TN Basic ED Course 2013
Real Estate Development & Reuse
SITES and BUILDINGS
• The Internet and technology play a significant role –
you are being looked at without your knowledge
• Most projects start out looking for an existing building
• Shovel-ready sites give a competitive advantage
The prospect is looking for a location
with the fewest
?????
Site Selection Process
RISKS!
Site Selection Process
Sample Consulting is working on behalf of a confidential client that seeks to
identify a community and site for a North American manufacturing operation.
The search area for this confidential project includes a multi-state area. The
states, counties and local/regional jurisdictions that receive this Request for
Information (RFI) have been qualified for the project through pre-screening.
Estimated Project Investment:
Our client is anticipating hiring 300 to 500 employees and investing $200 million
in capital, not including investments in the site and site development.
ALL SUBMISSIONS SHOULD BE SENT DIRECTLY TO SAMPLE CONSULTING. SUBMIT THE
TOP THREE (3) SITES PER COUNTY ONLY. IF MORE THAN THREE SITES PER COUNTY
ARE SUBMITTED, ONLY THE FIRST THREE RECEIVED WILL BE REVIEWED. IT IS
ACCEPTABLE FOR ONE OR ALL OF YOUR THREE SITES SUBMITTED TO BE PROXIMIALLY
ADJACENT TO ONE OF THE COUNTIES APPROVED THROUGH THE PRESCREENING
PROCESS AND LISTED IN THE SET OF ELIGIBLE COUNITES (SENT TO YOU UNDER
SEPARATE COVER).
Project Sample
Key Project Drivers:
• A labor force with the education and experience to support this operation
• Access to reliable, high quality utilities and infrastructure
• Proximity to a major interstate highway (within 10 miles)
• Convenient access to a modern transportation network
• A business and regulatory environment that will support the timely
development of this project
• Compatible setting, zoning (suited for manufacturing), and surroundings
• Access to an airport with small parcel and cargo services strongly
preferred
• Competitive overall operating, real estate, and utility costs (electric)
• Competitive incentives and access to relevant training programs
• Access to government agencies experienced with the attraction,
development, permitting, and operations of distribution facilities
The RFI (Request for Information)
Please provide the following information on each of the available site(s) you are proposing:
• Location, including address, community name, population, and distance to Interstate and
appropriate airport (please provide airport name);
• Map identifying site boundary and local and regional location;
• Site size (acreage, etc.);
• Date available;
• Present use and user;
• Past use(s) and user(s);
• Surrounding uses;
• Zoning (provide applicable ordinances, and verify suitability)
• Photographs;
• Map showing utility and road infrastructure servicing the site;
• Depiction/description of known or potential easements;
• Names of utility-service providers;
• Site ownership, and demonstrable intent/willingness to sell;
• Land asking price, indicating/reflecting market rate commissions;
• Property tax rates, including millage rate and assessment ratio.
The RFI (Request for Information)
Site Requirements:
Suitable Available Site and Site Specifications
The primary requirement for an existing site to be suitable for Project Sample is the site’s
potential for manufacturing. We are interested in evaluating only those sites that meet this
criterion and are otherwise generally consistent with the specifications below.
• Site Size:Minimum of 62 acres, and up to 76 acres (of useable acreage)
• Dimensions:Rectangular/square site preferred, with a maximum length to width ratio of 1.5 to 1
• Special Site Characteristics:Standard soil load bearing characteristics, no wetlands, flat terrain
with no hills, ravines or quarries. The site must have no known environmental concerns. Dual
carriage way access is preferred, wastewater treatment is necessary, and the adjoining uses
must be odor free
• Building Size:400,000 sqft, expandable to 600,000 sqft. 75% for production, 15% for offices,
5% for warehousing, and 5% for pilot plant / R&D
• Ceiling height:Minimum 55’ to 60’ preferred
• Car parking: 200 spaces, tentatively
• Fire protection: ESFR sprinkler system
• Electric:2.23 million kWh/month usage, 24 hour operation. Electricity
primarily used for chillers, HVAC, compressors, and process equipment. The
load cannot be interruptible and a dual feed may be required
• Water supply:Municipal water supply with dual 14” lines required. 400 million
gallons per year usage for boilers, process water, and as an ingredient.
Water pressure must be constant. The company is willing to consider use of
a septic tank or other private disposal system
• Wastewater:275 million gallons annually, will contain some clean in place
detergents
• Natural gas:3.06 million therms annually, primarily used for boilers and
HVAC. Service must be constant, natural gas with propane backup
• Telecom:Fiber optic access; T-1 connectivity
• Zoning:Compatible with manufacturing and distribution
Site Requirements:
Suitable Available Site and Site Specifications
• ECD launched the Tennessee Premier Sites program in Spring 2012 to certify
high-quality sites across the state through a respected national site selection
firm
• ECD will aggressively market Premier Sites to site selection consultants and
companies, helping create a level playing field for all high-quality sites across
the state
• Austin Group was selected for the project.
Tennessee Premier Sites
What can be a deal breaker?
Deal Breakers
1. Infrastructure Costs
2. Not having a site action plan
3. Lack of answers and data and info
4. Uncontrolled site – who owns it?
5. Lack of community leadership
6. Poorly maintained site
7. Unknowns?
Deal Breakers
Toyota, MS
Hyundai, AL
VW, TN
Questions?
Questions?
Thank You!

