Chapter 7 – COST Management
GSN Notes- 7 Cost Page 1 of 5
Cost Estimating - Developing an approximation (estimate) of the costs of the resources needed
to complete project activities.
Cost Budgeting - Allocating the overall cost estimate to individual work activities.
Cost Control - Controlling changes to the project budget.
Resource Planning—determining what resources (people, equipment, materials) and what
quantities of each should be used to perform project activities.
Life Cycle Costing – Broader view of Project Cost Management, which includes cost of resources
needed to complete schedule activities along with effect of decisions on cost of using,
maintaining & supporting the product, service or result of the project.
Cost Management Plan - It is created as part of the Develop Project Management Plan process.
It can establish
1. Precision Level ($100, $1000 etc)
2. Units of Measure (Staff hours/days/lump sum etc)
3. Organizational Procedure Links (Control Account, code or account number directly
linked accounting system)
4. Control thresholds (Agreed amount of variation allowed)
5. Earned Value rules (1.Computation Formula 2.Earned Value Credit Criteria 3.WBS Level)
6. Reporting Formats
7. Process descriptions (Each of the three cost management Processes)
ROM – Accuracy of project estimate will increase as it progresses, project at initial stages can
have rough order of magnitude (ROM) in the range of –50 to +100% later it will narrow to a range
of –10 to +15%.
Contingency Reserve - 1.Project (known Unknowns) – Part of Cost Baseline
2.Management (Unknown Unknowns) – Part of Cost Budget
Chart of Accounts - A chart of accounts describes the coding structure used by the performing
organization to report financial information in its general ledger.
Analogous estimating - also called top-down estimating, means using the actual cost of a
previous, similar project
Parametric modeling - mathematical model to predict project costs - per square foot of living
space
Parametric Estimation – It uses statistical relationship between historical data and other variables
to calculate cost estimate. It can produce higher levels of accuracy depending on
sophistication, resource quantity and cost data.
Bottom-up estimating - the cost of individual activities or work packages rolled up to get the
estimate for whole component.
Cost baseline - The cost baseline is a time-phased budget that will be used to measure and
monitor cost performance on the project. It is shown as an S curve.
Chapter 7 – COST Management
GSN Notes- 7 Cost Page 2 of 5
Funding Limit Reconciliation – Customer will set limits on disbursement of funds for the project.
Funding Limit Reconciliation (TT of Cost Budgeting) will necessitate the scheduling of work to be
adjusted to smooth or regulate those expenditures. It is accomplished by placing imposed date
constraints for some work packages.
Project Performance Reviews (TT of Cost Control) – 1.Variance Analysis 2.Trend Analysis 3.Earned
Value Technique
Performance Measurement Analysis (TT of Cost Control)– PV, EV, AC, ETC, CV, SV, CPI, SPI
EAC -Original estimating assumptions were fundamentally flawed, or that they are no longer
relevant to a change in conditions. Formula: EAC = AC + ETC.
Current variances are seen as atypical and the project management team expectations are
that similar variances will not occur in the future. Formula: EAC = AC + BAC – EV.
When current variances are seen as typical of future variances. Formula: EAC = AC + ((BAC –
EV)/CPI)
Project Cost
Management
Processes required to ensure that the project is completed within the approved
budget.
Benefit Cost Ratio Expected Revenues / Expected Costs. Measure benefits (payback) to costs; not
just profits. The higher the better (if rating over 1, the benefits are greater than
the costs)
Internal Rate of Return Interest Rate which makes the PV of costs equal to PV of benefits
Payback Period Number of time periods up to the point where cumulative revenues exceeds
cumulative costs. Weakness in this approach is the lack of emphasis on the
magnitude of the profitability. Does not account for time value of money nor
consider value benefits after payback.
Opportunity Cost Cost of choosing one alternative and therefore giving up the potential benefits
of another alternative: it is the value of the project not selected (lost
opportunity).
Sunk Cost Expended costs which should be ignored when making decisions about
whether to continue investing in a project
Law of Diminishing
Returns
Straight Line
Depreciation
The point beyond which the marginal addition of resources does not provide a
proportional amount of utility. Same amount each time period (e.g. 10 – 10 –
10).
Types 1. Straight Line 2. Accelerated (1. Double Declining Balance 2. Sum of
Years Digits)
Contingency Reserve Separate quantity of time/money for known unknowns. Designed to cover
specific risk events previously identified and measured in the Risk Management
Process.
Management Reserve Separate quantity of time/money for unknown unknowns
Chapter 7 – COST Management
GSN Notes- 7 Cost Page 3 of 5
Working Capital Current Assets - Current Liabilities
Value Analysis Cost reduction tool that considers whether function is really necessary and
whether it can be provided at a lower cost without degrading performance or
