REIT Center @ Schack Institute of Real Estate
	
	
July 27, 2016
COULD MODULAR CONSTRUCTION INFLUENCE HOUSING AFFORDABILITY?
Modular construction holds a promise of affordable housing but compelling economics thus
far have been elusive.
By: Denham Apperley & Scott Robinson
Developers have attempted to perfect the process of modular construction in the hope of improving
construction efficiencies in high-rise developments. Many believe that this will result in cost savings,
improved scheduling, the provision of a better quality product at an affordable price, as well as less waste.
However, modular construction of multifamily residential (for-rent and for-sale), as well as commercial
office buildings, remains a complex proposition with many process-specific benefits and challenges. In
particular, many efficiency advantages as a result of shifting the bulk of the construction process onto an off-
site production line are eroded when the costs of shipping built product into dense cities such as New York
are factored-in. Indeed, many manufacturing facilities have been relocated further away in suburban
manufacturing markets, as ever-increasing rental rates and other expenses price-out industries requiring
large factory spaces.
The following article provides an overview of the concept of modular construction, its current
implementation to date (particularly in New York City), as well as both its qualitative benefits and
drawbacks.
Overview: Modular Construction in New York City
New York City’s first modular building was The Stack, completed in 2014 in the Northern Manhattan
neighborhood of Inwood ‘Utilizing an off-site construction method and an innovative design strategy, The
Stack has managed to streamline the entire development process and create a high-quality product with a
small carbon footprint, pioneering the future of construction in New York City’.1
The modules were
manufactured by Deluxe Building Systems, a company based out of Pennsylvania. These apartments
comprise a combination of one, two and three-bedroomed units over seven stories. In contrast, the city’s
second modular building is also its first micro unit building. Carmel Place in Kips Bay, a 55-microunit
building, was constructed with modules manufactured by Capsys Corp. It rises nine floors, costing between
$300 and $400 per square foot.
The primary difficulty with modular construction has been attaining the necessary height within cities such
as New York, subject to high land values;2
the engineering issues arise out of having to account for wind
shear and seismic forces. Forest City Ratner Companies is of the belief that it has tackled this height issue.3
In partnership with Greenland USA, it is developing the Pacific Park project (formerly Atlantic Yards) in
Brooklyn. Of note, the first building of this project to be delivered – B2 – will be the world’s largest and
tallest prefabricated modular building upon its slated completion in February 2017. It will rise 32 floors and
consist of 930 modules manufactured at FC Modular, Forest City’s modular construction company located
in the Brooklyn Navy Yards.4
This is also the only module manufacturer in New York City. These modular
units are delivered to the site almost fully complete, with most fixtures and fittings preinstalled.5
Although
the original intent was to construct all Pacific Park buildings in this way, this idea has been disregarded,
raising questions as to the efficiency benefits of modular construction.
Modular Construction: The Process
On a practical level, modular construction is relatively simple, at lower building heights. A steel brace frame
is erected incrementally, and this provides lateral support for the module-structure, inserted using a crane.
More than sixty percent of the construction work for such modular products takes place in the factory. This
REIT Center @ Schack Institute of Real Estate
	
	
is not a simple process, however: the stacking of rigid modular boxes within a steel frame, which bends and
compresses with height, creates engineering challenges.
Modular construction provides the possibility of improved sustainability, higher quality and lower costs,
world-class architecture and faster delivery. On the other hand, this incremental construction process means
that there is no flexibility for error, the effects of which would multiply as the building rose. Further, it is
difficult to predetermine such a building’s performance upon completion.
The Benefits
Shifting the construction process into a factory environment, as contrasted by typical on-site development,
results in an approximate 20% improvement to return. It is important to note, however, that this is based on
delivering the project more quickly than traditional methods, allowing for the developer to benefit from
additional rental revenue. Indeed, the hard per square foot construction costs are similar to those in
traditional developments. The implementation of a production line means that scheduling and costing are
both more efficient and more accurate, given repeated processes and material usage. There is also less waste,
lower labor costs and significantly reduced risk.
On site, only minor installations are needed to fully install the modules. There are an estimated 48% fewer
truck deliveries, and 70% fewer site workers needed compared to traditional development. Manufacturing
these modules indoors, where risk is more easily managed, drastically improves safety, thus theoretically
reducing insurance and delay costs. Further, these buildings can have traditional exterior facades, and thus
their design is in no way affected by their construction method.
In the case of building B2, the delivery time was shortened by almost 50% from 27 months to 14 months.6
Indeed, efficient, repeatable processes and highly skilled union labor enable production of between 600,000
and 900,000 square feet per year, depending on the nature of the project.’7
In general, this ‘all translates to a
cost-controlled, ultra-high quality product that beats conventional construction to market by months.’8
The Drawbacks
Modular development creates a number of atypical issues relating to labor, delivery costs, building codes,
and warehouse space.
Creating a manufactured production process introduces union factory labor into the equation, who typically
earn ~25% less than the average onsite union construction worker.9
Creating a manufactured production
process within a city environment will subject the operation to high operating costs, causing a migration of
factories outside of urban cores. So while the production process may reduce construction costs, the
aforementioned higher delivery costs tend to off-set a portion of these savings.
Additionally, shifting the development of buildings onto a production line creates issues relating to building
codes. Most Departments of Buildings have been of the view that offsite prefabrication does not require
licensed plumbing and fire suppression work; these certified contractors are only required for the installation
of their respective systems on-site, which must be performed in line with the city’s construction codes.
Manufacturing in a town different from where the building will reside means that manufacturers should have
a familiarity with the building codes and regulations facing the project’s final location.10
To mitigate this
risk, a third party consultant acts as intermediary between the local Department of Buildings and the
production facility.
Finally, the physical plat required to build this product is quite large. The large amount of space needed for
modular factories, typically in the range of between 180,000 and 200,000 square feet, is prohibitively
expensive in cities like New York. Indeed, Susan Hayes, president of FC Modular, believes that the largest
hurdle of the growth of modular construction in New York is “a dearth of available, affordable space, which
is necessary for a modular construction factory.”11
REIT Center @ Schack Institute of Real Estate
	
