SlideShare a Scribd company logo
1 of 8
Curriculum Vitae
Personal Details
Name : Hassan Ali Mohamed Abd Elwahab
Current Country of Residence : Qatar
Cellular Number : Mobile (Qatar): +974 66610340
Mobile (Egypt): +2 01125242459
E-mail : habdelwahab_1970@yahoo.com
Nationality : Egyptian
Martial Status : Married
Date of Birth : 11/10/1970
Education/Professional Qualifications
B.Sc. of Communication & Electronics engineering (May 1993).
El Minia University -Egypt - General Grade: Good
Courses Attained
Design of electronic circuits (Faculty of Engineering “AIN Shams University) Egypt
Calculation of Electrical Loads (Faculty of Engineering “AIN Shams University) Egypt
Green buildings - Sustainability - LEED (TECHNICAL & PROJECT MANAGEMENT (PMT)-Qatar)
Cost management (Fundamentals) (TECHNICAL & PROJECT MANAGEMENT (PMT)-Qatar)
Quality management (Fundamentals) (TECHNICAL & PROJECT MANAGEMENT (PMT)-Qatar)
Computer Skills
Microsoft Office (Excel, Word).
NAVIS Project 3-D Model
VBC Engine for Project Documents
Languages
Arabic and English
1
Practical experiences around (22 years) as mentioned below:
From July 2007 till now working with consolidated contractors company CCC
• (From Feb 2015- Till now)
Company : Sidra Medical & Research Center- SMRC
Contractor : KEO
Title : MEP- Construction Manager (External &UGCP &WT)
Project : Completion of Design and construction of SMRC Project
Duties &Responsibilities
• Reviewing contract and preparing mobilization /demobilization schedule.
• Participating in management safety walks and holding safety meetings with MEP sub-contractors.
• Attending internal and client progress monitoring meetings.
• Studying cost and productivity reports and implementing necessary actions.
• Follow up for incentive Mile stone targets with the sub-contractors to achieving it.
• Following up any design changes as per site conditions with KEO.
• Establish together with the project manager and MEP sub-contractors the resourcing requirements for the
section including staffing, PMV etc. to ensure that these are accurate and realistic.
• Plan/schedule section priorities & resources in line with the construction schedule, monitoring subsequent
progress, ensuring that correction action is agreed & implemented where variation from schedule occurs.
• Monitor the sub-contractors of the MEP work are being undertaken within his section taking any necessary
remedial action to ensure full compliance from MEP sub-contractors with all relevant standards e.g.
contract documents, specifications, method statement.
• Maintain very good relation with client / MEP sub-contractor and always taking the initiative in site
problem solving, taking part with shared site walk downs and follow up of comments clearing.
• Avoiding previous projects problems and applying lessons learned at site.
• (From April 2012- January 2015)
Company : Ras Gas Company Limited
Contractor : JGC Corporation
Title : E/I Project Engineer (Train 1& Train 2)
Project : BARZAN ONSHORE PROJECT
Duties &Responsibilities
• Managing and arranging materials as per MTO for instrument works.
• Following up six week ahead works for instrument activities.
• Scheduling the jobs & manpower according to priority.
• Managing the design changes as per site conditions with engineering and JGC.
• Managing and following up all instrument installations such as junction boxes, local panels, level
transmitters, flow transmitters, temperature/pressure transmitters, controllers, indicators,
temperature/pressure gauges & switches, F&G detectors, control valves, safety valves, .etc.
• Progress monitoring with site engineers on daily basis.
• Managing and following up calibration of field instruments.
2
• Managing and following up loop checking for the field instruments.
• Managing and following up OTDR testing, splicing and termination of the fiber optic cables from the field
to control room.
• Attending the meetings with directory board.
• Coordinate safety trainings and programs with HSSE team.
• Managing and following up all the activities related to control rooms.
• (January 2011 – March 2012)
Company : Qatar Petroleum
Contractor : CCIC
Title : E&I Section Engineer
Project : Ras Laffan Expansion Port Project
Duties &Responsibilities
• Final Review for pre commissioning for E/I & MEP works related dossiers prior to hand over to client for
final approval.
• Discuss with pre- commissioning team all documents and working hand by hand to clear all comments and
punch lists.
• Coordinate with client and find solutions for bending E/I & MEP issues and ensure all required certificates
are accepted and signed by client.
• Set system for E/I & MEP dossier acceptance in order to complete the work in short and right time.
• Final review for all E/I & MEP RLM drawings with the client as per site modifications to release them for
AS BUILT.
• Always discuss with pre-commissioning team and certification team to improve the flow of work
As well the progress.
• Final review for all E/I & MEP project dossiers for materials and vendor data sheets and as built drawings
before handover to the client.
• Final review of all E/I & MEP damage reports and ensures that all materials already installed at site to
close out the damage report with the client.
• Final review of all E/I & MEP construction, pre commissioning, commissioning dossiers with QP staff to
take code A and hand over the dossiers to them at the last stage.
• (SEP. 2008 – Dec.2010)
Company : SHELL &QATAR petroleum
Contractor : JGC@KBR JV
Title : E&I section engineer
Project : PEARL GTL PROJECT (SHELL)
Duties &Responsibilities
• Managing and Arranging materials as per MTO for E&I activities.