quality. Finding the least expensive way to do the scope of work.
Value Estimating Part of Cost Control
Value Engineering Tool Tool for analyzing a design, determining its function, and assessing how to
provide those functions cost effectively.
50-50 Rule At beginning, charge 50% of its BCWS to the account. Charge remaining at
completion.
Analogous Estimating Top down; based on similar projects. Represents a form of expert judgment.
Gives project team an understanding of management’s expectations (part of
cost budgeting and cost estimating)
Bottom-up Estimating Detailed cost estimates of work packages are aggregated. Would provide best
overall quality of the estimate.
Parametric Estimating Relies on knowledge of mathematical relationships; measured in $/unit
(scalable, quantifiable). It does not make use of team estimate. (part of cost
budgeting and cost estimating). Using a mathematical model to predict the
duration of a task (e.g. taking the average duration of all past tasks)
Regression Analysis Statistical technique graphically represented on scatter diagram
Learning Curve Mathematically models the intuitive notion that the more times we do
something, the faster we will be able to perform
Variable Costs Costs rise directly with the size and scope of the project
Fixed Costs Costs do not change; non-recurring (e.g. project setup costs)
Direct Costs Incurred directly by a specific project. The PMI want the team to participate in
the cost estimates to get their buy-in.
Indirect Costs Part of the overall organization's cost of doing business and are shared by all
projects. Usually computed as a percentage of the direct costs.
Cost accounts Represent the basic level at which project performance is measured and
reported. The purpose of cost accounts is to monitor and report on project
performance.
Cost Change Control
Systems
Includes the documentation, tracking systems, and approval levels needed to
authorize a change.
Budget updates Should be the next steps after an approved cost baseline has changed
because of a major change on a project.
Chapter 7 – COST Management
GSN Notes- 7 Cost Page 4 of 5
Operating profit Amount of money earned: Revenue – (direct + indirect costs)
Discounted cash-flow
approach
Present value method determines the net present value of all cash flow by
discounting it by the required rate of return.
Parametric modeling Involves using project characteristics (parameters) in a mathematical model to
predict project costs.
Life-Cycle Cost Provide a picture of the total cost for the product (project, operations and
maintenance).
Project Closeout (output to cost control) Process and procedures developed for the closing or
canceling of projects
Formulae
Expected Value
Present Value
Probability * Impact
FV / (1 + r)t
Cost Variance
CV
EV = BAC * (work completed/total work required)
EV – AC [BCWP – ACWP] Variance = planned – actual
Schedule Variance
SV
PV = BAC *(Total time passed /total schedule time)
EV – PV [BCWP – BCWS] (if <0; work completed is less than what was
planned)
Cost Performance Index
(CPI)
EV/AC [BCWP / ACWP] I am getting ____ out of each dollar. (>1
good; <1 bad)
Schedule Performance
Index (SPI)
EV/PV [BCWP / BCWS] I am progressing at ____% of the rate originally
planned
Estimate at Completion
(EAC)
BAC / CPI
AC+ETC (when original estimates are considered flawed)
AC+BAC-EV (when everything is OK and variance will not occur in the
future)
AC+((BAC-EV)/CPI) (when everything is OK and variance will occur in
the future)
Estimate to Completion
(ETC)
EAC - AC or (BAC - EV) / CPI
Variance at Completion
(VAR)
BAC – EAC
% Spent AC/BAC
Chapter 7 – COST Management
GSN Notes- 7 Cost Page 5 of 5
Formulae
Cost Variance in % CV/EV
Schedule Variance in % SV/PV
To Complete
Performance Index
(TCPI)
(BAC-EV)/(BAC – AC)
BCWS (PV) How much should be done? This is the performance measurement
baseline.
BCWP (EV) How much work is done? (Progress) Budgeted cost of work performed.
Value of the work completed in terms of what you budgeted (your
baseline)
ACWP (AC) How much did the “is done” work cost?
BAC Budget at Completion – How much is budgeted for the total job? BAC
would change every time there is a funded scope change approved
for activity to be performed in the future.
EAC Based on project performance and risk quantification
ETC Estimate to Complete
CPI Cumulative CPI does not change by more than 10% once a project is
approximately 20% complete. The CPI provides a quick statistical
forecast of final project costs.
EV=PV [BCWP=BCWS] EV equals PV when the project is completed.
Cost Management Plan – (from Cost Estimating) The action taken by the project manager for all
variances are described in the Cost Management Plan.
Documentation
Cost Calculations - Costs are more practical to calculate at one level higher (Control Account)
than work package level
Cost Questions
What is life cycle costing? Concept of including acquisition, operating, maintenance,
and disposal costs; total cost of ownership
Which of the following includes an
audit; Administrative Closure or
Contract Closure?
Contract Closure includes an audit.
What is "chart of accounts"? Coding structure used to report financial information in general
ledger. Code of accounts is numbering of WBS elements
What are cost accounts? They represent the basic level at which project performance is
measured and reported.

