REQUIREMENTS FOR BUILDING PLAN APPROVAL
RESIDENTIAL BUILDING
Bungalow Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦25/M3
iv. Ratification Fee= ₦10/M2
v. Land use clearance = ₦1,000
vi. Perimeter Fencing = (Perimeter) x ₦50
vii. Location plan must be sealed by a Registered Town Planner.
Bungalow Building in Other Local Government Headquarters
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦22.5/M3
iv. Ratification Fee= ₦5/M2
v. Land use clearance = ₦1,000
vi. Perimeter Fencing = (Perimeter) x ₦50
vii. Location plan must be sealed by a Registered Town Planner.
Bungalow Building in Other Towns
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦20/M3
iv. Ratification Fee= ₦5/M2
v. Land use clearance = ₦1,000
vi. Perimeter Fencing = (Perimeter) x ₦50
vii. Location plan must be sealed by a Registered Town Planner.
Storey Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦25/M3
vi. Ratification Fee= ₦10/M2
vii. Land use clearance = ₦1,000
viii. Perimeter Fencing = (Perimeter) x ₦50
ix. Location plan must be sealed by a Registered Town Planner.
Storey Building in Other Local Government Headquarters.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦22.5/M3
vi. Ratification Fee= ₦5/M2
vii. Land use clearance = ₦1,000
viii. Perimeter Fencing = (Perimeter) x ₦50
ix. Location plan must be sealed by a Registered Town Planner.
Storey Building in Other Towns.
I. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦20/M3
vi. Ratification Fee= ₦5/M2
vii. Land use clearance = ₦1,000
viii. Perimeter Fencing = (Perimeter) x ₦50
ix. Location plan must be sealed by a Registered Town Planner.
COMMERCIAL BUILDING
Bungalow/ Storey Building in Ado Ekiti.
I. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Environmental Impact Assessment.
iv. Letter of supervision by the Structural Engineer.
v. Approved survey plan by surveyor General.
vi. Assessment Fee = ₦40/M3
vii. Ratification Fee= ₦15/M2
viii. Land use clearance = ₦5,000
ix. Perimeter Fencing = (Perimeter) x ₦100
x. Location plan must be sealed by a Registered Town Planner.
Bungalow/ Storey Building in Other Towns.
I. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Environmental Impact Assessment.
iv. Letter of supervision by the Structural Engineer.
v. Approved survey plan by surveyor General.
vi. Assessment Fee = ₦40/M3
vii. Ratification Fee= ₦10/M2
viii. Land use clearance = ₦5,000
ix. Perimeter Fencing = (Perimeter) x ₦100
x. Location plan must be sealed by a Registered Town Planner.
BANK BUILDING
I. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Environmental Impact Assessment.
iv. Letter of supervision by the Structural Engineer.
v. Approved survey plan by surveyor General.
vi. Assessment Fee = ₦400/M3
vii. Ratification Fee= ₦15/M2
viii. Land use clearance = ₦5,000
ix. Perimeter Fencing = (Perimeter) x ₦100
x. Location plan must be sealed by a Registered Town Planner.
PETROL FILLING STATION
Filling Station in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer.
iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer
v. Environmental Impact Assessment.
vi. Fire Service Clearance.
vii. Police Traffic Clearance.
viii. Letter of suitability/feasibility Approval from DPR.
ix. Land use clearance Approval.
x. Current 3 years tax clearance and 3 years Development levy.
xi. Letter of supervision by the Structural Engineer.
xii. Approved survey plan by surveyor General.
xiii. Assessment Fee = ₦200,000/pump
xiv. Ratification Fee= ₦15/M2
xv. Land use clearance = ₦5,000
xvi. Perimeter Fencing = (Perimeter) x ₦100
xvii. Location plan must be sealed by a Registered Town Planner.
Filling Station in Other Local Government Area.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer.
iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer
v. Environmental Impact Assessment.
vi. Fire Service Clearance.
vii. Police Traffic Clearance.
viii. Land use clearance Approval.
ix. Letter of suitability/feasibility Approval from DPR.
x. Current 3 years tax clearance and 3 years Development levy.
xi. Letter of supervision by the Structural Engineer.
xii. Approved survey plan by surveyor General.
xiii. Assessment Fee = ₦150,000/pump
xiv. Ratification Fee= ₦15/M2
xv. Land use clearance = ₦5,000
xvi. Perimeter Fencing = (Perimeter) x ₦100
xvii. Location plan must be sealed by a Registered Town Planner.
Filling Station in Other Towns.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer.
iii. Four (4) sets of Electrical drawings sealed by a Registered Engineer
iv. Environmental Impact Assessment.
v. Fire Service Clearance.
vi. Police Traffic Clearance.
vii. Land use clearance Approval.
viii. Letter of suitability/feasibility Clearance from DPR.
ix. Current 3 years tax clearance and 3 years Development Levy.
x. Letter of supervision by the Structural Engineer.
xi. Approved survey plan by surveyor General.
xii. Assessment Fee = ₦100,000/pump
xiii. Ratification Fee= ₦15/M2
xiv. Land use clearance = ₦5,000
xv. Perimeter Fencing = (Perimeter) x ₦100
xvi. Location plan must be sealed by a Registered Town Planner.
GAS STATION.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer.
iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer
v. Environmental Impact Assessment.
vi. Fire Service Clearance.
vii. Police Traffic Clearance.
viii. Land use clearance Approval.
ix. Letter of suitability/feasibility from DPR.
x. Current 3 years tax clearance and 3 years Development Levy.
xi. Letter of supervision by the Structural Engineer.
xii. Approved survey plan by surveyor General.
xiii. Assessment Fee = ₦500,000
xiv. Ratification Fee= ₦15/M2
xv. Land use clearance = ₦5,000
xvi. Perimeter Fencing = (Perimeter) x ₦100
xvii. Location plan must be sealed by a Registered Town Planner.
HOSTEL.
Bungalow Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦35/M3
iv. Ratification Fee= ₦15/M2
v. Land use clearance = ₦5,000
vi. Perimeter Fencing = (Perimeter) x ₦100
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
Storey Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦35/M3
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Bungalow Building in Other Local Government.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦35/M3
iv. Ratification Fee= ₦10/M2
