Publicidad
PUNCH LIST FOR BOILER COMMISSIONING.pdf
Próximo SlideShare
Piping systemPiping system
Cargando en ... 3
1 de 1
Publicidad

Más contenido relacionado

Publicidad

PUNCH LIST FOR BOILER COMMISSIONING.pdf

  1. PUNCH LIST FOR BOILER COMMISSIONING Iraq site yesterday (18-12-2022) on a video call. / Mr. Rustom – Forbes Marshall / Mr. Abbas - HGC Following was checked in your steam boiler house; • Both Boiler flue gas ducts, dampers etc were checked for connections, etc. • Both Feed water complete circuit from feed water tank to boiler feed water pumps, etc. • Both Fuel oil lines from DOT to both steam boilers along with return lines, etc. • Both steam Boilers mountings, fittings were checked, etc. • Steam lines from both steam boiler up to common header, etc was checked. • Condensate pump and feed water tank deaerator head was also checked. Request you to kindly attend the following; ➢ Both Feed water pump discharge line PG siphon gauge cocks placement to be changed. ➢ FWT to be cleaned & checked. ➢ Both feed water lines to be thoroughly flushed at site, by opening strainers, etc. ➢ Both Feed water line strainers before FW pumps, to be checked for 80 # mesh size only, if not please arrange. ➢ Feed water tank insulation to be done, once the FW is filled & water leakage if any is checked. ➢ Water Softening Plant needs to be commissioned and only soft water needs to be used at site in both steam boilers to avoid scaling & other issues, etc. ➢ For both Boiler fuel oil lines, request you to install 1 no of ball valve in return line of both steam boilers after the NRV. This will help you in case of any NRV failure / or any leakage from flanges, etc in future. ➢ DOT tank to be cleaned and checked before filling HSD / LDO. ➢ Both Boiler fuel incoming lines to be flushed from DOT tank to inlet of fuel pump / flexible hose pipe. ➢ Safety valve drain pipes installed 1 no union to be arranged as discussed, as removing the same in future will be easy. ➢ Air vent valve horizontal pipe clamping needs to be done, of both steam boilers. ➢ SS Drain pipes – 5 nos connectors to be installed and connected in a common drain pipe and this pipe to be laid upto the drain for both steam boilers, as discussed. ➢ Blowdown valves horizontal pipes to be supported and rigidly clamped as shown, of both steam boilers. ➢ Blowdown valve pipes of both steam boilers, to be taken separately to a common blowdown pit. ➢ If these BD pipes are connected to SS blowdown vessel, proper separate NRV’s to be installed / designed before the Blowdown vessel. ➢ All FM piston valves installed on your steam boilers, steam header, etc needs to be lubricated at site before commissioning. ➢ Condensate line discharge from FM-PPPPU installed on FW Deaerator head to be checked for connection as discussed. ➢ Feed water line which is to be installed for filling make up water, should be connected to Deaerator Head as discussed. ➢ Steam lines and steam header to be flushed with steam, accordingly. ➢ Electrical earthing to be provided on both steam boiler and main electrical panels & same to be checked at site.
Publicidad