Strategic project integration

Strategic Integration
Business Case
Cultural Evaluation
Project Plan
Policy Deployment Matrix
Results
Strategic Integration Project
Business Problems
Poor Delivery and Customer Service
Cost Competiveness
Scrap at 5% of sales
Plant losing significant cash and income
Company Culture Evaluation
Operations
No lean work
Labor underutilized
Bottleneck not managed
High energy cost electricity used for
wash water $1,100,000 energy bill
No significant safety process
Bonding
Weekly customer rejects
On time delivery is dismal
Strained personal relationships,
customer can go elsewhere for parts.
Product Offering
New product introduced with
significant quality problems.
Quality
$1,000,000 in scrap
No process controls
Human Resources
No training of senior or middle
managers.
Direct labor are basically
considered machine loaders
Technology
Sister plant making similar product
are automated to reduce labor cost.
Projects to move from A to B
Operations
Plant layout improvement to
improve bottleneck
Standard work project to improve
labor utilization.
Standard work project to improve
labor utilization in assembly/honing etc.
Do significant cap ex energy project
to convert electric heat to gas heat.
Bonding
Create written corrective actions for
all customer rejects to demonstrate we
have controls on the problems.
Make presentation on bottleneck
improvements and lean improvements.
.
Product Offering
Suggest design changes in new
product.
Quality
Perform Black Belt level project
and 4 Green Belt projects.
Create controls in plating and
machining.
Human Resources
Eliminate some managers.
Training for managers, ISO,
Greenbelt, Lean, Safety,
Train direct labor in SPC, Process
control, and lean implementation
Technology
Create robust processes ready for
automation.
Strategic Integration Project
Long term plan: Solve all of the problems and leverage the
knowledge to automate the plant.
Strategic project integration
Project Performance
All projects at edwardhalljones.com
Lean Process Design
Scorecard A3: 2 stroke machining
Plant layout Project
Resilient Quality Systems Design
Case Study: Improve Process Control, Implement SPC, Resilient Corrective
Actions----- summary of actual work performed
Six Sigma Projects
Broken Fins, Perpendicularity of bore, Compression Volume
Energy Systems
Case Study: Reduce Process Energy
Use Minitab to track cost improvement
Note reduction in cost variation as lean is implemented
Determine the supply curve
Demonstrates the effectiveness of continuous improvement and the effects
of volume on price.
1 de 9

Más contenido relacionado

La actualidad más candente

factors affecting produtionfactors affecting prodution
factors affecting produtionaliyashakil
8.9K vistas16 diapositivas
Paul_Resume-2017Paul_Resume-2017
Paul_Resume-2017Paul Kizewski
63 vistas2 diapositivas
MethodsMethods
Methodssunainaganotra
1.5K vistas18 diapositivas

La actualidad más candente(20)

factors affecting produtionfactors affecting prodution
factors affecting prodution
aliyashakil8.9K vistas
Paul_Resume-2017Paul_Resume-2017
Paul_Resume-2017
Paul Kizewski63 vistas
MethodsMethods
Methods
sunainaganotra1.5K vistas
Concurrent Engineering in IndustryConcurrent Engineering in Industry
Concurrent Engineering in Industry
Prashanth Selvam80 vistas
Concurrent engineering Concurrent engineering
Concurrent engineering
Amol Chakankar979 vistas
MxMax Productivity IntroMxMax Productivity Intro
MxMax Productivity Intro
DBrownMx528 vistas
Concurrent EngineeringConcurrent Engineering
Concurrent Engineering
BipinKumarJha1591 vistas
SAP Business One for Quality ManagementSAP Business One for Quality Management
SAP Business One for Quality Management
Uneecops_Technologies547 vistas
Driving innovation through simulation ANSYSDriving innovation through simulation ANSYS
Driving innovation through simulation ANSYS
Olivia Margot Giussani188 vistas
Cost of Quality Short OverviewCost of Quality Short Overview
Cost of Quality Short Overview
Sheryl Johnson1.1K vistas
Quality BenifitsQuality Benifits
Quality Benifits
Ahmed Seraj1K vistas
Concurrent engineeringConcurrent engineering
Concurrent engineering
SHAKTI PRASAD327 vistas

Destacado

Safety System ProcessSafety System Process
Safety System ProcessEdward Jones
287 vistas11 diapositivas
Actual cost exampleActual cost example
Actual cost exampleEdward Jones
444 vistas3 diapositivas
Alba y ángelaAlba y ángela
Alba y ángelaMercheClemente
123 vistas7 diapositivas
Las plantas y los hongosLas plantas y los hongos
Las plantas y los hongosMercheClemente
3.1K vistas9 diapositivas

