5LB-05 Inductive Shielded Superconducting
Fault Current Limiter:
Test Results for Scaled Model
F. Moriconi1, A. Usoskin2, A. Henning3, S. Schmidt3, K. Bäuml4, T. Janetschek5
1Bruker EST, Fremont, CA, USA, 2Bruker HTS GmbH, Alzenau, 3Bruker Advanced Supercon GmbH, Cologne,
Germany, 4Schneider Electric Sachsenwerk GmbH, Regensburg, Germany, 5Stadtwerke Augsburg Energie
GmbH, Augsburg, Germany.
Bruker EST
Industrial Plant
Outline
• Product Development
• Application 10.6 kV
• Principle of Operation iSFCL
• Prototype test results
• Model Validation
• Future Work
• Q&A
ASC 2012 – Portland-Oct 12 - oral # 5LB-05 2
Bruker EST
Planned iSFCL in Augsburg
Substation
iSFCL
Industrial Plant
Federal Ministry
of Economics
and Technology
Sponsored by:
Mandated by Parliament
Federal Republic of Germany
iSFCL Funded Project
• Project
Inductive shielded superconducting fault current limiter
(iSFCL) as a "smart grid" device for energy efficiency
and security of electricity supply
• Application
Fault current management in Augsburg network
connecting substation to an industrial plant MTU Onsite
Energy (manufacturing and testing of CHP plants)
• Partners
3ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
MTU On-Site Power – 10.6 kV
iSFCL Technical Requirements
Augsburg Installation
Line Voltage = 10.6 kV
Rated Current = 817 A
Prospective Peak = 25.1 kA
Prospective Symmetric = 10.1 kA
Limited Peak < 5 kA
Limited Symmetric < 2 kA
Fault Duration 500 ms
10.6 kV
80% Fault
Reduction
Additional requirements
• Active losses smaller than for
comparable Current Limiting
Reactor CLR (including cryo-
losses)
• Low maintenance
• Fail Safe
4ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
iSFCL Technical Requirements
Augsburg Installation
MTU On-Site Power – 10.6 kV
Line Voltage = 10.6 kV
Rated Current = 817 A
10.6 kV
5
Property iSFCL 15-MVA reactor
Total impedance
(normal operation)
1.4 Ω ⇒
Voltage change Uϕ
~5%
2.7 Ω ⇒
Voltage change Uϕ
~10%
Operating losses 45 – 50 kW
(incl. cryogenics)
95 kW
Impedance increase at
fault
Factor 2 none
Fault current limitation
first peak
Factor 5 Factor 5
ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
iSFCL Advantages
• Low operating losses compared to conventional reactors, low
resistive losses/cryo-losses, and low insertion impedance
• Low voltage drop under normal operating conditions
• Fail-safe triggering through material properties / no active
trigger / no control needed
• Fast response time (first peak is limited)
• Self-recovery
• Long fault duration (up to 500 ms and possibly longer)
• Easy configurability of key operating parameters (switching
current)
• Scalable due to flexible design (in size, power and voltage)
• Smaller than competing technologies for similar performances
6ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
Normal Operating Conditions
• HTS is superconducting
⇒ no magnetic field penetrates the HTS shield
⇒ reduced flux linkage of primary winding
⇒ primary inductance mainly due to stray fields
⇒ small insertion impedance
⇒ primary winding smaller than a comparable air coil
reactor
Fault Conditions
• HTS becomes normal conducting
⇒ magnetic flux penetrates shield and iron core
⇒ increased flux linkage of primary winding
⇒ large impedance gain
CB
Primary coil
Load
Cryostat
Superconducting short-circuited
secondary
CB
Primary coil
Load
Cryostat
Superconducting short-circuited
secondary
iSFCL Principle of Operation
7ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
0%
10%
20%
30%
40%
50%
60%
70%
80%
0 500 1000 1500 2000
VOLTAGEDROPACROSSFCL
[%ofSourceV]
LIMITED CURRENT – PRIMARY [A]
Air Core
Iron Core
Shielded
Unshielded
GAIN (2-3)
iSFCL
iSFCL Principle of Operation
8
Shielded
Iron-core
Air-Core
Iron-Core
Unshielded
Iron-Core
Quenched Shield
ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
2500mm
iSFCL DESIGN
9
Shield
ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
Open-Core Prototype
10
Core Area 358 cm2 Core Height 710 mm
Core Weight 230 Kg ID Primary 454 mm
OD Primary 625 mm H Primary 140 mm
# of Turns 20 Inductance 240 µH (air core)
# of Modules 3 Inductance 470 µH (iron core)
HTS Current 6 kA HTS Material 12 m
ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
Test Circuit
11
V Source = 300 V Amplitude
Z Source = 0.154 Ohms (mainly resistive)
Z Load = 0.937 Ohms (power factor 0.98)
• Load Current Only
• Short-Circuit
• Long Duration Short-Circuit
ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
Circuit Calibration
12
-2000
-1500
-1000
-500
0
500
1000
1500
2000
-500
-400
-300
-200
-100
0
100
200
300
400
500 0.00
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.10
0.11
0.12
0.13
0.14
0.15
0.16
0.17
0.18
0.19
0.20
0.21
0.22
CURRENT[A]
VOLTAGE[V]
Time [s]
Source Voltage Prospective Current
I prospective= 1950 A
I Load= 285 A
ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
Open-Core iSFCL Measurements
13
-2000
-1500
-1000
-500
0
500
1000
1500
2000
-200
-150
-100
-50
0
50
100
150
200
0.00
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.10
0.11
0.12
0.13
0.14
0.15
0.16
0.17
0.18
0.19
0.20
0.21
0.22
CURRENT[A]
VOLTAGE[V]
Time [s]
Voltage iSFCL Prospective Current Limited Current
Z pre-fault= 55 mΩ
16V, 285A
Inductance 175 µΗ
Z fault= 143 mΩ
187V, 1285A
Inductance 455 µΗ
Impedance GAIN= 2.6
ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
iSFCL Measurements
Quench Stability and Robustness
14
-1500
-1000
-500
0
500
1000
1500
0 0,02 0,04 0,06 0,08 0,1 0,12 0,14 0,16 0,18 0,2 0,22
CurrentinA
Time in s
ComparisonOpen Core 20120117-12 and 20120127-19
I 20120117-12 I 20120127-19
Î = 325A
(20120117-12)
Î = 325A
(20120117-12)
Î = 275A
(20120127-19)
-200
-150
-100
-50
0
50
100
150
200
0 0,02 0,04 0,06 0,08 0,1 0,12 0,14 0,16 0,18 0,2 0,22
VoltageinV
Time in s
ComparisonOpen Core 20120117-12 and 20120127-19
U 20120117-12 U 20120127-19NO DEGRADATION of PERFORMANCE
AFTER SEVERAL QUENCHES (~100)
ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
iSFCL Measurements
Long Duration Short-Circuit
15
~0.5 s faults were achieved
Shunt resistance must be revised
-600
-400
-200
0
200
400
600
-150
-100
-50
0
50
100
150
0 0,1 0,2 0,3 0,4 0,5
CurrentinA
VoltageinV
Time in s
Voltage at iSFCL Current
ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
Quench Model Validation
16
-0.2
0.0
0.2
0.4
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
2.2
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1
E/Ec
J/Jc
Measured (J/Jc)^43 Power Function
ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
Finite Elements Model Validation
17
-2000
-1500
-1000
-500
0
500
1000
1500
2000
0.00
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.10
0.11
0.12
0.13
0.14
0.15
0.16
0.17
0.18
0.19
0.20
0.21
0.22
CURRENT[A]
Time [s]
Prospective Current Limited Current Limited Current Predicted
0.75 T
Measured Measured
3 mT
ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
Finite Elements Model Validation
18
0.75 T
Measured
3 mT
-200
-150
-100
-50
0
50
100
150
200
0.00
0.01
0.02
0.03
0.04
0.05
0.06
0.07
0.08
0.09
0.10
0.11
0.12
0.13
0.14
0.15
0.16
0.17
0.18
0.19
0.20
0.21
0.22
VOLTAGE[V]
Time [s]
Voltage iSFCL Voltage iSFCL Predicted
ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
From Prototype to Full-Scale
19
2500mm
Prototype Full-Scale
358 Core Area cm2 1250
710 Core Height mm 2500
230 Core Weight Kg 2750
454 ID Primary mm 977
625 OD Primary mm 1180
140 H Primary mm 600
20 # of Turns # 74
0.24 Inductance air-core mH 5
0.47 Inductance iron-core mH 16
3 # of Modules # 10
6 HTS Current kA 50
12 HTS Material m 250
ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
25 I [kA]
15
10
20
5
0
Predicted Performance iSFCL Augsburg
10.6kV, 817A, 80% Fault Reduction
20
25kA PEAK
5kA PEAK
ASC 2012 – Portland-Oct 12 - oral # 5LB-05
Bruker EST
Future Work
• Perform AC Losses Measurements (CAPS)
• Assemble and test Full-Scale HTS Modules
• Integrate single-phase 12 kV- 820A device
• High-Power and HV testing of single-phase
• Build, Test and Commission 12kV, 3-Phase
Augsburg Installation
21ASC 2012 – Portland-Oct 12 - oral # 5LB-05
www.bruker-est.com
ASC 2012 – Portland-Oct 12 - oral # 5LB-05

