Strategic project integration

Strategic Integration
Business Case
Cultural Evaluation
Project Plan
Policy Deployment Matrix
Results
Strategic Integration Project
Business Problems
Poor Delivery and Customer Service
Cost Competiveness
Scrap at 5% of sales
Plant losing significant cash and income
Company Culture Evaluation
Operations
No lean work
Labor underutilized
Bottleneck not managed
High energy cost electricity used for
wash water $1,100,000 energy bill
No significant safety process
Bonding
Weekly customer rejects
On time delivery is dismal
Strained personal relationships,
customer can go elsewhere for parts.
Product Offering
New product introduced with
significant quality problems.
Quality
$1,000,000 in scrap
No process controls
Human Resources
No training of senior or middle
managers.
Direct labor are basically
considered machine loaders
Technology
Sister plant making similar product
are automated to reduce labor cost.
Projects to Move the company
Operations
Plant layout improvement to
improve bottleneck
Standard work project to improve
labor utilization.
Standard work project to improve
labor utilization in assembly/honing etc.
Do significant cap ex energy project
to convert electric heat to gas heat.
Bonding
Create written corrective actions for
all customer rejects to demonstrate we
have controls on the problems.
Make presentation on bottleneck
improvements and lean improvements.
.
Product Offering
Suggest design changes in new
product.
Quality
Perform Black Belt level project
and 4 Green Belt projects.
Create controls in plating and
machining.
Human Resources
Eliminate some managers.
Training for managers, ISO,
Greenbelt, Lean, Safety,
Train direct labor in SPC, Process
control, and lean implementation
Technology
Create robust processes ready for
automation.
Strategic Integration Project
Long term plan: Solve all of the problems and leverage the
knowledge to automate the plant.
Strategic project integration
Project Performance
All projects at edwardhalljones.com
Lean Process Design
Scorecard A3: 2 stroke machining
Plant layout Project
Resilient Quality Systems Design
Case Study: Improve Process Control, Implement SPC, Resilient Corrective
Actions----- summary of actual work performed
Six Sigma Projects
Broken Fins, Perpendicularity of bore, Compression Volume
Energy Systems
Case Study: Reduce Process Energy
Use Minitab to track cost improvement
Note reduction in cost variation as lean is implemented
Determine the supply curve
Demonstrates the effectiveness of continuous improvement and the effects
of volume on price.
1 de 9

Recomendados

Strategic project integration por
Strategic project integrationStrategic project integration
Strategic project integrationEdward Jones
59 vistas9 diapositivas
Strategic project integration por
Strategic project integrationStrategic project integration
Strategic project integrationEdward Jones
248 vistas11 diapositivas
Lean manufacturing case study por
  Lean manufacturing case study  Lean manufacturing case study
Lean manufacturing case studymallicknazrul
372 vistas2 diapositivas
Lean manufacturing case study por
Lean manufacturing case studyLean manufacturing case study
Lean manufacturing case studyTri Dung Nguyen
4.1K vistas25 diapositivas
Cost of Poor quality por
Cost of  Poor qualityCost of  Poor quality
Cost of Poor qualityRaghvendra Rangaswamy Gopal
896 vistas10 diapositivas
Knowledge Management at Tata Autocomp Ltd. por
Knowledge Management at Tata Autocomp Ltd. Knowledge Management at Tata Autocomp Ltd.
Knowledge Management at Tata Autocomp Ltd. Meenakshi Gedala
194 vistas8 diapositivas

Más contenido relacionado

La actualidad más candente

Cost of quality por
Cost of qualityCost of quality
Cost of qualityWael Khalil
864 vistas12 diapositivas
Paul_Resume-2017 por
Paul_Resume-2017Paul_Resume-2017
Paul_Resume-2017Paul Kizewski
63 vistas2 diapositivas
Decision Optimization for Manufacturing por
Decision Optimization for ManufacturingDecision Optimization for Manufacturing
Decision Optimization for ManufacturingOptimiser.com
34 vistas4 diapositivas
Concurrent Engineering in Industry por
Concurrent Engineering in IndustryConcurrent Engineering in Industry
Concurrent Engineering in IndustryPrashanth Selvam
80 vistas19 diapositivas
Cost of Poor Quality - Lean Conference 2016 por
Cost of Poor Quality - Lean Conference 2016Cost of Poor Quality - Lean Conference 2016
Cost of Poor Quality - Lean Conference 2016Senapu
1.1K vistas17 diapositivas
Listing of courses and seminars, May 2016 por
Listing of courses and seminars, May 2016Listing of courses and seminars, May 2016
Listing of courses and seminars, May 2016Denis Hogya
106 vistas1 diapositiva