Más contenido relacionado

Destacado (6)

Investment Tools-Jamie Stitt-TN Economic Development Finance Course
Investment Tools-Jamie Stitt-TN Economic Development Finance CourseInvestment Tools-Jamie Stitt-TN Economic Development Finance Course
Investment Tools-Jamie Stitt-TN Economic Development Finance Course
 
Business Retention and Expansion, TN Basic Economic Development Course 2013
Business Retention and Expansion, TN Basic Economic Development Course 2013Business Retention and Expansion, TN Basic Economic Development Course 2013
Business Retention and Expansion, TN Basic Economic Development Course 2013
 
Managing for Excellence-Outcome-Based Performance for the Economic Developmen...
Managing for Excellence-Outcome-Based Performance for the Economic Developmen...Managing for Excellence-Outcome-Based Performance for the Economic Developmen...
Managing for Excellence-Outcome-Based Performance for the Economic Developmen...
 
Economic Development Finance, TN Basic Economic Development Course 2013
Economic Development Finance, TN Basic Economic Development Course 2013Economic Development Finance, TN Basic Economic Development Course 2013
Economic Development Finance, TN Basic Economic Development Course 2013
 
BID CE WORKSHOP 1 - Session 01 - Introduction
BID CE WORKSHOP 1 -  Session 01 - IntroductionBID CE WORKSHOP 1 -  Session 01 - Introduction
BID CE WORKSHOP 1 - Session 01 - Introduction
 
Cdg 35 actualites statutaires
Cdg 35 actualites statutairesCdg 35 actualites statutaires
Cdg 35 actualites statutaires
 

Similar a Manufacturing Site RFI Details Projects Seeking 300-500 Jobs $200M Investment

Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessEMRoundtable
 
Wireless Infrastructure Solutions
Wireless Infrastructure SolutionsWireless Infrastructure Solutions
Wireless Infrastructure Solutionstelecom-wiring
 
Storage methods and location systems
Storage methods and location systemsStorage methods and location systems
Storage methods and location systemsNavindu Munidasa
 
Architectural Professional Practice - Site الممارسة المهنية المعمارية - الموقع
Architectural Professional Practice - Site الممارسة المهنية المعمارية - الموقعArchitectural Professional Practice - Site الممارسة المهنية المعمارية - الموقع
Architectural Professional Practice - Site الممارسة المهنية المعمارية - الموقعGalala University
 
Plugging In Oregon: Community Charging Rebates Program by JR Anderson
Plugging In Oregon: Community Charging Rebates Program by JR AndersonPlugging In Oregon: Community Charging Rebates Program by JR Anderson
Plugging In Oregon: Community Charging Rebates Program by JR AndersonForth
 
Plantlocationandlayoutplanning
PlantlocationandlayoutplanningPlantlocationandlayoutplanning
PlantlocationandlayoutplanningJoseph Konnully
 
DEVNET-1145 How APIs are Driving City Digitization
DEVNET-1145	How APIs are Driving City DigitizationDEVNET-1145	How APIs are Driving City Digitization
DEVNET-1145 How APIs are Driving City DigitizationCisco DevNet
 