	
Although many argue that the portability of modular construction implies that units can be manufactured
elsewhere and delivered to their destination, oversight issues result in the fact that architects and engineers
are unable to monitor the construction frequently enough. This can lead to large potential delays if any
construction problems are not identified early. Moving production further away also makes the process more
susceptible to time delays, transportation expenses, and on-site logistical issues of having to store the
modules and manage their placement.
Conclusion
As real estate developers seek alternative, innovative means to reduce construction costs and speed time-to-
market, modular construction holds much appeal. However, this construction technique is still in its infancy
and therefore difficult to properly evaluate, especially in cities with complex zoning and regulation
requirements. Nevertheless, many industry participants remain positive about modular construction, so the
completion of Forest City’s B2 project will hopefully provide better physical evidence as to the success of
such a business model.
About the authors:
Scott Robinson is a managing director at Oberon Securities, a FINRA-regulated broker-dealer, and has held
senior positions at Citigroup and Standard & Poor’s. He is also an associate clinical professor at the NYU
Schack Institute of Real Estate and Director of The REIT Center at NYU. Mr. Robinson earned an M.S. in
Real Estate (Finance) from NYU and has a degree in economics from the University of California,
Riverside. He can be contacted at scott.robinson@nyu.edu
Denham Apperley recently graduated from the NYU Schack Institute of Real Estate with an M.S. in Real
Estate Development. His interests lie in improving process efficiency in the development of real estate
within dense urban environments. Mr. Apperley also has a degree in economics with law from the
University of Cape Town. He can be contacted at Denham.apperley@nyu.edu
About the NYU Schack Institute of Real Estate and the REIT Center
Established in 1998, the REIT Center provides a forum for the study and analysis of publicly-traded REITs
and other real estate operating companies and the related corporatization, securitization, and consolidation
trends that are transforming the real estate industry nationally and globally.
The NYU School of Professional Studies Schack Institute of Real Estate (sps.nyu.edu/schack) was founded
in 1967 at the initiative of prominent real estate leaders, who encouraged NYU to establish an academic
center that provided an educational foundation for professionals within their industry. Today, the Schack
Institute of Real Estate offers graduate degrees, notably the MS in Real Estate, the MS in Construction
Management, and the MS in Real Estate Development, as well as an undergraduate degree, the BS in Real
Estate.
Endnotes
																																																								
1
 Streeteasy. 2016. ‘Building: The Stack’. [Online]. Available at: http://streeteasy.com/building/the‐stack (accessed 
April 17, 2016). 
2
 Modular construction, if its manufacturing process is perfected, means that developers operating in high land value 
areas may be able to improve their basis if they can reduce construction costs.   
3
 Daily News. 2015. ‘Forest City Ratner’s modular Brooklyn tower is back on track’. [Online]. Available at: 
http://www.nydailynews.com/life‐style/real‐estate/forest‐city‐ratner‐modular‐brooklyn‐tower‐back‐track‐article‐
1.2076674 (accessed April 10, 2016). Bruce Ratner also believes that his firm has managed to crack the code of this 
type of construction, thus possessing the ability to provide higher quality units at a more affordable price point.  
REIT Center @ Schack Institute of Real Estate
	
	
																																																																																																																																																																																							
4
 These modular units are typically 14 feet wide by 35 feet long, and 10 feet tall.  
5
 These include floors, walls, electric lines, plumbing, kitchens, toilets, exterior facades, and even smaller details such 
as towel racks.	
6
 This is not including the delays resulting from legal proceedings and other issues.  
7
 FCModular. 2016. ‘Your Vision: Faster, Safer, Smarter’. [Online]. Available at: http://fcmodular.com (accessed April 
9, 2016).  
8
 FCModular. 2016. ‘Innovation Done’. [Online]. Available at: http://fcmodular.com (accessed April 10, 2016). 
9
 Of course, the availability of factory work is more stable given fewer temperamental on‐site issues. Thus, workers 
can more adequately account for the incomes they will make during any given period. Further, their income levels are 
smoother.  
10
 As expressed by Patricia Lancaster in The Real Deal. 2015. ‘Modular imports edge into nascent Brooklyn industry’. 
[Online]. Available at: http://therealdeal.com/issues_articles/modular‐imports‐edge‐into‐nascent‐brooklyn‐industry/ 
(accessed April 11, 2016). 
11
 NY Curbed. 2016. ‘Modular Construction in New York City, Once the Future, Is Fading’. [Online]. Available at: 
http://ny.curbed.com/2016/1/15/10849436/modular‐construction‐in‐new‐york‐city‐once‐the‐future‐is‐fading 
(accessed April 10, 2016).

Más contenido relacionado

La actualidad más candente

Dawn of the Building Performance Era WP
Dawn of the Building Performance Era WPDawn of the Building Performance Era WP
Dawn of the Building Performance Era WPErin Grossi
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwaresRuchy Lakhani
 
Human resource management for const management
Human resource management for const managementHuman resource management for const management
Human resource management for const managementMd Manzoor Akhtar
 
2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdc2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdcAvi Grigorescu
 
CAD and BIM Outsourcing Services
CAD and BIM Outsourcing ServicesCAD and BIM Outsourcing Services
CAD and BIM Outsourcing Servicestheaecassociates1
 
Bim presentation km 21-10-2011
Bim presentation km 21-10-2011Bim presentation km 21-10-2011
Bim presentation km 21-10-2011KarinSundberg
 
BIM, Adoption, Implementation and Future
BIM, Adoption, Implementation and FutureBIM, Adoption, Implementation and Future
BIM, Adoption, Implementation and FutureIJERDJOURNAL
 
The Corner of Mu sic in Digital Glass and Ark Mode
The Corner of Mu sic in Digital Glass and Ark ModeThe Corner of Mu sic in Digital Glass and Ark Mode
The Corner of Mu sic in Digital Glass and Ark ModeBrij Consulting, LLC
 
(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 Sigma(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 SigmaDimitrios Kordas
 