Más contenido relacionado

La actualidad más candente

Introduction to cost management &amp; control in construction projects
Introduction to cost management &amp; control in construction projectsIntroduction to cost management &amp; control in construction projects
Introduction to cost management &amp; control in construction projectsEssam Lotffy, PMP®, CCP®
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost controlGuhan M
 
Project Management 5 Cost Management
Project Management 5 Cost ManagementProject Management 5 Cost Management
Project Management 5 Cost Managementgrmkslideshare
 
Chapter 07 project cost management
Chapter 07 project cost managementChapter 07 project cost management
Chapter 07 project cost managementghizlanejabri
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementHayat Denzi
 
07.cost management updated
07.cost management updated07.cost management updated
07.cost management updatedShraddha PMP
 
Cost control monitoring and accounting
Cost control monitoring and accountingCost control monitoring and accounting
Cost control monitoring and accountingImran Amami
 
PMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost ManagementPMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost ManagementOleksandr Lutsaievskyi
 
Quality Assurance and Cost Control for Construction
Quality Assurance and Cost Control for ConstructionQuality Assurance and Cost Control for Construction
Quality Assurance and Cost Control for ConstructionRich Purtell
 
Constructiion cost estimating 2017
Constructiion cost estimating 2017Constructiion cost estimating 2017
Constructiion cost estimating 2017Peter Cholakis
 
Pm deep dive cost management
Pm deep dive   cost managementPm deep dive   cost management
Pm deep dive cost managementNiraj Agarwal
 
Cost & value management
Cost & value management Cost & value management
Cost & value management kamariya keyur
 
Cost management plan
Cost management planCost management plan
Cost management planJody R Flower
 

La actualidad más candente (20)

Introduction to cost management &amp; control in construction projects
Introduction to cost management &amp; control in construction projectsIntroduction to cost management &amp; control in construction projects
Introduction to cost management &amp; control in construction projects
 
Construction scheduling & Cost control
Construction scheduling & Cost controlConstruction scheduling & Cost control
Construction scheduling & Cost control
 
Project Management 5 Cost Management
Project Management 5 Cost ManagementProject Management 5 Cost Management
Project Management 5 Cost Management
 
Project cost management
Project cost management Project cost management
Project cost management
 
Chapter 07 project cost management
Chapter 07 project cost managementChapter 07 project cost management
Chapter 07 project cost management
 
07 project cost management
07 project cost management07 project cost management
07 project cost management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
07.cost management updated
07.cost management updated07.cost management updated
07.cost management updated
 
COST MANAGEMENT
COST MANAGEMENT COST MANAGEMENT
COST MANAGEMENT
 
Cost control monitoring and accounting
Cost control monitoring and accountingCost control monitoring and accounting
Cost control monitoring and accounting
 
Cost management
Cost managementCost management
Cost management
 
PMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost ManagementPMBoK, discussion #5: Project Cost Management
PMBoK, discussion #5: Project Cost Management
 
Quality Assurance and Cost Control for Construction
Quality Assurance and Cost Control for ConstructionQuality Assurance and Cost Control for Construction
Quality Assurance and Cost Control for Construction
 
Project cost management-slides
Project cost management-slidesProject cost management-slides
Project cost management-slides
 