Building GovCon Indirect Rates
Building GovCon Indirect RatesBuilding GovCon Indirect Rates
Building GovCon Indirect RatesRobert E Jones
 
Encoursa Webinar - Building GovCon Indirect Rates
Encoursa Webinar - Building GovCon Indirect RatesEncoursa Webinar - Building GovCon Indirect Rates
Encoursa Webinar - Building GovCon Indirect RatesRobert E Jones
 
RV 2014: Space Exploration: Innovative Parking Tools + Strategies
RV 2014: Space Exploration: Innovative Parking Tools + StrategiesRV 2014: Space Exploration: Innovative Parking Tools + Strategies
RV 2014: Space Exploration: Innovative Parking Tools + StrategiesRail~Volution
 
Infrastructure Levy rate setting workshop.pptx
Infrastructure Levy rate setting workshop.pptxInfrastructure Levy rate setting workshop.pptx
Infrastructure Levy rate setting workshop.pptxRachaelFerryJones
 
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...PAS_Team
 
Electrifying City Fleets by Randal Kaufman
Electrifying City Fleets by Randal KaufmanElectrifying City Fleets by Randal Kaufman
Electrifying City Fleets by Randal KaufmanForth
 
What's Next for Uber
What's Next for Uber What's Next for Uber
What's Next for Uber Yash Sinha
 
Broadband Grant Workshop - PSC (Oneida County)
Broadband Grant Workshop - PSC (Oneida County)Broadband Grant Workshop - PSC (Oneida County)
Broadband Grant Workshop - PSC (Oneida County)WI Broadband
 
PSC Broadband Grant Workshop September 2014
PSC Broadband Grant Workshop September 2014PSC Broadband Grant Workshop September 2014
PSC Broadband Grant Workshop September 2014WI Broadband
 

Similar a Manufacturing Site RFI Details Projects Seeking 300-500 Jobs $200M Investment (20)

Gemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site ReadinessGemmen- Industrial Site Certification & Site Readiness
Gemmen- Industrial Site Certification & Site Readiness
 
Wireless Infrastructure Solutions
Wireless Infrastructure SolutionsWireless Infrastructure Solutions
Wireless Infrastructure Solutions
 
150615 Wainfleet SPC Guidelines
150615 Wainfleet SPC Guidelines150615 Wainfleet SPC Guidelines
150615 Wainfleet SPC Guidelines
 
2_plant_location.ppt
2_plant_location.ppt2_plant_location.ppt
2_plant_location.ppt
 
Storage methods and location systems
Storage methods and location systemsStorage methods and location systems
Storage methods and location systems
 
JAGDISH Updated
JAGDISH UpdatedJAGDISH Updated
JAGDISH Updated
 
Architectural Professional Practice - Site الممارسة المهنية المعمارية - الموقع
Architectural Professional Practice - Site الممارسة المهنية المعمارية - الموقعArchitectural Professional Practice - Site الممارسة المهنية المعمارية - الموقع
Architectural Professional Practice - Site الممارسة المهنية المعمارية - الموقع
 
Plugging In Oregon: Community Charging Rebates Program by JR Anderson
Plugging In Oregon: Community Charging Rebates Program by JR AndersonPlugging In Oregon: Community Charging Rebates Program by JR Anderson
Plugging In Oregon: Community Charging Rebates Program by JR Anderson
 
Plantlocationandlayoutplanning
PlantlocationandlayoutplanningPlantlocationandlayoutplanning
Plantlocationandlayoutplanning
 
DEVNET-1145 How APIs are Driving City Digitization
DEVNET-1145	How APIs are Driving City DigitizationDEVNET-1145	How APIs are Driving City Digitization
DEVNET-1145 How APIs are Driving City Digitization
 
Building GovCon Indirect Rates
Building GovCon Indirect RatesBuilding GovCon Indirect Rates
Building GovCon Indirect Rates
 
Encoursa Webinar - Building GovCon Indirect Rates
Encoursa Webinar - Building GovCon Indirect RatesEncoursa Webinar - Building GovCon Indirect Rates
Encoursa Webinar - Building GovCon Indirect Rates
 
RV 2014: Space Exploration: Innovative Parking Tools + Strategies
RV 2014: Space Exploration: Innovative Parking Tools + StrategiesRV 2014: Space Exploration: Innovative Parking Tools + Strategies
RV 2014: Space Exploration: Innovative Parking Tools + Strategies
 
Redevelopment
RedevelopmentRedevelopment
Redevelopment
 
Infrastructure Levy rate setting workshop.pptx
Infrastructure Levy rate setting workshop.pptxInfrastructure Levy rate setting workshop.pptx
Infrastructure Levy rate setting workshop.pptx
 
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
Infrastructure Levy Technical Consultation (Workshop 1 Setting rates and char...
 