• Scheduling the jobs & manpower according to priority activities for phase I &II.
• Following up any design changes as per site conditions with JK.
• Ensure that all actions & activities assigned to Instrument section at the mobilization stage are
implemented within agreed timescales.
3
• Plan/schedule section priorities & resources in line with the construction schedule, monitoring subsequent
progress, ensuring that correction action is agreed & implemented where variation from schedule occurs.
• Monitor the supervision of the work being undertaken within his section taking any necessary remedial
action to ensure full compliance with all relevant standards e.g. contract documents, specifications,
method statement, CCC policy & requirements.
• Managing and following up all instrument installations such as junction boxes, local panels, level
transmitters, flow transmitters, temperature/pressure transmitters, controllers, indicators,
temperature/pressure gauges & switches, F&G detectors, control valves, safety valves,… etc for phase I
and phase II.
• Managing and following up the calibration of field instruments at calibration shop.
• Managing and following up the loop checking of the field instruments and inside the control room.
• Managing and following up the OTDR testing, splicing and termination of the fiber optic cables in the field
and control room with Q soft subcontractor
• .Managing and following up all building works such as lighting, firefighting, and lightning works.
• (July 2007 – Sep. 2008)
Company : QATAR GAS
Contractor : CHYOUDA& TECHNIP France
Title : E&I Section Engineer
Project : Qatar Gas onshore facilities Development Project "QGX Π" Train 4&5
Duties &Responsibilities
• Managing and Arranging materials as per MTO for E/I works for tow berth 4&5.
• Preparation and control of man power mobilization histogram to match with project schedule.
• Equipment allocation at site to cope with priority and project schedule.
• Preparing all the relevant documents such as method statement JSA for different activities.
• Progress / six week look ahead monitoring with site engineers and subordinate.
• Attending internal and client progress monitoring meeting.
• Studying cost and productivity reports and implementing necessary action.
• Follow up for incentive Mile stone targets and achieving it.
• Establish & subsequently monitor all work process & system within own section to ensure that CCC policy
& procedures are consistently implemented taking effective remedial action where non-compliance is
identified.
• Managing the design changes as per site conditions with CTJV.
• Co-ordinate the work with subcontractors.
• Managing and following up all instrument installations such as junction boxes, local panels, level
transmitters, flow transmitters, temperature/pressure transmitters, controllers, indicators,
temperature/pressure gauges & switches, F&G detectors, control valves, safety valves, .etc.
• Progress monitoring with site engineers on daily basis.
• Managing and following up calibration of field instruments for tow loading arms of jetty area.
• Managing and following up loop checking of the field instruments at jetty area.
• Managing and following up OTDR testing, splicing and termination of the fiber optic cables from the field
to control room.
• Attending the meetings with directory board.
• Coordinate safety trainings and programs with HSSE team.
4
• Managing and following up electrical works installations for tow loading arms for berth 4 and berth 5such
as lighting works, heat tracing works, power works, Earthing works for all process area and loading
arms.
• Managing and following up all buildings (2 substations and 2 control rooms) works such as power
and lighting works, firefighting, fire and gas and Earthing & lightning works for berth 4&5.
From June 1995 till June 2007 working with ( PETROJET) at Egypt and Qatar:
• August 2006 to June 2007
Company : Ras laffan Olefin Company
Title : E/I Construction Manager
Main Contractor : TECHNIP France
Project : Construction of Process Area of Olefin Plant.
Duties &Responsibilities
• In-charge of E/I and MEP construction activities works related to the contract which includes installation
of switch gears, transformers, all instruments activities.
• Site co-ordination with client; inter departments and other disciplines to resolve technical problems.
• Preparing construction schedule, implementing the project targets, solving the obstacles and attending
project management meetings.
• Make sure that all the works are carried out in compliance with the project safety standard.
• Resolve technical problems encountered at all times between site and clients.
• Coordinates all project E/I and MEP works, ensures that all materials / equipment’s are properly used.
• Review contract / tendering documentation to ensure a thorough understanding of the relevant contract
requirements liaising with planning & budgeting engineers as necessary to establish and implement
systems for the section
• Managing and following up Installation of cable ladders for accommodating main and secondary
cables.
• Managing and following up installation of switch gears for 33 KV and 6.6 KV.
• Managing and following up installation of transformers.
• Managing and following up testing of transformers and switch gears.
• Managing and following up installation and testing of fire and gas systems.
• Managing and following up installation and testing of communication systems (PAGA).
• Managing and following up installation and testing of CCTV circuits.
• Managing and following up all instrument installations such as junction boxes, local panels, level