v. Land use clearance = ₦5,000
vi. Perimeter Fencing = (Perimeter) x ₦100
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
Storey Building in Other Towns.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦35/M3
vi. Ratification Fee= ₦10/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
SAWMILL.
Saw Mill in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦250,000/Mill
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Saw Mill in Other Towns.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦150,000/Mill
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
HOTEL/EATERY/RESTAURANTS
Bungalow Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦50/M3
iv. Ratification Fee= ₦15/M2
v. Land use clearance = ₦5,000
vi. Perimeter Fencing = (Perimeter) x ₦100
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
Storey Building in Ado Ekiti.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦50/M3
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Bungalow Building in Other Local Government.
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦50/M3
iv. Ratification Fee= ₦10/M2
v. Land use clearance = ₦5,000
vi. Perimeter Fencing = (Perimeter) x ₦100
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
Storey Building in Other Towns.
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦50/M3
vi. Ratification Fee= ₦10/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
LIGHT INDUSTRY
Block Making Industry
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦25,000
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Concrete Industry
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦40,000
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Stone crushing Industry (Mechanical)
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦500,000
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
Stone crushing Industry with Asphalt
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦800,000
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
AGRICULTURAL DEVELOPMENT
Mechanized Farming
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦5,000/Ha
iv. Ratification Fee= ₦15/M2
v. Land use clearance = ₦5,000
vi. Perimeter Fencing = (Perimeter) x ₦100
vii. Location plan must be sealed by a Registered Town Planner.
viii. Environmental Impact Assessment.
POULTRY FARMING
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦10,000 for (100-200) Birds
iv. Assessment Fee = ₦20,000 for (201-500) Birds
v. Ratification Fee= ₦15/M2
vi. Land use clearance = ₦5,000
vii. Perimeter Fencing = (Perimeter) x ₦100
viii. Location plan must be sealed by a Registered Town Planner.
ix. Environmental Impact Assessment.
FISHERY FARMING
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee (commercial)= ₦20,000
iv. Assessment Fee (Domestic)= ₦5,000
v. Ratification Fee= ₦15/M2
vi. Land use clearance = ₦5,000
vii. Perimeter Fencing = (Perimeter) x ₦100
viii. Location plan must be sealed by a Registered Town Planner.
ix. Environmental Impact Assessment.
PIGGERY FARMING
i. Four (4) sets of working drawings with architectural seal.
ii. Approved survey plan by surveyor General.
iii. Assessment Fee (commercial)= ₦25,000
iv. Assessment Fee (Domestic)= ₦10,000
v. Ratification Fee= ₦15/M2
vi. Land use clearance = ₦5,000
vii. Perimeter Fencing = (Perimeter) x ₦100
viii. Location plan must be sealed by a Registered Town Planner.
ix. Environmental Impact Assessment.
RELIGION CAMP GROUND
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦25/M3
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
PLACE OF WORSHIP
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦20/M3
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
EDUCATION INSTITUTION
Nursery/Primary school/Secondary school/post-Secondary school
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = ₦30/M3
vi. Ratification Fee= ₦15/M2
vii. Land use clearance = ₦5,000
viii. Perimeter Fencing = (Perimeter) x ₦100
ix. Location plan must be sealed by a Registered Town Planner.
x. Environmental Impact Assessment.
CHANGE OF SITE OF AN APPROVED PLAN
Residential
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = 25% of current charge
vi. Location plan must be sealed by a Registered Town Planner.
Commercial/Petrol Station/ Sawmill
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = 25% of current charge
vi. Location plan must be sealed by a Registered Town Planner.
vii. Environmental Impact Assessment.
RENEWAL OF BUILDING PLAN
Residential/Commercial/Industrial
i. Four (4) sets of working drawings with architectural seal.
ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
iii. Letter of supervision by the Structural Engineer.
iv. Approved survey plan by surveyor General.
v. Assessment Fee = 20% of current charge
vi. Location plan must be sealed by a Registered Town Planner.
vii. Environmental Impact Assessment. (Commercial/Industrial)
LAYOUT PLAN
i. Six (6) sets of layout plan with locational plan prepared by a Registered
Town Planner.
ii. Approved survey plan by surveyor General.
iii. Land Use Clearance =₦5,000
iv. Assessment Fee 0.5 Ha- 2.5Ha = ₦10,000
2.5Ha - 5.0Ha = ₦20,000
5.1Ha - 10Ha = ₦40,000
Above 10Ha = ₦100,000
v. Location plan must be sealed by a Registered Town Planner.
vi. Environmental Impact Assessment.
ROAD CONSTRUCTION YARD PROJECT SITE
i. Four (4) sets of working drawings with architectural seal
ii. Approved survey plan by surveyor General.
iii. Assessment Fee = ₦50,000
iv. Location plan must be sealed by a Registered Town Planner.
v. Environmental Impact Assessment.
PENALTY IN RESPECT OF UNAPPROVED EXISTING BUILDING PLAN
i. Assessment Fee = The present Assessment + 50% of the assessment
Stanchion 5
S/N Category Purpose
Amount
N
ANALYSIS
Form
fee
LUC
Registration
Construction
Permit fee
EIA
Registration
Site
inspection/
Supervision
1. Commercial 850,000 50,000 100,000 400,000 150,000 150,000
2. Corporate Bodies 200,000 20,000 25,000 100,000 30,000 25,000
3. Individual/Private 75,000 5,000 10,000 35,000 15,000 10,000
4.
Payment of Optic
Fibre
2,500 Per linear metre.
5. Caution fee 1,500 Per linear metre.
Note: Penalty for contravenor is double of the assessment fee above and other
condition determined by the ministry.

