1. CURRICULUM VITAE
EQUBAL AHMAD
Mechanical Engineer
E-mail: Equbalahmad0309@gmail.com
Mobile: +919631575826, +91- 7506908722
POST APPLIED FOR : PIPING CONSTRUCTION SUPERVISOR
OBJECTIVE
To associate with an esteemed industry that provides me an opportunity to show my skills,
improve my ken with latest trends and to be a part of the team that works dynamically towards the
growth of the organization
PROFILE SUMMARY
6 years’experience in piping
Installation of pipe, erection of pipe, small bore Drainage & piping installation
material and practices, clearance of loop for visual test, NDT, RT, (radiographic test),
MPT(magnetic particle test) etc. Installation & erection of pipe support (primary
support, secondary support, etc.)
EXPERIENCE
Professional Experience: 1
Company: GS ENGINEERING (HDGSK JV-IRAQ)
Client : SCOP (MENISTRY OF OIL IRAQ)
Date : JAN 2016 to till date
Position: PIPING ENGINEER (Emp. ID. NO. Kis-00090)
Project : Shah Process Plant EPC2 East, Shah Gas Development (SGD) Project
Location : Karbala Refinery Project IRAQ.
Duties & Responsibilities:-
Supervise and monitor various constructions activities related to above ground piping.
Support sub-contractors for the erection of above ground piping spools and coordination with
drawings and materials availability.
Fully appraise with following day’s work in advance and discuss any special requirements
with Area In charge.
Coordinates with engineering and other department with regards to site modification and
technical query.
Ensure safe and effective of piping construction activities with respect to the quality and
schedule.
Follow-up and pushed sub-contractor for better progress in day to day activities including
precise keeping of records, paper works and filing.
Prepare site instruction and review sub-contractors construction technical query (CTQ) before
forwarding to engineering.
Review and sign RFI (Request for Inspection) of subcontractor for equipment which are ready
for client inspection.
Prepare daily production report and attend weekly meeting with the project manager.
Familiar with various codes and standards viz., ANSI, ASME, API, ASTM, etc.
Ensuring the construction work are carried out to the required project
specification , Drawing & compliance to the specific ITP/MS/QC procedure.
Coordinate between fabrication QA/QC and planning.
2. Professional Experience: 2
Designation : (piping supervisor)
Company : HPCL MUMBAI AS A SUBCONTRACTER 8 MONTH
SHUTDOWN PROJECT
Duration : Since 23/03/2015 to 30/11/2015.
ADDITIONAL INFORMATION:-
Supervising and handling of drawing (isometric, general arrangement, P&ID) for project
work and guide of worker which are present in site work.
Handling the assigned area as a fully responsibilities as an area in charge.
Plan drawing, isometric drawing, scotches drawing.
Excellent communication and interpersonal skills.
Ensure safe and effective of piping construction activities with respect to the quality and schedule
Fabrication and erection of piping and structural works as per the issued construction drawings.
Direct control over fabrication and erection of piping and pipe support for various systems.
Organize daily Toolbox Talk explaining the team target of the day and safety and technical
requirement to execute the target job for the day.
Conducting hydro testing accordance with the approved hydro test procedure.
Piping & pipe support as built drawing.
Supervision of all piping works and ensures safety and quality standards of the client.
Professional Experience: 3
Designation: Piping Engineer
Company : IRAQI ELITE COMPANY FOR GENERAL CONTRACTS &
ENGINEERING LTD
Duration : Since June 2013 to September 2014.
Project : Badra oil field project IRAQ.
Role and Responsibilities:
Handling the assigned area as a fully responsibilities as an area in charge.
Working on piping connection and installation of all utility piping system within the
assignment area.
Installation of civil support, primary support and secondary support and all type of structure.
Supervising and handling of drawing (isometric, general arrangement, P&ID) for project
work and guide of worker which are present in site work.
Planning as daily and weekly basis to meet project target.
Attending the meeting with management to aware about the project status and requirement
for system completion.
