San Diego
Retrocommissioning
Program
Erin L. Kelley
April 28, 2009
Portland Energy Conservation, Inc.
at a Glance
3
Portland Energy Conservation, Inc. (PECI)
4
 Commissioning and
Retrocommissioning research
& engineering
 Tools & resource development
 Energy efficiency policy &
standard development
 Program design,
implementation & marketing
PECI offers services in the
following areas:
To learn more, visit:
www.peci.org
PECI Retrocommissioning
Programs:
Retrocommissioning Basics
5
6
Retrocommissioning (RCx): What is it?
• A systematic process for improving building
performance by identifying and implementing low-
cost operational and maintenance improvements
• Process focuses on the operation of mechanical
equipment, lighting, and related controls and is
intended to optimize how equipment operates
and functions as an integrated system
• Excludes retrofit items such as installing high efficiency
lamps, chiller replacements, and air conditioning subsystem
replacements
77
Typical Problems Identified
• Simultaneous heating and cooling
• Lighting and HVAC running when not required
• Opening throttled discharge valves
• Controls needing to be retuned
• Critical control sensors out of calibration
• Energy management systems that are not taking
full advantage of their capabilities
• Economizers not operating properly
88
What Can Be Expected from RCx?
• Energy cost savings (5-20%) with little capital
expense
• High potential for project simple payback of <2 years
• Increased equipment reliability
• Increased occupant comfort
• Involvement of building operators to increase
understanding of systems
• Complete documentation of the RCx measures
implemented through the Program
99
What Makes a Good Building Candidate?
• Greater than 100,000 square feet of conditioned space
• High energy use intensity (EUI)
• Mechanical equipment in relatively good condition
• A Direct Digital Control (DDC) system in place
• Committed ownership, management, and building
operators
• Buildings with central plants preferred, though RTU and
heat pump buildings have qualified
• Hotels, office buildings, hospitals, data centers, retail . . .
1010
The San Diego
Retrocommissioning Program
1111
Program Background
• Funded by San Diego Gas & Electric (SDG&E)
• Launched as a pilot program in 2004 for large commercial
buildings
– Four buildings totaling 2.7M ft2
enrolled, achieving savings of:
• 9.9M kWh
• 266,000 therms
• Peak demand reduction of 1,445 kW
• Based on this success, SDG&E scaled the program up to
10M ft2
, aiming to save 8.5% of electric usage in the 2006-
2008 program cycle
1212
What Does the San Diego RCx Program Offer?
• Free building screening to determine eligibility for the Program
• Customized investigation of building operations
– Custom incentive estimated at $0.10 per ft2
up to $100,000 (paid directly
to retrocommissioning provider)
• Implementation assistance for energy saving improvements
– Custom incentive estimated at $0.05 per ft2
, applies to measures with a
simple payback of longer than one year (paid directly to owner)
• Free documentation and training on improvements
– Custom incentive ranges from $3,000-7,500 (paid directly to
retrocommissioning provider)
• Free pre- and post-project ENERGY STAR®
Benchmark
• Tailored Performance Tracking Plan for RCx measures to ensure
persistence
1313
What are the Customer’s Responsibilities?
• Sign the Owner Program Agreement (OPA)
– Commit to implementing measures with a one year or less
payback
• A cap is set at project start for the maximum financial responsibility for
implementing measures that pay back in one year or less (8.5% of
current energy bills)
– If measures are not implemented as agreed, the owner must
reimburse the Program for the investigation costs
• Have funding available to implement measures within 12
months of project start
• Commit at least 40 hours of senior building operations
staff time to support the project
• Hire and oversee contractors to provide implementation of
selected measures
1414
What is the Program Process?
• The Program operates in distinct phases:
– Application
– Screening
– Agreement Development
– Investigation
– Implementation
– Follow-Up
– Performance Tracking (Optional)
• RCx projects typically take 9-18 months to
complete
1515
Who Provides the Services?
• The Program has a pool of pre-qualified and trained
retrocommissioning providers (RCx Providers)
– 56 firms, 142 individuals
– Selected based on their previous retrocommissioning experience
and expertise in identifying O&M-type energy savings
opportunities
• RCx Providers conduct the in-depth investigation, work
with building staff to select cost-effective measures for
implementation, and provide project documentation and
training
• For implementation, the owner may utilize in-house
building staff, hire the RCx Provider to implement or
provide technical assistance, contract with outside service
contractors, or any combination of the above
1616
Innovative Features
1717
RCx Roadblocks
1. Lack of market awareness of RCx benefits and scope
2. Inconsistent approaches to RCx created uneven results
in the past
3. RCx entails operational changes requiring buy-in from
various levels of an organization
4. Cost of investigation typically a big hurdle
5. RCx is a long-term (9-18 month) endeavor
6. RCx measures can be easily undone
SDG&E recognized these barriers could be lessened through an
innovative RCx program
1818
Program Solutions
1. Lack of market awareness of RCx
benefits and scope
2. Inconsistent approaches to RCx
created uneven results in the past
 Deploy Field Energy Analyst
(FEA) to local industry players to
build market awareness and
educate prospective customers,
providers, and contractors
 Pre-qualify pool of RCx providers
 Develop streamlined process
and toolkit
 Provide third-party engineering
reviews of technical deliverables
SolutionRoadblock
1919
Program Solutions
3. RCx entails operational changes
requiring buy-in from various
levels of an organization
4. Cost of investigation typically a
big hurdle
 Engage all players in process
from start to finish
 Design toolkit and deliverables
that speak to all levels of the
organization
 Facilitate meetings with decision
makers throughout the project
 Investigation fully covered by
program incentives
 Owner obligated to implement
measures with <1 year payback
SolutionRoadblock
2020
Program Solutions
5. RCx is a long-term (9-18 month)
endeavor
6. RCx measures can easily be
undone
 Obtain owner commitment up
front
 Provide incentives to keep owner
engaged
 Define clear roles &
responsibilities, processes,
deliverables and schedules to
coordinate the players
 Deploy FEA to manage project
from start to finish
 Deliver focused training and
measure documentation to
building operators during handoff
 Provide an ongoing performance
tracking option and incentives
SolutionRoadblock
2121
Program Results
2222
Results
 The San Diego RCx Program bases
its success on goals of electric
energy savings, demand savings,
and gas savings
 Average building kWh savings (9%)
have exceeded expectations
 The ‘06-08 Program gained
significant momentum through the
cycle, leaving a strong pipeline for
2009
Goal
Estimated
Results
% of Goal
Electric
Savings
(kWh)
17.4 M 13.8 M 80%
Demand
Savings
(kW)
2,698 1,503 56%
Gas Savings
(therms)
244,707 72,207 30%
Goal Result % of Goal
Electric
Savings
(kWh)
6.2 M 9.9 M 160%
Demand
Savings (kW)
780 1,445 185%
Gas Savings
(therms)
NA 266,000 NA
2004-2005 Pilot Program
2006-2009 Program
2323
Case Study
24
Case Study
Marriott Downtown & Marina
 1,400,000 ft2
with 1,362 guest rooms
 Facility includes parking garage, marina,
meeting spaces, and restaurants
Quantified Costs and Savings To-Date
 1,470,000 kWh - Annual kWh Savings
 88,000 therms - Annual Therm Savings
 Project Cost, Incentives, and $ Savings:
 $391,716 - Total Project Cost
 $196,412 - Total Program Incentive
 $195,304 - Net Owner Cost
 $272,500 - Total Cost Savings
 Simple Payback: < 1 year
Energy savings reflect anticipated project savings based on implemented measures. Actual energy savings may vary with each project.
25
Case Study (cont.)
Reduce simultaneous heating and cooling
(Fix valves, replace failed fan VFD, lower VAV box flow rates)
Re-enable demand-controlled ventilation on parking garage
Optimize flow and scheduling of water feature pumps
Install VFD on condenser pump
Install VFDs on domestic water booster pumps
Install VFD on evaporator pump
Recommended Measures for Retrocommissioning
and Associated Cost Savings
Energy savings reflect anticipated project savings based on implemented measures. Actual energy savings may vary with each project.
2626
Contact
2727
Want to Learn More about the Program?
The San Diego Retrocommissioning Program
Erin Kelley, Program Manager
Portland Energy Conservation, Inc. (PECI)
tel: 503.961.6169
email: ekelley@peci.org
www.peci.org/LgCommercial/incentive_programs/sandiegorcx2.html
www.sandiegorcx.com
San Diego Retrocommissioning Program Overview