Electrifying City Fleets by Randal Kaufman
Electrifying City Fleets by Randal KaufmanElectrifying City Fleets by Randal Kaufman
Electrifying City Fleets by Randal Kaufman
 
What's Next for Uber
What's Next for Uber What's Next for Uber
What's Next for Uber
 
Broadband Grant Workshop - PSC (Oneida County)
Broadband Grant Workshop - PSC (Oneida County)Broadband Grant Workshop - PSC (Oneida County)
Broadband Grant Workshop - PSC (Oneida County)
 
PSC Broadband Grant Workshop September 2014
PSC Broadband Grant Workshop September 2014PSC Broadband Grant Workshop September 2014
PSC Broadband Grant Workshop September 2014
 

Más de University of Tennessee-Center for Industrial Services-Economic Development

Más de University of Tennessee-Center for Industrial Services-Economic Development (18)

Investment Tools-Ira Weinstein-TN Economic Development Finance Course
Investment Tools-Ira Weinstein-TN Economic Development Finance CourseInvestment Tools-Ira Weinstein-TN Economic Development Finance Course
Investment Tools-Ira Weinstein-TN Economic Development Finance Course
 
Bonds and Basics-Lauren Lowe-TN Economic Development Finance Course
Bonds and Basics-Lauren Lowe-TN Economic Development Finance CourseBonds and Basics-Lauren Lowe-TN Economic Development Finance Course
Bonds and Basics-Lauren Lowe-TN Economic Development Finance Course
 
Access to Capital-TN Economic Development Finance Course
Access to Capital-TN Economic Development Finance CourseAccess to Capital-TN Economic Development Finance Course
Access to Capital-TN Economic Development Finance Course
 
Investment Tools-TN Economic Development Finance Course
Investment Tools-TN Economic Development Finance CourseInvestment Tools-TN Economic Development Finance Course
Investment Tools-TN Economic Development Finance Course
 
Targeted Tools-TN Economic Development Finance Course
Targeted Tools-TN Economic Development Finance CourseTargeted Tools-TN Economic Development Finance Course
Targeted Tools-TN Economic Development Finance Course
 
Support Tools-TN Economic Development Finance Course
Support Tools-TN Economic Development Finance CourseSupport Tools-TN Economic Development Finance Course
Support Tools-TN Economic Development Finance Course
 
Understanding Economic Development Finance-TN Economic Development Finance Co...
Understanding Economic Development Finance-TN Economic Development Finance Co...Understanding Economic Development Finance-TN Economic Development Finance Co...
Understanding Economic Development Finance-TN Economic Development Finance Co...
 
TN Business Retention & Expansion Course 2013 Case Study Documents
TN Business Retention & Expansion Course 2013 Case Study DocumentsTN Business Retention & Expansion Course 2013 Case Study Documents
TN Business Retention & Expansion Course 2013 Case Study Documents
 
TN Business Retention & Expansion Course 2013 - Experts Panel - Jamie Stitt P...
TN Business Retention & Expansion Course 2013 - Experts Panel - Jamie Stitt P...TN Business Retention & Expansion Course 2013 - Experts Panel - Jamie Stitt P...
TN Business Retention & Expansion Course 2013 - Experts Panel - Jamie Stitt P...
 
TN Business Retention & Expansion Course 2013 - Experts Panel - Judith Hill P...
TN Business Retention & Expansion Course 2013 - Experts Panel - Judith Hill P...TN Business Retention & Expansion Course 2013 - Experts Panel - Judith Hill P...
TN Business Retention & Expansion Course 2013 - Experts Panel - Judith Hill P...
 