Attending system and subsystem wise test pack and follow up its release for hydro test.
Monitor and ensure working hours are maximized without a reduction in Quality. Monitor
and report manning levels daily.
Ensuring all fabrication is to approve drawings and all flanges/valves etc are correctly
orientated and that spools are correctly identified.
Ensure spools are installed in Rack on site methodically in order to open a number of work
fronts ensuring Sub contractor maintains maximum productivity.
Prepare daily reports of work progress and man power utilization.
Prepare weekly reports of the total spool erection, isometric weight installed, welded dia
inches of supports and joints and the remaining work front with the materials available.
Co-ordinate with the sub-contractors to achieve the targets and schedule set by the planning.
Issue the work permits ensuring SHE requirements.
3. Conduct safety walk through in the site in co-ordination with the safety department on
weekly basis.
Supervision of all piping works and ensures safety and quality standards of the client
Professional Experience: 4
Designation : Mechanical Engineer (piping engineer)
Company : D - MECH ENGINEERING CO. (DME)
Duration : 11/05/2011 to 27/04/2013.
Role and Responsibilities:
Responsible for analysis of piping systems in conformance with project requirements, design
parameters, codes and industry practices under general direction of the Chief Engineer. May
supervise specialized technical sub-groups.
Experience in pipe fitting, pressure testing, commissioning and welding procedure will
be highly advantageous in the application process.
• Resolved all complaints regarding material and control work and updated all equipment and
maintain in system accordingly requirement..
• Supervising and handling of drawing for project work and guide of worker which are present
in site work.
• Working in assign area as a fully responsibility as a area in charge.
• Monitoring the productivity of fitters and welder and insure the completion of task in given
time frame.
• Preparing daily and weekly productivity report and submitting to management
• Supervision of all piping works and ensures safety and quality standards of the client.
• Inspection and approval of all the QA/QC submittals of the subcontractor.
ProjectCoordination
Handling project activities to ensure timely accomplishment of targets within
the time and cost parameters.
Executing of project activities in the plant.
Coordinating with Fabricators and Contractors for planning and effective
execution of the jobs.
Presenting current commercial & job execution status of various projects in
front of senior management when need.
ACADEMIC CREDENTIALS
2011
B Tech in
Mechanical
engineer
Royal institute of technology and science,
Jawaharlal Nehru Technological University-Hyderabad
2007
Intermediate(XII)
Science (PCM)
Bihar Intermediate Education Council , Patna (Bihar)
2004 S.S.C. (Class X) Bihar State Examination Board, Patna (Bihar)
4. CERTIFICATION UNDERGONE
AutoCAD 2D/3D from CAD/CAM INFOTECH, Mehdipatnam Hyderabad, (A.P)
Quality Control & Engineering Inspection from ADVANCED TRAINING INSTITUTE
(A.T.I.) Hyderabad (A.P).
TQM&ISO 9001-2008 full time course from ADVANCED TRAINING INSTITUTE
(A.T.I.) Hyderabad (A.P).
COMPUTER SKILLS
Proficient in Microsoft Word, Excel and Power Point
Proficient in handling Internet & Computer
knowledge of AutoCAD (2D, 3D),
knowledge and operating of Navies Works freedom-2015
STRENGTH
● Good problem understanding and solving ability.
● Can do work as individual or a team member.
● Quick learner
● Passion for learning new technologies
● Loyalty/commitment towards my work.
PERSONAL PROFILE
Date of Birth : 24th
May, 1989
Marital Status : Single
Blood Group : O+
Nationality : Indian
Religion : Muslim
Passport No. : K1332364
Date of issue : 28-10-2011
Date of expiry : 27-10-2021
Languages Known : English, Hindi, and Urdu
PERSONAL PROFILE
I hereby declare that the above mentioned information is correct up to my knowledge and I
bear responsibilities for the correction of the above mentioned particulars.
DATE :-
PLACE:-
SIGNATURE