transmitters, flow transmitters, temperature/pressure transmitters, controllers, indicators,
temperature/pressure gauges & switches, F&G detectors, control valves, safety valves, .etc.
• Managing and following up construction and loop checking of control rooms & field instruments.
• June 2005 to July 2006
Company : PETRO SPORTS (Cairo)
Contractor : ENPPI
Title : MEP Project Engineer
Project : Construction of Sports City for Egyptian Petroleum Sector
5
Duties &Responsibilities
• In-charge of MEP construction activities works related to the contract.
• Reviewing contract and preparing mobilization / demobilization schedule.
• Establishing progress reporting & monitoring system with clear course of action due to any deficiency.
• Monitoring cost reports and correction of any deficiency.
• Resolve technical problems encountered at all times between site and clients.
• Monitoring site operations and verifying if it is matching with company procedures
• Provide timely reliable standard reports to project management.
• Managing and following up All the Lighting and power work installation for the club Buildings.
• Managing and following up Installation of lighting towers for the stadium, CCTV system for the club.
• Managing and following up Cable pulling around 230 Km of Power & Control cables.
• Managing and following up Illumination test for the lighting network in the stadium as per FIFA specs.
• Managing and following up Planning & Progress Monitoring with management.
• March 2003 to May 2005
Company : United Gas Derivative Company (UGDC)
Contractor : ENPPI
Title : E&I Project Engineer
Project : Propane Gas Plant for Export (DAMMETA)
Duties &Responsibilities
• Managing the installation of All the Lighting and power work for the Buildings.
• Managing the Installation of CCTV system, Cable pulling around 270 Km of Power & Control and
instrument cables.
• Attending Planning & Progress Monitoring meetings with our management.
• Installation of cable ladders for accommodating main and secondary cables.
• Managing and following up Installation of switch gears for 33 KV and 6.6 KV.
• Managing and following up Installation of transformers for 33 KV and 6.6 KV.
• Managing and following up testing of transformers and switch gears.
• Managing and following up installation and testing of fire and gas systems.
• Managing and following up all instrument installations such as junction boxes, local panels, level
transmitters, flow transmitters, temperature/pressure transmitters, controllers, indicators,
temperature/pressure gauges & switches, F&G detectors, control valves, safety valves, .etc.
• Progress monitoring with site engineers.
• Managing and following up calibration of field instruments all types.
• Managing and following up loop checking of the field instruments.
• Managing and following up OTDR testing, splicing and termination of the fiber optic cables in the field
and control room.
• Attending the meetings with directory board.
• November 2000 to February 2003
Company : Egyptian Company for Natural Gas (GASCO)
Contractor : ENPPI
6
Title : E&I section Engineer
Project : EL- Tina-Meet Nama Pipe line 36”
Duties &Responsibilities
• Managing and following up Cathodic Protection system installation for 36” pipe line of length 161km
such as, Installation of 20 nos. anode pit, Installation of 150 nos. Test station, Installation of 8 nos.
cathodic protection transformers with +ve & -ve junction boxes.
• Managing and following up Commissioning of the cathodic protection systems.
• Preparation and control of man power mobilization histogram to match with project schedule.
• Equipment allocation at site to cope with priority and project schedule.
• Preparing all the relevant documents such as method statement JSA for different activities.
• Review contract / tendering documentation to ensure a thorough understanding of the relevant contract
requirements liaising with planning & budgeting engineers as necessary to establish and implement
systems for the section.
• Progress / six week look ahead monitoring with site engineers and subordinate.
• January 1997 to October 2000
Company : Alex Petroleum Company (Alexandria)
Contractor : TECHNIP Italy
Title : Lead Electrical Engineer
Project : Naphta complex project
Duties &Responsibilities
• Review contract / tendering documentation to ensure a thorough understanding of the relevant contract
requirements liaising with planning & budgeting engineers as necessary to establish and implement
systems for the section.
• Preparing all the relevant documents such as method statement JSA for different activities.
• Co-ordinate and controlled the work site engineers who were involved in supervision of construction
work.
• Ensured that the site engineers were provided with the necessary information, materials, equipments and
manpower for the performance of the work according to program.
• Attending internal and client progress monitoring meetings.
• Coordinate safety trainings and programs with HSSE team.
• Follow up for incentive Mile stone targets and achieving.
• June 1995 to Dec.1996
Company : Qaroun Petroleum Company
Contractor : ENPPI
Title : E&I Site Engineer
Project : construction of Qaroun petroleum plant.
Duties &Responsibilities
• In-charge of all electrical and instrumentation construction works.
7
• Installation of control panels, transformers, and consoles.
• Installation of cable ladders for power and lighting cables.
• Power and control cable rout designing.
• Termination of power and control cables.
• Installation of cathodic protection system for pipe lines.
• Installation of lighting and power activities.
• In charge of Pre-commissioning activities with vendors.
8