Más contenido relacionado

La actualidad más candente

A Fault Current Limiter Circuit to Improve Transient Stability in Power System
A Fault Current Limiter Circuit to Improve Transient Stability in Power SystemA Fault Current Limiter Circuit to Improve Transient Stability in Power System
A Fault Current Limiter Circuit to Improve Transient Stability in Power SystemIAES-IJPEDS
 
Surge current protection using superconductor ppt mahesh
Surge current protection using superconductor ppt maheshSurge current protection using superconductor ppt mahesh
Surge current protection using superconductor ppt maheshKuldeep Singh
 
Surgecurrentprotectionusingsuperconductorpptmahesh 140326104357-phpapp02
Surgecurrentprotectionusingsuperconductorpptmahesh 140326104357-phpapp02Surgecurrentprotectionusingsuperconductorpptmahesh 140326104357-phpapp02
Surgecurrentprotectionusingsuperconductorpptmahesh 140326104357-phpapp02Raghunath Pradhan
 
Analysis of the Performance of Active Type SFCL and FCL for Reduction Capabil...
Analysis of the Performance of Active Type SFCL and FCL for Reduction Capabil...Analysis of the Performance of Active Type SFCL and FCL for Reduction Capabil...
Analysis of the Performance of Active Type SFCL and FCL for Reduction Capabil...IJSRD
 
