ITEM DESCRIPTION UNIT RATE
(RM)
BILL NO. 7 - Doors and Windows
Precast Concrete Lintel
A 115 mm x 150mm depth m 18
precast concrete grade 20 lintel
reinforced with 2 nos 12mm diameter
high tensile bars ands 6mm mild steel
stirrup at 150mm center and bedded in
cement and sand (1:3) mortar.
Packing piece
B 75mm x 16mm sawn pressure treated m 48
Grade B timber guard fixed to conrete
work & brickwork
Purpose made windows & frame
C 1690mmx1280mm pressure No 8
treated Grade B timber windows &
window frames including
25mm x 75mm double leaves, rebated
casement in single pane, 150mmx50mm
rebated head & jambs, twice rebated
mullions, 200mm x 50mm sunk,
weathered & throated sill & screwed to timber guards.
Ironmongeries
Supply and fix the following or other
equal and approved ironmongery complete
with requisite matching screws:-
D Dex 100mm pressed steel butt hinges & No 32
fixed to timber
E Yale 5400 Series Window lock handle including nuts and No 16
bolts fixed to timber window.
Glazing
F 5mm thick clear float glass fixed to m2 12
timber beads in panes area exceeding
0.1m2 but not exceeding 0.5 m2
Painting
Prepare and apply one coat of Jotun Gardex zinc
chromate primer or other approved equivalent
primer paints as desribed on:
G General surface of timber not exceeding
150mm girth m 96
Knotting, stopping and apply one coat of Jotun
Gardex primer, one Jotun Gardex undercoat
and two finishing coats of Jotun Gardex or other
approved equivalent gloss paint
as desribed on:
H Timber window, over 300mm girth m2 35
TO COLLECTION (RM)
AMOUNTQTY.

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Measurement III:Doors & Windows
Measurement III:Doors & WindowsMeasurement III:Doors & Windows
Measurement III:Doors & Windows
 
5) int walls finishes bq
5) int walls finishes bq5) int walls finishes bq
5) int walls finishes bq
 
Int walls finishes to list
Int walls finishes to list Int walls finishes to list
Int walls finishes to list
 
Solid Ground Floors
 Solid Ground Floors  Solid Ground Floors
Solid Ground Floors
 
Boq sample
Boq sampleBoq sample
Boq sample
 
Earthwork support
Earthwork supportEarthwork support
Earthwork support
 
How do you takeoff a staircase?
How do you takeoff a staircase?How do you takeoff a staircase?
How do you takeoff a staircase?
 
Bill Of Quantities
Bill Of QuantitiesBill Of Quantities
Bill Of Quantities
 
Superstructure design
Superstructure designSuperstructure design
Superstructure design
 
SMM2 Explained
SMM2 ExplainedSMM2 Explained
SMM2 Explained
 
Mooc smm substructure_2
Mooc smm substructure_2Mooc smm substructure_2
Mooc smm substructure_2
 
Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)
 
Cast in situ Pile
Cast in situ PileCast in situ Pile
Cast in situ Pile
 
Ibs score
Ibs scoreIbs score
Ibs score
 
Masonry of Building
Masonry of Building Masonry of Building
Masonry of Building
 
Types of ground floors
Types of ground floorsTypes of ground floors
Types of ground floors
 
Superstructure construction
Superstructure constructionSuperstructure construction
Superstructure construction
 
Excavation2014a-Lecture1
Excavation2014a-Lecture1Excavation2014a-Lecture1
Excavation2014a-Lecture1
 
Concrete 2014a-Lecture7
Concrete 2014a-Lecture7Concrete 2014a-Lecture7
Concrete 2014a-Lecture7
 
BQ
BQBQ
BQ
 

Destacado

Mpu3123 assignment-final-version-1
Mpu3123 assignment-final-version-1Mpu3123 assignment-final-version-1
Mpu3123 assignment-final-version-1Lin Hui
 
M3 Lecture 6 notes timber frame panel door
M3 Lecture 6 notes timber frame panel doorM3 Lecture 6 notes timber frame panel door
M3 Lecture 6 notes timber frame panel doorEst
 
Measurement4
Measurement4Measurement4
Measurement4kohwenqi
 
M3 Lecture 7 notes aluminium door
M3 Lecture 7 notes aluminium doorM3 Lecture 7 notes aluminium door
M3 Lecture 7 notes aluminium doorEst
 
M3 Lecture 5 metal frame door notes
M3 Lecture 5 metal frame door notesM3 Lecture 5 metal frame door notes
M3 Lecture 5 metal frame door notesEst
 
Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster Lin Hui
 
Measurement Assignment 2
Measurement Assignment 2 Measurement Assignment 2
Measurement Assignment 2 Wan Nee
 
Charity drive report 2
Charity drive report 2Charity drive report 2
Charity drive report 2Lin Hui
 