More Related Content

What's hot

QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&INASIM NEZAM
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC Firoz Mohammad
 
QAQC Coordinator CV
QAQC Coordinator CVQAQC Coordinator CV
QAQC Coordinator CVZAIDI Djahid
 
Updated CV Lead QAQC Engineer Acting QaQc Manager
Updated CV Lead QAQC Engineer Acting QaQc ManagerUpdated CV Lead QAQC Engineer Acting QaQc Manager
Updated CV Lead QAQC Engineer Acting QaQc ManagerMuhammad Rehman
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CVAbdul Hakkim
 
Updated Umang resume
Updated Umang resumeUpdated Umang resume
Updated Umang resumeUmang Tailor
 
mallick resume qc eng.
mallick resume qc eng.mallick resume qc eng.
mallick resume qc eng.SAJID MALLICK
 
Job Desciption Completions Engineer
Job Desciption Completions EngineerJob Desciption Completions Engineer
Job Desciption Completions EngineerDenis Utebaliev
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos BalanaoFroilan Balanao
 
Peter Fru, Curriculum Vitae
Peter Fru, Curriculum VitaePeter Fru, Curriculum Vitae
Peter Fru, Curriculum VitaePeter Fru
 

What's hot (20)

E&I inspector cv
E&I inspector cvE&I inspector cv
E&I inspector cv
 
CV 23-10-2014
CV 23-10-2014CV 23-10-2014
CV 23-10-2014
 
Shakir CV
Shakir CV Shakir CV
Shakir CV
 
QC INSPECTOR E&I
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&I
 
CV Instrument Control Inspector QAQC
CV Instrument Control Inspector  QAQC CV Instrument Control Inspector  QAQC
CV Instrument Control Inspector QAQC
 
tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
 
QAQC Coordinator CV
QAQC Coordinator CVQAQC Coordinator CV
QAQC Coordinator CV
 
CV of Dinesh
CV of DineshCV of Dinesh
CV of Dinesh
 
Updated CV Lead QAQC Engineer Acting QaQc Manager
Updated CV Lead QAQC Engineer Acting QaQc ManagerUpdated CV Lead QAQC Engineer Acting QaQc Manager
Updated CV Lead QAQC Engineer Acting QaQc Manager
 
Resume_Inst. QC_Hasnat
Resume_Inst. QC_HasnatResume_Inst. QC_Hasnat
Resume_Inst. QC_Hasnat
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
 
MOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QCMOHD JAMAL AKTAR QA/QC
MOHD JAMAL AKTAR QA/QC
 
Ng Eng Beng CV
Ng Eng Beng CVNg Eng Beng CV
Ng Eng Beng CV
 
My Resume
My ResumeMy Resume
My Resume
 
Updated Umang resume
Updated Umang resumeUpdated Umang resume
Updated Umang resume
 
mallick resume qc eng.
mallick resume qc eng.mallick resume qc eng.
mallick resume qc eng.
 
Job Desciption Completions Engineer
Job Desciption Completions EngineerJob Desciption Completions Engineer
Job Desciption Completions Engineer
 
CV - MEP Inspector Engineer Froilan Ramos Balanao
CV -  MEP Inspector Engineer  Froilan Ramos BalanaoCV -  MEP Inspector Engineer  Froilan Ramos Balanao
CV - MEP Inspector Engineer Froilan Ramos Balanao
 
Peter Fru, Curriculum Vitae
Peter Fru, Curriculum VitaePeter Fru, Curriculum Vitae
Peter Fru, Curriculum Vitae
 
Ayman curriculum vitae
Ayman curriculum vitaeAyman curriculum vitae
Ayman curriculum vitae
 

Viewers also liked

The DDI (Drug-Drug Interaction) Corpus
The DDI (Drug-Drug Interaction) CorpusThe DDI (Drug-Drug Interaction) Corpus
The DDI (Drug-Drug Interaction) CorpusGrupo HULAT
 
краткая характеристика примерной образовательной программы мдоу
краткая характеристика примерной образовательной программы мдоукраткая характеристика примерной образовательной программы мдоу
краткая характеристика примерной образовательной программы мдоу48452119
 
morphima.image.sml
morphima.image.smlmorphima.image.sml
morphima.image.smlHans Verleur
 
helo training off shore bsioet 20150108134849574
helo training off shore bsioet 20150108134849574helo training off shore bsioet 20150108134849574
helo training off shore bsioet 20150108134849574Mike Sherrington
 
