SlideShare a Scribd company logo
1 of 29
INTEGRATINGINTEGRATING
CONSTRUCTABLITYCONSTRUCTABLITY
WITH QMS & JITWITH QMS & JIT
helpdesk@construction-productivity.co.uk
htt://www.construction-productivity.
INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY
WITH QMS & JITWITH QMS & JIT
IMPLEMENTING PROJECTIMPLEMENTING PROJECT
CONSTRUCTABILITYCONSTRUCTABILITY
Constructability is the integration of
construction expertise into all phases of
the project.
For Improving factors such as:
cost
schedule
quality
and overall project objectives.
IMPLEMENTING PROJECTIMPLEMENTING PROJECT
CONSTRUCTABILITYCONSTRUCTABILITY
The proper use of the knowledge gained
by participants such as:
managers
designers
site workers
other contributors
Learning from their past experience
increases the level of productivity/project
success.
IMPLEMENTING PROJECTIMPLEMENTING PROJECT
CONSTRUCTABILITYCONSTRUCTABILITY
Constructability must be used at key
points in the project life cycle. This
includes:
in the planning phase;
early in the design phase;
prior to the procurement phase;
prior to the mobilization phase for
construction.
IMPLEMENTING PROJECTIMPLEMENTING PROJECT
CONSTRUCTABILITYCONSTRUCTABILITY
Constructability process considers a
detailed review of:
Design drawings;
Models;
Specifications;
and construction processes.
IMPLEMENTING PROJECTIMPLEMENTING PROJECT
CONSTRUCTABILITYCONSTRUCTABILITY
The purpose of the constructability review
is to identify the following items:
• Design errors (both material selection or
dimensions)
• Un clear specifications
• Unnecessary work
• Complexity that does not serve the
project objectives
IMPLEMENTING PROJECTIMPLEMENTING PROJECT
CONSTRUCTABILITYCONSTRUCTABILITY
• Project features-difficult and very
costly to construct.
• Project complexity- that exceed the
capability of industry to properly
build.
• Project features that are difficult to
interpret and will be hard to
accurately bid.
QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
Steps to take:
 Identify the processes needed for the
Quality Management System
 Its application in the organization
 Its customers
 Determine the sequence and interaction
of these processes
 Determine the criteria and methods
required to ensure that the operation
runs well
QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
Determine the criteria and methods
required to ensure that controls of these
processes are effective.
Ensure that the necessary resources,
information necessary to support the
operation are in place.
Make sure monitoring of these processes
will be provided.
Set up systems to monitor measure and
analyse the processes.
QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
Total Quality Management
QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
The construction industry has embraced
the ISO 9000 standard since its inception.
The QMS has become the benchmark for
successful construction companies.
The QMS has also become the
benchmarking for successful construction
companies worldwide.
QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
QMS has helped many companies to
structure their management and
processes to consistently meet the
client’s requirements.
QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
The eight Quality Management Principles
stated in ISO 9000:2000 and ISO
9004:2000 provide the basis for the
performance improvement.
Focusing on the Customer to increase
revenue and market share.
 Choose Effective Leaders to motivate
the organization towards achieving
organisational goals. 
QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
 Involving People to become:
1.Innovative
2.Creative
3.Accountable
 Understanding Processes. This will help
to define activities necessary to obtain a
desirable result.
 Valuing a Systems Approach-Structuring a
system to achieve the organisation's
objectives in the most effective and
efficient way. 
Wheel of QMSWheel of QMS
QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
JIT & Quality Management SystemsJIT & Quality Management Systems
The existing quality management systems
-ISO 9000 should include JIT.
It is practical to integrate ISO 9000 (20
clauses) with the 7 JIT concepts
Successful firms are using 7 concepts of
JIT with ISO 9000 quality management
systems in order to improve their
productivity.
JIT & Quality Management SystemsJIT & Quality Management Systems
To have high quality product and high
productivity is a challenging task for
project management team.
All large construction companies have
already established quality management
systems within their organisation to meet
ISO 9000 requirements.
Some companies are implementing the
concepts of JIT and ISO 9000 separately.
JIT & Quality Management SystemsJIT & Quality Management Systems
Both ISO 9000 and JIT objectives are:
1) high productivity
2) perfect product each time and every
time.
ISO has no any clause related to project
time.
 It is a tool for productivity improvement.
JIT & Quality ManagementJIT & Quality Management
Systems-waste reductionSystems-waste reduction
Quality and productivity are inter-
related.
High quality product will eliminate repeat
work and increases productivity.
Overproduction
Long waiting times
Poor transportation schedules
JIT & Quality Management SystemsJIT & Quality Management Systems
Processing failures
High inventories
Excessive movement of materials on
site
Poor workmanship
Defective products
JIT & Quality Management SystemsJIT & Quality Management Systems
INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY
WITH QMS & JITWITH QMS & JIT
Cost savings derive from:
Fewer delays.
Fewer disruptions.
Shortened duration of activities.
Less work at higher elevations.
Less material required.
Decreased likelihood of labour conflicts.
INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY
WITH QMS & JITWITH QMS & JIT
One must initially invest to earn the cost
savings from better constructability, such
as:
More effort for design and procurement.
More communication among builders,
designers, and the client.
More communication among supply
chain(including customers)
INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY
WITH QMS & JITWITH QMS & JIT
Improve constructability reduces
costs by:
Mitigating the effects of adverse site
conditions.
Implementing better design, better
buildings.
Advance technologies.
INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY
WITH QMS & JITWITH QMS & JIT
Offering assembly-line conditions.
Accelerating the schedule by decoupling
sequential workface activities.
Reducing the number of workers and
costlier skills.
Better constructability methods can
include:
• Prefabrication.
• Economies and quality via manufacturing
process.
INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY
WITH QMS & JITWITH QMS & JIT
• Preassembly-Join components into
subunit at the factory.
• Under more advance and better-
controlled location.
• Modularization-Assembly operations
create the largest unit logistically possible.
• Contains all components of final state.

