Bill of Materials (BOM)
2 © 2010 eresource Infotech Private Limited. All rights reserved
An essential and concise guide to
understanding eresource
Release 2.8
3 © 2010 eresource Infotech Private Limited. All rights reserved
Copyright
© Copyright 2011 ERESOURCE. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or for any purpose
without the express permission of eresource Infotech P. Ltd. The information contained herein may be
changed without prior notice.
Microsoft®, WINDOWS®, NT®, EXCEL®, Word®, PowerPoint® and SQL Server® are registered
trademarks of Microsoft Corporation.
HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C®, World Wide
Web Consortium,
eresource, eresource Logo. Eresourceerp.com are trademarks or registered trademarks of eresource
Infotech in India and several other countries all over the world. All other products mentioned are
trademarks or registered trademarks of their respective companies.
4 © 2010 eresource Infotech Private Limited. All rights reserved
Table of Contents
Bill of Material (BOM)...................................................................................................................................5
Definition of Bill of Material (BOM) in eresource:........................................................................................5
Single Level BOM in eresource ERP: .............................................................................................................6
Multi level BOM in eresource ERP:...............................................................................................................7
Standard BOM :.............................................................................................................................................7
Order Based BOM : .......................................................................................................................................8
Revision of BOM / Engineering Change Request (ECR) and Engineering Change Note (ECN):....................9
The Modular Bill of Materials: ....................................................................................................................11
5 © 2010 eresource Infotech Private Limited. All rights reserved
Bill of Material (BOM)
The Bill of Materials is considered to be an engineering document that specifies the ingredients or
subordinate components required physically to make each part number or assembly. Or A bill of
materials is a list of the raw materials, sub-assemblies, intermediate assemblies, sub-components,
components, parts and the quantities of each needed to manufacture an end product.
In eresource, a Single level Bill of Material comprises only those subordinate components that are
immediately required, not the components of the components.
An indented Bill of Material is a list of components, from the end item all the way down to the raw
materials; it also doesn’t show the components of the components.
The BOM components in eresource support the use of the Bill of Material concept in a wide range of
circumstances where there is a tree structure of associated items. BOM can be generated in the
following forms:
Material BOM
Equipment BOM
Order Based BOM
In each form, the BOM comprises a structured list that specifies what is needed in each of the
components – Name, UOM (Unit of Measurement), Quantity.
Definition of Bill of Material (BOM) in eresource:
Bills of Materials (BOM) are normally accessed according to production or procurement deadlines. The
History Management function allows several types of BOM to be managed simultaneously, and can be
operated according to the needs of the customer.
Single Level Bills of materials and Multi Level Bills of Material can be generated in eresource ERP. For
each manufactured line item on a Work Order, the system provides a bill of materials (BOM) and
routing.
Single level Bill of Material
Multi level Bill of Material
6 © 2010 eresource Infotech Private Limited. All rights reserved
Single Level BOM in eresource ERP:
In the single Level bill of materials only those subordinate components can be captured that are
immediately required to manufacture the product.
eresource ERP gives you provision to create Single level Bill of Material which is comprises only those
subordinate components that are immediately required, not components of components.
In the single level BOM master you have provision to plan that how much days will be required to
manufacture a particular BOM. Also you have provision to define what and how much Packing material
will be required for that Item Batch.
7 © 2010 eresource Infotech Private Limited. All rights reserved
Multi level BOM in eresource ERP:
The multiple BOM concept aids the management of a variety of similar BOMs (variant problem).
Common components of similar BOMs are recorded in a 'Reference BOM-M' while components specific
to individual BOMs are recorded in a separate 'Single Level BOM-M'. In this way, the BOM of a given
material consists of a combination of data referring to common and individual components.
Standard BOM :
While making a new standard BOM eresource ERP gives you the provision of copy any standard BOM
from existing BOM or from existing Sales order BOM. You have facility to add any other material or any
other semi finished item in the new BOM you are making. You can also define the No. of days required
to process the batch.
8 © 2010 eresource Infotech Private Limited. All rights reserved
Order Based BOM :
eresource ERP gives you the provision to create a BOM again the sales order of any customer. Again
you can copy BOM from any existing standard BOM or from any previous Sales order BOM. The data of
BOMs is automatically shown against the work orders providing the ability to include configured items
on a WO's BOM.
9 © 2010 eresource Infotech Private Limited. All rights reserved
This gives the stores department to check if the stock of materials is available for a product
manufacturing or batch manufacturing. Once the individual customer order is entered, it specifies how
much components are required, the quantity including wastage and at what level of production the
components will be required.
eresource ERP Bills of Materials are completely integrated into the system and support:
• The procurement of materials at the optimum time (Material Requirement Planning module)
• The placing of production orders (Production Planning and Control Module)
• The issue of goods (Inventory Management Module)
Revision of BOM / Engineering Change Request (ECR) and Engineering Change
Note (ECN):
eresource ERP gives you the provision of Revision of BOM which is called ECR (Engineering Change
Requisition). With the selection of any item this form gives you the provision to zoom in the BOM by the
click on View BOM. You can make any changes on that particular BOM if there is any requisition came
for changes.
10 © 2010 eresource Infotech Private Limited. All rights reserved
The Engineering Change Notice (ECN) module allows you to establish controls and manage the process
of making changes to documents and drawings, parts, Bills of Material (BOMs) and routings, work
orders, and projects. The ECN module allows you to:
• Create an ECN process flow with multiple ECN user groups and notification systems.
• Generate and track ECN tasks and apply electronic signatures for approvals and task completion.
• Track ECN and revision history on all parts, documents, bills of manufacture, work orders, and
projects.
• Maintain an audit trail of changes to the ECN record throughout the change process.
11 © 2010 eresource Infotech Private Limited. All rights reserved
The Modular Bill of Materials:
A key use of bill of materials files is in translating the MPS into subordinate components requirements.
One bill of materials structure or architecture calls for maintaining all end item buildable configurations.
This bill of materials structure is appropriate for the make-to-stock firm, where the <PS id stated in end
items. For each end item, a single-level bill is maintained, which contains those components that
physically go into the item.
End Items
Options
Components
The MPS Hourglass
MPS
12 © 2010 eresource Infotech Private Limited. All rights reserved
In eresource a solution is to establish the MPS at the option or module level. This intent is to
state the MPS in units associated with the ‘waist’ of hourglass. This necessitates that bill of
materials files be structured accordingly; each option or module will be defined fully in the bill if
materials file as a single-level bill of material. If the options are simply buildable subassemblies
as end items; that is, designate them as level 0, instead of level 1.