Destacado(14)

Strategic project integrationStrategic project integration
Strategic project integration
Edward Jones56 vistas
Safety System ProcessSafety System Process
Safety System Process
Edward Jones287 vistas
Actual cost exampleActual cost example
Actual cost example
Edward Jones444 vistas
Biografía de pepe jose lucas paulaBiografía de pepe jose lucas paula
Biografía de pepe jose lucas paula
MercheClemente922 vistas
Alba y ángelaAlba y ángela
Alba y ángela
MercheClemente123 vistas
Las plantas y los hongosLas plantas y los hongos
Las plantas y los hongos
MercheClemente3.1K vistas
ConstructivismoConstructivismo
Constructivismo
Tania Tingo356 vistas
project report on hadoopproject report on hadoop
project report on hadoop
Manoj Jangalva469 vistas
Betsy leon ramirez22222Betsy leon ramirez22222
Betsy leon ramirez22222
lilibets57 vistas
CAREER strategy placemat for Roger Clowater - police foundationsCAREER strategy placemat for Roger Clowater - police foundations
CAREER strategy placemat for Roger Clowater - police foundations
Roger Clowater MSc LION roger@rogerclowater.ca332 vistas
Proyecto 2 los seres vivos.los animalesProyecto 2 los seres vivos.los animales
Proyecto 2 los seres vivos.los animales
MercheClemente834 vistas
Docentes en entronos virtuales, grupo 3Docentes en entronos virtuales, grupo 3
Docentes en entronos virtuales, grupo 3
yarelisgonzalezperez248 vistas

Similar a Strategic project integration

Hi Performance ManufacturingHi Performance Manufacturing
Hi Performance ManufacturingAlex Diong
493 vistas33 diapositivas
NPI operations eng NPI operations eng
NPI operations eng Craig Oeser
82 vistas2 diapositivas
What is six sigmaWhat is six sigma
What is six sigmaMuhammad Islam
277 vistas4 diapositivas
Dulan_Resume_QEDulan_Resume_QE
Dulan_Resume_QERobert Dulan
123 vistas2 diapositivas
C12 qualityC12 quality
C12 qualityhakimizaki
3.8K vistas62 diapositivas

Similar a Strategic project integration(20)

Hi Performance ManufacturingHi Performance Manufacturing
Hi Performance Manufacturing
Alex Diong493 vistas
NPI operations eng NPI operations eng
NPI operations eng
Craig Oeser82 vistas
Gazelles_Mfg_casestudiesGazelles_Mfg_casestudies
Gazelles_Mfg_casestudies
Santosh Govind Bhosale270 vistas
What is six sigmaWhat is six sigma
What is six sigma
Muhammad Islam277 vistas
Dulan_Resume_QEDulan_Resume_QE
Dulan_Resume_QE
Robert Dulan123 vistas
C12 qualityC12 quality
C12 quality
hakimizaki3.8K vistas
C12 qualityC12 quality
C12 quality
hakimizaki1.2K vistas
principle of six sigmaprinciple of six sigma
principle of six sigma
Lyceum of The Philippines University3.7K vistas
cost of qualitycost of quality
cost of quality
Mr.Ramesh Chandra Panda4.9K vistas
Stevenson9e Ch04Stevenson9e Ch04
Stevenson9e Ch04
ajithsrc2.7K vistas
Lean Tools and resulting ROI 2015Lean Tools and resulting ROI 2015
Lean Tools and resulting ROI 2015
Bill Bearnson209 vistas
LEAN MANUFACTURING USESLEAN MANUFACTURING USES
LEAN MANUFACTURING USES
venky venkatesh471 vistas
Angela Gallegos - Sept 2015 v1Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1
Angela H. Gallegos290 vistas
Lean vs six sigma  -jkLean vs six sigma  -jk
Lean vs six sigma -jk
Julian Kalac P.Eng4.5K vistas
About Andrew AvgoustiAbout Andrew Avgousti
About Andrew Avgousti
aavgousti593 vistas
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
Keya Bhattacharyya177 vistas