More Related Content

What's hot

Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
ALPESH CONTRACTOR
 
Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect
wael hassan
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction Project
IOSR Journals
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
Ismail Shaikh
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
Abdulaziz Kaya
 

What's hot (20)

Resume Gp
Resume GpResume Gp
Resume Gp
 
Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015
 
Construction Project Process Flow
Construction Project Process FlowConstruction Project Process Flow
Construction Project Process Flow
 
CV of KP Tomy
CV of KP TomyCV of KP Tomy
CV of KP Tomy
 
Pp1 group assignment presentation slides
Pp1 group assignment presentation slidesPp1 group assignment presentation slides
Pp1 group assignment presentation slides
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
Quantity Surveyor
Quantity SurveyorQuantity Surveyor
Quantity Surveyor
 
Resume Gp
Resume GpResume Gp
Resume Gp
 
Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect
 
Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
PP1 assignment presentation slides
PP1 assignment presentation slidesPP1 assignment presentation slides
PP1 assignment presentation slides
 
TCG Construction Project Management
TCG Construction Project Management TCG Construction Project Management
TCG Construction Project Management
 
Construction Management (1st Lecture)
Construction Management (1st Lecture) Construction Management (1st Lecture)
Construction Management (1st Lecture)
 
PP1 presentation
PP1 presentationPP1 presentation
PP1 presentation
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction Project
 
Construction Management Services
Construction Management ServicesConstruction Management Services
Construction Management Services
 
CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015CV ISMAIL SHAIKH-31.10.2015
CV ISMAIL SHAIKH-31.10.2015
 
4. offer tendering - site
4. offer   tendering - site4. offer   tendering - site
4. offer tendering - site
 
Sterling Project Management profile for project management, contruction manag...
Sterling Project Management profile for project management, contruction manag...Sterling Project Management profile for project management, contruction manag...
Sterling Project Management profile for project management, contruction manag...
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 

Viewers also liked

Constructability Presentation 2.29.16
Constructability Presentation 2.29.16Constructability Presentation 2.29.16
Constructability Presentation 2.29.16
Amanda Podbelsek
 
CONSTRUCTABILIDAD O CONSTRUCTIBILIDAD EN PROYECTOS DE INFRAESTRUCTURA
CONSTRUCTABILIDAD O CONSTRUCTIBILIDAD EN PROYECTOS DE INFRAESTRUCTURACONSTRUCTABILIDAD O CONSTRUCTIBILIDAD EN PROYECTOS DE INFRAESTRUCTURA
CONSTRUCTABILIDAD O CONSTRUCTIBILIDAD EN PROYECTOS DE INFRAESTRUCTURA
marxhdz
 