Más contenido relacionado

La actualidad más candente

Eng_1st Qtr 2014 Ops Meeting
Eng_1st Qtr 2014 Ops MeetingEng_1st Qtr 2014 Ops Meeting
Eng_1st Qtr 2014 Ops MeetingKurt Holobaugh
 
Energy Into Action – Commercial Institutional (Hydro One)
Energy Into Action  – Commercial Institutional (Hydro One)Energy Into Action  – Commercial Institutional (Hydro One)
Energy Into Action – Commercial Institutional (Hydro One)EnergyIntoAction
 
Development and transfer of technology implementation for climate change miti...
Development and transfer of technology implementation for climate change miti...Development and transfer of technology implementation for climate change miti...
Development and transfer of technology implementation for climate change miti...Dewan Nasional Perubahan Iklim
 
Arokia Raj RM Resume
Arokia Raj RM  ResumeArokia Raj RM  Resume
Arokia Raj RM Resumearokiagetz
 
DarlingtonRefurb_PerfomanceReport_July2014
DarlingtonRefurb_PerfomanceReport_July2014DarlingtonRefurb_PerfomanceReport_July2014
DarlingtonRefurb_PerfomanceReport_July2014Piyush Sharma
 
The Role of Incentives in Advancing Energy Efficiency Initiatives
The Role of Incentives in Advancing Energy Efficiency InitiativesThe Role of Incentives in Advancing Energy Efficiency Initiatives
The Role of Incentives in Advancing Energy Efficiency InitiativesAnne Patenaude
 
ICANN 52: New gTLD Program: Status, Reviews and Next Round
ICANN 52: New gTLD Program: Status, Reviews and Next RoundICANN 52: New gTLD Program: Status, Reviews and Next Round
ICANN 52: New gTLD Program: Status, Reviews and Next RoundICANN
 
Nov 25, 2014 Hydro Ottawa Breakfast: Beyond the Incentive
Nov 25, 2014 Hydro Ottawa Breakfast: Beyond the IncentiveNov 25, 2014 Hydro Ottawa Breakfast: Beyond the Incentive
Nov 25, 2014 Hydro Ottawa Breakfast: Beyond the IncentiveAnne Patenaude
 
Centralizing energy efforts
Centralizing energy effortsCentralizing energy efforts
Centralizing energy effortsTNenergy
 