More Related Content

What's hot

Aim and objectives of Professional Institutions of Planning.
Aim and objectives of Professional Institutions of Planning.Aim and objectives of Professional Institutions of Planning.
Aim and objectives of Professional Institutions of Planning.KARTHICK KRISHNA
 
Revit Structure Training
Revit Structure TrainingRevit Structure Training
Revit Structure Trainingpinoy cadplus
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)Farid Ghori
 
Building information modeling
Building information modelingBuilding information modeling
Building information modelingPradeepa M
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBESahl Buhary
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction CostingManish Kandpal
 
Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Jamal Nelson, CCM
 
building process Flowchart
building process Flowchart building process Flowchart
building process Flowchart Stephen Ransley
 
5 Steps of Generating Clash Report Using Navisworks
5 Steps of Generating Clash Report Using Navisworks5 Steps of Generating Clash Report Using Navisworks
5 Steps of Generating Clash Report Using NavisworksUnited-BIM
 
Building Information Modeling (BIM) & Industry Foundation Classes (IFC)
Building Information Modeling (BIM)  & Industry Foundation Classes (IFC)Building Information Modeling (BIM)  & Industry Foundation Classes (IFC)
Building Information Modeling (BIM) & Industry Foundation Classes (IFC)metalalp
 
Intro to BIM and Revit Structure
Intro to BIM and Revit StructureIntro to BIM and Revit Structure
Intro to BIM and Revit StructureMostafa El-Ashmawy
 

What's hot (20)

Revit architecture
Revit architectureRevit architecture
Revit architecture
 
Aim and objectives of Professional Institutions of Planning.
Aim and objectives of Professional Institutions of Planning.Aim and objectives of Professional Institutions of Planning.
Aim and objectives of Professional Institutions of Planning.
 