Bim101 Aec
Bim101 AecBim101 Aec
Bim101 Aec
marybk
 

Viewers also liked (9)

Constructability Presentation 2.29.16
Constructability Presentation 2.29.16Constructability Presentation 2.29.16
Constructability Presentation 2.29.16
 
049 Communication, Constructability and high productivity
049 Communication, Constructability and high productivity 049 Communication, Constructability and high productivity
049 Communication, Constructability and high productivity
 
Análisis de constructibilidad aplicado a una planta compresora para alta pres...
Análisis de constructibilidad aplicado a una planta compresora para alta pres...Análisis de constructibilidad aplicado a una planta compresora para alta pres...
Análisis de constructibilidad aplicado a una planta compresora para alta pres...
 
Constructabilidad
ConstructabilidadConstructabilidad
Constructabilidad
 
Constructabilidad
ConstructabilidadConstructabilidad
Constructabilidad
 
Constructability Assessment of Climbing Formwork Systems using Building Infor...
Constructability Assessment of Climbing Formwork Systems using Building Infor...Constructability Assessment of Climbing Formwork Systems using Building Infor...
Constructability Assessment of Climbing Formwork Systems using Building Infor...
 
CONSTRUCTABILIDAD O CONSTRUCTIBILIDAD EN PROYECTOS DE INFRAESTRUCTURA
CONSTRUCTABILIDAD O CONSTRUCTIBILIDAD EN PROYECTOS DE INFRAESTRUCTURACONSTRUCTABILIDAD O CONSTRUCTIBILIDAD EN PROYECTOS DE INFRAESTRUCTURA
CONSTRUCTABILIDAD O CONSTRUCTIBILIDAD EN PROYECTOS DE INFRAESTRUCTURA
 
120 tqm-constructability-bar chart
120 tqm-constructability-bar chart120 tqm-constructability-bar chart
120 tqm-constructability-bar chart
 
Bim101 Aec
Bim101 AecBim101 Aec
Bim101 Aec
 

Similar to 039 Integrating Constructability

Quality managment impacts in construction
Quality managment impacts in constructionQuality managment impacts in construction
Quality managment impacts in construction
Khaled Eid
 
Corporate Presentation MRS
Corporate Presentation MRSCorporate Presentation MRS
Corporate Presentation MRS
Paul Morffew
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In Construction
Isidro Sid Calayag
 

Similar to 039 Integrating Constructability (20)

039 integrating constructability-short
039 integrating constructability-short039 integrating constructability-short
039 integrating constructability-short
 
039 Integrating Constructability-short
039 Integrating Constructability-short039 Integrating Constructability-short
039 Integrating Constructability-short
 
Quality managment impacts in construction
Quality managment impacts in constructionQuality managment impacts in construction
Quality managment impacts in construction
 
047 INTERGRATING TQM WITH CONSTRUCTABILITY/VE
047  INTERGRATING TQM WITH CONSTRUCTABILITY/VE047  INTERGRATING TQM WITH CONSTRUCTABILITY/VE
047 INTERGRATING TQM WITH CONSTRUCTABILITY/VE
 
047 integrating tqm-cons-ve
047 integrating tqm-cons-ve047 integrating tqm-cons-ve
047 integrating tqm-cons-ve
 
Strategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas IndustryStrategic Project Selection in Oil & Gas Industry
Strategic Project Selection in Oil & Gas Industry
 
Quality Management System
Quality Management SystemQuality Management System
Quality Management System
 
IRJET- Construction Quality Management on Site
IRJET-  	  Construction Quality Management on SiteIRJET-  	  Construction Quality Management on Site
IRJET- Construction Quality Management on Site
 
Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...Quality management at construction projects: Case study of a stormwater netwo...
Quality management at construction projects: Case study of a stormwater netwo...
 