The Glass House V3 The Economics of Glass in Ark Mode
The Glass House V3 The Economics of Glass in Ark ModeThe Glass House V3 The Economics of Glass in Ark Mode
The Glass House V3 The Economics of Glass in Ark ModeBrij Consulting, LLC
 
Handout Practical bim collaboration in a ppp
Handout Practical bim collaboration in a pppHandout Practical bim collaboration in a ppp
Handout Practical bim collaboration in a pppVivi Nyehuus
 
BIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project DeliveryBIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project DeliveryAWC|WEST
 
Project Management Experience - Anthony D. Braunscheidel
Project Management Experience - Anthony D. BraunscheidelProject Management Experience - Anthony D. Braunscheidel
Project Management Experience - Anthony D. BraunscheidelAnthony Braunscheidel
 
White Paper: The Value Of Bim For Lifecycle Management In Critical Facilities...
White Paper: The Value Of Bim For Lifecycle Management In Critical Facilities...White Paper: The Value Of Bim For Lifecycle Management In Critical Facilities...
White Paper: The Value Of Bim For Lifecycle Management In Critical Facilities...AndyFuhrman
 
The Glass House V2 Matrix Expansion
The Glass House V2 Matrix ExpansionThe Glass House V2 Matrix Expansion
The Glass House V2 Matrix ExpansionBrij Consulting, LLC
 

La actualidad más candente (20)

Dawn of the Building Performance Era WP
Dawn of the Building Performance Era WPDawn of the Building Performance Era WP
Dawn of the Building Performance Era WP
 
Quy trình BIM
Quy trình BIMQuy trình BIM
Quy trình BIM
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwares
 
Human resource management for const management
Human resource management for const managementHuman resource management for const management
Human resource management for const management
 
2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdc2010 uci douglas hospital team platinum award by bdc
2010 uci douglas hospital team platinum award by bdc
 
CAD and BIM Outsourcing Services
CAD and BIM Outsourcing ServicesCAD and BIM Outsourcing Services
CAD and BIM Outsourcing Services
 
Bim presentation km 21-10-2011
Bim presentation km 21-10-2011Bim presentation km 21-10-2011
Bim presentation km 21-10-2011
 
BIM Report 3
BIM Report 3BIM Report 3
BIM Report 3
 
BIM, Adoption, Implementation and Future
BIM, Adoption, Implementation and FutureBIM, Adoption, Implementation and Future
BIM, Adoption, Implementation and Future
 
The Corner of Mu sic in Digital Glass and Ark Mode
The Corner of Mu sic in Digital Glass and Ark ModeThe Corner of Mu sic in Digital Glass and Ark Mode
The Corner of Mu sic in Digital Glass and Ark Mode
 
(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 Sigma(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 Sigma
 
Permanent alternative Construction
Permanent alternative ConstructionPermanent alternative Construction
Permanent alternative Construction
 
The Glass House V3 The Economics of Glass in Ark Mode
The Glass House V3 The Economics of Glass in Ark ModeThe Glass House V3 The Economics of Glass in Ark Mode
The Glass House V3 The Economics of Glass in Ark Mode
 
Handout Practical bim collaboration in a ppp
Handout Practical bim collaboration in a pppHandout Practical bim collaboration in a ppp
Handout Practical bim collaboration in a ppp
 
BIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project DeliveryBIM: The Promise of an Integrated Approach to Project Delivery
BIM: The Promise of an Integrated Approach to Project Delivery
 
Zak World of Façades South East Asia - Singapore 2017 edition
Zak World of Façades South East Asia - Singapore 2017 editionZak World of Façades South East Asia - Singapore 2017 edition
Zak World of Façades South East Asia - Singapore 2017 edition
 
Project Management Experience - Anthony D. Braunscheidel
Project Management Experience - Anthony D. BraunscheidelProject Management Experience - Anthony D. Braunscheidel
Project Management Experience - Anthony D. Braunscheidel
 
White Paper: The Value Of Bim For Lifecycle Management In Critical Facilities...
White Paper: The Value Of Bim For Lifecycle Management In Critical Facilities...White Paper: The Value Of Bim For Lifecycle Management In Critical Facilities...
White Paper: The Value Of Bim For Lifecycle Management In Critical Facilities...
 
Zak World of Façades Australia - Sydney 2018 edition
Zak World of Façades Australia - Sydney 2018 editionZak World of Façades Australia - Sydney 2018 edition
Zak World of Façades Australia - Sydney 2018 edition
 
The Glass House V2 Matrix Expansion
The Glass House V2 Matrix ExpansionThe Glass House V2 Matrix Expansion
The Glass House V2 Matrix Expansion
 

Destacado

Lean Data Quality Management
Lean Data Quality ManagementLean Data Quality Management
Lean Data Quality Managementdatatovalue
 
SolidWorks Secondary Development with Visual Basic 6 for an Automated Modular...
SolidWorks Secondary Development with Visual Basic 6 for an Automated Modular...SolidWorks Secondary Development with Visual Basic 6 for an Automated Modular...
SolidWorks Secondary Development with Visual Basic 6 for an Automated Modular...CSCJournals
 
041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)Dr Fereidoun Dejahang
 
The assure model
The assure modelThe assure model
The assure modelMarie Booth
 
Revised Corporate Power Point 2010
Revised Corporate Power Point 2010Revised Corporate Power Point 2010
Revised Corporate Power Point 2010devinreffitt
 
ASQ Presentation Lean Mgt Reviews
ASQ Presentation Lean Mgt ReviewsASQ Presentation Lean Mgt Reviews
ASQ Presentation Lean Mgt ReviewsRich Laguna
 
Nick Flanagan - Advanced Modular Construction, an opportunity for sa
Nick Flanagan - Advanced Modular Construction, an opportunity for saNick Flanagan - Advanced Modular Construction, an opportunity for sa
Nick Flanagan - Advanced Modular Construction, an opportunity for saMelanie Innes
 
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPSDr Fereidoun Dejahang
 
Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Jayson Narito
 
Lean Construction - Introduction
Lean Construction - IntroductionLean Construction - Introduction
Lean Construction - Introductiontabdelhamid
 