Cost Control Process for Construction
Cost Control Process for ConstructionCost Control Process for Construction
Cost Control Process for Construction
 
Constructiion cost estimating 2017
Constructiion cost estimating 2017Constructiion cost estimating 2017
Constructiion cost estimating 2017
 
Pm deep dive cost management
Pm deep dive   cost managementPm deep dive   cost management
Pm deep dive cost management
 
Cost & value management
Cost & value management Cost & value management
Cost & value management
 
Cost management plan
Cost management planCost management plan
Cost management plan
 
Project Management 12
Project Management 12Project Management 12
Project Management 12
 

Similar a 7 cost PMBOK

2.07 cost management 1
2.07 cost management 12.07 cost management 1
2.07 cost management 1reddvise
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost managementejlp12
 
projectcostcontrol-130625012804-phpapp02 (1)
projectcostcontrol-130625012804-phpapp02 (1)projectcostcontrol-130625012804-phpapp02 (1)
projectcostcontrol-130625012804-phpapp02 (1)Nita Cristian
 
A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost managementImran Jamil
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost ManagementSerdar Temiz
 
L06 cost management
L06 cost managementL06 cost management
L06 cost managementAsa Chan
 
CostManagementSlides.pdf
CostManagementSlides.pdfCostManagementSlides.pdf
CostManagementSlides.pdfAmrishTyagi8
 
03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdf03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdfzohir khellouf
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptsheryl90
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptsheryl90
 
Earned Value Probabilistic Forecasting Using Monte Carlo Simulation
Earned Value Probabilistic Forecasting Using Monte Carlo SimulationEarned Value Probabilistic Forecasting Using Monte Carlo Simulation
Earned Value Probabilistic Forecasting Using Monte Carlo SimulationRicardo Viana Vargas
 
Quality metrics in project management
Quality metrics in project managementQuality metrics in project management
Quality metrics in project managementselinasimpson1601
 
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.pptProfDrAnbalaganChinn
 
Basic Concepts of Earned Value Management.pdf
Basic Concepts of Earned Value Management.pdfBasic Concepts of Earned Value Management.pdf
Basic Concepts of Earned Value Management.pdfElyes ELEBRI
 
Software Project Cost Management and estimation
Software Project Cost Management and estimationSoftware Project Cost Management and estimation
Software Project Cost Management and estimationssuser9d62d6
 
Nasa+evm+reference+card nov+2015
Nasa+evm+reference+card nov+2015Nasa+evm+reference+card nov+2015
Nasa+evm+reference+card nov+2015Dr Ezzat Mansour
 

Similar a 7 cost PMBOK (20)

2.07 cost management 1
2.07 cost management 12.07 cost management 1
2.07 cost management 1
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
PMP Training - 07 project cost management
PMP Training - 07 project cost managementPMP Training - 07 project cost management
PMP Training - 07 project cost management
 
projectcostcontrol-130625012804-phpapp02 (1)
projectcostcontrol-130625012804-phpapp02 (1)projectcostcontrol-130625012804-phpapp02 (1)
projectcostcontrol-130625012804-phpapp02 (1)
 
A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost management
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
L06 cost management
L06 cost managementL06 cost management
L06 cost management
 
CostManagementSlides.pdf
CostManagementSlides.pdfCostManagementSlides.pdf
CostManagementSlides.pdf
 
03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdf03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdf
 
Software Project Management Spm1176
Software Project Management Spm1176Software Project Management Spm1176
Software Project Management Spm1176
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.ppt
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.ppt
 
Earned Value Probabilistic Forecasting Using Monte Carlo Simulation
Earned Value Probabilistic Forecasting Using Monte Carlo SimulationEarned Value Probabilistic Forecasting Using Monte Carlo Simulation
Earned Value Probabilistic Forecasting Using Monte Carlo Simulation
 
Quality metrics in project management
Quality metrics in project managementQuality metrics in project management
Quality metrics in project management
 
EVA - Metrics.ppt
EVA - Metrics.pptEVA - Metrics.ppt
EVA - Metrics.ppt
 
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
5. PAE AcFn621 Ch-5 Execution and Monitoring.ppt
 
Cost managment
Cost managmentCost managment
Cost managment
 
Basic Concepts of Earned Value Management.pdf
Basic Concepts of Earned Value Management.pdfBasic Concepts of Earned Value Management.pdf
Basic Concepts of Earned Value Management.pdf
 