Integrated project report
Integrated project reportIntegrated project report
Integrated project reportLin Hui
 
M3 Lecture 10 timber roof structure answer
M3 Lecture 10 timber roof structure answerM3 Lecture 10 timber roof structure answer
M3 Lecture 10 timber roof structure answerEst
 
M3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred windowM3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred windowEst
 
M2 project assignment aug 2016
M2 project assignment aug 2016M2 project assignment aug 2016
M2 project assignment aug 2016Lin Hui
 
Bs1 assignment semester 2016 august
Bs1 assignment   semester 2016 augustBs1 assignment   semester 2016 august
Bs1 assignment semester 2016 augustLin Hui
 
Design project one full
Design project one full   Design project one full
Design project one full Lin Hui
 
M3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windowsM3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windowsEst
 
M3 Metal roof lecture rv2 an
M3 Metal roof lecture rv2 anM3 Metal roof lecture rv2 an
M3 Metal roof lecture rv2 anEst
 
Ms ct-bm
Ms ct-bmMs ct-bm
Ms ct-bmLin Hui
 
M3 Lecture 8 specification
M3 Lecture 8 specificationM3 Lecture 8 specification
M3 Lecture 8 specificationEst
 
ITD Presentation Slides
ITD Presentation SlidesITD Presentation Slides
ITD Presentation SlidesHappy Phiphi
 
Group Assignment: Bill Quantities
Group Assignment: Bill Quantities Group Assignment: Bill Quantities
Group Assignment: Bill Quantities Lin Hui
 

Destacado (20)

Mpu3123 assignment-final-version-1
Mpu3123 assignment-final-version-1Mpu3123 assignment-final-version-1
Mpu3123 assignment-final-version-1
 
M3 Lecture 6 notes timber frame panel door
M3 Lecture 6 notes timber frame panel doorM3 Lecture 6 notes timber frame panel door
M3 Lecture 6 notes timber frame panel door
 
Measurement4
Measurement4Measurement4
Measurement4
 
M3 Lecture 7 notes aluminium door
M3 Lecture 7 notes aluminium doorM3 Lecture 7 notes aluminium door
M3 Lecture 7 notes aluminium door
 
M3 Lecture 5 metal frame door notes
M3 Lecture 5 metal frame door notesM3 Lecture 5 metal frame door notes
M3 Lecture 5 metal frame door notes
 
Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster Ipoh railway station - Scientific Poster
Ipoh railway station - Scientific Poster
 
Measurement Assignment 2
Measurement Assignment 2 Measurement Assignment 2
Measurement Assignment 2
 
Charity drive report 2
Charity drive report 2Charity drive report 2
Charity drive report 2
 
Integrated project report
Integrated project reportIntegrated project report
Integrated project report
 
M3 Lecture 10 timber roof structure answer
M3 Lecture 10 timber roof structure answerM3 Lecture 10 timber roof structure answer
M3 Lecture 10 timber roof structure answer
 
M3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred windowM3 Lecture 3 notes timber lourvred window
M3 Lecture 3 notes timber lourvred window
 
M2 project assignment aug 2016
M2 project assignment aug 2016M2 project assignment aug 2016
M2 project assignment aug 2016
 
Bs1 assignment semester 2016 august
Bs1 assignment   semester 2016 augustBs1 assignment   semester 2016 august
Bs1 assignment semester 2016 august
 
Design project one full
Design project one full   Design project one full
Design project one full
 
M3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windowsM3 Lecture 1 notes aluminium windows
M3 Lecture 1 notes aluminium windows
 
M3 Metal roof lecture rv2 an
M3 Metal roof lecture rv2 anM3 Metal roof lecture rv2 an
M3 Metal roof lecture rv2 an
 
Ms ct-bm
Ms ct-bmMs ct-bm
Ms ct-bm
 
M3 Lecture 8 specification
M3 Lecture 8 specificationM3 Lecture 8 specification
M3 Lecture 8 specification
 
ITD Presentation Slides
ITD Presentation SlidesITD Presentation Slides
ITD Presentation Slides
 
Group Assignment: Bill Quantities
Group Assignment: Bill Quantities Group Assignment: Bill Quantities
Group Assignment: Bill Quantities
 

Similar a M3 EG BQ timber windows

Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Trevain Bechan
 
Lynca Meats - Pork Factory - Meyerton - Details 01
Lynca Meats - Pork Factory - Meyerton - Details 01Lynca Meats - Pork Factory - Meyerton - Details 01
Lynca Meats - Pork Factory - Meyerton - Details 01Trevain Bechan
 
Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updatedArthur Wilson
 
Doors final ppt
Doors final pptDoors final ppt
Doors final pptvmit4
 
Porta Cabin Presentation
Porta Cabin PresentationPorta Cabin Presentation
Porta Cabin Presentationamcoengg
 