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...AELC
 
Lean manufacturing concepts and tools and quality management1
Lean manufacturing concepts and tools and quality management1Lean manufacturing concepts and tools and quality management1
Lean manufacturing concepts and tools and quality management1hgalinova
 
Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...Eng Marzouk
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation pptbwu.nl
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In ConstructionIsidro Sid Calayag
 

Destacado (18)

039 Integrating Constructability
039 Integrating Constructability039 Integrating Constructability
039 Integrating Constructability
 
Lean Data Quality Management
Lean Data Quality ManagementLean Data Quality Management
Lean Data Quality Management
 
Pre 100227 R (Lean And Agile)
Pre 100227 R (Lean And Agile)Pre 100227 R (Lean And Agile)
Pre 100227 R (Lean And Agile)
 
SolidWorks Secondary Development with Visual Basic 6 for an Automated Modular...
SolidWorks Secondary Development with Visual Basic 6 for an Automated Modular...SolidWorks Secondary Development with Visual Basic 6 for an Automated Modular...
SolidWorks Secondary Development with Visual Basic 6 for an Automated Modular...
 
Supply Chain Modularity
Supply Chain ModularitySupply Chain Modularity
Supply Chain Modularity
 
041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)041 Integrating Lean Construction (PART 2)
041 Integrating Lean Construction (PART 2)
 
The assure model
The assure modelThe assure model
The assure model
 
Revised Corporate Power Point 2010
Revised Corporate Power Point 2010Revised Corporate Power Point 2010
Revised Corporate Power Point 2010
 
ASQ Presentation Lean Mgt Reviews
ASQ Presentation Lean Mgt ReviewsASQ Presentation Lean Mgt Reviews
ASQ Presentation Lean Mgt Reviews
 
Nick Flanagan - Advanced Modular Construction, an opportunity for sa
Nick Flanagan - Advanced Modular Construction, an opportunity for saNick Flanagan - Advanced Modular Construction, an opportunity for sa
Nick Flanagan - Advanced Modular Construction, an opportunity for sa
 
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
059 LEAN CONSTRUCTION SUPPLY CHAIN-SCM &LPS
 
Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)
 
Lean Construction - Introduction
Lean Construction - IntroductionLean Construction - Introduction
Lean Construction - Introduction
 
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...1.	STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
1. STUDY ON QUALITY ASSURANCE AND QUALITY CONTROL MANAGEMENT SYSTEM IN 20 STO...
 
Lean manufacturing concepts and tools and quality management1
Lean manufacturing concepts and tools and quality management1Lean manufacturing concepts and tools and quality management1
Lean manufacturing concepts and tools and quality management1
 
Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...Cutting costs, improving quality, & speeding delivery through continous impro...
Cutting costs, improving quality, & speeding delivery through continous impro...
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In Construction
 

Similar a Could modular construction influence housing affordability 7.27.16

Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxFabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxlmelaine
 
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxFabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxmecklenburgstrelitzh
 
5 Ways Prefabrication Benefits your Construction Project.pptx
5 Ways Prefabrication Benefits your Construction Project.pptx5 Ways Prefabrication Benefits your Construction Project.pptx
5 Ways Prefabrication Benefits your Construction Project.pptxArpitGautam20
 
Modular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of HousingModular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of HousingLoay Ghazaleh MBA, BSc Civil Eng.
 
Modular Construction: Trends in the U.S.
Modular Construction: Trends in the U.S.Modular Construction: Trends in the U.S.
Modular Construction: Trends in the U.S.M SPACE
 
Fall Accidents Caused By Accidents
Fall Accidents Caused By AccidentsFall Accidents Caused By Accidents
Fall Accidents Caused By AccidentsAnn Johnson
 
Acsa2008ne zal-cox-pre fab-myth-hype-reality
Acsa2008ne zal-cox-pre fab-myth-hype-realityAcsa2008ne zal-cox-pre fab-myth-hype-reality
Acsa2008ne zal-cox-pre fab-myth-hype-realityDarryl Duffe
 
AEC-CIVIL-DESIGN-WAVE-2-WP-SMEDI-CIVIL-DESIGN-INNOV
AEC-CIVIL-DESIGN-WAVE-2-WP-SMEDI-CIVIL-DESIGN-INNOVAEC-CIVIL-DESIGN-WAVE-2-WP-SMEDI-CIVIL-DESIGN-INNOV
AEC-CIVIL-DESIGN-WAVE-2-WP-SMEDI-CIVIL-DESIGN-INNOVAlban Thomann
 
Article Petroleum Economist Feb 2015
Article Petroleum Economist Feb 2015Article Petroleum Economist Feb 2015
Article Petroleum Economist Feb 2015Eric Janvier
 
RESI modular construction
RESI modular constructionRESI modular construction
RESI modular constructionLilly Aaron
 
Essay On Stage Scheduling
Essay On Stage SchedulingEssay On Stage Scheduling
Essay On Stage SchedulingJessica Lopez
 
Construction economic
Construction economicConstruction economic
Construction economicfauziani
 
Reinforce your working domain with leading-edge BIM training and skills to th...
Reinforce your working domain with leading-edge BIM training and skills to th...Reinforce your working domain with leading-edge BIM training and skills to th...
Reinforce your working domain with leading-edge BIM training and skills to th...nibtedu
 
Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Rob Madill
 
Recent developments in BIM in geotechnics
Recent developments in BIM  in geotechnicsRecent developments in BIM  in geotechnics
Recent developments in BIM in geotechnicsRob Madill
 
6th Modular & Precast Construction event
6th Modular & Precast Construction event6th Modular & Precast Construction event
6th Modular & Precast Construction eventPaco Conde Fernández
 
Off-site and on -site modern method of construction
Off-site and on -site modern method of constructionOff-site and on -site modern method of construction
Off-site and on -site modern method of constructionANNA REBECCA PRASAD
 
Reinforce your working domain with leading-edge BIM training.pdf
Reinforce your working domain with leading-edge BIM training.pdfReinforce your working domain with leading-edge BIM training.pdf
Reinforce your working domain with leading-edge BIM training.pdfnibtedu
 