TN Business Retention & Expansion Course 2013 - Experts Panel - Jennifer Haga...
TN Business Retention & Expansion Course 2013 - Experts Panel - Jennifer Haga...TN Business Retention & Expansion Course 2013 - Experts Panel - Jennifer Haga...
TN Business Retention & Expansion Course 2013 - Experts Panel - Jennifer Haga...
 
TN Business Retention & Expansion Course 2013 Day 1 Presentation
TN Business Retention & Expansion Course 2013 Day 1 PresentationTN Business Retention & Expansion Course 2013 Day 1 Presentation
TN Business Retention & Expansion Course 2013 Day 1 Presentation
 
Entrepreneurship and Small Business Development, 2103 Tennessee Basic Economi...
Entrepreneurship and Small Business Development, 2103 Tennessee Basic Economi...Entrepreneurship and Small Business Development, 2103 Tennessee Basic Economi...
Entrepreneurship and Small Business Development, 2103 Tennessee Basic Economi...
 
Real Estate Development and Reuse (part 1), TN Basic Economic Development Cou...
Real Estate Development and Reuse (part 1), TN Basic Economic Development Cou...Real Estate Development and Reuse (part 1), TN Basic Economic Development Cou...
Real Estate Development and Reuse (part 1), TN Basic Economic Development Cou...
 
Community Research and Analysis, TN Basic Economic Development Course 2013
Community Research and Analysis, TN Basic Economic Development Course 2013Community Research and Analysis, TN Basic Economic Development Course 2013
Community Research and Analysis, TN Basic Economic Development Course 2013
 
Strategic Planning, TN Basic Economic Development Course 2013
Strategic Planning, TN Basic Economic Development Course 2013Strategic Planning, TN Basic Economic Development Course 2013
Strategic Planning, TN Basic Economic Development Course 2013
 
Education and Workforce Development, TN Basic Economic Development Course 2013
Education and Workforce Development, TN Basic Economic Development Course 2013Education and Workforce Development, TN Basic Economic Development Course 2013
Education and Workforce Development, TN Basic Economic Development Course 2013
 
Trends in Economic Development, TN Basic Economic Development Course 2013
Trends in Economic Development, TN Basic Economic Development Course 2013Trends in Economic Development, TN Basic Economic Development Course 2013
Trends in Economic Development, TN Basic Economic Development Course 2013
 

Último

Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataBabyAnnMotar
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptshraddhaparab530
 
EMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxEMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxElton John Embodo
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)lakshayb543
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEaurabinda banchhor
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationRosabel UA
 

Último (20)

Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
Measures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped dataMeasures of Position DECILES for ungrouped data
Measures of Position DECILES for ungrouped data
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
Integumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.pptIntegumentary System SMP B. Pharm Sem I.ppt
Integumentary System SMP B. Pharm Sem I.ppt
 
EMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docxEMBODO Lesson Plan Grade 9 Law of Sines.docx
EMBODO Lesson Plan Grade 9 Law of Sines.docx
 
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
Visit to a blind student's school🧑‍🦯🧑‍🦯(community medicine)
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Dust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSEDust Of Snow By Robert Frost Class-X English CBSE
Dust Of Snow By Robert Frost Class-X English CBSE
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
Activity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translationActivity 2-unit 2-update 2024. English translation
Activity 2-unit 2-update 2024. English translation
 