Surge current protection using super conductors
Surge current protection using super conductorsSurge current protection using super conductors
Surge current protection using super conductorsVamshiKrishna947
 
Super conductors as surge current protectors
Super conductors as surge current protectorsSuper conductors as surge current protectors
Super conductors as surge current protectorsQD764
 
digital testing of high voltage circuit breaker
digital testing of high voltage circuit breakerdigital testing of high voltage circuit breaker
digital testing of high voltage circuit breakerRenuka Verma
 
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)Hazem El-Henawy
 
Earth leakege circuit breaker
Earth leakege circuit breakerEarth leakege circuit breaker
Earth leakege circuit breakerSooraj Maurya
 
Earth Leakage Circuit Breaker
Earth Leakage Circuit BreakerEarth Leakage Circuit Breaker
Earth Leakage Circuit Breakermilanpatel007
 
What is the Difference Between MCB, MCCB, ELCB and RCCB?
What is the Difference Between MCB, MCCB, ELCB and RCCB?What is the Difference Between MCB, MCCB, ELCB and RCCB?
What is the Difference Between MCB, MCCB, ELCB and RCCB?BurraqEngineeringSol
 
ppt of Elcb( earth leakage circuit breaker)
ppt of Elcb( earth leakage circuit breaker)ppt of Elcb( earth leakage circuit breaker)
ppt of Elcb( earth leakage circuit breaker)stanley christy
 
Circuit protection devices perfect ppt
Circuit protection devices perfect ppt Circuit protection devices perfect ppt
Circuit protection devices perfect ppt vikram rajpurohit
 
Surge arrester and surge suppressor on transformer
Surge arrester and surge suppressor on transformerSurge arrester and surge suppressor on transformer
Surge arrester and surge suppressor on transformerVIKAS KUMAR MANJHI
 
Low Voltage Circuit Breaker
Low Voltage Circuit BreakerLow Voltage Circuit Breaker
Low Voltage Circuit BreakerAbdul Haseeb
 
Introduction to switchgear
Introduction to switchgearIntroduction to switchgear
Introduction to switchgearAdnan Sayed
 
Power System Protection Presentation
Power System Protection PresentationPower System Protection Presentation
Power System Protection PresentationAdeen Syed
 
Feasibility Analysis of the Positioning of Superconducting Fault Current Limi...
Feasibility Analysis of the Positioning of Superconducting Fault Current Limi...Feasibility Analysis of the Positioning of Superconducting Fault Current Limi...
Feasibility Analysis of the Positioning of Superconducting Fault Current Limi...mkanth
 
New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660bhagat ram meena
 

La actualidad más candente (20)

A Fault Current Limiter Circuit to Improve Transient Stability in Power System
A Fault Current Limiter Circuit to Improve Transient Stability in Power SystemA Fault Current Limiter Circuit to Improve Transient Stability in Power System
A Fault Current Limiter Circuit to Improve Transient Stability in Power System
 
Surge current protection using superconductor ppt mahesh
Surge current protection using superconductor ppt maheshSurge current protection using superconductor ppt mahesh
Surge current protection using superconductor ppt mahesh
 
Surgecurrentprotectionusingsuperconductorpptmahesh 140326104357-phpapp02
Surgecurrentprotectionusingsuperconductorpptmahesh 140326104357-phpapp02Surgecurrentprotectionusingsuperconductorpptmahesh 140326104357-phpapp02
Surgecurrentprotectionusingsuperconductorpptmahesh 140326104357-phpapp02
 
Analysis of the Performance of Active Type SFCL and FCL for Reduction Capabil...
Analysis of the Performance of Active Type SFCL and FCL for Reduction Capabil...Analysis of the Performance of Active Type SFCL and FCL for Reduction Capabil...
Analysis of the Performance of Active Type SFCL and FCL for Reduction Capabil...
 
Surge current protection using super conductors
Surge current protection using super conductorsSurge current protection using super conductors
Surge current protection using super conductors
 
Super conductors as surge current protectors
Super conductors as surge current protectorsSuper conductors as surge current protectors
Super conductors as surge current protectors
 
digital testing of high voltage circuit breaker
digital testing of high voltage circuit breakerdigital testing of high voltage circuit breaker
digital testing of high voltage circuit breaker
 
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
Moulded Case Circuit Breaker (Mccb) & air circuit breaker (acb)
 
Earth leakege circuit breaker
Earth leakege circuit breakerEarth leakege circuit breaker
Earth leakege circuit breaker
 
Earth Leakage Circuit Breaker
Earth Leakage Circuit BreakerEarth Leakage Circuit Breaker
Earth Leakage Circuit Breaker
 
What is the Difference Between MCB, MCCB, ELCB and RCCB?
What is the Difference Between MCB, MCCB, ELCB and RCCB?What is the Difference Between MCB, MCCB, ELCB and RCCB?
What is the Difference Between MCB, MCCB, ELCB and RCCB?
 
ppt of Elcb( earth leakage circuit breaker)
ppt of Elcb( earth leakage circuit breaker)ppt of Elcb( earth leakage circuit breaker)
ppt of Elcb( earth leakage circuit breaker)
 
Circuit protection devices perfect ppt
Circuit protection devices perfect ppt Circuit protection devices perfect ppt
Circuit protection devices perfect ppt
 