Revit Structure Training
Revit Structure TrainingRevit Structure Training
Revit Structure Training
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
Building information modeling
Building information modelingBuilding information modeling
Building information modeling
 
Measuring tendering and estimating for CBE
Measuring tendering and estimating for CBEMeasuring tendering and estimating for CBE
Measuring tendering and estimating for CBE
 
Design Checklist Civil & Structural
Design Checklist Civil & StructuralDesign Checklist Civil & Structural
Design Checklist Civil & Structural
 
what is BIM
what is BIMwhat is BIM
what is BIM
 
Bim and building life cycle
Bim and building life cycleBim and building life cycle
Bim and building life cycle
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction Costing
 
Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011Construction Monthly Progress Report - June 2011
Construction Monthly Progress Report - June 2011
 
building process Flowchart
building process Flowchart building process Flowchart
building process Flowchart
 
The Architecture Profession
The Architecture ProfessionThe Architecture Profession
The Architecture Profession
 
BIM Execution Plan
BIM Execution PlanBIM Execution Plan
BIM Execution Plan
 
Space syntax
Space syntaxSpace syntax
Space syntax
 
Economic-Benefits-BIM
Economic-Benefits-BIMEconomic-Benefits-BIM
Economic-Benefits-BIM
 
5 Steps of Generating Clash Report Using Navisworks
5 Steps of Generating Clash Report Using Navisworks5 Steps of Generating Clash Report Using Navisworks
5 Steps of Generating Clash Report Using Navisworks
 
Simplified planning technique
Simplified planning techniqueSimplified planning technique
Simplified planning technique
 
Building Information Modeling (BIM) & Industry Foundation Classes (IFC)
Building Information Modeling (BIM)  & Industry Foundation Classes (IFC)Building Information Modeling (BIM)  & Industry Foundation Classes (IFC)
Building Information Modeling (BIM) & Industry Foundation Classes (IFC)
 
Intro to BIM and Revit Structure
Intro to BIM and Revit StructureIntro to BIM and Revit Structure
Intro to BIM and Revit Structure
 

Similar to REQUIREMENTS FOR BUILDING PLAN APPROVAL

CAC BUOC DAU TU DU AN.pdf
CAC BUOC DAU TU DU AN.pdfCAC BUOC DAU TU DU AN.pdf
CAC BUOC DAU TU DU AN.pdfHuynhVu29
 
ICI/ITD P1
ICI/ITD P1ICI/ITD P1
ICI/ITD P1Mao Hua
 
ICI_P1_PLANNER
ICI_P1_PLANNERICI_P1_PLANNER
ICI_P1_PLANNERMao Hua
 
ITD/ICI Project 1
ITD/ICI Project 1ITD/ICI Project 1
ITD/ICI Project 1TeoViVien
 
ITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWINGITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWINGMao Hua
 
ICI Project 1- Urban Planner
ICI Project 1- Urban PlannerICI Project 1- Urban Planner
ICI Project 1- Urban PlannerEricaGloriaChin
 
Accounting assignment help
Accounting assignment helpAccounting assignment help
Accounting assignment helpTutor Help Desk
 

Similar to REQUIREMENTS FOR BUILDING PLAN APPROVAL (7)

CAC BUOC DAU TU DU AN.pdf
CAC BUOC DAU TU DU AN.pdfCAC BUOC DAU TU DU AN.pdf
CAC BUOC DAU TU DU AN.pdf
 
ICI/ITD P1
ICI/ITD P1ICI/ITD P1
ICI/ITD P1
 
ICI_P1_PLANNER
ICI_P1_PLANNERICI_P1_PLANNER
ICI_P1_PLANNER
 
ITD/ICI Project 1
ITD/ICI Project 1ITD/ICI Project 1
ITD/ICI Project 1
 
ITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWINGITD_P1_PLANNER DRAWING
ITD_P1_PLANNER DRAWING
 
ICI Project 1- Urban Planner
ICI Project 1- Urban PlannerICI Project 1- Urban Planner
ICI Project 1- Urban Planner
 
Accounting assignment help
Accounting assignment helpAccounting assignment help
Accounting assignment help
 

More from Government of Ekiti State, Nigeria

An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...Government of Ekiti State, Nigeria
 
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...Government of Ekiti State, Nigeria
 
Ekiti State Drugs and Health Supplies Management Agency Law 2021
Ekiti State Drugs and Health Supplies Management Agency Law 2021Ekiti State Drugs and Health Supplies Management Agency Law 2021
Ekiti State Drugs and Health Supplies Management Agency Law 2021Government of Ekiti State, Nigeria
 
State Address on the Occasion of 25th Anniversary of Ekiti State.
State Address on the Occasion of 25th Anniversary of Ekiti State.State Address on the Occasion of 25th Anniversary of Ekiti State.
State Address on the Occasion of 25th Anniversary of Ekiti State.Government of Ekiti State, Nigeria
 
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)Government of Ekiti State, Nigeria
 
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...Government of Ekiti State, Nigeria
 