Software Project Cost Management and estimation
Software Project Cost Management and estimationSoftware Project Cost Management and estimation
Software Project Cost Management and estimation
 
Nasa+evm+reference+card nov+2015
Nasa+evm+reference+card nov+2015Nasa+evm+reference+card nov+2015
Nasa+evm+reference+card nov+2015
 

Más de Waseem Siddique (11)

Waseem siddique cv
Waseem siddique cvWaseem siddique cv
Waseem siddique cv
 
5 scope
5 scope5 scope
5 scope
 
8 quality PMBOK
8 quality PMBOK8 quality PMBOK
8 quality PMBOK
 
6 time PMBOK
6 time PMBOK6 time PMBOK
6 time PMBOK
 
9 human resource PMBOK
9 human resource PMBOK9 human resource PMBOK
9 human resource PMBOK
 
4 integration
4 integration4 integration
4 integration
 
12 procurement
12 procurement12 procurement
12 procurement
 
10 communication
10 communication10 communication
10 communication
 
11 risk management
11 risk management11 risk management
11 risk management
 
Waseem siddique Resume
Waseem siddique ResumeWaseem siddique Resume
Waseem siddique Resume
 
Waseem siddique (li)
Waseem siddique (li)Waseem siddique (li)
Waseem siddique (li)
 

Último

Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchRashtriya Kisan Manch
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsCIToolkit
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project ManagementCIToolkit
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsCIToolkit
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixCIToolkit
 
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...PROF. PAUL ALLIEU KAMARA
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingCIToolkit
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramCIToolkit
 
Chapter 1 Performance Management HRM.ppt
Chapter 1 Performance Management HRM.pptChapter 1 Performance Management HRM.ppt
Chapter 1 Performance Management HRM.ppt2020102713
 
Choosing the best strategy qspm matrix.pptx
Choosing the best strategy qspm matrix.pptxChoosing the best strategy qspm matrix.pptx
Choosing the best strategy qspm matrix.pptxMadan Karki
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionCIToolkit
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsCIToolkit
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证jdkhjh
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingGiuseppe De Simone
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Giuseppe De Simone
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsHannah Smith
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 

Último (18)

Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan ManchFarmer Representative Organization in Lucknow | Rashtriya Kisan Manch
Farmer Representative Organization in Lucknow | Rashtriya Kisan Manch
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
Measuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield MetricsMeasuring True Process Yield using Robust Yield Metrics
Measuring True Process Yield using Robust Yield Metrics
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project Management
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
 
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency MatrixUnlocking Productivity and Personal Growth through the Importance-Urgency Matrix
Unlocking Productivity and Personal Growth through the Importance-Urgency Matrix
 
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...
THE LEADERSHIP TO CHANGE THE WOLRD THIS IS YOUR HOUR PURSUES YOUR GIFT, TALEN...
 
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes ThinkingSimplifying Complexity: How the Four-Field Matrix Reshapes Thinking
Simplifying Complexity: How the Four-Field Matrix Reshapes Thinking
 
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why DiagramBeyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
Beyond the Five Whys: Exploring the Hierarchical Causes with the Why-Why Diagram
 
Chapter 1 Performance Management HRM.ppt
Chapter 1 Performance Management HRM.pptChapter 1 Performance Management HRM.ppt
Chapter 1 Performance Management HRM.ppt
 
Choosing the best strategy qspm matrix.pptx
Choosing the best strategy qspm matrix.pptxChoosing the best strategy qspm matrix.pptx
Choosing the best strategy qspm matrix.pptx
 
How-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem ResolutionHow-How Diagram: A Practical Approach to Problem Resolution
How-How Diagram: A Practical Approach to Problem Resolution
 
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement RoadmapsFrom Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
From Goals to Actions: Uncovering the Key Components of Improvement Roadmaps
 
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
原版1:1复刻密西西比大学毕业证Mississippi毕业证留信学历认证
 
Shaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful ThinkingShaping Organizational Culture Beyond Wishful Thinking
Shaping Organizational Culture Beyond Wishful Thinking
 
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
Effective learning in the Age of Hybrid Work - Agile Saturday Tallinn 2024
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 