Surge arrester and surge suppressor on transformer
Surge arrester and surge suppressor on transformerSurge arrester and surge suppressor on transformer
Surge arrester and surge suppressor on transformer
 
Low Voltage Circuit Breaker
Low Voltage Circuit BreakerLow Voltage Circuit Breaker
Low Voltage Circuit Breaker
 
Introduction to switchgear
Introduction to switchgearIntroduction to switchgear
Introduction to switchgear
 
Power System Protection Presentation
Power System Protection PresentationPower System Protection Presentation
Power System Protection Presentation
 
ppt of EEE(MCB)
ppt of EEE(MCB)ppt of EEE(MCB)
ppt of EEE(MCB)
 
Feasibility Analysis of the Positioning of Superconducting Fault Current Limi...
Feasibility Analysis of the Positioning of Superconducting Fault Current Limi...Feasibility Analysis of the Positioning of Superconducting Fault Current Limi...
Feasibility Analysis of the Positioning of Superconducting Fault Current Limi...
 
New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660New bhgat ram ppt 7793005660
New bhgat ram ppt 7793005660
 

Similar a Inductive shielded superconducting fault current limiter: test results for scaled model

ABB POLIM-C..LB Medium Voltage Surge Arresters AC up to 5kV - AC Surge Arrest...
ABB POLIM-C..LB Medium Voltage Surge Arresters AC up to 5kV - AC Surge Arrest...ABB POLIM-C..LB Medium Voltage Surge Arresters AC up to 5kV - AC Surge Arrest...
ABB POLIM-C..LB Medium Voltage Surge Arresters AC up to 5kV - AC Surge Arrest...Thorne & Derrick International
 
Final Report -Group-41
Final Report -Group-41Final Report -Group-41
Final Report -Group-41Habib Ali Khan
 
Design, Test and Demonstration of Saturable- Core Reactor HTS Fault Current L...
Design, Test and Demonstration of Saturable- Core Reactor HTS Fault Current L...Design, Test and Demonstration of Saturable- Core Reactor HTS Fault Current L...
Design, Test and Demonstration of Saturable- Core Reactor HTS Fault Current L...Franco Moriconi
 
Catalog ELCB Fuji Electric dòng G-TWIN Mới Nhất
Catalog ELCB Fuji Electric dòng G-TWIN Mới NhấtCatalog ELCB Fuji Electric dòng G-TWIN Mới Nhất
Catalog ELCB Fuji Electric dòng G-TWIN Mới NhấtCTY TNHH HẠO PHƯƠNG
 
Fuji thiet bi dien-elcbfuji-160413044256 dienhathe.org
Fuji thiet bi dien-elcbfuji-160413044256 dienhathe.orgFuji thiet bi dien-elcbfuji-160413044256 dienhathe.org
Fuji thiet bi dien-elcbfuji-160413044256 dienhathe.orgDien Ha The
 
Fuji thiet bi dien-elcbfuji-160413044256
Fuji thiet bi dien-elcbfuji-160413044256Fuji thiet bi dien-elcbfuji-160413044256
Fuji thiet bi dien-elcbfuji-160413044256Thuan Kieu
 
Iskra Low Voltage Switchgear
Iskra Low Voltage SwitchgearIskra Low Voltage Switchgear
Iskra Low Voltage SwitchgearMinka Grdesic
 
Masterpact innovations.ppt
Masterpact innovations.pptMasterpact innovations.ppt
Masterpact innovations.pptelninoes1
 
Original N-Channel Mosfet STP55NF06LFP STB55NF06L-1 B55NF06L 60V 55A TO-252 N...
Original N-Channel Mosfet STP55NF06LFP STB55NF06L-1 B55NF06L 60V 55A TO-252 N...Original N-Channel Mosfet STP55NF06LFP STB55NF06L-1 B55NF06L 60V 55A TO-252 N...
Original N-Channel Mosfet STP55NF06LFP STB55NF06L-1 B55NF06L 60V 55A TO-252 N...AUTHELECTRONIC
 
Water Power FDR Presentation
Water Power FDR PresentationWater Power FDR Presentation
Water Power FDR PresentationNicholas Clements
 
Catalogue MCCB Fuji - Beeteco.com
Catalogue MCCB Fuji - Beeteco.comCatalogue MCCB Fuji - Beeteco.com
Catalogue MCCB Fuji - Beeteco.comBeeteco
 
OneGear SMC 15kV Soft Starter
OneGear SMC 15kV Soft StarterOneGear SMC 15kV Soft Starter
OneGear SMC 15kV Soft StarterPaul Plavicheanu
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installationAmitesh Kumar
 
Catalogue ELCB Fuji - Earth Leakage Circuit Breaker Fuji - Beeteco.com
 Catalogue ELCB Fuji - Earth Leakage Circuit Breaker  Fuji - Beeteco.com Catalogue ELCB Fuji - Earth Leakage Circuit Breaker  Fuji - Beeteco.com
Catalogue ELCB Fuji - Earth Leakage Circuit Breaker Fuji - Beeteco.comBeeteco
 

Similar a Inductive shielded superconducting fault current limiter: test results for scaled model (20)

Gis91
Gis91Gis91
Gis91
 
Report training 2012
Report training 2012Report training 2012
Report training 2012
 
ABB POLIM-C..LB Medium Voltage Surge Arresters AC up to 5kV - AC Surge Arrest...
ABB POLIM-C..LB Medium Voltage Surge Arresters AC up to 5kV - AC Surge Arrest...ABB POLIM-C..LB Medium Voltage Surge Arresters AC up to 5kV - AC Surge Arrest...
ABB POLIM-C..LB Medium Voltage Surge Arresters AC up to 5kV - AC Surge Arrest...
 