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...Government of Ekiti State, Nigeria
 
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...Government of Ekiti State, Nigeria
 
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...Government of Ekiti State, Nigeria
 
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF) MEDIUM TERM SECTORAL STRA...
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF)  MEDIUM TERM SECTORAL STRA...2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF)  MEDIUM TERM SECTORAL STRA...
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF) MEDIUM TERM SECTORAL STRA...Government of Ekiti State, Nigeria
 
A Communique issued at the end of the 30th teleconference meeting of the Nige...
A Communique issued at the end of the 30th teleconference meeting of the Nige...A Communique issued at the end of the 30th teleconference meeting of the Nige...
A Communique issued at the end of the 30th teleconference meeting of the Nige...Government of Ekiti State, Nigeria
 

More from Government of Ekiti State, Nigeria (20)

An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
An Account of Stewardship by the Biodun Abayomi Oyebanji Administration of Ek...
 
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
2021 REPORT OF THE EKITI STATE DEBT SUSTAINABILITY ANALYSIS AND DEBT MANAGEME...
 
COVID-19 VACCINATION SITES (EKITI STATE)
COVID-19  VACCINATION SITES (EKITI STATE)COVID-19  VACCINATION SITES (EKITI STATE)
COVID-19 VACCINATION SITES (EKITI STATE)
 
Re-Imagining Health Service Delivery 2020-2021 Annual Report
Re-Imagining Health Service Delivery  2020-2021 Annual ReportRe-Imagining Health Service Delivery  2020-2021 Annual Report
Re-Imagining Health Service Delivery 2020-2021 Annual Report
 
Ekiti State Mental Health Law 2021
Ekiti State Mental Health Law 2021Ekiti State Mental Health Law 2021
Ekiti State Mental Health Law 2021
 
Ekiti State Drugs and Health Supplies Management Agency Law 2021
Ekiti State Drugs and Health Supplies Management Agency Law 2021Ekiti State Drugs and Health Supplies Management Agency Law 2021
Ekiti State Drugs and Health Supplies Management Agency Law 2021
 
State Address on the Occasion of 25th Anniversary of Ekiti State.
State Address on the Occasion of 25th Anniversary of Ekiti State.State Address on the Occasion of 25th Anniversary of Ekiti State.
State Address on the Occasion of 25th Anniversary of Ekiti State.
 
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES – FIRMS)
 
ENTITLED: TOWARDS A MORE PERFECT UNION
ENTITLED: TOWARDS A MORE PERFECT UNIONENTITLED: TOWARDS A MORE PERFECT UNION
ENTITLED: TOWARDS A MORE PERFECT UNION
 
2021 WORLD HUMANITARIAN DAY
2021 WORLD HUMANITARIAN DAY2021 WORLD HUMANITARIAN DAY
2021 WORLD HUMANITARIAN DAY
 
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
PRESS STATEMENT FROM THE DESK OF THE CHAIRMAN, LOCAL COUNCIL DEVELOPMENT AREA...
 
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
PROFILE OF HIS ROYAL MAJESTY OBA GABRIEL AYODELE ADEJUWON, FCTI., ADETILA ILU...
 
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
Ekiti State Joint Local Government Account and Allocation of Revenue (3rd Ame...
 
Ekiti State Audit Service Commission Law, 2021
Ekiti State Audit Service Commission Law, 2021Ekiti State Audit Service Commission Law, 2021
Ekiti State Audit Service Commission Law, 2021
 
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
Projects (Completed and Ongoing) MINISTRY OF PHYSICAL, URBAN AND REGIONAL PLA...
 
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF) MEDIUM TERM SECTORAL STRA...
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF)  MEDIUM TERM SECTORAL STRA...2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF)  MEDIUM TERM SECTORAL STRA...
2020-2022 MEDIUM TERM EXPENDITURE FRAMEWORK (MTEF) MEDIUM TERM SECTORAL STRA...
 
RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019
RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019
RECORDS OF LAND DISPUTE (PETITION) AND RESOLUTION, 2017-2019
 
Keep Girls In School
Keep Girls In SchoolKeep Girls In School
Keep Girls In School
 
A Communique issued at the end of the 30th teleconference meeting of the Nige...
A Communique issued at the end of the 30th teleconference meeting of the Nige...A Communique issued at the end of the 30th teleconference meeting of the Nige...
A Communique issued at the end of the 30th teleconference meeting of the Nige...
 