Manufacturing Site RFI Details Projects Seeking 300-500 Jobs $200M Investment

  • 1. TN Basic ED Course 2013 Real Estate Development & Reuse SITES and BUILDINGS
  • 2. • The Internet and technology play a significant role – you are being looked at without your knowledge • Most projects start out looking for an existing building • Shovel-ready sites give a competitive advantage The prospect is looking for a location with the fewest ????? Site Selection Process
  • 4. Sample Consulting is working on behalf of a confidential client that seeks to identify a community and site for a North American manufacturing operation. The search area for this confidential project includes a multi-state area. The states, counties and local/regional jurisdictions that receive this Request for Information (RFI) have been qualified for the project through pre-screening. Estimated Project Investment: Our client is anticipating hiring 300 to 500 employees and investing $200 million in capital, not including investments in the site and site development. ALL SUBMISSIONS SHOULD BE SENT DIRECTLY TO SAMPLE CONSULTING. SUBMIT THE TOP THREE (3) SITES PER COUNTY ONLY. IF MORE THAN THREE SITES PER COUNTY ARE SUBMITTED, ONLY THE FIRST THREE RECEIVED WILL BE REVIEWED. IT IS ACCEPTABLE FOR ONE OR ALL OF YOUR THREE SITES SUBMITTED TO BE PROXIMIALLY ADJACENT TO ONE OF THE COUNTIES APPROVED THROUGH THE PRESCREENING PROCESS AND LISTED IN THE SET OF ELIGIBLE COUNITES (SENT TO YOU UNDER SEPARATE COVER). Project Sample
  • 5. Key Project Drivers: • A labor force with the education and experience to support this operation • Access to reliable, high quality utilities and infrastructure • Proximity to a major interstate highway (within 10 miles) • Convenient access to a modern transportation network • A business and regulatory environment that will support the timely development of this project • Compatible setting, zoning (suited for manufacturing), and surroundings • Access to an airport with small parcel and cargo services strongly preferred • Competitive overall operating, real estate, and utility costs (electric) • Competitive incentives and access to relevant training programs • Access to government agencies experienced with the attraction, development, permitting, and operations of distribution facilities The RFI (Request for Information)
  • 6. Please provide the following information on each of the available site(s) you are proposing: • Location, including address, community name, population, and distance to Interstate and appropriate airport (please provide airport name); • Map identifying site boundary and local and regional location; • Site size (acreage, etc.); • Date available; • Present use and user; • Past use(s) and user(s); • Surrounding uses; • Zoning (provide applicable ordinances, and verify suitability) • Photographs; • Map showing utility and road infrastructure servicing the site; • Depiction/description of known or potential easements; • Names of utility-service providers; • Site ownership, and demonstrable intent/willingness to sell; • Land asking price, indicating/reflecting market rate commissions; • Property tax rates, including millage rate and assessment ratio. The RFI (Request for Information)
  • 7. Site Requirements: Suitable Available Site and Site Specifications The primary requirement for an existing site to be suitable for Project Sample is the site’s potential for manufacturing. We are interested in evaluating only those sites that meet this criterion and are otherwise generally consistent with the specifications below. • Site Size:Minimum of 62 acres, and up to 76 acres (of useable acreage) • Dimensions:Rectangular/square site preferred, with a maximum length to width ratio of 1.5 to 1 • Special Site Characteristics:Standard soil load bearing characteristics, no wetlands, flat terrain with no hills, ravines or quarries. The site must have no known environmental concerns. Dual carriage way access is preferred, wastewater treatment is necessary, and the adjoining uses must be odor free • Building Size:400,000 sqft, expandable to 600,000 sqft. 75% for production, 15% for offices, 5% for warehousing, and 5% for pilot plant / R&D • Ceiling height:Minimum 55’ to 60’ preferred • Car parking: 200 spaces, tentatively • Fire protection: ESFR sprinkler system
  • 8. • Electric:2.23 million kWh/month usage, 24 hour operation. Electricity primarily used for chillers, HVAC, compressors, and process equipment. The load cannot be interruptible and a dual feed may be required • Water supply:Municipal water supply with dual 14” lines required. 400 million gallons per year usage for boilers, process water, and as an ingredient. Water pressure must be constant. The company is willing to consider use of a septic tank or other private disposal system • Wastewater:275 million gallons annually, will contain some clean in place detergents • Natural gas:3.06 million therms annually, primarily used for boilers and HVAC. Service must be constant, natural gas with propane backup • Telecom:Fiber optic access; T-1 connectivity • Zoning:Compatible with manufacturing and distribution Site Requirements: Suitable Available Site and Site Specifications
  • 9. • ECD launched the Tennessee Premier Sites program in Spring 2012 to certify high-quality sites across the state through a respected national site selection firm • ECD will aggressively market Premier Sites to site selection consultants and companies, helping create a level playing field for all high-quality sites across the state • Austin Group was selected for the project. Tennessee Premier Sites
  • 10. What can be a deal breaker? Deal Breakers
  • 11. 1. Infrastructure Costs 2. Not having a site action plan 3. Lack of answers and data and info 4. Uncontrolled site – who owns it? 5. Lack of community leadership 6. Poorly maintained site 7. Unknowns? Deal Breakers

Notas del editor

  1. Proof only
  2. Proof only