Final Report -Group-41
Final Report -Group-41Final Report -Group-41
Final Report -Group-41
 
Design, Test and Demonstration of Saturable- Core Reactor HTS Fault Current L...
Design, Test and Demonstration of Saturable- Core Reactor HTS Fault Current L...Design, Test and Demonstration of Saturable- Core Reactor HTS Fault Current L...
Design, Test and Demonstration of Saturable- Core Reactor HTS Fault Current L...
 
Catalog ELCB Fuji Electric dòng G-TWIN Mới Nhất
Catalog ELCB Fuji Electric dòng G-TWIN Mới NhấtCatalog ELCB Fuji Electric dòng G-TWIN Mới Nhất
Catalog ELCB Fuji Electric dòng G-TWIN Mới Nhất
 
Fuji thiet bi dien-elcbfuji-160413044256 dienhathe.org
Fuji thiet bi dien-elcbfuji-160413044256 dienhathe.orgFuji thiet bi dien-elcbfuji-160413044256 dienhathe.org
Fuji thiet bi dien-elcbfuji-160413044256 dienhathe.org
 
Fuji thiet bi dien-elcbfuji-160413044256
Fuji thiet bi dien-elcbfuji-160413044256Fuji thiet bi dien-elcbfuji-160413044256
Fuji thiet bi dien-elcbfuji-160413044256
 
07 - ELCB - Fuji Electric
07 - ELCB - Fuji Electric07 - ELCB - Fuji Electric
07 - ELCB - Fuji Electric
 
Iskra Low Voltage Switchgear
Iskra Low Voltage SwitchgearIskra Low Voltage Switchgear
Iskra Low Voltage Switchgear
 
Masterpact innovations.ppt
Masterpact innovations.pptMasterpact innovations.ppt
Masterpact innovations.ppt
 
Original N-Channel Mosfet STP55NF06LFP STB55NF06L-1 B55NF06L 60V 55A TO-252 N...
Original N-Channel Mosfet STP55NF06LFP STB55NF06L-1 B55NF06L 60V 55A TO-252 N...Original N-Channel Mosfet STP55NF06LFP STB55NF06L-1 B55NF06L 60V 55A TO-252 N...
Original N-Channel Mosfet STP55NF06LFP STB55NF06L-1 B55NF06L 60V 55A TO-252 N...
 
PFC Capacitors & Reactor brochure 3.2 mb
PFC Capacitors & Reactor brochure 3.2 mbPFC Capacitors & Reactor brochure 3.2 mb
PFC Capacitors & Reactor brochure 3.2 mb
 
Canadian 285w poly
Canadian 285w polyCanadian 285w poly
Canadian 285w poly
 
Water Power FDR Presentation
Water Power FDR PresentationWater Power FDR Presentation
Water Power FDR Presentation
 
Catalogue MCCB Fuji - Beeteco.com
Catalogue MCCB Fuji - Beeteco.comCatalogue MCCB Fuji - Beeteco.com
Catalogue MCCB Fuji - Beeteco.com
 
OneGear SMC 15kV Soft Starter
OneGear SMC 15kV Soft StarterOneGear SMC 15kV Soft Starter
OneGear SMC 15kV Soft Starter
 
Kaizenreport
KaizenreportKaizenreport
Kaizenreport
 
A Report on solar power plant installation
A Report on solar power plant installationA Report on solar power plant installation
A Report on solar power plant installation
 
Catalogue ELCB Fuji - Earth Leakage Circuit Breaker Fuji - Beeteco.com
 Catalogue ELCB Fuji - Earth Leakage Circuit Breaker  Fuji - Beeteco.com Catalogue ELCB Fuji - Earth Leakage Circuit Breaker  Fuji - Beeteco.com
Catalogue ELCB Fuji - Earth Leakage Circuit Breaker Fuji - Beeteco.com
 

Más de Franco Moriconi

Microgrid @ Maui Brewing Co.
Microgrid @ Maui Brewing Co.Microgrid @ Maui Brewing Co.
Microgrid @ Maui Brewing Co.Franco Moriconi
 
Microgrid Presentation to Isolated Power Systems Connnect
Microgrid Presentation to Isolated Power Systems ConnnectMicrogrid Presentation to Isolated Power Systems Connnect
Microgrid Presentation to Isolated Power Systems ConnnectFranco Moriconi
 
SFCL Superconducting Fault Current Limiter
SFCL Superconducting Fault Current LimiterSFCL Superconducting Fault Current Limiter
SFCL Superconducting Fault Current LimiterFranco Moriconi
 
APPENDICES California Energy Commission 500-2013-134-APPENDIXES
APPENDICES California Energy Commission 500-2013-134-APPENDIXESAPPENDICES California Energy Commission 500-2013-134-APPENDIXES
APPENDICES California Energy Commission 500-2013-134-APPENDIXESFranco Moriconi
 