Wholesale Silver Jewelry New York : Silver Alloys are in High Demand
Wholesale Silver Jewelry New York : Silver Alloys are in High DemandWholesale Silver Jewelry New York : Silver Alloys are in High Demand
Wholesale Silver Jewelry New York : Silver Alloys are in High Demandpandkjewelry
 
Tipsforgraduates 150507013539-lva1-app6891
Tipsforgraduates 150507013539-lva1-app6891Tipsforgraduates 150507013539-lva1-app6891
Tipsforgraduates 150507013539-lva1-app6891sadjida bellatreche
 
ICT Media Platform versie sept 2016
ICT  Media Platform  versie sept 2016ICT  Media Platform  versie sept 2016
ICT Media Platform versie sept 2016Aschwin Geerts
 
DYB - presentation
DYB - presentationDYB - presentation
DYB - presentationDYB_Ukraine
 
Straight A Fund Impact_ Managing Change, Lessons from Peers
Straight A Fund Impact_ Managing Change, Lessons from PeersStraight A Fund Impact_ Managing Change, Lessons from Peers
Straight A Fund Impact_ Managing Change, Lessons from PeersMary Welsh Schlueter
 

Viewers also liked (10)

The DDI (Drug-Drug Interaction) Corpus
The DDI (Drug-Drug Interaction) CorpusThe DDI (Drug-Drug Interaction) Corpus
The DDI (Drug-Drug Interaction) Corpus
 
краткая характеристика примерной образовательной программы мдоу
краткая характеристика примерной образовательной программы мдоукраткая характеристика примерной образовательной программы мдоу
краткая характеристика примерной образовательной программы мдоу
 
morphima.image.sml
morphima.image.smlmorphima.image.sml
morphima.image.sml
 
helo training off shore bsioet 20150108134849574
helo training off shore bsioet 20150108134849574helo training off shore bsioet 20150108134849574
helo training off shore bsioet 20150108134849574
 
Wholesale Silver Jewelry New York : Silver Alloys are in High Demand
Wholesale Silver Jewelry New York : Silver Alloys are in High DemandWholesale Silver Jewelry New York : Silver Alloys are in High Demand
Wholesale Silver Jewelry New York : Silver Alloys are in High Demand
 
Tipsforgraduates 150507013539-lva1-app6891
Tipsforgraduates 150507013539-lva1-app6891Tipsforgraduates 150507013539-lva1-app6891
Tipsforgraduates 150507013539-lva1-app6891
 
ICT Media Platform versie sept 2016
ICT  Media Platform  versie sept 2016ICT  Media Platform  versie sept 2016
ICT Media Platform versie sept 2016
 
EyeBizz 7-2016 JZ
EyeBizz 7-2016 JZEyeBizz 7-2016 JZ
EyeBizz 7-2016 JZ
 
DYB - presentation
DYB - presentationDYB - presentation
DYB - presentation
 
Straight A Fund Impact_ Managing Change, Lessons from Peers
Straight A Fund Impact_ Managing Change, Lessons from PeersStraight A Fund Impact_ Managing Change, Lessons from Peers
Straight A Fund Impact_ Managing Change, Lessons from Peers
 

Similar to HASSAN ALI CV1

Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa
 
Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv Yacine Sayad
 
ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011Iyad Hassan
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineernomanqudrat
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain
 
Naveen Curriculum vitae Project manager
Naveen Curriculum vitae Project managerNaveen Curriculum vitae Project manager
Naveen Curriculum vitae Project managerNaveen Rengasamy
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNouman Jamil
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) Tarun Kumar
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)Sunkara Gsk
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C
 

Similar to HASSAN ALI CV1 (20)

Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
 
update
updateupdate
update
 
ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011ayed cv.newest one 23.11.2011
ayed cv.newest one 23.11.2011
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
Sr.Electrical Engineer
Sr.Electrical EngineerSr.Electrical Engineer
Sr.Electrical Engineer
 
CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05CV Pholapatra Latest Rev 05
CV Pholapatra Latest Rev 05
 
NY_ CV
NY_ CVNY_ CV
NY_ CV
 
Curriculum vitae 3.2
Curriculum vitae 3.2Curriculum vitae 3.2
Curriculum vitae 3.2
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Naveen Curriculum vitae Project manager
Naveen Curriculum vitae Project managerNaveen Curriculum vitae Project manager
Naveen Curriculum vitae Project manager
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer)
 
Aftab CV.
Aftab CV.Aftab CV.
Aftab CV.
 
SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)SUNKARA.G.S.K (Circulam Vitae)
SUNKARA.G.S.K (Circulam Vitae)
 
Vignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI CoordinatorVignesh Kumar C- TPI Coordinator
Vignesh Kumar C- TPI Coordinator
 

HASSAN ALI CV1

  • 1. Curriculum Vitae Personal Details Name : Hassan Ali Mohamed Abd Elwahab Current Country of Residence : Qatar Cellular Number : Mobile (Qatar): +974 66610340 Mobile (Egypt): +2 01125242459 E-mail : habdelwahab_1970@yahoo.com Nationality : Egyptian Martial Status : Married Date of Birth : 11/10/1970 Education/Professional Qualifications B.Sc. of Communication & Electronics engineering (May 1993). El Minia University -Egypt - General Grade: Good Courses Attained Design of electronic circuits (Faculty of Engineering “AIN Shams University) Egypt Calculation of Electrical Loads (Faculty of Engineering “AIN Shams University) Egypt Green buildings - Sustainability - LEED (TECHNICAL & PROJECT MANAGEMENT (PMT)-Qatar) Cost management (Fundamentals) (TECHNICAL & PROJECT MANAGEMENT (PMT)-Qatar) Quality management (Fundamentals) (TECHNICAL & PROJECT MANAGEMENT (PMT)-Qatar) Computer Skills Microsoft Office (Excel, Word). NAVIS Project 3-D Model VBC Engine for Project Documents Languages Arabic and English 1
  • 2. Practical experiences around (22 years) as mentioned below: From July 2007 till now working with consolidated contractors company CCC • (From Feb 2015- Till now) Company : Sidra Medical & Research Center- SMRC Contractor : KEO Title : MEP- Construction Manager (External &UGCP &WT) Project : Completion of Design and construction of SMRC Project Duties &Responsibilities • Reviewing contract and preparing mobilization /demobilization schedule. • Participating in management safety walks and holding safety meetings with MEP sub-contractors. • Attending internal and client progress monitoring meetings. • Studying cost and productivity reports and implementing necessary actions. • Follow up for incentive Mile stone targets with the sub-contractors to achieving it. • Following up any design changes as per site conditions with KEO. • Establish together with the project manager and MEP sub-contractors the resourcing requirements for the section including staffing, PMV etc. to ensure that these are accurate and realistic. • Plan/schedule section priorities & resources in line with the construction schedule, monitoring subsequent progress, ensuring that correction action is agreed & implemented where variation from schedule occurs. • Monitor the sub-contractors of the MEP work are being undertaken within his section taking any necessary remedial action to ensure full compliance from MEP sub-contractors with all relevant standards e.g. contract documents, specifications, method statement. • Maintain very good relation with client / MEP sub-contractor and always taking the initiative in site problem solving, taking part with shared site walk downs and follow up of comments clearing. • Avoiding previous projects problems and applying lessons learned at site. • (From April 2012- January 2015) Company : Ras Gas Company Limited Contractor : JGC Corporation Title : E/I Project Engineer (Train 1& Train 2) Project : BARZAN ONSHORE PROJECT Duties &Responsibilities • Managing and arranging materials as per MTO for instrument works. • Following up six week ahead works for instrument activities. • Scheduling the jobs & manpower according to priority. • Managing the design changes as per site conditions with engineering and JGC. • Managing and following up all instrument installations such as junction boxes, local panels, level transmitters, flow transmitters, temperature/pressure transmitters, controllers, indicators, temperature/pressure gauges & switches, F&G detectors, control valves, safety valves, .etc. • Progress monitoring with site engineers on daily basis. • Managing and following up calibration of field instruments. 2
  • 3. • Managing and following up loop checking for the field instruments. • Managing and following up OTDR testing, splicing and termination of the fiber optic cables from the field to control room. • Attending the meetings with directory board. • Coordinate safety trainings and programs with HSSE team. • Managing and following up all the activities related to control rooms. • (January 2011 – March 2012) Company : Qatar Petroleum Contractor : CCIC Title : E&I Section Engineer Project : Ras Laffan Expansion Port Project Duties &Responsibilities • Final Review for pre commissioning for E/I & MEP works related dossiers prior to hand over to client for final approval. • Discuss with pre- commissioning team all documents and working hand by hand to clear all comments and punch lists. • Coordinate with client and find solutions for bending E/I & MEP issues and ensure all required certificates are accepted and signed by client. • Set system for E/I & MEP dossier acceptance in order to complete the work in short and right time. • Final review for all E/I & MEP RLM drawings with the client as per site modifications to release them for AS BUILT. • Always discuss with pre-commissioning team and certification team to improve the flow of work As well the progress. • Final review for all E/I & MEP project dossiers for materials and vendor data sheets and as built drawings before handover to the client. • Final review of all E/I & MEP damage reports and ensures that all materials already installed at site to close out the damage report with the client. • Final review of all E/I & MEP construction, pre commissioning, commissioning dossiers with QP staff to take code A and hand over the dossiers to them at the last stage. • (SEP. 2008 – Dec.2010) Company : SHELL &QATAR petroleum Contractor : JGC@KBR JV Title : E&I section engineer Project : PEARL GTL PROJECT (SHELL) Duties &Responsibilities • Managing and Arranging materials as per MTO for E&I activities. • Scheduling the jobs & manpower according to priority activities for phase I &II. • Following up any design changes as per site conditions with JK. • Ensure that all actions & activities assigned to Instrument section at the mobilization stage are implemented within agreed timescales. 3