Similar a Could modular construction influence housing affordability 7.27.16 (20)

Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxFabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
 
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docxFabulous Pre-fabApplying Modular Construction to Multifamily.docx
Fabulous Pre-fabApplying Modular Construction to Multifamily.docx
 
5 Ways Prefabrication Benefits your Construction Project.pptx
5 Ways Prefabrication Benefits your Construction Project.pptx5 Ways Prefabrication Benefits your Construction Project.pptx
5 Ways Prefabrication Benefits your Construction Project.pptx
 
Modular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of HousingModular Construction Solution For Rapid Cost-effective Development Of Housing
Modular Construction Solution For Rapid Cost-effective Development Of Housing
 
Modular Construction: Trends in the U.S.
Modular Construction: Trends in the U.S.Modular Construction: Trends in the U.S.
Modular Construction: Trends in the U.S.
 
Fall Accidents Caused By Accidents
Fall Accidents Caused By AccidentsFall Accidents Caused By Accidents
Fall Accidents Caused By Accidents
 
Acsa2008ne zal-cox-pre fab-myth-hype-reality
Acsa2008ne zal-cox-pre fab-myth-hype-realityAcsa2008ne zal-cox-pre fab-myth-hype-reality
Acsa2008ne zal-cox-pre fab-myth-hype-reality
 
AEC-CIVIL-DESIGN-WAVE-2-WP-SMEDI-CIVIL-DESIGN-INNOV
AEC-CIVIL-DESIGN-WAVE-2-WP-SMEDI-CIVIL-DESIGN-INNOVAEC-CIVIL-DESIGN-WAVE-2-WP-SMEDI-CIVIL-DESIGN-INNOV
AEC-CIVIL-DESIGN-WAVE-2-WP-SMEDI-CIVIL-DESIGN-INNOV
 
Article Petroleum Economist Feb 2015
Article Petroleum Economist Feb 2015Article Petroleum Economist Feb 2015
Article Petroleum Economist Feb 2015
 
Innovation technique in construction
Innovation technique in constructionInnovation technique in construction
Innovation technique in construction
 
RESI modular construction
RESI modular constructionRESI modular construction
RESI modular construction
 
Essay On Stage Scheduling
Essay On Stage SchedulingEssay On Stage Scheduling
Essay On Stage Scheduling
 
Construction economic
Construction economicConstruction economic
Construction economic
 
Reinforce your working domain with leading-edge BIM training and skills to th...
Reinforce your working domain with leading-edge BIM training and skills to th...Reinforce your working domain with leading-edge BIM training and skills to th...
Reinforce your working domain with leading-edge BIM training and skills to th...
 
WE Firm Profile
WE Firm ProfileWE Firm Profile
WE Firm Profile
 
Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics
 
Recent developments in BIM in geotechnics
Recent developments in BIM  in geotechnicsRecent developments in BIM  in geotechnics
Recent developments in BIM in geotechnics
 
6th Modular & Precast Construction event
6th Modular & Precast Construction event6th Modular & Precast Construction event
6th Modular & Precast Construction event
 
Off-site and on -site modern method of construction
Off-site and on -site modern method of constructionOff-site and on -site modern method of construction
Off-site and on -site modern method of construction
 
Reinforce your working domain with leading-edge BIM training.pdf
Reinforce your working domain with leading-edge BIM training.pdfReinforce your working domain with leading-edge BIM training.pdf
Reinforce your working domain with leading-edge BIM training.pdf
 

Último

The Shore16 Floor Plans By MSR Communities
The  Shore16 Floor Plans By MSR CommunitiesThe  Shore16 Floor Plans By MSR Communities
The Shore16 Floor Plans By MSR CommunitiesKranthi Shaik
 
SVN Live 4.15.24 Weekly Property Broadcast
SVN Live 4.15.24 Weekly Property BroadcastSVN Live 4.15.24 Weekly Property Broadcast
SVN Live 4.15.24 Weekly Property BroadcastSVN International Corp.
 
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...Tom Blefko
 
Listing Turkey Green life Istanbul Eyup Catalog
Listing Turkey Green life Istanbul Eyup CatalogListing Turkey Green life Istanbul Eyup Catalog
Listing Turkey Green life Istanbul Eyup CatalogListing Turkey
 
Experion Elements Sector 45 Noida E-Brochure
Experion Elements Sector 45 Noida E-BrochureExperion Elements Sector 45 Noida E-Brochure
Experion Elements Sector 45 Noida E-BrochureRealEstate Info
 
Experion Elements Phase 1 Noida E-Brochure
Experion Elements Phase 1 Noida E-BrochureExperion Elements Phase 1 Noida E-Brochure
Experion Elements Phase 1 Noida E-BrochureRealEstate Info
 
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|AkshayJoshi575980
 
LCAR RE Practice - The Pearson Vue State Exam
LCAR RE Practice - The Pearson Vue State ExamLCAR RE Practice - The Pearson Vue State Exam
LCAR RE Practice - The Pearson Vue State ExamTom Blefko
 
Shapoorji Pallonji Parkwest Sequoia Tower Binnypet, Central Bangalore E - Bro...
Shapoorji Pallonji Parkwest Sequoia Tower Binnypet, Central Bangalore E - Bro...Shapoorji Pallonji Parkwest Sequoia Tower Binnypet, Central Bangalore E - Bro...
Shapoorji Pallonji Parkwest Sequoia Tower Binnypet, Central Bangalore E - Bro...faheemali990101
 
Triaa Housing Lohegaon Pune E-Brochure.pdf
Triaa Housing Lohegaon Pune  E-Brochure.pdfTriaa Housing Lohegaon Pune  E-Brochure.pdf
Triaa Housing Lohegaon Pune E-Brochure.pdfManishSaxena95
 
Managing Uncertainty: Newman George Leech's Real Estate Finance Strategy
Managing Uncertainty: Newman George Leech's Real Estate Finance StrategyManaging Uncertainty: Newman George Leech's Real Estate Finance Strategy
Managing Uncertainty: Newman George Leech's Real Estate Finance StrategyNewman George Leech
 