California Energy Comission 500-2013-134 DEVELOPMENT OF FAULT CURRENT CONTRO...
California Energy Comission  500-2013-134 DEVELOPMENT OF FAULT CURRENT CONTRO...California Energy Comission  500-2013-134 DEVELOPMENT OF FAULT CURRENT CONTRO...
California Energy Comission 500-2013-134 DEVELOPMENT OF FAULT CURRENT CONTRO...Franco Moriconi
 
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...Franco Moriconi
 
Superconducting Fault Current Limiter
Superconducting Fault Current LimiterSuperconducting Fault Current Limiter
Superconducting Fault Current LimiterFranco Moriconi
 
An innovative compact saturable-core HTS Fault Current Limiter - development,...
An innovative compact saturable-core HTS Fault Current Limiter - development,...An innovative compact saturable-core HTS Fault Current Limiter - development,...
An innovative compact saturable-core HTS Fault Current Limiter - development,...Franco Moriconi
 
Saturated core fault current limiter field experience at a distribution subst...
Saturated core fault current limiter field experience at a distribution subst...Saturated core fault current limiter field experience at a distribution subst...
Saturated core fault current limiter field experience at a distribution subst...Franco Moriconi
 
Resonance of a distribution feeder with a saturable core fault current limiter
Resonance of a distribution feeder with a saturable core fault current limiterResonance of a distribution feeder with a saturable core fault current limiter
Resonance of a distribution feeder with a saturable core fault current limiterFranco Moriconi
 
Transient Recovery Voltage Test Results of a 25 MVA Saturable-Core Fault Curr...
Transient Recovery Voltage Test Results of a 25 MVA Saturable-Core Fault Curr...Transient Recovery Voltage Test Results of a 25 MVA Saturable-Core Fault Curr...
Transient Recovery Voltage Test Results of a 25 MVA Saturable-Core Fault Curr...Franco Moriconi
 
Multi-Objective design optimization of a Superconducting Fault Current Limiter
Multi-Objective design optimization of a Superconducting Fault Current LimiterMulti-Objective design optimization of a Superconducting Fault Current Limiter
Multi-Objective design optimization of a Superconducting Fault Current LimiterFranco Moriconi
 
Development and Deployment of Saturated-Core Fault Current Limiters in Distri...
Development and Deployment of Saturated-Core Fault Current Limiters in Distri...Development and Deployment of Saturated-Core Fault Current Limiters in Distri...
Development and Deployment of Saturated-Core Fault Current Limiters in Distri...Franco Moriconi
 
Review of the 11 KV saturated-core inductive FCL for the UK low-carbon networ...
Review of the 11 KV saturated-core inductive FCL for the UK low-carbon networ...Review of the 11 KV saturated-core inductive FCL for the UK low-carbon networ...
Review of the 11 KV saturated-core inductive FCL for the UK low-carbon networ...Franco Moriconi
 

Más de Franco Moriconi (15)

Microgrid @ Maui Brewing Co.
Microgrid @ Maui Brewing Co.Microgrid @ Maui Brewing Co.
Microgrid @ Maui Brewing Co.
 
Microgrid Presentation to Isolated Power Systems Connnect
Microgrid Presentation to Isolated Power Systems ConnnectMicrogrid Presentation to Isolated Power Systems Connnect
Microgrid Presentation to Isolated Power Systems Connnect
 
Miramar Microgrid
Miramar MicrogridMiramar Microgrid
Miramar Microgrid
 
SFCL Superconducting Fault Current Limiter
SFCL Superconducting Fault Current LimiterSFCL Superconducting Fault Current Limiter
SFCL Superconducting Fault Current Limiter
 
APPENDICES California Energy Commission 500-2013-134-APPENDIXES
APPENDICES California Energy Commission 500-2013-134-APPENDIXESAPPENDICES California Energy Commission 500-2013-134-APPENDIXES
APPENDICES California Energy Commission 500-2013-134-APPENDIXES
 
California Energy Comission 500-2013-134 DEVELOPMENT OF FAULT CURRENT CONTRO...
California Energy Comission  500-2013-134 DEVELOPMENT OF FAULT CURRENT CONTRO...California Energy Comission  500-2013-134 DEVELOPMENT OF FAULT CURRENT CONTRO...
California Energy Comission 500-2013-134 DEVELOPMENT OF FAULT CURRENT CONTRO...
 
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...
Design, Test and Demonstration of Saturable Reactor High-Temperature Supercon...
 
Superconducting Fault Current Limiter
Superconducting Fault Current LimiterSuperconducting Fault Current Limiter
Superconducting Fault Current Limiter
 
An innovative compact saturable-core HTS Fault Current Limiter - development,...
An innovative compact saturable-core HTS Fault Current Limiter - development,...An innovative compact saturable-core HTS Fault Current Limiter - development,...
An innovative compact saturable-core HTS Fault Current Limiter - development,...
 
Saturated core fault current limiter field experience at a distribution subst...
Saturated core fault current limiter field experience at a distribution subst...Saturated core fault current limiter field experience at a distribution subst...
Saturated core fault current limiter field experience at a distribution subst...
 