  • 4. • Plan/schedule section priorities & resources in line with the construction schedule, monitoring subsequent progress, ensuring that correction action is agreed & implemented where variation from schedule occurs. • Monitor the supervision of the work being undertaken within his section taking any necessary remedial action to ensure full compliance with all relevant standards e.g. contract documents, specifications, method statement, CCC policy & requirements. • Managing and following up all instrument installations such as junction boxes, local panels, level transmitters, flow transmitters, temperature/pressure transmitters, controllers, indicators, temperature/pressure gauges & switches, F&G detectors, control valves, safety valves,… etc for phase I and phase II. • Managing and following up the calibration of field instruments at calibration shop. • Managing and following up the loop checking of the field instruments and inside the control room. • Managing and following up the OTDR testing, splicing and termination of the fiber optic cables in the field and control room with Q soft subcontractor • .Managing and following up all building works such as lighting, firefighting, and lightning works. • (July 2007 – Sep. 2008) Company : QATAR GAS Contractor : CHYOUDA& TECHNIP France Title : E&I Section Engineer Project : Qatar Gas onshore facilities Development Project "QGX Π" Train 4&5 Duties &Responsibilities • Managing and Arranging materials as per MTO for E/I works for tow berth 4&5. • Preparation and control of man power mobilization histogram to match with project schedule. • Equipment allocation at site to cope with priority and project schedule. • Preparing all the relevant documents such as method statement JSA for different activities. • Progress / six week look ahead monitoring with site engineers and subordinate. • Attending internal and client progress monitoring meeting. • Studying cost and productivity reports and implementing necessary action. • Follow up for incentive Mile stone targets and achieving it. • Establish & subsequently monitor all work process & system within own section to ensure that CCC policy & procedures are consistently implemented taking effective remedial action where non-compliance is identified. • Managing the design changes as per site conditions with CTJV. • Co-ordinate the work with subcontractors. • Managing and following up all instrument installations such as junction boxes, local panels, level transmitters, flow transmitters, temperature/pressure transmitters, controllers, indicators, temperature/pressure gauges & switches, F&G detectors, control valves, safety valves, .etc. • Progress monitoring with site engineers on daily basis. • Managing and following up calibration of field instruments for tow loading arms of jetty area. • Managing and following up loop checking of the field instruments at jetty area. • Managing and following up OTDR testing, splicing and termination of the fiber optic cables from the field to control room. • Attending the meetings with directory board. • Coordinate safety trainings and programs with HSSE team. 4
  • 5. • Managing and following up electrical works installations for tow loading arms for berth 4 and berth 5such as lighting works, heat tracing works, power works, Earthing works for all process area and loading arms. • Managing and following up all buildings (2 substations and 2 control rooms) works such as power and lighting works, firefighting, fire and gas and Earthing & lightning works for berth 4&5. From June 1995 till June 2007 working with ( PETROJET) at Egypt and Qatar: • August 2006 to June 2007 Company : Ras laffan Olefin Company Title : E/I Construction Manager Main Contractor : TECHNIP France Project : Construction of Process Area of Olefin Plant. Duties &Responsibilities • In-charge of E/I and MEP construction activities works related to the contract which includes installation of switch gears, transformers, all instruments activities. • Site co-ordination with client; inter departments and other disciplines to resolve technical problems. • Preparing construction schedule, implementing the project targets, solving the obstacles and attending project management meetings. • Make sure that all the works are carried out in compliance with the project safety standard. • Resolve technical problems encountered at all times between site and clients. • Coordinates all project E/I and MEP works, ensures that all materials / equipment’s are properly used. • Review contract / tendering documentation to ensure a thorough understanding of the relevant contract requirements liaising with planning & budgeting engineers as necessary to establish and implement systems for the section • Managing and following up Installation of cable ladders for accommodating main and secondary cables. • Managing and following up installation of switch gears for 33 KV and 6.6 KV. • Managing and following up installation of transformers. • Managing and following up testing of transformers and switch gears. • Managing and following up installation and testing of fire and gas systems. • Managing and following up installation and testing of communication systems (PAGA). • Managing and following up installation and testing of CCTV circuits. • Managing and following up all instrument installations such as junction boxes, local panels, level transmitters, flow transmitters, temperature/pressure transmitters, controllers, indicators, temperature/pressure gauges & switches, F&G detectors, control valves, safety valves, .etc. • Managing and following up construction and loop checking of control rooms & field instruments. • June 2005 to July 2006 Company : PETRO SPORTS (Cairo) Contractor : ENPPI Title : MEP Project Engineer Project : Construction of Sports City for Egyptian Petroleum Sector 5