Lucy Fortress Feeder Pillars - Double Door Feeder Pillars
Lucy Fortress Feeder Pillars - Double Door Feeder PillarsLucy Fortress Feeder Pillars - Double Door Feeder Pillars
Lucy Fortress Feeder Pillars - Double Door Feeder PillarsThorne & Derrick International
 
Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaAaron Kaira
 
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 02
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 02Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 02
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 02Trevain Bechan
 
Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack Lambourne
 
Killeshin building it carlow
Killeshin building it carlowKilleshin building it carlow
Killeshin building it carlowTej Raj Upreti
 
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01Trevain Bechan
 
Lucy Fortress Feeder Pillars - Single Door Feeder Pillars
Lucy Fortress Feeder Pillars - Single Door Feeder PillarsLucy Fortress Feeder Pillars - Single Door Feeder Pillars
Lucy Fortress Feeder Pillars - Single Door Feeder PillarsThorne & Derrick International
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 

Similar a M3 EG BQ timber windows (20)

Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02Lynca Meats - Pork Factory - Meyerton - Details 02
Lynca Meats - Pork Factory - Meyerton - Details 02
 
Lynca Meats - Pork Factory - Meyerton - Details 01
Lynca Meats - Pork Factory - Meyerton - Details 01Lynca Meats - Pork Factory - Meyerton - Details 01
Lynca Meats - Pork Factory - Meyerton - Details 01
 
Branddeur
Branddeur Branddeur
Branddeur
 
Supplier's rates updated
Supplier's rates updatedSupplier's rates updated
Supplier's rates updated
 
Doors final ppt
Doors final pptDoors final ppt
Doors final ppt
 
Porta Cabin Presentation
Porta Cabin PresentationPorta Cabin Presentation
Porta Cabin Presentation
 
Lucy Fortress Feeder Pillars - Double Door Feeder Pillars
Lucy Fortress Feeder Pillars - Double Door Feeder PillarsLucy Fortress Feeder Pillars - Double Door Feeder Pillars
Lucy Fortress Feeder Pillars - Double Door Feeder Pillars
 
Plan Details 1-5
Plan Details 1-5Plan Details 1-5
Plan Details 1-5
 
Plan Details 1-5
Plan Details 1-5Plan Details 1-5
Plan Details 1-5
 
Item
ItemItem
Item
 
rahta.pdf
rahta.pdfrahta.pdf
rahta.pdf
 
Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron Kaira
 
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 02
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 02Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 02
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 02
 
Jack_Lambourne - Portfolio
Jack_Lambourne - PortfolioJack_Lambourne - Portfolio
Jack_Lambourne - Portfolio
 
Killeshin building it carlow
Killeshin building it carlowKilleshin building it carlow
Killeshin building it carlow
 
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01
Lynca Meats - Pork Factory - Meyerton - Plan @ Floor Level 01
 
The specs of container house
The specs of container houseThe specs of container house
The specs of container house
 
Lucy Fortress Feeder Pillars - Single Door Feeder Pillars
Lucy Fortress Feeder Pillars - Single Door Feeder PillarsLucy Fortress Feeder Pillars - Single Door Feeder Pillars
Lucy Fortress Feeder Pillars - Single Door Feeder Pillars
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 

Más de Est

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017Est
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3Est
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4Est
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmEst
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM PartneringEst
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in constructionEst
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscmEst
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangementEst
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2Est
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016Est
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systemsEst
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmEst
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docxEst
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignmentEst
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MSEst
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrmEst
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergEst
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationEst
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communicationEst
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016Est
 

Más de Est (20)

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
 
CSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscmCSCM Supply chain management 312 cscm
CSCM Supply chain management 312 cscm
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
 

Último

ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILES
ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILESABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILES
ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILESsriharshaganjam1
 
Increasing Community Impact with Meaningful Engagement by Brytanee Brown
Increasing Community Impact with Meaningful Engagement by Brytanee BrownIncreasing Community Impact with Meaningful Engagement by Brytanee Brown
Increasing Community Impact with Meaningful Engagement by Brytanee BrownForth
 
Clean Mobility Options Program by Sarah Huang
Clean Mobility Options Program by Sarah HuangClean Mobility Options Program by Sarah Huang
Clean Mobility Options Program by Sarah HuangForth
 
Infineon-Infineon_DC_EV_Charging_Trends_and_system_solutions-ApplicationPrese...
Infineon-Infineon_DC_EV_Charging_Trends_and_system_solutions-ApplicationPrese...Infineon-Infineon_DC_EV_Charging_Trends_and_system_solutions-ApplicationPrese...
Infineon-Infineon_DC_EV_Charging_Trends_and_system_solutions-ApplicationPrese...IEABODI2SnVVnGimcEAI
 