Resonance of a distribution feeder with a saturable core fault current limiter
Resonance of a distribution feeder with a saturable core fault current limiterResonance of a distribution feeder with a saturable core fault current limiter
Resonance of a distribution feeder with a saturable core fault current limiter
 
Transient Recovery Voltage Test Results of a 25 MVA Saturable-Core Fault Curr...
Transient Recovery Voltage Test Results of a 25 MVA Saturable-Core Fault Curr...Transient Recovery Voltage Test Results of a 25 MVA Saturable-Core Fault Curr...
Transient Recovery Voltage Test Results of a 25 MVA Saturable-Core Fault Curr...
 
Multi-Objective design optimization of a Superconducting Fault Current Limiter
Multi-Objective design optimization of a Superconducting Fault Current LimiterMulti-Objective design optimization of a Superconducting Fault Current Limiter
Multi-Objective design optimization of a Superconducting Fault Current Limiter
 
Development and Deployment of Saturated-Core Fault Current Limiters in Distri...
Development and Deployment of Saturated-Core Fault Current Limiters in Distri...Development and Deployment of Saturated-Core Fault Current Limiters in Distri...
Development and Deployment of Saturated-Core Fault Current Limiters in Distri...
 
Review of the 11 KV saturated-core inductive FCL for the UK low-carbon networ...
Review of the 11 KV saturated-core inductive FCL for the UK low-carbon networ...Review of the 11 KV saturated-core inductive FCL for the UK low-carbon networ...
Review of the 11 KV saturated-core inductive FCL for the UK low-carbon networ...
 

Último

SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 

Último (20)

SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 

Inductive shielded superconducting fault current limiter: test results for scaled model