ComEd Retro-Commissioning Program
ComEd Retro-Commissioning ProgramComEd Retro-Commissioning Program
ComEd Retro-Commissioning ProgramIllinois ASHRAE
 
Energy Audit Basics and Principles
Energy Audit Basics and Principles Energy Audit Basics and Principles
Energy Audit Basics and Principles RCREEE
 
Blythe.mike
Blythe.mikeBlythe.mike
Blythe.mikeNASAPMC
 
Responsible Global Spend - Sample Program and Timeline
Responsible Global Spend - Sample Program and TimelineResponsible Global Spend - Sample Program and Timeline
Responsible Global Spend - Sample Program and TimelineBill Kohnen
 
Bob-ICANN
Bob-ICANNBob-ICANN
Bob-ICANNAFRINIC
 
Updates on implementation of ISO 50001
Updates on implementation of ISO 50001Updates on implementation of ISO 50001
Updates on implementation of ISO 50001nooone
 
NCTD Sustainability Case Study
NCTD Sustainability Case StudyNCTD Sustainability Case Study
NCTD Sustainability Case Studykelangst
 
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...Kevin Perry
 

La actualidad más candente (20)

Eng_1st Qtr 2014 Ops Meeting
Eng_1st Qtr 2014 Ops MeetingEng_1st Qtr 2014 Ops Meeting
Eng_1st Qtr 2014 Ops Meeting
 
Energy Into Action – Commercial Institutional (Hydro One)
Energy Into Action  – Commercial Institutional (Hydro One)Energy Into Action  – Commercial Institutional (Hydro One)
Energy Into Action – Commercial Institutional (Hydro One)
 
The Commercial Energy Codes Support Program
The Commercial Energy Codes Support ProgramThe Commercial Energy Codes Support Program
The Commercial Energy Codes Support Program
 
Development and transfer of technology implementation for climate change miti...
Development and transfer of technology implementation for climate change miti...Development and transfer of technology implementation for climate change miti...
Development and transfer of technology implementation for climate change miti...
 
Arokia Raj RM Resume
Arokia Raj RM  ResumeArokia Raj RM  Resume
Arokia Raj RM Resume
 
DarlingtonRefurb_PerfomanceReport_July2014
DarlingtonRefurb_PerfomanceReport_July2014DarlingtonRefurb_PerfomanceReport_July2014
DarlingtonRefurb_PerfomanceReport_July2014
 
The Role of Incentives in Advancing Energy Efficiency Initiatives
The Role of Incentives in Advancing Energy Efficiency InitiativesThe Role of Incentives in Advancing Energy Efficiency Initiatives
The Role of Incentives in Advancing Energy Efficiency Initiatives
 
ICANN 52: New gTLD Program: Status, Reviews and Next Round
ICANN 52: New gTLD Program: Status, Reviews and Next RoundICANN 52: New gTLD Program: Status, Reviews and Next Round
ICANN 52: New gTLD Program: Status, Reviews and Next Round
 
Nov 25, 2014 Hydro Ottawa Breakfast: Beyond the Incentive
Nov 25, 2014 Hydro Ottawa Breakfast: Beyond the IncentiveNov 25, 2014 Hydro Ottawa Breakfast: Beyond the Incentive
Nov 25, 2014 Hydro Ottawa Breakfast: Beyond the Incentive
 
Centralizing energy efforts
Centralizing energy effortsCentralizing energy efforts
Centralizing energy efforts
 
ComEd Retro-Commissioning Program
ComEd Retro-Commissioning ProgramComEd Retro-Commissioning Program
ComEd Retro-Commissioning Program
 
Energy Audit Basics and Principles
Energy Audit Basics and Principles Energy Audit Basics and Principles
Energy Audit Basics and Principles
 
Blythe.mike
Blythe.mikeBlythe.mike
Blythe.mike
 
Responsible Global Spend - Sample Program and Timeline
Responsible Global Spend - Sample Program and TimelineResponsible Global Spend - Sample Program and Timeline
Responsible Global Spend - Sample Program and Timeline
 
Bob-ICANN
Bob-ICANNBob-ICANN
Bob-ICANN
 
Full presentation
Full presentationFull presentation
Full presentation
 
Updates on implementation of ISO 50001
Updates on implementation of ISO 50001Updates on implementation of ISO 50001
Updates on implementation of ISO 50001
 
SGIP August 15, 2013 eMeeting - State of the Union
SGIP August 15, 2013 eMeeting - State of the UnionSGIP August 15, 2013 eMeeting - State of the Union
SGIP August 15, 2013 eMeeting - State of the Union
 
NCTD Sustainability Case Study
NCTD Sustainability Case StudyNCTD Sustainability Case Study
NCTD Sustainability Case Study
 
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...
Srivastav, Piyush, NAQS Environmental Experts, Crash Course in PSD Permitting...
 

Destacado

EDGE AX Cloud solution for the apparel - TEAR DOWN THOSE SILOS
EDGE AX Cloud solution for the apparel - TEAR DOWN THOSE SILOSEDGE AX Cloud solution for the apparel - TEAR DOWN THOSE SILOS
EDGE AX Cloud solution for the apparel - TEAR DOWN THOSE SILOSVisionet Systems, Inc.
 