La actualidad más candente(20)

Cost of quality por Wael Khalil
Cost of qualityCost of quality
Cost of quality
Wael Khalil864 vistas
Decision Optimization for Manufacturing por Optimiser.com
Decision Optimization for ManufacturingDecision Optimization for Manufacturing
Decision Optimization for Manufacturing
Optimiser.com34 vistas
Cost of Poor Quality - Lean Conference 2016 por Senapu
Cost of Poor Quality - Lean Conference 2016Cost of Poor Quality - Lean Conference 2016
Cost of Poor Quality - Lean Conference 2016
Senapu1.1K vistas
Listing of courses and seminars, May 2016 por Denis Hogya
Listing of courses and seminars, May 2016Listing of courses and seminars, May 2016
Listing of courses and seminars, May 2016
Denis Hogya106 vistas
factors affecting prodution por aliyashakil
factors affecting produtionfactors affecting prodution
factors affecting prodution
aliyashakil8.9K vistas
Ops 571 final exam questions and correct answers 100% guaranteed# por siliverseyr
Ops 571 final exam questions and correct answers 100% guaranteed#Ops 571 final exam questions and correct answers 100% guaranteed#
Ops 571 final exam questions and correct answers 100% guaranteed#
siliverseyr7.4K vistas
A project management approach led process improvement ( case study) por Certification Planner
A project management approach led process improvement ( case study)A project management approach led process improvement ( case study)
A project management approach led process improvement ( case study)
Quantre Initial Solutions por Scott Mulkey
Quantre Initial SolutionsQuantre Initial Solutions
Quantre Initial Solutions
Scott Mulkey301 vistas
Cost of Quality Short Overview por Sheryl Johnson
Cost of Quality Short OverviewCost of Quality Short Overview
Cost of Quality Short Overview
Sheryl Johnson1.1K vistas

Destacado

Application Reports Success stories from the real world 2016 por
Application Reports Success stories from the real world 2016Application Reports Success stories from the real world 2016
Application Reports Success stories from the real world 2016ifm electronic gmbh
685 vistas40 diapositivas
Mustafa Değerli - 2017 - Doktora Tezi - Teknoloji Transfer Ofisleri için Krit... por
Mustafa Değerli - 2017 - Doktora Tezi - Teknoloji Transfer Ofisleri için Krit...Mustafa Değerli - 2017 - Doktora Tezi - Teknoloji Transfer Ofisleri için Krit...
Mustafa Değerli - 2017 - Doktora Tezi - Teknoloji Transfer Ofisleri için Krit...Dr. Mustafa Değerli
184 vistas23 diapositivas
Regularized Principal Component Analysis for Spatial Data por
Regularized Principal Component Analysis for Spatial DataRegularized Principal Component Analysis for Spatial Data
Regularized Principal Component Analysis for Spatial DataWen-Ting Wang
491 vistas116 diapositivas
Paisatge tropical por
Paisatge tropicalPaisatge tropical
Paisatge tropicalCristina Méndez Cuadrado
2.5K vistas10 diapositivas
El paisatge continental (1A) por
El paisatge continental (1A)El paisatge continental (1A)
El paisatge continental (1A)cmendez6
1.6K vistas9 diapositivas
презентация1 por
презентация1презентация1
презентация1ivelena
496 vistas7 diapositivas

Destacado(8)