Mana Dale Kodathi, Sarjapur Road, Bangalore E-Brochure.pdf
Mana Dale Kodathi, Sarjapur Road, Bangalore E-Brochure.pdfMana Dale Kodathi, Sarjapur Road, Bangalore E-Brochure.pdf
Mana Dale Kodathi, Sarjapur Road, Bangalore E-Brochure.pdffaheemali990101
 
Listing Turkey - Viva Perla Maltepe Catalog
Listing Turkey - Viva Perla Maltepe CatalogListing Turkey - Viva Perla Maltepe Catalog
Listing Turkey - Viva Perla Maltepe CatalogListing Turkey
 
Provident Kenworth Rajendra Nagar Hyderabad.pdf
Provident Kenworth Rajendra Nagar Hyderabad.pdfProvident Kenworth Rajendra Nagar Hyderabad.pdf
Provident Kenworth Rajendra Nagar Hyderabad.pdfashiyadav24
 
Honer Richmont Hyderabad E brochure - A Life With A View
Honer Richmont Hyderabad E brochure - A Life With A ViewHoner Richmont Hyderabad E brochure - A Life With A View
Honer Richmont Hyderabad E brochure - A Life With A ViewAhanundefined
 
Tribeca The Ark Voyage NIBM, Pune E-Brochure.pdf
Tribeca The Ark Voyage NIBM, Pune  E-Brochure.pdfTribeca The Ark Voyage NIBM, Pune  E-Brochure.pdf
Tribeca The Ark Voyage NIBM, Pune E-Brochure.pdfManishSaxena95
 
Prestige Sanctuary Nandi Hills Bangalore.pdf
Prestige Sanctuary Nandi Hills Bangalore.pdfPrestige Sanctuary Nandi Hills Bangalore.pdf
Prestige Sanctuary Nandi Hills Bangalore.pdfashiyadav24
 
What is Affordable Housing? Bristol Civic Society April 2024
What is Affordable Housing? Bristol Civic Society April 2024What is Affordable Housing? Bristol Civic Society April 2024
What is Affordable Housing? Bristol Civic Society April 2024Paul Smith
 
Lancaster Market Expenses and Company Worksheet
Lancaster Market Expenses and Company WorksheetLancaster Market Expenses and Company Worksheet
Lancaster Market Expenses and Company WorksheetTom Blefko
 
Ganga Fusion 85 Gurugram - PDF Download.pdf
Ganga Fusion 85 Gurugram - PDF Download.pdfGanga Fusion 85 Gurugram - PDF Download.pdf
Ganga Fusion 85 Gurugram - PDF Download.pdfanjalisaini334541
 

Último (20)

The Shore16 Floor Plans By MSR Communities
The  Shore16 Floor Plans By MSR CommunitiesThe  Shore16 Floor Plans By MSR Communities
The Shore16 Floor Plans By MSR Communities
 
SVN Live 4.15.24 Weekly Property Broadcast
SVN Live 4.15.24 Weekly Property BroadcastSVN Live 4.15.24 Weekly Property Broadcast
SVN Live 4.15.24 Weekly Property Broadcast
 
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
It’s Time to Fight Back Against the Media Narrative Regarding Real Estate Com...
 
Listing Turkey Green life Istanbul Eyup Catalog
Listing Turkey Green life Istanbul Eyup CatalogListing Turkey Green life Istanbul Eyup Catalog
Listing Turkey Green life Istanbul Eyup Catalog
 
Experion Elements Sector 45 Noida E-Brochure
Experion Elements Sector 45 Noida E-BrochureExperion Elements Sector 45 Noida E-Brochure
Experion Elements Sector 45 Noida E-Brochure
 
Experion Elements Phase 1 Noida E-Brochure
Experion Elements Phase 1 Noida E-BrochureExperion Elements Phase 1 Noida E-Brochure
Experion Elements Phase 1 Noida E-Brochure
 
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
Maha Mauka Squarefeet Brochure |Maha Mauka Squarefeet PDF Brochure|
 
LCAR RE Practice - The Pearson Vue State Exam
LCAR RE Practice - The Pearson Vue State ExamLCAR RE Practice - The Pearson Vue State Exam
LCAR RE Practice - The Pearson Vue State Exam
 
Shapoorji Pallonji Parkwest Sequoia Tower Binnypet, Central Bangalore E - Bro...
Shapoorji Pallonji Parkwest Sequoia Tower Binnypet, Central Bangalore E - Bro...Shapoorji Pallonji Parkwest Sequoia Tower Binnypet, Central Bangalore E - Bro...
Shapoorji Pallonji Parkwest Sequoia Tower Binnypet, Central Bangalore E - Bro...
 
Triaa Housing Lohegaon Pune E-Brochure.pdf
Triaa Housing Lohegaon Pune  E-Brochure.pdfTriaa Housing Lohegaon Pune  E-Brochure.pdf
Triaa Housing Lohegaon Pune E-Brochure.pdf
 
Managing Uncertainty: Newman George Leech's Real Estate Finance Strategy
Managing Uncertainty: Newman George Leech's Real Estate Finance StrategyManaging Uncertainty: Newman George Leech's Real Estate Finance Strategy
Managing Uncertainty: Newman George Leech's Real Estate Finance Strategy
 
Mana Dale Kodathi, Sarjapur Road, Bangalore E-Brochure.pdf
Mana Dale Kodathi, Sarjapur Road, Bangalore E-Brochure.pdfMana Dale Kodathi, Sarjapur Road, Bangalore E-Brochure.pdf
Mana Dale Kodathi, Sarjapur Road, Bangalore E-Brochure.pdf
 
Listing Turkey - Viva Perla Maltepe Catalog
Listing Turkey - Viva Perla Maltepe CatalogListing Turkey - Viva Perla Maltepe Catalog
Listing Turkey - Viva Perla Maltepe Catalog
 