FLAGGING OFF 0F EKITI RICE PYRAMID PROJECT
FLAGGING OFF 0F EKITI RICE PYRAMID PROJECTFLAGGING OFF 0F EKITI RICE PYRAMID PROJECT
FLAGGING OFF 0F EKITI RICE PYRAMID PROJECT
 

Recently uploaded

Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Dipal Arora
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...aartirawatdelhi
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.Christina Parmionova
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos WebinarLinda Reinstein
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...CedZabala
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...MOHANI PANDEY
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024ARCResearch
 
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escortssonatiwari757
 
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...tanu pandey
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxSwastiRanjanNayak
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCongressional Budget Office
 

Recently uploaded (20)

Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Connaught Place @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
Just Call Vip call girls Wardha Escorts ☎️8617370543 Starting From 5K to 25K ...
 
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...Night 7k to 12k  Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
Night 7k to 12k Call Girls Service In Navi Mumbai 👉 BOOK NOW 9833363713 👈 ♀️...
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.
 
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Kiwale ( Pune ) Call ON 8005736733 Starting From 5K to 2...
 
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Nanded City Call Me 7737669865 Budget Friendly No Advance Booking
 
2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar2024 Zoom Reinstein Legacy Asbestos Webinar
2024 Zoom Reinstein Legacy Asbestos Webinar
 
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
Artificial Intelligence in Philippine Local Governance: Challenges and Opport...
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024Regional Snapshot Atlanta Aging Trends 2024
Regional Snapshot Atlanta Aging Trends 2024
 
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our EscortsVIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
VIP Call Girl Service Ludhiana 7001035870 Enjoy Call Girls With Our Escorts
 
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Bhavnagar 7001035870 Whatsapp Number, 24/07 Booking
 
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Dapodi ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...Call On 6297143586  Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
Call On 6297143586 Viman Nagar Call Girls In All Pune 24/7 Provide Call With...
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
Postal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptxPostal Ballots-For home voting step by step process 2024.pptx
Postal Ballots-For home voting step by step process 2024.pptx
 
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(NEHA) Bhosari Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
CBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related TopicsCBO’s Recent Appeals for New Research on Health-Related Topics
CBO’s Recent Appeals for New Research on Health-Related Topics
 