Application Reports Success stories from the real world 2016 por ifm electronic gmbh
Application Reports Success stories from the real world 2016Application Reports Success stories from the real world 2016
Application Reports Success stories from the real world 2016
ifm electronic gmbh685 vistas
Mustafa Değerli - 2017 - Doktora Tezi - Teknoloji Transfer Ofisleri için Krit... por Dr. Mustafa Değerli
Mustafa Değerli - 2017 - Doktora Tezi - Teknoloji Transfer Ofisleri için Krit...Mustafa Değerli - 2017 - Doktora Tezi - Teknoloji Transfer Ofisleri için Krit...
Mustafa Değerli - 2017 - Doktora Tezi - Teknoloji Transfer Ofisleri için Krit...
Regularized Principal Component Analysis for Spatial Data por Wen-Ting Wang
Regularized Principal Component Analysis for Spatial DataRegularized Principal Component Analysis for Spatial Data
Regularized Principal Component Analysis for Spatial Data
Wen-Ting Wang491 vistas
El paisatge continental (1A) por cmendez6
El paisatge continental (1A)El paisatge continental (1A)
El paisatge continental (1A)
cmendez61.6K vistas
презентация1 por ivelena
презентация1презентация1
презентация1
ivelena496 vistas
El clima mediterrani (1B) por cmendez6
El clima mediterrani (1B)El clima mediterrani (1B)
El clima mediterrani (1B)
cmendez61.2K vistas

Similar a Strategic project integration

Hi Performance Manufacturing por
Hi Performance ManufacturingHi Performance Manufacturing
Hi Performance ManufacturingAlex Diong
493 vistas33 diapositivas
What is six sigma por
What is six sigmaWhat is six sigma
What is six sigmaMuhammad Islam
277 vistas4 diapositivas
NPI operations eng por
NPI operations eng NPI operations eng
NPI operations eng Craig Oeser
82 vistas2 diapositivas
Gazelles_Mfg_casestudies por
Gazelles_Mfg_casestudiesGazelles_Mfg_casestudies
Gazelles_Mfg_casestudiesSantosh Govind Bhosale
270 vistas10 diapositivas
C12 quality por
C12 qualityC12 quality
C12 qualityhakimizaki
3.8K vistas62 diapositivas
C12 quality por
C12 qualityC12 quality
C12 qualityhakimizaki
1.2K vistas62 diapositivas

Similar a Strategic project integration(20)

Hi Performance Manufacturing por Alex Diong
Hi Performance ManufacturingHi Performance Manufacturing
Hi Performance Manufacturing
Alex Diong493 vistas
NPI operations eng por Craig Oeser
NPI operations eng NPI operations eng
NPI operations eng
Craig Oeser82 vistas
C12 quality por hakimizaki
C12 qualityC12 quality
C12 quality
hakimizaki3.8K vistas
C12 quality por hakimizaki
C12 qualityC12 quality
C12 quality
hakimizaki1.2K vistas
Modern businessenvironmentandmanagementaccounting por Ismail Noordin
Modern businessenvironmentandmanagementaccountingModern businessenvironmentandmanagementaccounting
Modern businessenvironmentandmanagementaccounting
Ismail Noordin5.9K vistas
Introductory Advantage Presentation Case Study por Earlynn373
Introductory Advantage Presentation Case StudyIntroductory Advantage Presentation Case Study
Introductory Advantage Presentation Case Study
Earlynn373179 vistas
Stevenson9e Ch04 por ajithsrc
Stevenson9e Ch04Stevenson9e Ch04
Stevenson9e Ch04
ajithsrc2.7K vistas
Lean Tools and resulting ROI 2015 por Bill Bearnson
Lean Tools and resulting ROI 2015Lean Tools and resulting ROI 2015
Lean Tools and resulting ROI 2015
Bill Bearnson209 vistas
An introduction to EECO2-Energy Efficiency Consultancy Limited por EECO2
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy Limited
EECO2765 vistas
EECO2 GMP critical HVAC energy cost reduction por Keith Beattie
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reduction
Keith Beattie976 vistas
Make green go green by going lean por bwu.nl
Make green go green by going leanMake green go green by going lean
Make green go green by going lean
bwu.nl1.7K vistas
Six Sigma Vs Kaizen por pgopala
Six Sigma Vs KaizenSix Sigma Vs Kaizen
Six Sigma Vs Kaizen
pgopala1.4K vistas
Six sigma vs kaizen por Gopala P.
Six sigma vs kaizenSix sigma vs kaizen
Six sigma vs kaizen
Gopala P.29.2K vistas