Provident Kenworth Rajendra Nagar Hyderabad.pdf
Provident Kenworth Rajendra Nagar Hyderabad.pdfProvident Kenworth Rajendra Nagar Hyderabad.pdf
Provident Kenworth Rajendra Nagar Hyderabad.pdf
 
Honer Richmont Hyderabad E brochure - A Life With A View
Honer Richmont Hyderabad E brochure - A Life With A ViewHoner Richmont Hyderabad E brochure - A Life With A View
Honer Richmont Hyderabad E brochure - A Life With A View
 
Tribeca The Ark Voyage NIBM, Pune E-Brochure.pdf
Tribeca The Ark Voyage NIBM, Pune  E-Brochure.pdfTribeca The Ark Voyage NIBM, Pune  E-Brochure.pdf
Tribeca The Ark Voyage NIBM, Pune E-Brochure.pdf
 
Prestige Sanctuary Nandi Hills Bangalore.pdf
Prestige Sanctuary Nandi Hills Bangalore.pdfPrestige Sanctuary Nandi Hills Bangalore.pdf
Prestige Sanctuary Nandi Hills Bangalore.pdf
 
What is Affordable Housing? Bristol Civic Society April 2024
What is Affordable Housing? Bristol Civic Society April 2024What is Affordable Housing? Bristol Civic Society April 2024
What is Affordable Housing? Bristol Civic Society April 2024
 
Lancaster Market Expenses and Company Worksheet
Lancaster Market Expenses and Company WorksheetLancaster Market Expenses and Company Worksheet
Lancaster Market Expenses and Company Worksheet
 
Ganga Fusion 85 Gurugram - PDF Download.pdf
Ganga Fusion 85 Gurugram - PDF Download.pdfGanga Fusion 85 Gurugram - PDF Download.pdf
Ganga Fusion 85 Gurugram - PDF Download.pdf
 