Más de Edward Jones

Resilient systems designResilient systems design
Resilient systems designEdward Jones
234 vistas23 diapositivas
Resilient systems designResilient systems design
Resilient systems designEdward Jones
159 vistas23 diapositivas
 Scorecard a3  2 stroke Scorecard a3  2 stroke
Scorecard a3 2 strokeEdward Jones
305 vistas2 diapositivas
Plant layout a3Plant layout a3
Plant layout a3Edward Jones
419 vistas4 diapositivas
Carlin scorecard a3Carlin scorecard a3
Carlin scorecard a3Edward Jones
295 vistas2 diapositivas

Más de Edward Jones(10)

Resilient systems designResilient systems design
Resilient systems design
Edward Jones234 vistas
Resilient systems designResilient systems design
Resilient systems design
Edward Jones159 vistas
 Scorecard a3  2 stroke Scorecard a3  2 stroke
Scorecard a3 2 stroke
Edward Jones305 vistas
Plant layout a3Plant layout a3
Plant layout a3
Edward Jones419 vistas
Strategic project integrationStrategic project integration
Strategic project integration
Edward Jones86 vistas
Carlin scorecard a3Carlin scorecard a3
Carlin scorecard a3
Edward Jones295 vistas
Problem solving Problem solving
Problem solving
Edward Jones487 vistas
Mahle scorecard a3Mahle scorecard a3
Mahle scorecard a3
Edward Jones86 vistas
Syed salman abbas green belt nov15Syed salman abbas green belt nov15
Syed salman abbas green belt nov15
Edward Jones553 vistas
Yun Shen Green Belt Yun Shen Green Belt
Yun Shen Green Belt
Edward Jones271 vistas

Último(9)

balixa.io Plan.pdfbalixa.io Plan.pdf
balixa.io Plan.pdf
tycoonone9115 vistas
The Wheel of Life - Coaching WheelThe Wheel of Life - Coaching Wheel
The Wheel of Life - Coaching Wheel
Alex Clapson11 vistas
What Is Psychological Safety?What Is Psychological Safety?
What Is Psychological Safety?
Alex Clapson11 vistas
TAX ANALYSIS (CASE  OF RWANDA).pptxTAX ANALYSIS (CASE  OF RWANDA).pptx
TAX ANALYSIS (CASE OF RWANDA).pptx
SadamuFrancois5 vistas
Don't play the Blame GameDon't play the Blame Game
Don't play the Blame Game
schlimbachmichael47 vistas
TITAN SUBMARINETITAN SUBMARINE
TITAN SUBMARINE
supiriyakithuva15 vistas

Strategic project integration

  • 1. Strategic Integration Business Case Cultural Evaluation Project Plan Policy Deployment Matrix Results
  • 2. Strategic Integration Project Business Problems Poor Delivery and Customer Service Cost Competiveness Scrap at 5% of sales Plant losing significant cash and income
  • 3. Company Culture Evaluation Operations No lean work Labor underutilized Bottleneck not managed High energy cost electricity used for wash water $1,100,000 energy bill No significant safety process Bonding Weekly customer rejects On time delivery is dismal Strained personal relationships, customer can go elsewhere for parts. Product Offering New product introduced with significant quality problems. Quality $1,000,000 in scrap No process controls Human Resources No training of senior or middle managers. Direct labor are basically considered machine loaders Technology Sister plant making similar product are automated to reduce labor cost.
  • 4. Projects to move from A to B Operations Plant layout improvement to improve bottleneck Standard work project to improve labor utilization. Standard work project to improve labor utilization in assembly/honing etc. Do significant cap ex energy project to convert electric heat to gas heat. Bonding Create written corrective actions for all customer rejects to demonstrate we have controls on the problems. Make presentation on bottleneck improvements and lean improvements. . Product Offering Suggest design changes in new product. Quality Perform Black Belt level project and 4 Green Belt projects. Create controls in plating and machining. Human Resources Eliminate some managers. Training for managers, ISO, Greenbelt, Lean, Safety, Train direct labor in SPC, Process control, and lean implementation Technology Create robust processes ready for automation.
  • 5. Strategic Integration Project Long term plan: Solve all of the problems and leverage the knowledge to automate the plant.
  • 7. Project Performance All projects at edwardhalljones.com Lean Process Design Scorecard A3: 2 stroke machining Plant layout Project Resilient Quality Systems Design Case Study: Improve Process Control, Implement SPC, Resilient Corrective Actions----- summary of actual work performed Six Sigma Projects Broken Fins, Perpendicularity of bore, Compression Volume Energy Systems Case Study: Reduce Process Energy
  • 8. Use Minitab to track cost improvement Note reduction in cost variation as lean is implemented
  • 9. Determine the supply curve Demonstrates the effectiveness of continuous improvement and the effects of volume on price.