Sonríe es-gratis
Sonríe es-gratisSonríe es-gratis
Sonríe es-gratisMcRc16
 
Fairfax County Youth Survey School Year 2011-2012: Nutrition and Physical Act...
Fairfax County Youth Survey School Year 2011-2012: Nutrition and Physical Act...Fairfax County Youth Survey School Year 2011-2012: Nutrition and Physical Act...
Fairfax County Youth Survey School Year 2011-2012: Nutrition and Physical Act...Fairfax County
 
Leadership Conference Submission
Leadership Conference SubmissionLeadership Conference Submission
Leadership Conference SubmissionAlexander G. Skomra
 
Basicos De Modelado en Maya 3D
Basicos De Modelado en Maya 3DBasicos De Modelado en Maya 3D
Basicos De Modelado en Maya 3DIvan Castro
 
Vray 2.4 Guia Descriptiva
Vray 2.4 Guia DescriptivaVray 2.4 Guia Descriptiva
Vray 2.4 Guia DescriptivaDimas Franco
 
Toyo ito @ 361 degree conference feb'16
Toyo ito @ 361 degree conference   feb'16Toyo ito @ 361 degree conference   feb'16
Toyo ito @ 361 degree conference feb'16Parvez Memon
 

Destacado (13)

Atestat
AtestatAtestat
Atestat
 
Presentacion cartas
Presentacion cartasPresentacion cartas
Presentacion cartas
 
Tales from the HMDA Trenches
Tales from the HMDA TrenchesTales from the HMDA Trenches
Tales from the HMDA Trenches
 
Project proposal
Project proposalProject proposal
Project proposal
 
EDGE AX Cloud solution for the apparel - TEAR DOWN THOSE SILOS
EDGE AX Cloud solution for the apparel - TEAR DOWN THOSE SILOSEDGE AX Cloud solution for the apparel - TEAR DOWN THOSE SILOS
EDGE AX Cloud solution for the apparel - TEAR DOWN THOSE SILOS
 
Sonríe es-gratis
Sonríe es-gratisSonríe es-gratis
Sonríe es-gratis
 
Fairfax County Youth Survey School Year 2011-2012: Nutrition and Physical Act...
Fairfax County Youth Survey School Year 2011-2012: Nutrition and Physical Act...Fairfax County Youth Survey School Year 2011-2012: Nutrition and Physical Act...
Fairfax County Youth Survey School Year 2011-2012: Nutrition and Physical Act...
 
MagPi47
MagPi47MagPi47
MagPi47
 
Leadership Conference Submission
Leadership Conference SubmissionLeadership Conference Submission
Leadership Conference Submission
 
Basicos De Modelado en Maya 3D
Basicos De Modelado en Maya 3DBasicos De Modelado en Maya 3D
Basicos De Modelado en Maya 3D
 
Vray 2.4 Guia Descriptiva
Vray 2.4 Guia DescriptivaVray 2.4 Guia Descriptiva
Vray 2.4 Guia Descriptiva
 
Toyo ito @ 361 degree conference feb'16
Toyo ito @ 361 degree conference   feb'16Toyo ito @ 361 degree conference   feb'16
Toyo ito @ 361 degree conference feb'16
 
Employee motivation
Employee motivation   Employee motivation
Employee motivation
 

Similar a San Diego Retrocommissioning Program Overview

American Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentAmerican Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentCenter for Energy and Environment
 
Advanced Energy Design and Retrofit Guides Summary from the 2013 DOE BTO Peer...
Advanced Energy Design and Retrofit Guides Summary from the 2013 DOE BTO Peer...Advanced Energy Design and Retrofit Guides Summary from the 2013 DOE BTO Peer...
Advanced Energy Design and Retrofit Guides Summary from the 2013 DOE BTO Peer...Shanti Pless
 
GTC_Energy Services_Mexico City
GTC_Energy Services_Mexico CityGTC_Energy Services_Mexico City
GTC_Energy Services_Mexico CityDiana Nash
 
C&I Direct Program Presenation
C&I Direct Program PresenationC&I Direct Program Presenation
C&I Direct Program Presenationconed
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...guest3e1229f
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Alliance To Save Energy
 
Solar energy ongoing project by Magda Cayón
Solar energy ongoing project by Magda CayónSolar energy ongoing project by Magda Cayón
Solar energy ongoing project by Magda CayónASCAME
 
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...REBNY
 
RE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delaysRE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delaysIEA_RETD
 
ESN_Redaptive_Overview (1)
ESN_Redaptive_Overview (1)ESN_Redaptive_Overview (1)
ESN_Redaptive_Overview (1)Patrick OBrien
 
Achieving Superior Energy Performance (SEP) - U.S. DOE
Achieving Superior Energy Performance (SEP) - U.S. DOEAchieving Superior Energy Performance (SEP) - U.S. DOE
Achieving Superior Energy Performance (SEP) - U.S. DOEDQS Inc.
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedEECO2
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionKeith Beattie
 
Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Lucia Shen
 
Impact evaluation of Energy Efficiency and DSM programmes
Impact evaluation of Energy Efficiency and DSM programmesImpact evaluation of Energy Efficiency and DSM programmes
Impact evaluation of Energy Efficiency and DSM programmesLeonardo ENERGY
 

Similar a San Diego Retrocommissioning Program Overview (20)

American Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the EnvrinmentAmerican Institute of Architects Committee on the Envrinment
American Institute of Architects Committee on the Envrinment
 
Advanced Energy Design and Retrofit Guides Summary from the 2013 DOE BTO Peer...
Advanced Energy Design and Retrofit Guides Summary from the 2013 DOE BTO Peer...Advanced Energy Design and Retrofit Guides Summary from the 2013 DOE BTO Peer...
Advanced Energy Design and Retrofit Guides Summary from the 2013 DOE BTO Peer...
 