7 cost PMBOK

  • 1. Chapter 7 – COST Management GSN Notes- 7 Cost Page 1 of 5 Cost Estimating - Developing an approximation (estimate) of the costs of the resources needed to complete project activities. Cost Budgeting - Allocating the overall cost estimate to individual work activities. Cost Control - Controlling changes to the project budget. Resource Planning—determining what resources (people, equipment, materials) and what quantities of each should be used to perform project activities. Life Cycle Costing – Broader view of Project Cost Management, which includes cost of resources needed to complete schedule activities along with effect of decisions on cost of using, maintaining & supporting the product, service or result of the project. Cost Management Plan - It is created as part of the Develop Project Management Plan process. It can establish 1. Precision Level ($100, $1000 etc) 2. Units of Measure (Staff hours/days/lump sum etc) 3. Organizational Procedure Links (Control Account, code or account number directly linked accounting system) 4. Control thresholds (Agreed amount of variation allowed) 5. Earned Value rules (1.Computation Formula 2.Earned Value Credit Criteria 3.WBS Level) 6. Reporting Formats 7. Process descriptions (Each of the three cost management Processes) ROM – Accuracy of project estimate will increase as it progresses, project at initial stages can have rough order of magnitude (ROM) in the range of –50 to +100% later it will narrow to a range of –10 to +15%. Contingency Reserve - 1.Project (known Unknowns) – Part of Cost Baseline 2.Management (Unknown Unknowns) – Part of Cost Budget Chart of Accounts - A chart of accounts describes the coding structure used by the performing organization to report financial information in its general ledger. Analogous estimating - also called top-down estimating, means using the actual cost of a previous, similar project Parametric modeling - mathematical model to predict project costs - per square foot of living space Parametric Estimation – It uses statistical relationship between historical data and other variables to calculate cost estimate. It can produce higher levels of accuracy depending on sophistication, resource quantity and cost data. Bottom-up estimating - the cost of individual activities or work packages rolled up to get the estimate for whole component. Cost baseline - The cost baseline is a time-phased budget that will be used to measure and monitor cost performance on the project. It is shown as an S curve.
  • 2. Chapter 7 – COST Management GSN Notes- 7 Cost Page 2 of 5 Funding Limit Reconciliation – Customer will set limits on disbursement of funds for the project. Funding Limit Reconciliation (TT of Cost Budgeting) will necessitate the scheduling of work to be adjusted to smooth or regulate those expenditures. It is accomplished by placing imposed date constraints for some work packages. Project Performance Reviews (TT of Cost Control) – 1.Variance Analysis 2.Trend Analysis 3.Earned Value Technique Performance Measurement Analysis (TT of Cost Control)– PV, EV, AC, ETC, CV, SV, CPI, SPI EAC -Original estimating assumptions were fundamentally flawed, or that they are no longer relevant to a change in conditions. Formula: EAC = AC + ETC. Current variances are seen as atypical and the project management team expectations are that similar variances will not occur in the future. Formula: EAC = AC + BAC – EV. When current variances are seen as typical of future variances. Formula: EAC = AC + ((BAC – EV)/CPI) Project Cost Management Processes required to ensure that the project is completed within the approved budget. Benefit Cost Ratio Expected Revenues / Expected Costs. Measure benefits (payback) to costs; not just profits. The higher the better (if rating over 1, the benefits are greater than the costs) Internal Rate of Return Interest Rate which makes the PV of costs equal to PV of benefits Payback Period Number of time periods up to the point where cumulative revenues exceeds cumulative costs. Weakness in this approach is the lack of emphasis on the magnitude of the profitability. Does not account for time value of money nor consider value benefits after payback. Opportunity Cost Cost of choosing one alternative and therefore giving up the potential benefits of another alternative: it is the value of the project not selected (lost opportunity). Sunk Cost Expended costs which should be ignored when making decisions about whether to continue investing in a project Law of Diminishing Returns Straight Line Depreciation The point beyond which the marginal addition of resources does not provide a proportional amount of utility. Same amount each time period (e.g. 10 – 10 – 10). Types 1. Straight Line 2. Accelerated (1. Double Declining Balance 2. Sum of Years Digits) Contingency Reserve Separate quantity of time/money for known unknowns. Designed to cover specific risk events previously identified and measured in the Risk Management Process. Management Reserve Separate quantity of time/money for unknown unknowns
