
al.
cial and resid
n divided into
orey building
includes the
Saudi Oger Ltd
.
ual
tual
rchitecture De
to avoid any c
r shop drawing
work flow in o
ch priority.
mit & organiz
chedule & Do
d Non Fire Ra
e elements.
niversity - (J
f Saudi Arabia
alth sciences
he capital of S
h and Al-Ahsa
rameters of
the Saudi Nat
has integrated
MC. The camp
t – Blaise Dia
new internatio
ar-Yoff; this ne
raffic.
m runways
-capacity aircr
rs per year, wh
er year by 202
lion Euros).
ar Al-Handasa
dential
o two
s, a 6-
other
d.
epartment.
contradiction b
gs (false ceilin
order to re-dist
e meetings wi
or details as p
ated for steel a
Jeddah Site) -
a and
. Its
Saudi
a. All
King
ional
the
us
agne – Dakar
nal airport, to
ew airport wi
raft
hich
20.
ah.
between
ng and
tribute the
ith
per approved
and wooden
Saudia Arabi
– Senegal
o replace the
ill be built to
ia.
7. Client
Interior D
11. Feb. 200
Pro
Project Desc
The K
(KAUST) is b
graduate-leve
million squar
Owner
Designer
Contracto
Job Title
-
-
Tasks in
- Review
as Curt
- Conduc
drawing
- Preparin
- Preparin
- Review
12. June 200
Arabia (A
Project Desc
A proje
Makkah, righ
6 residential t
a new record
below ground
Owner &
Consulta
Skin Con
Pre-cast &
Interior D
: Rep
Design : Aree
08 till July 20
oject: The Ki
cription:
King Abdullah
being built in
el research uni
e meters on th
: Sau
r : HE
or : Sau
Over V
Severa
Yacht
Service
Galleri
Public
Theatr
Bank.
Waste
e:
Team Lead
Junior (To
nclude but not
wing the shop d
tain walls, Gr
cting all neces
gs, then submi
ng the interior
ng the Reques
wing Site’s Tec
07 till Jan. 20
Project: Dev
Abraj El-Bait)
cription:
ect of a total a
ht in front of th
towers over 3
of 564 m high
d, serving as re
& Main Contra
ant
nsultant
&GRC Contra
Designer
public of Seneg
en Design Ser
009:
ing Abdullah
Sa
h University o
Saudi Arabia
iversity campu
he Red Sea.
udi Aramco.
ELLMUTH ,O
udi Bin Laden
View:
al Types of Re
Club
e Building.
ia.
Library.
e.
Transfer Stati
der (Tower K
ower C & D)
t limited to th
drawings from
anite & others
ssary coordina
itting them for
r shop drawin
st for Informa
chnical Querie
09 then May
velopment of K
area (5 millio
he Holly Hara
0 floors high,
h, all based on
etail and servi
actor : Saudi B
actor
gal.
rvices.
University of
audia Arabia
of Science and
as an internat
us, located on
OBATA+ KAS
n Group
esidential Buil
ion.
K, F & H/Borj
he following:
m skin subcon
s.
ation among a
r consultant ap
ngs (false ceilin
ation and discu
es.
y 2010 till Apr
King Abdul-A
on m2), and a
am Mosque, K
and one towe
n a 10 floors p
ice areas.
Bin Laden Gro
: Dar Al Han
: CDC
: Premco-Jed
: Richmond I
f Science and
(KAUST)
d Technology
tional,
n more than 36
SSABAUM ,L
ldings.
Elsaa) in Arc
tractors conce
ll skin activiti
pproval.
ng and floorin
uss it with Des
r. 2011:
Aziz Endowm
total cost of
Kingdom of S
er serves as a
podium above
oup.
dasah.
ddah.
International
d Technology
6
LP
chitecture Dep
erning Precast
ies including s
ng).
signer/Consul
ment for Makk
over (7 Milli
audi Arabia, c
Seven stars ho
e ground level
– Jeddah –
partment.
t unit, such
structural and
ltant.
kah, Saudi
iard S.R.), in
consisting of
otel reaching
l and 4 floors
MEP shop
8. 13. December 2006 – May 2007
Making a private work & study Hebrew Language .
14. June 2004 – November 2006
Working at Bibliotheca Alexandrina, Alexandria and Mediterranean research Center.
Job Title:
Junior Architect.
Tasks include but not limited to the following:
- Survey streets map (stage 1 and stage 2).
- Filling in research data on excel sheets &AutoCAD map.
- Translating and writing.
- Making search for data in heritage unit.
- Making Library services.
- Scanning of documents (old materials).
- Checking streets map survey (stage 1 and stage 2).
- Researching & inserting data on aerial photograph.
- Working in land division consecution in Alexandria then inserts the data on work sheet
& maps.
- Helping the external relation team in some of Bibliotheca Alexandrina conferences &
seminar.
Hobbies and Interests:
Reading, traveling, current affairs, fashion design, music (listening and playing keyboard), sports,
acting, driving, learning new things and embarking upon new experiences.
Other Qualifications:
Fast learner.
Able to work under high pressure.
Well discussion and negotiation.
Solving team member’s internal & external problems.
Able to work with a team work by respect and good relation.
Gained excellent communication and leadership skills throughout my work experience.
Career objectives:
I aim to be a highly successful, professional with a great level of productivity and to complete
tasks in organized manner and high speed.
References:
All certificates and references are able upon request.
Availability:
Able to start work after a month from announcement.