  • 6. Duties &Responsibilities • In-charge of MEP construction activities works related to the contract. • Reviewing contract and preparing mobilization / demobilization schedule. • Establishing progress reporting & monitoring system with clear course of action due to any deficiency. • Monitoring cost reports and correction of any deficiency. • Resolve technical problems encountered at all times between site and clients. • Monitoring site operations and verifying if it is matching with company procedures • Provide timely reliable standard reports to project management. • Managing and following up All the Lighting and power work installation for the club Buildings. • Managing and following up Installation of lighting towers for the stadium, CCTV system for the club. • Managing and following up Cable pulling around 230 Km of Power & Control cables. • Managing and following up Illumination test for the lighting network in the stadium as per FIFA specs. • Managing and following up Planning & Progress Monitoring with management. • March 2003 to May 2005 Company : United Gas Derivative Company (UGDC) Contractor : ENPPI Title : E&I Project Engineer Project : Propane Gas Plant for Export (DAMMETA) Duties &Responsibilities • Managing the installation of All the Lighting and power work for the Buildings. • Managing the Installation of CCTV system, Cable pulling around 270 Km of Power & Control and instrument cables. • Attending Planning & Progress Monitoring meetings with our management. • Installation of cable ladders for accommodating main and secondary cables. • Managing and following up Installation of switch gears for 33 KV and 6.6 KV. • Managing and following up Installation of transformers for 33 KV and 6.6 KV. • Managing and following up testing of transformers and switch gears. • Managing and following up installation and testing of fire and gas systems. • Managing and following up all instrument installations such as junction boxes, local panels, level transmitters, flow transmitters, temperature/pressure transmitters, controllers, indicators, temperature/pressure gauges & switches, F&G detectors, control valves, safety valves, .etc. • Progress monitoring with site engineers. • Managing and following up calibration of field instruments all types. • Managing and following up loop checking of the field instruments. • Managing and following up OTDR testing, splicing and termination of the fiber optic cables in the field and control room. • Attending the meetings with directory board. • November 2000 to February 2003 Company : Egyptian Company for Natural Gas (GASCO) Contractor : ENPPI 6
  • 7. Title : E&I section Engineer Project : EL- Tina-Meet Nama Pipe line 36” Duties &Responsibilities • Managing and following up Cathodic Protection system installation for 36” pipe line of length 161km such as, Installation of 20 nos. anode pit, Installation of 150 nos. Test station, Installation of 8 nos. cathodic protection transformers with +ve & -ve junction boxes. • Managing and following up Commissioning of the cathodic protection systems. • Preparation and control of man power mobilization histogram to match with project schedule. • Equipment allocation at site to cope with priority and project schedule. • Preparing all the relevant documents such as method statement JSA for different activities. • Review contract / tendering documentation to ensure a thorough understanding of the relevant contract requirements liaising with planning & budgeting engineers as necessary to establish and implement systems for the section. • Progress / six week look ahead monitoring with site engineers and subordinate. • January 1997 to October 2000 Company : Alex Petroleum Company (Alexandria) Contractor : TECHNIP Italy Title : Lead Electrical Engineer Project : Naphta complex project Duties &Responsibilities • Review contract / tendering documentation to ensure a thorough understanding of the relevant contract requirements liaising with planning & budgeting engineers as necessary to establish and implement systems for the section. • Preparing all the relevant documents such as method statement JSA for different activities. • Co-ordinate and controlled the work site engineers who were involved in supervision of construction work. • Ensured that the site engineers were provided with the necessary information, materials, equipments and manpower for the performance of the work according to program. • Attending internal and client progress monitoring meetings. • Coordinate safety trainings and programs with HSSE team. • Follow up for incentive Mile stone targets and achieving. • June 1995 to Dec.1996 Company : Qaroun Petroleum Company Contractor : ENPPI Title : E&I Site Engineer Project : construction of Qaroun petroleum plant. Duties &Responsibilities • In-charge of all electrical and instrumentation construction works. 7
  • 8. • Installation of control panels, transformers, and consoles. • Installation of cable ladders for power and lighting cables. • Power and control cable rout designing. • Termination of power and control cables. • Installation of cathodic protection system for pipe lines. • Installation of lighting and power activities. • In charge of Pre-commissioning activities with vendors. 8