Bizwerx Innovation & Mobility Hub by Dr. Cassandra Little
Bizwerx Innovation & Mobility Hub by Dr. Cassandra LittleBizwerx Innovation & Mobility Hub by Dr. Cassandra Little
Bizwerx Innovation & Mobility Hub by Dr. Cassandra LittleForth
 
Welcome to Auto Know University Orientation
Welcome to Auto Know University OrientationWelcome to Auto Know University Orientation
Welcome to Auto Know University Orientationxlr8sales
 
怎么办理美国UCONN毕业证康涅狄格大学学位证书一手渠道
怎么办理美国UCONN毕业证康涅狄格大学学位证书一手渠道怎么办理美国UCONN毕业证康涅狄格大学学位证书一手渠道
怎么办理美国UCONN毕业证康涅狄格大学学位证书一手渠道7283h7lh
 
Human Resource Practices TATA MOTORS.pdf
Human Resource Practices TATA MOTORS.pdfHuman Resource Practices TATA MOTORS.pdf
Human Resource Practices TATA MOTORS.pdfAditiMishra247289
 

Último (8)

ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILES
ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILESABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILES
ABOUT REGENERATIVE BRAKING SYSTEM ON AUTOMOBILES
 
Increasing Community Impact with Meaningful Engagement by Brytanee Brown
Increasing Community Impact with Meaningful Engagement by Brytanee BrownIncreasing Community Impact with Meaningful Engagement by Brytanee Brown
Increasing Community Impact with Meaningful Engagement by Brytanee Brown
 
Clean Mobility Options Program by Sarah Huang
Clean Mobility Options Program by Sarah HuangClean Mobility Options Program by Sarah Huang
Clean Mobility Options Program by Sarah Huang
 
Infineon-Infineon_DC_EV_Charging_Trends_and_system_solutions-ApplicationPrese...
Infineon-Infineon_DC_EV_Charging_Trends_and_system_solutions-ApplicationPrese...Infineon-Infineon_DC_EV_Charging_Trends_and_system_solutions-ApplicationPrese...
Infineon-Infineon_DC_EV_Charging_Trends_and_system_solutions-ApplicationPrese...
 
Bizwerx Innovation & Mobility Hub by Dr. Cassandra Little
Bizwerx Innovation & Mobility Hub by Dr. Cassandra LittleBizwerx Innovation & Mobility Hub by Dr. Cassandra Little
Bizwerx Innovation & Mobility Hub by Dr. Cassandra Little
 
Welcome to Auto Know University Orientation
Welcome to Auto Know University OrientationWelcome to Auto Know University Orientation
Welcome to Auto Know University Orientation
 
怎么办理美国UCONN毕业证康涅狄格大学学位证书一手渠道
怎么办理美国UCONN毕业证康涅狄格大学学位证书一手渠道怎么办理美国UCONN毕业证康涅狄格大学学位证书一手渠道
怎么办理美国UCONN毕业证康涅狄格大学学位证书一手渠道
 
Human Resource Practices TATA MOTORS.pdf
Human Resource Practices TATA MOTORS.pdfHuman Resource Practices TATA MOTORS.pdf
Human Resource Practices TATA MOTORS.pdf
 

M3 EG BQ timber windows

  • 1. ITEM DESCRIPTION UNIT RATE (RM) BILL NO. 7 - Doors and Windows Precast Concrete Lintel A 115 mm x 150mm depth m 18 precast concrete grade 20 lintel reinforced with 2 nos 12mm diameter high tensile bars ands 6mm mild steel stirrup at 150mm center and bedded in cement and sand (1:3) mortar. Packing piece B 75mm x 16mm sawn pressure treated m 48 Grade B timber guard fixed to conrete work & brickwork Purpose made windows & frame C 1690mmx1280mm pressure No 8 treated Grade B timber windows & window frames including 25mm x 75mm double leaves, rebated casement in single pane, 150mmx50mm rebated head & jambs, twice rebated mullions, 200mm x 50mm sunk, weathered & throated sill & screwed to timber guards. Ironmongeries Supply and fix the following or other equal and approved ironmongery complete with requisite matching screws:- D Dex 100mm pressed steel butt hinges & No 32 fixed to timber E Yale 5400 Series Window lock handle including nuts and No 16 bolts fixed to timber window. Glazing F 5mm thick clear float glass fixed to m2 12 timber beads in panes area exceeding 0.1m2 but not exceeding 0.5 m2 Painting Prepare and apply one coat of Jotun Gardex zinc chromate primer or other approved equivalent primer paints as desribed on: G General surface of timber not exceeding 150mm girth m 96 Knotting, stopping and apply one coat of Jotun Gardex primer, one Jotun Gardex undercoat and two finishing coats of Jotun Gardex or other approved equivalent gloss paint as desribed on: H Timber window, over 300mm girth m2 35 TO COLLECTION (RM) AMOUNTQTY.