Could modular construction influence housing affordability 7.27.16

  • 1. REIT Center @ Schack Institute of Real Estate July 27, 2016 COULD MODULAR CONSTRUCTION INFLUENCE HOUSING AFFORDABILITY? Modular construction holds a promise of affordable housing but compelling economics thus far have been elusive. By: Denham Apperley & Scott Robinson Developers have attempted to perfect the process of modular construction in the hope of improving construction efficiencies in high-rise developments. Many believe that this will result in cost savings, improved scheduling, the provision of a better quality product at an affordable price, as well as less waste. However, modular construction of multifamily residential (for-rent and for-sale), as well as commercial office buildings, remains a complex proposition with many process-specific benefits and challenges. In particular, many efficiency advantages as a result of shifting the bulk of the construction process onto an off- site production line are eroded when the costs of shipping built product into dense cities such as New York are factored-in. Indeed, many manufacturing facilities have been relocated further away in suburban manufacturing markets, as ever-increasing rental rates and other expenses price-out industries requiring large factory spaces. The following article provides an overview of the concept of modular construction, its current implementation to date (particularly in New York City), as well as both its qualitative benefits and drawbacks. Overview: Modular Construction in New York City New York City’s first modular building was The Stack, completed in 2014 in the Northern Manhattan neighborhood of Inwood ‘Utilizing an off-site construction method and an innovative design strategy, The Stack has managed to streamline the entire development process and create a high-quality product with a small carbon footprint, pioneering the future of construction in New York City’.1 The modules were manufactured by Deluxe Building Systems, a company based out of Pennsylvania. These apartments comprise a combination of one, two and three-bedroomed units over seven stories. In contrast, the city’s second modular building is also its first micro unit building. Carmel Place in Kips Bay, a 55-microunit building, was constructed with modules manufactured by Capsys Corp. It rises nine floors, costing between $300 and $400 per square foot. The primary difficulty with modular construction has been attaining the necessary height within cities such as New York, subject to high land values;2 the engineering issues arise out of having to account for wind shear and seismic forces. Forest City Ratner Companies is of the belief that it has tackled this height issue.3 In partnership with Greenland USA, it is developing the Pacific Park project (formerly Atlantic Yards) in Brooklyn. Of note, the first building of this project to be delivered – B2 – will be the world’s largest and tallest prefabricated modular building upon its slated completion in February 2017. It will rise 32 floors and consist of 930 modules manufactured at FC Modular, Forest City’s modular construction company located in the Brooklyn Navy Yards.4 This is also the only module manufacturer in New York City. These modular units are delivered to the site almost fully complete, with most fixtures and fittings preinstalled.5 Although the original intent was to construct all Pacific Park buildings in this way, this idea has been disregarded, raising questions as to the efficiency benefits of modular construction. Modular Construction: The Process On a practical level, modular construction is relatively simple, at lower building heights. A steel brace frame is erected incrementally, and this provides lateral support for the module-structure, inserted using a crane. More than sixty percent of the construction work for such modular products takes place in the factory. This
  • 2. REIT Center @ Schack Institute of Real Estate is not a simple process, however: the stacking of rigid modular boxes within a steel frame, which bends and compresses with height, creates engineering challenges. Modular construction provides the possibility of improved sustainability, higher quality and lower costs, world-class architecture and faster delivery. On the other hand, this incremental construction process means that there is no flexibility for error, the effects of which would multiply as the building rose. Further, it is difficult to predetermine such a building’s performance upon completion. The Benefits Shifting the construction process into a factory environment, as contrasted by typical on-site development, results in an approximate 20% improvement to return. It is important to note, however, that this is based on delivering the project more quickly than traditional methods, allowing for the developer to benefit from additional rental revenue. Indeed, the hard per square foot construction costs are similar to those in traditional developments. The implementation of a production line means that scheduling and costing are both more efficient and more accurate, given repeated processes and material usage. There is also less waste, lower labor costs and significantly reduced risk. On site, only minor installations are needed to fully install the modules. There are an estimated 48% fewer truck deliveries, and 70% fewer site workers needed compared to traditional development. Manufacturing these modules indoors, where risk is more easily managed, drastically improves safety, thus theoretically reducing insurance and delay costs. Further, these buildings can have traditional exterior facades, and thus their design is in no way affected by their construction method. In the case of building B2, the delivery time was shortened by almost 50% from 27 months to 14 months.6 Indeed, efficient, repeatable processes and highly skilled union labor enable production of between 600,000 and 900,000 square feet per year, depending on the nature of the project.’7 In general, this ‘all translates to a cost-controlled, ultra-high quality product that beats conventional construction to market by months.’8 The Drawbacks Modular development creates a number of atypical issues relating to labor, delivery costs, building codes, and warehouse space. Creating a manufactured production process introduces union factory labor into the equation, who typically earn ~25% less than the average onsite union construction worker.9 Creating a manufactured production process within a city environment will subject the operation to high operating costs, causing a migration of factories outside of urban cores. So while the production process may reduce construction costs, the aforementioned higher delivery costs tend to off-set a portion of these savings. Additionally, shifting the development of buildings onto a production line creates issues relating to building codes. Most Departments of Buildings have been of the view that offsite prefabrication does not require licensed plumbing and fire suppression work; these certified contractors are only required for the installation of their respective systems on-site, which must be performed in line with the city’s construction codes. Manufacturing in a town different from where the building will reside means that manufacturers should have a familiarity with the building codes and regulations facing the project’s final location.10 To mitigate this risk, a third party consultant acts as intermediary between the local Department of Buildings and the production facility. Finally, the physical plat required to build this product is quite large. The large amount of space needed for modular factories, typically in the range of between 180,000 and 200,000 square feet, is prohibitively expensive in cities like New York. Indeed, Susan Hayes, president of FC Modular, believes that the largest hurdle of the growth of modular construction in New York is “a dearth of available, affordable space, which is necessary for a modular construction factory.”11
  • 3. REIT Center @ Schack Institute of Real Estate Although many argue that the portability of modular construction implies that units can be manufactured elsewhere and delivered to their destination, oversight issues result in the fact that architects and engineers are unable to monitor the construction frequently enough. This can lead to large potential delays if any construction problems are not identified early. Moving production further away also makes the process more susceptible to time delays, transportation expenses, and on-site logistical issues of having to store the modules and manage their placement. Conclusion As real estate developers seek alternative, innovative means to reduce construction costs and speed time-to- market, modular construction holds much appeal. However, this construction technique is still in its infancy and therefore difficult to properly evaluate, especially in cities with complex zoning and regulation requirements. Nevertheless, many industry participants remain positive about modular construction, so the completion of Forest City’s B2 project will hopefully provide better physical evidence as to the success of such a business model. About the authors: Scott Robinson is a managing director at Oberon Securities, a FINRA-regulated broker-dealer, and has held senior positions at Citigroup and Standard & Poor’s. He is also an associate clinical professor at the NYU Schack Institute of Real Estate and Director of The REIT Center at NYU. Mr. Robinson earned an M.S. in Real Estate (Finance) from NYU and has a degree in economics from the University of California, Riverside. He can be contacted at scott.robinson@nyu.edu Denham Apperley recently graduated from the NYU Schack Institute of Real Estate with an M.S. in Real Estate Development. His interests lie in improving process efficiency in the development of real estate within dense urban environments. Mr. Apperley also has a degree in economics with law from the University of Cape Town. He can be contacted at Denham.apperley@nyu.edu About the NYU Schack Institute of Real Estate and the REIT Center Established in 1998, the REIT Center provides a forum for the study and analysis of publicly-traded REITs and other real estate operating companies and the related corporatization, securitization, and consolidation trends that are transforming the real estate industry nationally and globally. The NYU School of Professional Studies Schack Institute of Real Estate (sps.nyu.edu/schack) was founded in 1967 at the initiative of prominent real estate leaders, who encouraged NYU to establish an academic center that provided an educational foundation for professionals within their industry. Today, the Schack Institute of Real Estate offers graduate degrees, notably the MS in Real Estate, the MS in Construction Management, and the MS in Real Estate Development, as well as an undergraduate degree, the BS in Real Estate. Endnotes 1  Streeteasy. 2016. ‘Building: The Stack’. [Online]. Available at: http://streeteasy.com/building/the‐stack (accessed  April 17, 2016).  2  Modular construction, if its manufacturing process is perfected, means that developers operating in high land value  areas may be able to improve their basis if they can reduce construction costs.    3  Daily News. 2015. ‘Forest City Ratner’s modular Brooklyn tower is back on track’. [Online]. Available at:  http://www.nydailynews.com/life‐style/real‐estate/forest‐city‐ratner‐modular‐brooklyn‐tower‐back‐track‐article‐ 1.2076674 (accessed April 10, 2016). Bruce Ratner also believes that his firm has managed to crack the code of this  type of construction, thus possessing the ability to provide higher quality units at a more affordable price point.  
  • 4. REIT Center @ Schack Institute of Real Estate 4  These modular units are typically 14 feet wide by 35 feet long, and 10 feet tall.   5  These include floors, walls, electric lines, plumbing, kitchens, toilets, exterior facades, and even smaller details such  as towel racks. 6  This is not including the delays resulting from legal proceedings and other issues.   7  FCModular. 2016. ‘Your Vision: Faster, Safer, Smarter’. [Online]. Available at: http://fcmodular.com (accessed April  9, 2016).   8  FCModular. 2016. ‘Innovation Done’. [Online]. Available at: http://fcmodular.com (accessed April 10, 2016).  9  Of course, the availability of factory work is more stable given fewer temperamental on‐site issues. Thus, workers  can more adequately account for the incomes they will make during any given period. Further, their income levels are  smoother.   10  As expressed by Patricia Lancaster in The Real Deal. 2015. ‘Modular imports edge into nascent Brooklyn industry’.  [Online]. Available at: http://therealdeal.com/issues_articles/modular‐imports‐edge‐into‐nascent‐brooklyn‐industry/  (accessed April 11, 2016).  11  NY Curbed. 2016. ‘Modular Construction in New York City, Once the Future, Is Fading’. [Online]. Available at:  http://ny.curbed.com/2016/1/15/10849436/modular‐construction‐in‐new‐york‐city‐once‐the‐future‐is‐fading  (accessed April 10, 2016).