GTC_Energy Services_Mexico City
GTC_Energy Services_Mexico CityGTC_Energy Services_Mexico City
GTC_Energy Services_Mexico City
 
C&I Direct Program Presenation
C&I Direct Program PresenationC&I Direct Program Presenation
C&I Direct Program Presenation
 
Solwatt Energy Performance Contract
Solwatt Energy Performance ContractSolwatt Energy Performance Contract
Solwatt Energy Performance Contract
 
Solwatt Energy Performance Contract
Solwatt Energy Performance ContractSolwatt Energy Performance Contract
Solwatt Energy Performance Contract
 
Cold-Climate Research Round-Up
Cold-Climate Research Round-UpCold-Climate Research Round-Up
Cold-Climate Research Round-Up
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Solar energy ongoing project by Magda Cayón
Solar energy ongoing project by Magda CayónSolar energy ongoing project by Magda Cayón
Solar energy ongoing project by Magda Cayón
 
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
REBNY NYC Benchmarking Seminar: NYSERDA Commercial Incentive Programs: Commer...
 
RE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delaysRE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delays
 
Innovations in Multifamily Building Energy Savings
Innovations in Multifamily Building Energy SavingsInnovations in Multifamily Building Energy Savings
Innovations in Multifamily Building Energy Savings
 
ESN_Redaptive_Overview (1)
ESN_Redaptive_Overview (1)ESN_Redaptive_Overview (1)
ESN_Redaptive_Overview (1)
 
Achieving Superior Energy Performance (SEP) - U.S. DOE
Achieving Superior Energy Performance (SEP) - U.S. DOEAchieving Superior Energy Performance (SEP) - U.S. DOE
Achieving Superior Energy Performance (SEP) - U.S. DOE
 
A. Feigl_Level-UpProject.pdf
A. Feigl_Level-UpProject.pdfA. Feigl_Level-UpProject.pdf
A. Feigl_Level-UpProject.pdf
 
An introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy LimitedAn introduction to EECO2-Energy Efficiency Consultancy Limited
An introduction to EECO2-Energy Efficiency Consultancy Limited
 
EECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reductionEECO2 GMP critical HVAC energy cost reduction
EECO2 GMP critical HVAC energy cost reduction
 
Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015Equota Pitch Deck EN 2015
Equota Pitch Deck EN 2015
 
Impact evaluation of Energy Efficiency and DSM programmes
Impact evaluation of Energy Efficiency and DSM programmesImpact evaluation of Energy Efficiency and DSM programmes
Impact evaluation of Energy Efficiency and DSM programmes
 