Más contenido relacionado

Destacado

Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraintsEka Darmadi
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraintsMOHD ARISH
 
Capacity and Demand Management
Capacity and Demand ManagementCapacity and Demand Management
Capacity and Demand ManagementVishwanath Ramdas
 
Forecasting Techniques
Forecasting TechniquesForecasting Techniques
Forecasting Techniquesguest865c0e0c
 

Destacado (6)

Demand management
Demand managementDemand management
Demand management
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Theory of constraints
Theory of constraintsTheory of constraints
Theory of constraints
 
Demand Management
Demand ManagementDemand Management
Demand Management
 
Capacity and Demand Management
Capacity and Demand ManagementCapacity and Demand Management
Capacity and Demand Management
 
Forecasting Techniques
Forecasting TechniquesForecasting Techniques
Forecasting Techniques
 

Similar a Bom bill of material eresource

Production planning mps mrp eresource
Production planning mps mrp eresourceProduction planning mps mrp eresource
Production planning mps mrp eresourceEresource Erp
 
Chris's editorial march '13
Chris's editorial march '13Chris's editorial march '13
Chris's editorial march '13Victoria Smith
 
Mrpii manufacturing resource planning eresource
Mrpii manufacturing resource planning eresourceMrpii manufacturing resource planning eresource
Mrpii manufacturing resource planning eresourceEresource Erp
 