REQUIREMENTS FOR BUILDING PLAN APPROVAL

  • 1. REQUIREMENTS FOR BUILDING PLAN APPROVAL RESIDENTIAL BUILDING Bungalow Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦25/M3 iv. Ratification Fee= ₦10/M2 v. Land use clearance = ₦1,000 vi. Perimeter Fencing = (Perimeter) x ₦50 vii. Location plan must be sealed by a Registered Town Planner. Bungalow Building in Other Local Government Headquarters i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦22.5/M3 iv. Ratification Fee= ₦5/M2 v. Land use clearance = ₦1,000 vi. Perimeter Fencing = (Perimeter) x ₦50 vii. Location plan must be sealed by a Registered Town Planner. Bungalow Building in Other Towns i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦20/M3 iv. Ratification Fee= ₦5/M2 v. Land use clearance = ₦1,000 vi. Perimeter Fencing = (Perimeter) x ₦50 vii. Location plan must be sealed by a Registered Town Planner.
  • 2. Storey Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦25/M3 vi. Ratification Fee= ₦10/M2 vii. Land use clearance = ₦1,000 viii. Perimeter Fencing = (Perimeter) x ₦50 ix. Location plan must be sealed by a Registered Town Planner. Storey Building in Other Local Government Headquarters. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦22.5/M3 vi. Ratification Fee= ₦5/M2 vii. Land use clearance = ₦1,000 viii. Perimeter Fencing = (Perimeter) x ₦50 ix. Location plan must be sealed by a Registered Town Planner. Storey Building in Other Towns. I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦20/M3 vi. Ratification Fee= ₦5/M2 vii. Land use clearance = ₦1,000 viii. Perimeter Fencing = (Perimeter) x ₦50 ix. Location plan must be sealed by a Registered Town Planner.
  • 3. COMMERCIAL BUILDING Bungalow/ Storey Building in Ado Ekiti. I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Environmental Impact Assessment. iv. Letter of supervision by the Structural Engineer. v. Approved survey plan by surveyor General. vi. Assessment Fee = ₦40/M3 vii. Ratification Fee= ₦15/M2 viii. Land use clearance = ₦5,000 ix. Perimeter Fencing = (Perimeter) x ₦100 x. Location plan must be sealed by a Registered Town Planner. Bungalow/ Storey Building in Other Towns. I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Environmental Impact Assessment. iv. Letter of supervision by the Structural Engineer. v. Approved survey plan by surveyor General. vi. Assessment Fee = ₦40/M3 vii. Ratification Fee= ₦10/M2 viii. Land use clearance = ₦5,000 ix. Perimeter Fencing = (Perimeter) x ₦100 x. Location plan must be sealed by a Registered Town Planner. BANK BUILDING I. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Environmental Impact Assessment. iv. Letter of supervision by the Structural Engineer. v. Approved survey plan by surveyor General.
  • 4. vi. Assessment Fee = ₦400/M3 vii. Ratification Fee= ₦15/M2 viii. Land use clearance = ₦5,000 ix. Perimeter Fencing = (Perimeter) x ₦100 x. Location plan must be sealed by a Registered Town Planner. PETROL FILLING STATION Filling Station in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer v. Environmental Impact Assessment. vi. Fire Service Clearance. vii. Police Traffic Clearance. viii. Letter of suitability/feasibility Approval from DPR. ix. Land use clearance Approval. x. Current 3 years tax clearance and 3 years Development levy. xi. Letter of supervision by the Structural Engineer. xii. Approved survey plan by surveyor General. xiii. Assessment Fee = ₦200,000/pump xiv. Ratification Fee= ₦15/M2 xv. Land use clearance = ₦5,000 xvi. Perimeter Fencing = (Perimeter) x ₦100 xvii. Location plan must be sealed by a Registered Town Planner. Filling Station in Other Local Government Area. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer v. Environmental Impact Assessment.
  • 5. vi. Fire Service Clearance. vii. Police Traffic Clearance. viii. Land use clearance Approval. ix. Letter of suitability/feasibility Approval from DPR. x. Current 3 years tax clearance and 3 years Development levy. xi. Letter of supervision by the Structural Engineer. xii. Approved survey plan by surveyor General. xiii. Assessment Fee = ₦150,000/pump xiv. Ratification Fee= ₦15/M2 xv. Land use clearance = ₦5,000 xvi. Perimeter Fencing = (Perimeter) x ₦100 xvii. Location plan must be sealed by a Registered Town Planner. Filling Station in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iii. Four (4) sets of Electrical drawings sealed by a Registered Engineer iv. Environmental Impact Assessment. v. Fire Service Clearance. vi. Police Traffic Clearance. vii. Land use clearance Approval. viii. Letter of suitability/feasibility Clearance from DPR. ix. Current 3 years tax clearance and 3 years Development Levy. x. Letter of supervision by the Structural Engineer. xi. Approved survey plan by surveyor General. xii. Assessment Fee = ₦100,000/pump xiii. Ratification Fee= ₦15/M2 xiv. Land use clearance = ₦5,000 xv. Perimeter Fencing = (Perimeter) x ₦100 xvi. Location plan must be sealed by a Registered Town Planner.
  • 6. GAS STATION. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Four (4) sets of Mechanical drawings sealed by a Registered Engineer. iv. Four (4) sets of Electrical drawings sealed by a Registered Engineer v. Environmental Impact Assessment. vi. Fire Service Clearance. vii. Police Traffic Clearance. viii. Land use clearance Approval. ix. Letter of suitability/feasibility from DPR. x. Current 3 years tax clearance and 3 years Development Levy. xi. Letter of supervision by the Structural Engineer. xii. Approved survey plan by surveyor General. xiii. Assessment Fee = ₦500,000 xiv. Ratification Fee= ₦15/M2 xv. Land use clearance = ₦5,000 xvi. Perimeter Fencing = (Perimeter) x ₦100 xvii. Location plan must be sealed by a Registered Town Planner. HOSTEL. Bungalow Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦35/M3 iv. Ratification Fee= ₦15/M2 v. Land use clearance = ₦5,000 vi. Perimeter Fencing = (Perimeter) x ₦100 vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment.
  • 7. Storey Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦35/M3 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Bungalow Building in Other Local Government. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦35/M3 iv. Ratification Fee= ₦10/M2 v. Land use clearance = ₦5,000 vi. Perimeter Fencing = (Perimeter) x ₦100 vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. Storey Building in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦35/M3 vi. Ratification Fee= ₦10/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment.