  • 1. Federal Ministry of Economics and Technology Sponsored by: Mandated by Parliament Federal Republic of Germany 5LB-05 Inductive Shielded Superconducting Fault Current Limiter: Test Results for Scaled Model F. Moriconi1, A. Usoskin2, A. Henning3, S. Schmidt3, K. Bäuml4, T. Janetschek5 1Bruker EST, Fremont, CA, USA, 2Bruker HTS GmbH, Alzenau, 3Bruker Advanced Supercon GmbH, Cologne, Germany, 4Schneider Electric Sachsenwerk GmbH, Regensburg, Germany, 5Stadtwerke Augsburg Energie GmbH, Augsburg, Germany.
  • 2. Bruker EST Industrial Plant Outline • Product Development • Application 10.6 kV • Principle of Operation iSFCL • Prototype test results • Model Validation • Future Work • Q&A ASC 2012 – Portland-Oct 12 - oral # 5LB-05 2
  • 3. Bruker EST Planned iSFCL in Augsburg Substation iSFCL Industrial Plant Federal Ministry of Economics and Technology Sponsored by: Mandated by Parliament Federal Republic of Germany iSFCL Funded Project • Project Inductive shielded superconducting fault current limiter (iSFCL) as a "smart grid" device for energy efficiency and security of electricity supply • Application Fault current management in Augsburg network connecting substation to an industrial plant MTU Onsite Energy (manufacturing and testing of CHP plants) • Partners 3ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 4. Bruker EST MTU On-Site Power – 10.6 kV iSFCL Technical Requirements Augsburg Installation Line Voltage = 10.6 kV Rated Current = 817 A Prospective Peak = 25.1 kA Prospective Symmetric = 10.1 kA Limited Peak < 5 kA Limited Symmetric < 2 kA Fault Duration 500 ms 10.6 kV 80% Fault Reduction Additional requirements • Active losses smaller than for comparable Current Limiting Reactor CLR (including cryo- losses) • Low maintenance • Fail Safe 4ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 5. Bruker EST iSFCL Technical Requirements Augsburg Installation MTU On-Site Power – 10.6 kV Line Voltage = 10.6 kV Rated Current = 817 A 10.6 kV 5 Property iSFCL 15-MVA reactor Total impedance (normal operation) 1.4 Ω ⇒ Voltage change Uϕ ~5% 2.7 Ω ⇒ Voltage change Uϕ ~10% Operating losses 45 – 50 kW (incl. cryogenics) 95 kW Impedance increase at fault Factor 2 none Fault current limitation first peak Factor 5 Factor 5 ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 6. Bruker EST iSFCL Advantages • Low operating losses compared to conventional reactors, low resistive losses/cryo-losses, and low insertion impedance • Low voltage drop under normal operating conditions • Fail-safe triggering through material properties / no active trigger / no control needed • Fast response time (first peak is limited) • Self-recovery • Long fault duration (up to 500 ms and possibly longer) • Easy configurability of key operating parameters (switching current) • Scalable due to flexible design (in size, power and voltage) • Smaller than competing technologies for similar performances 6ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 7. Bruker EST Normal Operating Conditions • HTS is superconducting ⇒ no magnetic field penetrates the HTS shield ⇒ reduced flux linkage of primary winding ⇒ primary inductance mainly due to stray fields ⇒ small insertion impedance ⇒ primary winding smaller than a comparable air coil reactor Fault Conditions • HTS becomes normal conducting ⇒ magnetic flux penetrates shield and iron core ⇒ increased flux linkage of primary winding ⇒ large impedance gain CB Primary coil Load Cryostat Superconducting short-circuited secondary CB Primary coil Load Cryostat Superconducting short-circuited secondary iSFCL Principle of Operation 7ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 8. Bruker EST 0% 10% 20% 30% 40% 50% 60% 70% 80% 0 500 1000 1500 2000 VOLTAGEDROPACROSSFCL [%ofSourceV] LIMITED CURRENT – PRIMARY [A] Air Core Iron Core Shielded Unshielded GAIN (2-3) iSFCL iSFCL Principle of Operation 8 Shielded Iron-core Air-Core Iron-Core Unshielded Iron-Core Quenched Shield ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 9. Bruker EST 2500mm iSFCL DESIGN 9 Shield ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 10. Bruker EST Open-Core Prototype 10 Core Area 358 cm2 Core Height 710 mm Core Weight 230 Kg ID Primary 454 mm OD Primary 625 mm H Primary 140 mm # of Turns 20 Inductance 240 µH (air core) # of Modules 3 Inductance 470 µH (iron core) HTS Current 6 kA HTS Material 12 m ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 11. Bruker EST Test Circuit 11 V Source = 300 V Amplitude Z Source = 0.154 Ohms (mainly resistive) Z Load = 0.937 Ohms (power factor 0.98) • Load Current Only • Short-Circuit • Long Duration Short-Circuit ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 12. Bruker EST Circuit Calibration 12 -2000 -1500 -1000 -500 0 500 1000 1500 2000 -500 -400 -300 -200 -100 0 100 200 300 400 500 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 0.10 0.11 0.12 0.13 0.14 0.15 0.16 0.17 0.18 0.19 0.20 0.21 0.22 CURRENT[A] VOLTAGE[V] Time [s] Source Voltage Prospective Current I prospective= 1950 A I Load= 285 A ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 13. Bruker EST Open-Core iSFCL Measurements 13 -2000 -1500 -1000 -500 0 500 1000 1500 2000 -200 -150 -100 -50 0 50 100 150 200 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 0.10 0.11 0.12 0.13 0.14 0.15 0.16 0.17 0.18 0.19 0.20 0.21 0.22 CURRENT[A] VOLTAGE[V] Time [s] Voltage iSFCL Prospective Current Limited Current Z pre-fault= 55 mΩ 16V, 285A Inductance 175 µΗ Z fault= 143 mΩ 187V, 1285A Inductance 455 µΗ Impedance GAIN= 2.6 ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 14. Bruker EST iSFCL Measurements Quench Stability and Robustness 14 -1500 -1000 -500 0 500 1000 1500 0 0,02 0,04 0,06 0,08 0,1 0,12 0,14 0,16 0,18 0,2 0,22 CurrentinA Time in s ComparisonOpen Core 20120117-12 and 20120127-19 I 20120117-12 I 20120127-19 Î = 325A (20120117-12) Î = 325A (20120117-12) Î = 275A (20120127-19) -200 -150 -100 -50 0 50 100 150 200 0 0,02 0,04 0,06 0,08 0,1 0,12 0,14 0,16 0,18 0,2 0,22 VoltageinV Time in s ComparisonOpen Core 20120117-12 and 20120127-19 U 20120117-12 U 20120127-19NO DEGRADATION of PERFORMANCE AFTER SEVERAL QUENCHES (~100) ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 15. Bruker EST iSFCL Measurements Long Duration Short-Circuit 15 ~0.5 s faults were achieved Shunt resistance must be revised -600 -400 -200 0 200 400 600 -150 -100 -50 0 50 100 150 0 0,1 0,2 0,3 0,4 0,5 CurrentinA VoltageinV Time in s Voltage at iSFCL Current ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 16. Bruker EST Quench Model Validation 16 -0.2 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 2.2 0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 E/Ec J/Jc Measured (J/Jc)^43 Power Function ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 17. Bruker EST Finite Elements Model Validation 17 -2000 -1500 -1000 -500 0 500 1000 1500 2000 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 0.10 0.11 0.12 0.13 0.14 0.15 0.16 0.17 0.18 0.19 0.20 0.21 0.22 CURRENT[A] Time [s] Prospective Current Limited Current Limited Current Predicted 0.75 T Measured Measured 3 mT ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 18. Bruker EST Finite Elements Model Validation 18 0.75 T Measured 3 mT -200 -150 -100 -50 0 50 100 150 200 0.00 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09 0.10 0.11 0.12 0.13 0.14 0.15 0.16 0.17 0.18 0.19 0.20 0.21 0.22 VOLTAGE[V] Time [s] Voltage iSFCL Voltage iSFCL Predicted ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 19. Bruker EST From Prototype to Full-Scale 19 2500mm Prototype Full-Scale 358 Core Area cm2 1250 710 Core Height mm 2500 230 Core Weight Kg 2750 454 ID Primary mm 977 625 OD Primary mm 1180 140 H Primary mm 600 20 # of Turns # 74 0.24 Inductance air-core mH 5 0.47 Inductance iron-core mH 16 3 # of Modules # 10 6 HTS Current kA 50 12 HTS Material m 250 ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 20. Bruker EST 25 I [kA] 15 10 20 5 0 Predicted Performance iSFCL Augsburg 10.6kV, 817A, 80% Fault Reduction 20 25kA PEAK 5kA PEAK ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 21. Bruker EST Future Work • Perform AC Losses Measurements (CAPS) • Assemble and test Full-Scale HTS Modules • Integrate single-phase 12 kV- 820A device • High-Power and HV testing of single-phase • Build, Test and Commission 12kV, 3-Phase Augsburg Installation 21ASC 2012 – Portland-Oct 12 - oral # 5LB-05
  • 22. www.bruker-est.com ASC 2012 – Portland-Oct 12 - oral # 5LB-05