Bill of Material Federation
Bill of Material Federation Bill of Material Federation
Bill of Material Federation Ad Ghauri
 
Introduction to Bill Of Materials
Introduction to Bill Of MaterialsIntroduction to Bill Of Materials
Introduction to Bill Of MaterialsRajat Singla
 
Teamcenter Integration Adapter - Datasheet
Teamcenter Integration Adapter - DatasheetTeamcenter Integration Adapter - Datasheet
Teamcenter Integration Adapter - DatasheetKovair
 
ERP for Manufacturing | Manufacturing ERP software System | eresource ERP
ERP for Manufacturing | Manufacturing ERP software System | eresource ERPERP for Manufacturing | Manufacturing ERP software System | eresource ERP
ERP for Manufacturing | Manufacturing ERP software System | eresource ERPeresource infotech pvt ltd
 
Discrete manufacturing in Microsoft Dynamics AX 2012
Discrete manufacturing in Microsoft Dynamics AX 2012Discrete manufacturing in Microsoft Dynamics AX 2012
Discrete manufacturing in Microsoft Dynamics AX 2012Mohamed Salah Eldin
 
Product Costing Software
Product Costing SoftwareProduct Costing Software
Product Costing SoftwareSaurabhChobe
 
Manufacturing Software for Electronics Industry
Manufacturing Software for Electronics IndustryManufacturing Software for Electronics Industry
Manufacturing Software for Electronics IndustryArtur Gradow
 
Complete step by step guide to odoo 13 manufacturing
Complete step by step guide to odoo 13 manufacturingComplete step by step guide to odoo 13 manufacturing
Complete step by step guide to odoo 13 manufacturingPlanetOdoo
 
In Mind Cloud - Product Release - 1811
In Mind Cloud - Product Release - 1811In Mind Cloud - Product Release - 1811
In Mind Cloud - Product Release - 1811In Mind Cloud
 
Zero breakdown solution for lg_taehwa
Zero breakdown solution for lg_taehwaZero breakdown solution for lg_taehwa
Zero breakdown solution for lg_taehwaVaibhav Sharma
 
Feature list of openbravo for distribution business
Feature list of openbravo for distribution businessFeature list of openbravo for distribution business
Feature list of openbravo for distribution businessAbul Khayer
 

Similar a Bom bill of material eresource (20)

eresource ERP Manufacturing (bom)
eresource ERP Manufacturing (bom)eresource ERP Manufacturing (bom)
eresource ERP Manufacturing (bom)
 
eresource ERP Manufacturing
eresource ERP Manufacturing eresource ERP Manufacturing
eresource ERP Manufacturing
 
Production planning mps mrp eresource
Production planning mps mrp eresourceProduction planning mps mrp eresource
Production planning mps mrp eresource
 
Chris's editorial march '13
Chris's editorial march '13Chris's editorial march '13
Chris's editorial march '13
 
Mrpii manufacturing resource planning eresource
Mrpii manufacturing resource planning eresourceMrpii manufacturing resource planning eresource
Mrpii manufacturing resource planning eresource
 
Cots integration
Cots integrationCots integration
Cots integration
 
Bill of Material Federation
Bill of Material Federation Bill of Material Federation
Bill of Material Federation
 
Introduction to Bill Of Materials
Introduction to Bill Of MaterialsIntroduction to Bill Of Materials
Introduction to Bill Of Materials
 
Teamcenter Integration Adapter - Datasheet
Teamcenter Integration Adapter - DatasheetTeamcenter Integration Adapter - Datasheet
Teamcenter Integration Adapter - Datasheet
 
Overview of ERP System
Overview of ERP SystemOverview of ERP System
Overview of ERP System
 
ERP for Manufacturing | Manufacturing ERP software System | eresource ERP
ERP for Manufacturing | Manufacturing ERP software System | eresource ERPERP for Manufacturing | Manufacturing ERP software System | eresource ERP
ERP for Manufacturing | Manufacturing ERP software System | eresource ERP
 