  • 8. SAWMILL. Saw Mill in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦250,000/Mill vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Saw Mill in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦150,000/Mill vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. HOTEL/EATERY/RESTAURANTS Bungalow Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦50/M3 iv. Ratification Fee= ₦15/M2 v. Land use clearance = ₦5,000 vi. Perimeter Fencing = (Perimeter) x ₦100
  • 9. vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. Storey Building in Ado Ekiti. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦50/M3 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Bungalow Building in Other Local Government. i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦50/M3 iv. Ratification Fee= ₦10/M2 v. Land use clearance = ₦5,000 vi. Perimeter Fencing = (Perimeter) x ₦100 vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment. Storey Building in Other Towns. i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦50/M3 vi. Ratification Fee= ₦10/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100
  • 10. ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. LIGHT INDUSTRY Block Making Industry i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦25,000 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Concrete Industry i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦40,000 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Stone crushing Industry (Mechanical) i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer.
  • 11. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦500,000 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. Stone crushing Industry with Asphalt i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦800,000 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. AGRICULTURAL DEVELOPMENT Mechanized Farming i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦5,000/Ha iv. Ratification Fee= ₦15/M2 v. Land use clearance = ₦5,000 vi. Perimeter Fencing = (Perimeter) x ₦100 vii. Location plan must be sealed by a Registered Town Planner. viii. Environmental Impact Assessment.
  • 12. POULTRY FARMING i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦10,000 for (100-200) Birds iv. Assessment Fee = ₦20,000 for (201-500) Birds v. Ratification Fee= ₦15/M2 vi. Land use clearance = ₦5,000 vii. Perimeter Fencing = (Perimeter) x ₦100 viii. Location plan must be sealed by a Registered Town Planner. ix. Environmental Impact Assessment. FISHERY FARMING i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee (commercial)= ₦20,000 iv. Assessment Fee (Domestic)= ₦5,000 v. Ratification Fee= ₦15/M2 vi. Land use clearance = ₦5,000 vii. Perimeter Fencing = (Perimeter) x ₦100 viii. Location plan must be sealed by a Registered Town Planner. ix. Environmental Impact Assessment. PIGGERY FARMING i. Four (4) sets of working drawings with architectural seal. ii. Approved survey plan by surveyor General. iii. Assessment Fee (commercial)= ₦25,000 iv. Assessment Fee (Domestic)= ₦10,000 v. Ratification Fee= ₦15/M2 vi. Land use clearance = ₦5,000 vii. Perimeter Fencing = (Perimeter) x ₦100 viii. Location plan must be sealed by a Registered Town Planner. ix. Environmental Impact Assessment.
  • 13. RELIGION CAMP GROUND i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦25/M3 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. PLACE OF WORSHIP i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦20/M3 vi. Ratification Fee= ₦15/M2 vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. EDUCATION INSTITUTION Nursery/Primary school/Secondary school/post-Secondary school i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = ₦30/M3 vi. Ratification Fee= ₦15/M2
  • 14. vii. Land use clearance = ₦5,000 viii. Perimeter Fencing = (Perimeter) x ₦100 ix. Location plan must be sealed by a Registered Town Planner. x. Environmental Impact Assessment. CHANGE OF SITE OF AN APPROVED PLAN Residential i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = 25% of current charge vi. Location plan must be sealed by a Registered Town Planner. Commercial/Petrol Station/ Sawmill i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = 25% of current charge vi. Location plan must be sealed by a Registered Town Planner. vii. Environmental Impact Assessment. RENEWAL OF BUILDING PLAN Residential/Commercial/Industrial i. Four (4) sets of working drawings with architectural seal. ii. Four (4) sets of structural drawings sealed by a Registered Engineer. iii. Letter of supervision by the Structural Engineer. iv. Approved survey plan by surveyor General. v. Assessment Fee = 20% of current charge vi. Location plan must be sealed by a Registered Town Planner. vii. Environmental Impact Assessment. (Commercial/Industrial)
  • 15. LAYOUT PLAN i. Six (6) sets of layout plan with locational plan prepared by a Registered Town Planner. ii. Approved survey plan by surveyor General. iii. Land Use Clearance =₦5,000 iv. Assessment Fee 0.5 Ha- 2.5Ha = ₦10,000 2.5Ha - 5.0Ha = ₦20,000 5.1Ha - 10Ha = ₦40,000 Above 10Ha = ₦100,000 v. Location plan must be sealed by a Registered Town Planner. vi. Environmental Impact Assessment. ROAD CONSTRUCTION YARD PROJECT SITE i. Four (4) sets of working drawings with architectural seal ii. Approved survey plan by surveyor General. iii. Assessment Fee = ₦50,000 iv. Location plan must be sealed by a Registered Town Planner. v. Environmental Impact Assessment. PENALTY IN RESPECT OF UNAPPROVED EXISTING BUILDING PLAN i. Assessment Fee = The present Assessment + 50% of the assessment Stanchion 5 S/N Category Purpose Amount N ANALYSIS Form fee LUC Registration Construction Permit fee EIA Registration Site inspection/ Supervision 1. Commercial 850,000 50,000 100,000 400,000 150,000 150,000
  • 16. 2. Corporate Bodies 200,000 20,000 25,000 100,000 30,000 25,000 3. Individual/Private 75,000 5,000 10,000 35,000 15,000 10,000 4. Payment of Optic Fibre 2,500 Per linear metre. 5. Caution fee 1,500 Per linear metre. Note: Penalty for contravenor is double of the assessment fee above and other condition determined by the ministry.