San Diego Retrocommissioning Program Overview

  • 1.
  • 3. Portland Energy Conservation, Inc. at a Glance 3
  • 4. Portland Energy Conservation, Inc. (PECI) 4  Commissioning and Retrocommissioning research & engineering  Tools & resource development  Energy efficiency policy & standard development  Program design, implementation & marketing PECI offers services in the following areas: To learn more, visit: www.peci.org PECI Retrocommissioning Programs:
  • 6. 6 Retrocommissioning (RCx): What is it? • A systematic process for improving building performance by identifying and implementing low- cost operational and maintenance improvements • Process focuses on the operation of mechanical equipment, lighting, and related controls and is intended to optimize how equipment operates and functions as an integrated system • Excludes retrofit items such as installing high efficiency lamps, chiller replacements, and air conditioning subsystem replacements
  • 7. 77 Typical Problems Identified • Simultaneous heating and cooling • Lighting and HVAC running when not required • Opening throttled discharge valves • Controls needing to be retuned • Critical control sensors out of calibration • Energy management systems that are not taking full advantage of their capabilities • Economizers not operating properly
  • 8. 88 What Can Be Expected from RCx? • Energy cost savings (5-20%) with little capital expense • High potential for project simple payback of <2 years • Increased equipment reliability • Increased occupant comfort • Involvement of building operators to increase understanding of systems • Complete documentation of the RCx measures implemented through the Program
  • 9. 99 What Makes a Good Building Candidate? • Greater than 100,000 square feet of conditioned space • High energy use intensity (EUI) • Mechanical equipment in relatively good condition • A Direct Digital Control (DDC) system in place • Committed ownership, management, and building operators • Buildings with central plants preferred, though RTU and heat pump buildings have qualified • Hotels, office buildings, hospitals, data centers, retail . . .
  • 11. 1111 Program Background • Funded by San Diego Gas & Electric (SDG&E) • Launched as a pilot program in 2004 for large commercial buildings – Four buildings totaling 2.7M ft2 enrolled, achieving savings of: • 9.9M kWh • 266,000 therms • Peak demand reduction of 1,445 kW • Based on this success, SDG&E scaled the program up to 10M ft2 , aiming to save 8.5% of electric usage in the 2006- 2008 program cycle
  • 12. 1212 What Does the San Diego RCx Program Offer? • Free building screening to determine eligibility for the Program • Customized investigation of building operations – Custom incentive estimated at $0.10 per ft2 up to $100,000 (paid directly to retrocommissioning provider) • Implementation assistance for energy saving improvements – Custom incentive estimated at $0.05 per ft2 , applies to measures with a simple payback of longer than one year (paid directly to owner) • Free documentation and training on improvements – Custom incentive ranges from $3,000-7,500 (paid directly to retrocommissioning provider) • Free pre- and post-project ENERGY STAR® Benchmark • Tailored Performance Tracking Plan for RCx measures to ensure persistence
  • 13. 1313 What are the Customer’s Responsibilities? • Sign the Owner Program Agreement (OPA) – Commit to implementing measures with a one year or less payback • A cap is set at project start for the maximum financial responsibility for implementing measures that pay back in one year or less (8.5% of current energy bills) – If measures are not implemented as agreed, the owner must reimburse the Program for the investigation costs • Have funding available to implement measures within 12 months of project start • Commit at least 40 hours of senior building operations staff time to support the project • Hire and oversee contractors to provide implementation of selected measures
  • 14. 1414 What is the Program Process? • The Program operates in distinct phases: – Application – Screening – Agreement Development – Investigation – Implementation – Follow-Up – Performance Tracking (Optional) • RCx projects typically take 9-18 months to complete
  • 15. 1515 Who Provides the Services? • The Program has a pool of pre-qualified and trained retrocommissioning providers (RCx Providers) – 56 firms, 142 individuals – Selected based on their previous retrocommissioning experience and expertise in identifying O&M-type energy savings opportunities • RCx Providers conduct the in-depth investigation, work with building staff to select cost-effective measures for implementation, and provide project documentation and training • For implementation, the owner may utilize in-house building staff, hire the RCx Provider to implement or provide technical assistance, contract with outside service contractors, or any combination of the above
  • 17. 1717 RCx Roadblocks 1. Lack of market awareness of RCx benefits and scope 2. Inconsistent approaches to RCx created uneven results in the past 3. RCx entails operational changes requiring buy-in from various levels of an organization 4. Cost of investigation typically a big hurdle 5. RCx is a long-term (9-18 month) endeavor 6. RCx measures can be easily undone SDG&E recognized these barriers could be lessened through an innovative RCx program
  • 18. 1818 Program Solutions 1. Lack of market awareness of RCx benefits and scope 2. Inconsistent approaches to RCx created uneven results in the past  Deploy Field Energy Analyst (FEA) to local industry players to build market awareness and educate prospective customers, providers, and contractors  Pre-qualify pool of RCx providers  Develop streamlined process and toolkit  Provide third-party engineering reviews of technical deliverables SolutionRoadblock
  • 19. 1919 Program Solutions 3. RCx entails operational changes requiring buy-in from various levels of an organization 4. Cost of investigation typically a big hurdle  Engage all players in process from start to finish  Design toolkit and deliverables that speak to all levels of the organization  Facilitate meetings with decision makers throughout the project  Investigation fully covered by program incentives  Owner obligated to implement measures with <1 year payback SolutionRoadblock
  • 20. 2020 Program Solutions 5. RCx is a long-term (9-18 month) endeavor 6. RCx measures can easily be undone  Obtain owner commitment up front  Provide incentives to keep owner engaged  Define clear roles & responsibilities, processes, deliverables and schedules to coordinate the players  Deploy FEA to manage project from start to finish  Deliver focused training and measure documentation to building operators during handoff  Provide an ongoing performance tracking option and incentives SolutionRoadblock
  • 22. 2222 Results  The San Diego RCx Program bases its success on goals of electric energy savings, demand savings, and gas savings  Average building kWh savings (9%) have exceeded expectations  The ‘06-08 Program gained significant momentum through the cycle, leaving a strong pipeline for 2009 Goal Estimated Results % of Goal Electric Savings (kWh) 17.4 M 13.8 M 80% Demand Savings (kW) 2,698 1,503 56% Gas Savings (therms) 244,707 72,207 30% Goal Result % of Goal Electric Savings (kWh) 6.2 M 9.9 M 160% Demand Savings (kW) 780 1,445 185% Gas Savings (therms) NA 266,000 NA 2004-2005 Pilot Program 2006-2009 Program
  • 24. 24 Case Study Marriott Downtown & Marina  1,400,000 ft2 with 1,362 guest rooms  Facility includes parking garage, marina, meeting spaces, and restaurants Quantified Costs and Savings To-Date  1,470,000 kWh - Annual kWh Savings  88,000 therms - Annual Therm Savings  Project Cost, Incentives, and $ Savings:  $391,716 - Total Project Cost  $196,412 - Total Program Incentive  $195,304 - Net Owner Cost  $272,500 - Total Cost Savings  Simple Payback: < 1 year Energy savings reflect anticipated project savings based on implemented measures. Actual energy savings may vary with each project.
  • 25. 25 Case Study (cont.) Reduce simultaneous heating and cooling (Fix valves, replace failed fan VFD, lower VAV box flow rates) Re-enable demand-controlled ventilation on parking garage Optimize flow and scheduling of water feature pumps Install VFD on condenser pump Install VFDs on domestic water booster pumps Install VFD on evaporator pump Recommended Measures for Retrocommissioning and Associated Cost Savings Energy savings reflect anticipated project savings based on implemented measures. Actual energy savings may vary with each project.
  • 27. 2727 Want to Learn More about the Program? The San Diego Retrocommissioning Program Erin Kelley, Program Manager Portland Energy Conservation, Inc. (PECI) tel: 503.961.6169 email: ekelley@peci.org www.peci.org/LgCommercial/incentive_programs/sandiegorcx2.html www.sandiegorcx.com