Proteus mmx overview
Proteus mmx overviewProteus mmx overview
Proteus mmx overview
 
Discrete manufacturing in Microsoft Dynamics AX 2012
Discrete manufacturing in Microsoft Dynamics AX 2012Discrete manufacturing in Microsoft Dynamics AX 2012
Discrete manufacturing in Microsoft Dynamics AX 2012
 
Product Costing Software
Product Costing SoftwareProduct Costing Software
Product Costing Software
 
Manufacturing Software for Electronics Industry
Manufacturing Software for Electronics IndustryManufacturing Software for Electronics Industry
Manufacturing Software for Electronics Industry
 
Complete step by step guide to odoo 13 manufacturing
Complete step by step guide to odoo 13 manufacturingComplete step by step guide to odoo 13 manufacturing
Complete step by step guide to odoo 13 manufacturing
 
In Mind Cloud - Product Release - 1811
In Mind Cloud - Product Release - 1811In Mind Cloud - Product Release - 1811
In Mind Cloud - Product Release - 1811
 
Ia rm001 -en-p
Ia rm001 -en-pIa rm001 -en-p
Ia rm001 -en-p
 
Zero breakdown solution for lg_taehwa
Zero breakdown solution for lg_taehwaZero breakdown solution for lg_taehwa
Zero breakdown solution for lg_taehwa
 
Feature list of openbravo for distribution business
Feature list of openbravo for distribution businessFeature list of openbravo for distribution business
Feature list of openbravo for distribution business
 

Último

Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 

Último (20)

Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 

Bom bill of material eresource

  • 2. 2 © 2010 eresource Infotech Private Limited. All rights reserved An essential and concise guide to understanding eresource Release 2.8
  • 3. 3 © 2010 eresource Infotech Private Limited. All rights reserved Copyright © Copyright 2011 ERESOURCE. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of eresource Infotech P. Ltd. The information contained herein may be changed without prior notice. Microsoft®, WINDOWS®, NT®, EXCEL®, Word®, PowerPoint® and SQL Server® are registered trademarks of Microsoft Corporation. HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C®, World Wide Web Consortium, eresource, eresource Logo. Eresourceerp.com are trademarks or registered trademarks of eresource Infotech in India and several other countries all over the world. All other products mentioned are trademarks or registered trademarks of their respective companies.
  • 4. 4 © 2010 eresource Infotech Private Limited. All rights reserved Table of Contents Bill of Material (BOM)...................................................................................................................................5 Definition of Bill of Material (BOM) in eresource:........................................................................................5 Single Level BOM in eresource ERP: .............................................................................................................6 Multi level BOM in eresource ERP:...............................................................................................................7 Standard BOM :.............................................................................................................................................7 Order Based BOM : .......................................................................................................................................8 Revision of BOM / Engineering Change Request (ECR) and Engineering Change Note (ECN):....................9 The Modular Bill of Materials: ....................................................................................................................11
  • 5. 5 © 2010 eresource Infotech Private Limited. All rights reserved Bill of Material (BOM) The Bill of Materials is considered to be an engineering document that specifies the ingredients or subordinate components required physically to make each part number or assembly. Or A bill of materials is a list of the raw materials, sub-assemblies, intermediate assemblies, sub-components, components, parts and the quantities of each needed to manufacture an end product. In eresource, a Single level Bill of Material comprises only those subordinate components that are immediately required, not the components of the components. An indented Bill of Material is a list of components, from the end item all the way down to the raw materials; it also doesn’t show the components of the components. The BOM components in eresource support the use of the Bill of Material concept in a wide range of circumstances where there is a tree structure of associated items. BOM can be generated in the following forms: Material BOM Equipment BOM Order Based BOM In each form, the BOM comprises a structured list that specifies what is needed in each of the components – Name, UOM (Unit of Measurement), Quantity. Definition of Bill of Material (BOM) in eresource: Bills of Materials (BOM) are normally accessed according to production or procurement deadlines. The History Management function allows several types of BOM to be managed simultaneously, and can be operated according to the needs of the customer. Single Level Bills of materials and Multi Level Bills of Material can be generated in eresource ERP. For each manufactured line item on a Work Order, the system provides a bill of materials (BOM) and routing. Single level Bill of Material Multi level Bill of Material
  • 6. 6 © 2010 eresource Infotech Private Limited. All rights reserved Single Level BOM in eresource ERP: In the single Level bill of materials only those subordinate components can be captured that are immediately required to manufacture the product. eresource ERP gives you provision to create Single level Bill of Material which is comprises only those subordinate components that are immediately required, not components of components. In the single level BOM master you have provision to plan that how much days will be required to manufacture a particular BOM. Also you have provision to define what and how much Packing material will be required for that Item Batch.
  • 7. 7 © 2010 eresource Infotech Private Limited. All rights reserved Multi level BOM in eresource ERP: The multiple BOM concept aids the management of a variety of similar BOMs (variant problem). Common components of similar BOMs are recorded in a 'Reference BOM-M' while components specific to individual BOMs are recorded in a separate 'Single Level BOM-M'. In this way, the BOM of a given material consists of a combination of data referring to common and individual components. Standard BOM : While making a new standard BOM eresource ERP gives you the provision of copy any standard BOM from existing BOM or from existing Sales order BOM. You have facility to add any other material or any other semi finished item in the new BOM you are making. You can also define the No. of days required to process the batch.
  • 8. 8 © 2010 eresource Infotech Private Limited. All rights reserved Order Based BOM : eresource ERP gives you the provision to create a BOM again the sales order of any customer. Again you can copy BOM from any existing standard BOM or from any previous Sales order BOM. The data of BOMs is automatically shown against the work orders providing the ability to include configured items on a WO's BOM.
  • 9. 9 © 2010 eresource Infotech Private Limited. All rights reserved This gives the stores department to check if the stock of materials is available for a product manufacturing or batch manufacturing. Once the individual customer order is entered, it specifies how much components are required, the quantity including wastage and at what level of production the components will be required. eresource ERP Bills of Materials are completely integrated into the system and support: • The procurement of materials at the optimum time (Material Requirement Planning module) • The placing of production orders (Production Planning and Control Module) • The issue of goods (Inventory Management Module) Revision of BOM / Engineering Change Request (ECR) and Engineering Change Note (ECN): eresource ERP gives you the provision of Revision of BOM which is called ECR (Engineering Change Requisition). With the selection of any item this form gives you the provision to zoom in the BOM by the click on View BOM. You can make any changes on that particular BOM if there is any requisition came for changes.
  • 10. 10 © 2010 eresource Infotech Private Limited. All rights reserved The Engineering Change Notice (ECN) module allows you to establish controls and manage the process of making changes to documents and drawings, parts, Bills of Material (BOMs) and routings, work orders, and projects. The ECN module allows you to: • Create an ECN process flow with multiple ECN user groups and notification systems. • Generate and track ECN tasks and apply electronic signatures for approvals and task completion. • Track ECN and revision history on all parts, documents, bills of manufacture, work orders, and projects. • Maintain an audit trail of changes to the ECN record throughout the change process.
  • 11. 11 © 2010 eresource Infotech Private Limited. All rights reserved The Modular Bill of Materials: A key use of bill of materials files is in translating the MPS into subordinate components requirements. One bill of materials structure or architecture calls for maintaining all end item buildable configurations. This bill of materials structure is appropriate for the make-to-stock firm, where the <PS id stated in end items. For each end item, a single-level bill is maintained, which contains those components that physically go into the item. End Items Options Components The MPS Hourglass MPS
  • 12. 12 © 2010 eresource Infotech Private Limited. All rights reserved In eresource a solution is to establish the MPS at the option or module level. This intent is to state the MPS in units associated with the ‘waist’ of hourglass. This necessitates that bill of materials files be structured accordingly; each option or module will be defined fully in the bill if materials file as a single-level bill of material. If the options are simply buildable subassemblies as end items; that is, designate them as level 0, instead of level 1.