Project Quality Management
Project Quality ManagementProject Quality Management
Project Quality Management
 
Workshop on ISO 9001 2008
Workshop on ISO 9001 2008Workshop on ISO 9001 2008
Workshop on ISO 9001 2008
 
Corporate Presentation MRS
Corporate Presentation MRSCorporate Presentation MRS
Corporate Presentation MRS
 
A project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan KumarA project report on TQM by Abhinandan Kumar
A project report on TQM by Abhinandan Kumar
 
Quality Management In Construction
Quality Management In ConstructionQuality Management In Construction
Quality Management In Construction
 
Resumepmlatest
ResumepmlatestResumepmlatest
Resumepmlatest
 
044 integrating scm with fem and tqm
044 integrating scm with fem and tqm044 integrating scm with fem and tqm
044 integrating scm with fem and tqm
 
044 INTERGRATING SCN WITH FEM AND TQM
044 INTERGRATING SCN WITH FEM AND TQM 044 INTERGRATING SCN WITH FEM AND TQM
044 INTERGRATING SCN WITH FEM AND TQM
 
Resume Giridhar
Resume GiridharResume Giridhar
Resume Giridhar
 
A project report on TQM
A project report on TQMA project report on TQM
A project report on TQM
 
Software Quality.pptx
Software Quality.pptxSoftware Quality.pptx
Software Quality.pptx
 

More from Dr Fereidoun Dejahang

More from Dr Fereidoun Dejahang (20)

27 j20 my news punch -dr f dejahang 27-01-2020
27 j20 my news punch -dr f dejahang  27-01-202027 j20 my news punch -dr f dejahang  27-01-2020
27 j20 my news punch -dr f dejahang 27-01-2020
 
28 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-201928 dej my news punch rev 28-12-2019
28 dej my news punch rev 28-12-2019
 
16 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-201916 fd my news punch rev 16-12-2019
16 fd my news punch rev 16-12-2019
 
029 fast-tracking projects
029 fast-tracking projects029 fast-tracking projects
029 fast-tracking projects
 
028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun028 fast-tracking projects & cost overrun
028 fast-tracking projects & cost overrun
 
027 fast-tracked projects-materials
027 fast-tracked projects-materials027 fast-tracked projects-materials
027 fast-tracked projects-materials
 
026 fast react-productivity improvement
026 fast react-productivity improvement026 fast react-productivity improvement
026 fast react-productivity improvement
 
025 enterprise resources management
025 enterprise resources management025 enterprise resources management
025 enterprise resources management
 
022 b construction productivity-write
022 b construction productivity-write022 b construction productivity-write
022 b construction productivity-write
 
022 a construction productivity (2)
022 a construction productivity (2)022 a construction productivity (2)
022 a construction productivity (2)
 
021 construction productivity (1)
021 construction productivity (1)021 construction productivity (1)
021 construction productivity (1)
 
019 competencies-managers
019 competencies-managers019 competencies-managers
019 competencies-managers
 
018 company productivity
018 company productivity018 company productivity
018 company productivity
 
017 communication
017 communication017 communication
017 communication
 
016 communication in construction sector
016 communication in construction sector016 communication in construction sector
016 communication in construction sector
 
015 changes-process model
015 changes-process model015 changes-process model
015 changes-process model
 
014 changes-cost overrun measurement
014 changes-cost overrun measurement014 changes-cost overrun measurement
014 changes-cost overrun measurement
 
013 changes in construction projects
013 changes in construction projects013 changes in construction projects
013 changes in construction projects
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
011 business performance management
011 business performance management011 business performance management
011 business performance management
 

Recently uploaded

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 

Recently uploaded (20)