Notas del editor

  1. Cover Page
  2. Good morning! My name is Erin Kelley and I’m a program manager with Portland Energy Conservation Incorporated. I’m here to talk to you today about the award-winning San Diego Retrocommissioning Program. In the next 20 minutes, I will - Introduce Portland Energy Conservation, Inc, the firm that administers this program - Discuss the basics of retrocommissioning (RCx) and then The San Diego RCx Program Giving you some Background as to how the program came about, What we’ve done with it that makes it worthy of recognition, And will conclude with a case study
  3. Portland Energy Conservation, Incorporated is PECI.
  4. PECI has nearly 30 years experience in the energy conservation industry. We are a not-for-profit organization based in Portland, Oregon. PECI has played a major role in developing the Cx industry, writing research papers, running projects and implementing programs. We also run the NCBC, which in 2009 is in its 17th year. To learn more about commissioning, please come to NCBC in Seattle from June 3 to 5. PECI also runs various other EE programs and research projects, in the commercial and residential fields. I invite you to explore the programs and resources we offer on our website, www.peci.org In terms of RCx, we administer 4 major programs in California. I manage two of these, the San Diego and SMUD (or Sacramento) RCx programs. Each of the CA programs has been tailored to the region and to the client, though they are based on the same platform. California had a few conditions that made it ripe for entry - among which were their high rates and decoupling. Our retrocommissioning model can work in any part of the country. And we’re interested in exploring opportunities!
  5. So what is retrocommissioning and how does it work?
  6. RCx helps improve building performance by optimizing how equipment operates. RCx addresses problems that lead to high energy and maintenance costs, occupant complaints, poor indoor environmental quality, and premature equipment failure. Generally we exclude retrofits, but there is some grey area here. We make judgment calls when low cost retrofit opportunities are identified through our process. Often it makes sense to install VFDs, or variable frequency drives, as part of RCx, for example. When major retrofit opportunties are identified that do not fall under the RCx umbrella, we help direct customers to the best programs to fit their needs.
  7. You can see here a variety of problems that we find in a RCx investigation. Some of these you might call easy wins, such as scheduling to turn lights off at night when no one is in the building. A calibration &amp; controls retuning example would be when the outside air temperature sensor reads 65 when it’s actually 75 outside. The building might be missing opportunities for free cooling, allowing too much warm outside air into the building, increasing the cooling load, and subcooling the space in the winter months. Of course, this can lead to tenant comfort issues. Economizers are frequently broken due to mechanical failure or corrosion. In San Diego, economizer and free-cooling measures are great energy savers, in particular, because of the coastal climate.
  8. With retrocommissioning, we expect owners to save between 5 &amp; 20 % off of their annual electric bill. The San Diego Rcx program has averaged 9% savings so far, with over a 1/3 of the projects achieving savings over 15% per year. The measure payback of less than 2 years presents a strong financial case to the building management to move forward with RCx. The process helps increase both equipment reliability and occupant comfort. We don’t just turn the air conditioning off to save energy or equipment life. Documentation and training for building operators are critical to maintain the energy savings after the RCx project has completed.
  9. How do we know when a building should be retrocommissioned? We like buildings that have high energy use or high EUIs compared to other buildings in their climate zone. We want to see direct digital controls as this helps with persistence of measures. We must have a firm commitment from the building staff, from management to operators, to ensure the projects receive the attention they need to be completed on schedule and to the maximum benefit of all involved parties… (providers, owners, maintenance staff, utilities, evaluators, and so on)…
  10. The San Diego RCx program has innovated design elements that increase this owner commitment. It also helps grow and educate the RCx provider market, encourages persistence and on-going benchmarking, and streamlines and supports the process for smoother program administration.
  11. In 2004, PECI and SDG&amp;E introduced a RCx pilot program because we believed substantial energy savings opportunities could be achieved by increasing the RCx of existing buildings. In the pilot, we had big savings per building We found much larger than expected therm savings The results of the pilot indicated demand existed in San Diego for this service. In short, buildings really needed help! So in 2006-2008, we ran a program to help meet this need.
  12. So what does the program offer? The building owner receives the following: An initial screening of the facility performed by PECI staff A full-scale RCx investigation by an engineering firm of the owner’s choosing Implementation incentives to help buy down the cost of the measures Training for building staff Documentation for the implemented measures, and sometimes improved building documentation, as well A pre- and post-RCx Energy Star benchmark score (which helps meet the requirement set by Assembly Bill 1103 in CA, which requires building benchmarking). And finally, for projects that qualify for performance tracking, we enter into a separate contract with the owner and provider for a one-year period solely to ensure persistence of the implemented rcx measures.
  13. The investigation is no cost to the owner. But there is a catch. The owner must commit to implementing all reasonable measures with a one year or less payback up to a defined minimum dollar amount. If they do not, the owner must reimburse the program for the cost of the investigation. When possible, we time our projects to fit into the existing budget cycles of our customers. And to ensure project success, it is key that at least 40 hours of senior building operations staff time are committed over the life of the project. In large part, this is needed because the owner is responsible for hiring and overseeing the contractors who will ultimately implement the RCx measures.
  14. Each project in our program goes through the same six phases, listed here. Screening, again, is performed by PECI staff. The agreement development phase allows everyone to get on the same page and to ensure commitment before the project gets underway. The investigatin is performed by the rcx provider Implementation work is overseen by the owner Follow-up is performed by the rcx provider, who submits final energy savings calculations at project completion and concludes with providing building documentation and training for the owner. Projects that qualify, undergo performance tracking for a period of one year. We initially believed projects would take 9-12 months to complete, but experience shows it can take up to 18 months, depending on complexities with the facilities or staffing.