Más de Edward Jones

Resilient systems design por
Resilient systems designResilient systems design
Resilient systems designEdward Jones
234 vistas23 diapositivas
Resilient systems design por
Resilient systems designResilient systems design
Resilient systems designEdward Jones
159 vistas23 diapositivas
Strategic project integration por
Strategic project integrationStrategic project integration
Strategic project integrationEdward Jones
56 vistas9 diapositivas
Scorecard a3 2 stroke por
 Scorecard a3  2 stroke Scorecard a3  2 stroke
Scorecard a3 2 strokeEdward Jones
305 vistas2 diapositivas
Actual cost example por
Actual cost exampleActual cost example
Actual cost exampleEdward Jones
444 vistas3 diapositivas
Plant layout a3 por
Plant layout a3Plant layout a3
Plant layout a3Edward Jones
419 vistas4 diapositivas

Más de Edward Jones(13)

Resilient systems design por Edward Jones
Resilient systems designResilient systems design
Resilient systems design
Edward Jones234 vistas
Resilient systems design por Edward Jones
Resilient systems designResilient systems design
Resilient systems design
Edward Jones159 vistas
Strategic project integration por Edward Jones
Strategic project integrationStrategic project integration
Strategic project integration
Edward Jones56 vistas
Scorecard a3 2 stroke por Edward Jones
 Scorecard a3  2 stroke Scorecard a3  2 stroke
Scorecard a3 2 stroke
Edward Jones305 vistas
Actual cost example por Edward Jones
Actual cost exampleActual cost example
Actual cost example
Edward Jones444 vistas
Strategic project integration por Edward Jones
Strategic project integrationStrategic project integration
Strategic project integration
Edward Jones86 vistas
Carlin scorecard a3 por Edward Jones
Carlin scorecard a3Carlin scorecard a3
Carlin scorecard a3
Edward Jones295 vistas
Syed salman abbas green belt nov15 por Edward Jones
Syed salman abbas green belt nov15Syed salman abbas green belt nov15
Syed salman abbas green belt nov15
Edward Jones553 vistas
Safety System Process por Edward Jones
Safety System ProcessSafety System Process
Safety System Process
Edward Jones287 vistas
Yun Shen Green Belt por Edward Jones
Yun Shen Green Belt Yun Shen Green Belt
Yun Shen Green Belt
Edward Jones271 vistas

Último

7 Questions on Leadership with William H. Bender.pdf por
7 Questions on Leadership with William H. Bender.pdf7 Questions on Leadership with William H. Bender.pdf
7 Questions on Leadership with William H. Bender.pdfWilliam (Bill) H. Bender, FCSI
17 vistas10 diapositivas
SpatzAI - Powering Bold Idea-sharing in Teams Spat by Spat por
SpatzAI - Powering Bold Idea-sharing in Teams Spat by SpatSpatzAI - Powering Bold Idea-sharing in Teams Spat by Spat
SpatzAI - Powering Bold Idea-sharing in Teams Spat by SpatDesmond Sherlock
20 vistas11 diapositivas
TITAN SUBMARINE por
TITAN SUBMARINETITAN SUBMARINE
TITAN SUBMARINEsupiriyakithuva
21 vistas9 diapositivas
TAX ANALYSIS (CASE OF RWANDA).pptx por
TAX ANALYSIS (CASE  OF RWANDA).pptxTAX ANALYSIS (CASE  OF RWANDA).pptx
TAX ANALYSIS (CASE OF RWANDA).pptxSadamuFrancois
10 vistas29 diapositivas
The Wheel of Life - Coaching Wheel por
The Wheel of Life - Coaching WheelThe Wheel of Life - Coaching Wheel
The Wheel of Life - Coaching WheelAlex Clapson
20 vistas1 diapositiva
Action Project Presentation.pptx por
Action Project Presentation.pptxAction Project Presentation.pptx
Action Project Presentation.pptxKhondoker Rukaiya Siddiqa
17 vistas5 diapositivas

Último(14)