1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 

039 Integrating Constructability

  • 1. INTEGRATINGINTEGRATING CONSTRUCTABLITYCONSTRUCTABLITY WITH QMS & JITWITH QMS & JIT helpdesk@construction-productivity.co.uk htt://www.construction-productivity.
  • 3. IMPLEMENTING PROJECTIMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITY Constructability is the integration of construction expertise into all phases of the project. For Improving factors such as: cost schedule quality and overall project objectives.
  • 4. IMPLEMENTING PROJECTIMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITY The proper use of the knowledge gained by participants such as: managers designers site workers other contributors Learning from their past experience increases the level of productivity/project success.
  • 5. IMPLEMENTING PROJECTIMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITY Constructability must be used at key points in the project life cycle. This includes: in the planning phase; early in the design phase; prior to the procurement phase; prior to the mobilization phase for construction.
  • 6. IMPLEMENTING PROJECTIMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITY Constructability process considers a detailed review of: Design drawings; Models; Specifications; and construction processes.
  • 7. IMPLEMENTING PROJECTIMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITY The purpose of the constructability review is to identify the following items: • Design errors (both material selection or dimensions) • Un clear specifications • Unnecessary work • Complexity that does not serve the project objectives
  • 8. IMPLEMENTING PROJECTIMPLEMENTING PROJECT CONSTRUCTABILITYCONSTRUCTABILITY • Project features-difficult and very costly to construct. • Project complexity- that exceed the capability of industry to properly build. • Project features that are difficult to interpret and will be hard to accurately bid.
  • 9. QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS) Steps to take:  Identify the processes needed for the Quality Management System  Its application in the organization  Its customers  Determine the sequence and interaction of these processes  Determine the criteria and methods required to ensure that the operation runs well
  • 10. QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS) Determine the criteria and methods required to ensure that controls of these processes are effective. Ensure that the necessary resources, information necessary to support the operation are in place. Make sure monitoring of these processes will be provided. Set up systems to monitor measure and analyse the processes.
  • 11. QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS) Total Quality Management
  • 12. QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS) The construction industry has embraced the ISO 9000 standard since its inception. The QMS has become the benchmark for successful construction companies. The QMS has also become the benchmarking for successful construction companies worldwide.
  • 13. QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS) QMS has helped many companies to structure their management and processes to consistently meet the client’s requirements.
  • 14. QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS) The eight Quality Management Principles stated in ISO 9000:2000 and ISO 9004:2000 provide the basis for the performance improvement. Focusing on the Customer to increase revenue and market share.  Choose Effective Leaders to motivate the organization towards achieving organisational goals. 
  • 15. QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)  Involving People to become: 1.Innovative 2.Creative 3.Accountable  Understanding Processes. This will help to define activities necessary to obtain a desirable result.  Valuing a Systems Approach-Structuring a system to achieve the organisation's objectives in the most effective and efficient way. 
  • 17. QUALITY MANAGEMENT SYSTEM(QMS)QUALITY MANAGEMENT SYSTEM(QMS)
  • 18. JIT & Quality Management SystemsJIT & Quality Management Systems The existing quality management systems -ISO 9000 should include JIT. It is practical to integrate ISO 9000 (20 clauses) with the 7 JIT concepts Successful firms are using 7 concepts of JIT with ISO 9000 quality management systems in order to improve their productivity.
  • 19. JIT & Quality Management SystemsJIT & Quality Management Systems To have high quality product and high productivity is a challenging task for project management team. All large construction companies have already established quality management systems within their organisation to meet ISO 9000 requirements. Some companies are implementing the concepts of JIT and ISO 9000 separately.
  • 20. JIT & Quality Management SystemsJIT & Quality Management Systems Both ISO 9000 and JIT objectives are: 1) high productivity 2) perfect product each time and every time. ISO has no any clause related to project time.  It is a tool for productivity improvement.
  • 21. JIT & Quality ManagementJIT & Quality Management Systems-waste reductionSystems-waste reduction Quality and productivity are inter- related. High quality product will eliminate repeat work and increases productivity. Overproduction Long waiting times Poor transportation schedules
  • 22. JIT & Quality Management SystemsJIT & Quality Management Systems Processing failures High inventories Excessive movement of materials on site Poor workmanship Defective products
  • 23. JIT & Quality Management SystemsJIT & Quality Management Systems
  • 24.
  • 25. INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY WITH QMS & JITWITH QMS & JIT Cost savings derive from: Fewer delays. Fewer disruptions. Shortened duration of activities. Less work at higher elevations. Less material required. Decreased likelihood of labour conflicts.
  • 26. INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY WITH QMS & JITWITH QMS & JIT One must initially invest to earn the cost savings from better constructability, such as: More effort for design and procurement. More communication among builders, designers, and the client. More communication among supply chain(including customers)
  • 27. INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY WITH QMS & JITWITH QMS & JIT Improve constructability reduces costs by: Mitigating the effects of adverse site conditions. Implementing better design, better buildings. Advance technologies.
  • 28. INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY WITH QMS & JITWITH QMS & JIT Offering assembly-line conditions. Accelerating the schedule by decoupling sequential workface activities. Reducing the number of workers and costlier skills. Better constructability methods can include: • Prefabrication. • Economies and quality via manufacturing process.
  • 29. INTEGRATING CONSTRUCTABLITYINTEGRATING CONSTRUCTABLITY WITH QMS & JITWITH QMS & JIT • Preassembly-Join components into subunit at the factory. • Under more advance and better- controlled location. • Modularization-Assembly operations create the largest unit logistically possible. • Contains all components of final state.