  15. Who are these Rcx providers? As of today, we have 56 firms and 142 individuals qualified to perform RCx investigations in our buildings. We are continually qualifying new firms and adding to this pool. So much depends on the quality and timeliness of the provider’s work, so clear guidelines and expectations need to be set and managed. PECI has developed extensive guidelines for each phase of the process and orients each provider firm to ensure their understanding. With so many players, it takes great teamwork and communicators to successfully complete a RCx project.
  16. The San Diego RCx program won AESP’s Energy Award for Outstanding Achievement in Energy Program Design &amp; Implementation because of its innovative features, which I’d now like to outline.
  17. Innovation is usually a byproduct of facing challenges head-on. There are no exceptions here! These are some of the big things we took on Let’s go over how in the next few slides.
  18. First, market awareness of RCx Outside of Portland, PECI employees Field Energy Analysts, or FEAs. These staff, with a deep understanding of the program, are critical to help building owners understand the benefits of RCx, as well as the details of the RCx process. Extreme focus is required to get the word out and help build an understanding of the program. FEAs represent the program at local events and do direct marketing through various building management associations, such as BOMA (building owners management association) and IFMA (int’l facilities management association). Second, standard guidelines and processes did not exist, so in the past, owners who decided to undergo RCx found a pool of providers with widely varying practices. The program overcomes this by training providers in our methodology, guiding them through the process with our toolkit, and controlling quality by reviewing the provider deliverables. Our toolkit includes guidelines for the investigation and implementation, as well as a findings workbook in which to record savings. This toolkit helps to ensure: the program’s expectations are clear upfront; the process is streamlined for providers; owners know what to expect; and energy savings from implemented measures can be verified and evaluated with confidence. Because of the toolkit, owners who decide to undergo the RCx process will now find more consistent results.
  19. Third, Buy-in from several levels of the organization. We have everyone at the kick off meeting so they know what is going to happen and we can see the customer commitment. Constant communication is absolutely critical to the success of the project. Here, the FEA plays a major role. Presentations and deliverables are adapted to address concerns and speak the language of various decision-makers. The buy-in process requires significant program resources and adaptability, especially because the RCx process is still not widely known or understood. Fourth, the cost of investigation is taken care of by the program. And further, the owner’s investment responsibility is well defined before any commitment is made.
  20. Fifth, RCx takes a long-term commitment. We ensure buy in from all players. We define the investment responsibility up front by setting the implementation cap for the owner. Further, undertaking a RCx project can be a complex decision for a building owner. In addition to making a financial commitment, the owner must dedicate staff resources, commit to making operational changes, and agree to participate in a multi-step process that may extend over several months or even years. Understanding the greater burden these decisions place on the owner and making sure the program provides assistance and solutions to overcome owners’ concerns is critical to program success. Finally, RCx measures can easily come undone. RCx measures typically include controls modifications, such as scheduling changes and revising zone setpoints, and can produce significant energy and demand savings. These types of measurs are generally easy to implement, but can also be easy to reverse as oeprations and maintenance personnel may unknowning override corrective actions implemented through the program. So we don’t just leave a binder behind. RCx providers develop targeted documentation and conduct a building operator training session on the implemented measures. This provides the building owner and operators with resources to maintain and monitor the implemented measures and ensure savings persist over time. In addition, through performance tracking, measures are monitored for one year after implementation completes. Either the existing building automation system or independent data acquisition systems are used to monitor critical points for verifying the performance of the measures and providing feedback to the operators and owners so they can take corrective actions as needed. This feedback loop helps building staff instill confidence that implemented measures continue to perform as expected.
  21. So how did we do?
  22. The program’s success is based on kWh and kW or demand savings. For these two measures, we achieved well over 100% of goal. While there were not explicit gas goals, the program did record incidental savings of 266,000 therms in the pilot program. For the 2006-2008 program cycle, SDG&amp;E increased the goals. We’re on bridge funding for 2009 and have combined the values in these charts. As the SDG&amp;E team discovered throughout the program, the RCx process is a time-consuming one that depends on many factors outside the control of the program. The program has seen time delays in gaining owner commitment, working within owner budget cycles, accessing building data from controls systems, reviewing building models and energy savings calculations, getting bids from implementation contractors, waiting for contractors to complete implementation, and gathering appropriate building data for verification of measures. These delays have resulted in a postponement of installed savings, though they have been minimized through process streamlining and other program innovations I previously mentioned.
  23. I’d like to walk you through one of our projects.
  24. What was the key to success here? Relationships? Collaboration between PECI and the Marriott? How did PECI influence this?
  25. Check our website for the full write-up of this project. You’ll also be able to access several others.
  26. Use for all content pages.
  27. In the San Diego Retrocommissioning Program, SDG&amp;E and PECI created an adaptive program that has identified and responded to a variety of market barriers. These innovations now set the standard for best practices in RCx processes, deliverables, and program design. CALL TO ACTION!! Sign up for our newsletter! (send me an email) Visit our website – 1) find more information about RCx 2) we can offer RCx programs around the country Please contact me if you’d like more information about this or other programs PECI offers. Thank you! I’m happy to take your questions.
  28. Last Page