SpatzAI - Powering Bold Idea-sharing in Teams Spat by Spat por Desmond Sherlock
SpatzAI - Powering Bold Idea-sharing in Teams Spat by SpatSpatzAI - Powering Bold Idea-sharing in Teams Spat by Spat
SpatzAI - Powering Bold Idea-sharing in Teams Spat by Spat
Desmond Sherlock20 vistas
TAX ANALYSIS (CASE OF RWANDA).pptx por SadamuFrancois
TAX ANALYSIS (CASE  OF RWANDA).pptxTAX ANALYSIS (CASE  OF RWANDA).pptx
TAX ANALYSIS (CASE OF RWANDA).pptx
SadamuFrancois10 vistas
The Wheel of Life - Coaching Wheel por Alex Clapson
The Wheel of Life - Coaching WheelThe Wheel of Life - Coaching Wheel
The Wheel of Life - Coaching Wheel
Alex Clapson20 vistas
Lucky Cement Presentation.pdf por bakhtawaraq
Lucky Cement Presentation.pdfLucky Cement Presentation.pdf
Lucky Cement Presentation.pdf
bakhtawaraq9 vistas
balixa.io Plan.pdf por tycoonone91
balixa.io Plan.pdfbalixa.io Plan.pdf
balixa.io Plan.pdf
tycoonone9128 vistas
Workplace innovation webinar and book presentation por Peter Oeij
Workplace innovation webinar and book presentationWorkplace innovation webinar and book presentation
Workplace innovation webinar and book presentation
Peter Oeij24 vistas
v20231127 WHOPE BEMA Day One Sendai Framework Volunteer Workshop Session Zoom... por Andrew Networks
v20231127 WHOPE BEMA Day One Sendai Framework Volunteer Workshop Session Zoom...v20231127 WHOPE BEMA Day One Sendai Framework Volunteer Workshop Session Zoom...
v20231127 WHOPE BEMA Day One Sendai Framework Volunteer Workshop Session Zoom...
Andrew Networks48 vistas
Cracking the Optimism vs Pessimism Code.pptx por Workforce Group
Cracking the Optimism vs Pessimism Code.pptxCracking the Optimism vs Pessimism Code.pptx
Cracking the Optimism vs Pessimism Code.pptx
Workforce Group27 vistas
What Is Psychological Safety? por Alex Clapson
What Is Psychological Safety?What Is Psychological Safety?
What Is Psychological Safety?
Alex Clapson24 vistas

Strategic project integration

  • 1. Strategic Integration Business Case Cultural Evaluation Project Plan Policy Deployment Matrix Results
  • 2. Strategic Integration Project Business Problems Poor Delivery and Customer Service Cost Competiveness Scrap at 5% of sales Plant losing significant cash and income
  • 3. Company Culture Evaluation Operations No lean work Labor underutilized Bottleneck not managed High energy cost electricity used for wash water $1,100,000 energy bill No significant safety process Bonding Weekly customer rejects On time delivery is dismal Strained personal relationships, customer can go elsewhere for parts. Product Offering New product introduced with significant quality problems. Quality $1,000,000 in scrap No process controls Human Resources No training of senior or middle managers. Direct labor are basically considered machine loaders Technology Sister plant making similar product are automated to reduce labor cost.
  • 4. Projects to Move the company Operations Plant layout improvement to improve bottleneck Standard work project to improve labor utilization. Standard work project to improve labor utilization in assembly/honing etc. Do significant cap ex energy project to convert electric heat to gas heat. Bonding Create written corrective actions for all customer rejects to demonstrate we have controls on the problems. Make presentation on bottleneck improvements and lean improvements. . Product Offering Suggest design changes in new product. Quality Perform Black Belt level project and 4 Green Belt projects. Create controls in plating and machining. Human Resources Eliminate some managers. Training for managers, ISO, Greenbelt, Lean, Safety, Train direct labor in SPC, Process control, and lean implementation Technology Create robust processes ready for automation.
  • 5. Strategic Integration Project Long term plan: Solve all of the problems and leverage the knowledge to automate the plant.
  • 7. Project Performance All projects at edwardhalljones.com Lean Process Design Scorecard A3: 2 stroke machining Plant layout Project Resilient Quality Systems Design Case Study: Improve Process Control, Implement SPC, Resilient Corrective Actions----- summary of actual work performed Six Sigma Projects Broken Fins, Perpendicularity of bore, Compression Volume Energy Systems Case Study: Reduce Process Energy
  • 8. Use Minitab to track cost improvement Note reduction in cost variation as lean is implemented
  • 9. Determine the supply curve Demonstrates the effectiveness of continuous improvement and the effects of volume on price.