  • 3. Chapter 7 – COST Management GSN Notes- 7 Cost Page 3 of 5 Working Capital Current Assets - Current Liabilities Value Analysis Cost reduction tool that considers whether function is really necessary and whether it can be provided at a lower cost without degrading performance or quality. Finding the least expensive way to do the scope of work. Value Estimating Part of Cost Control Value Engineering Tool Tool for analyzing a design, determining its function, and assessing how to provide those functions cost effectively. 50-50 Rule At beginning, charge 50% of its BCWS to the account. Charge remaining at completion. Analogous Estimating Top down; based on similar projects. Represents a form of expert judgment. Gives project team an understanding of management’s expectations (part of cost budgeting and cost estimating) Bottom-up Estimating Detailed cost estimates of work packages are aggregated. Would provide best overall quality of the estimate. Parametric Estimating Relies on knowledge of mathematical relationships; measured in $/unit (scalable, quantifiable). It does not make use of team estimate. (part of cost budgeting and cost estimating). Using a mathematical model to predict the duration of a task (e.g. taking the average duration of all past tasks) Regression Analysis Statistical technique graphically represented on scatter diagram Learning Curve Mathematically models the intuitive notion that the more times we do something, the faster we will be able to perform Variable Costs Costs rise directly with the size and scope of the project Fixed Costs Costs do not change; non-recurring (e.g. project setup costs) Direct Costs Incurred directly by a specific project. The PMI want the team to participate in the cost estimates to get their buy-in. Indirect Costs Part of the overall organization's cost of doing business and are shared by all projects. Usually computed as a percentage of the direct costs. Cost accounts Represent the basic level at which project performance is measured and reported. The purpose of cost accounts is to monitor and report on project performance. Cost Change Control Systems Includes the documentation, tracking systems, and approval levels needed to authorize a change. Budget updates Should be the next steps after an approved cost baseline has changed because of a major change on a project.
  • 4. Chapter 7 – COST Management GSN Notes- 7 Cost Page 4 of 5 Operating profit Amount of money earned: Revenue – (direct + indirect costs) Discounted cash-flow approach Present value method determines the net present value of all cash flow by discounting it by the required rate of return. Parametric modeling Involves using project characteristics (parameters) in a mathematical model to predict project costs. Life-Cycle Cost Provide a picture of the total cost for the product (project, operations and maintenance). Project Closeout (output to cost control) Process and procedures developed for the closing or canceling of projects Formulae Expected Value Present Value Probability * Impact FV / (1 + r)t Cost Variance CV EV = BAC * (work completed/total work required) EV – AC [BCWP – ACWP] Variance = planned – actual Schedule Variance SV PV = BAC *(Total time passed /total schedule time) EV – PV [BCWP – BCWS] (if <0; work completed is less than what was planned) Cost Performance Index (CPI) EV/AC [BCWP / ACWP] I am getting ____ out of each dollar. (>1 good; <1 bad) Schedule Performance Index (SPI) EV/PV [BCWP / BCWS] I am progressing at ____% of the rate originally planned Estimate at Completion (EAC) BAC / CPI AC+ETC (when original estimates are considered flawed) AC+BAC-EV (when everything is OK and variance will not occur in the future) AC+((BAC-EV)/CPI) (when everything is OK and variance will occur in the future) Estimate to Completion (ETC) EAC - AC or (BAC - EV) / CPI Variance at Completion (VAR) BAC – EAC % Spent AC/BAC
  • 5. Chapter 7 – COST Management GSN Notes- 7 Cost Page 5 of 5 Formulae Cost Variance in % CV/EV Schedule Variance in % SV/PV To Complete Performance Index (TCPI) (BAC-EV)/(BAC – AC) BCWS (PV) How much should be done? This is the performance measurement baseline. BCWP (EV) How much work is done? (Progress) Budgeted cost of work performed. Value of the work completed in terms of what you budgeted (your baseline) ACWP (AC) How much did the “is done” work cost? BAC Budget at Completion – How much is budgeted for the total job? BAC would change every time there is a funded scope change approved for activity to be performed in the future. EAC Based on project performance and risk quantification ETC Estimate to Complete CPI Cumulative CPI does not change by more than 10% once a project is approximately 20% complete. The CPI provides a quick statistical forecast of final project costs. EV=PV [BCWP=BCWS] EV equals PV when the project is completed. Cost Management Plan – (from Cost Estimating) The action taken by the project manager for all variances are described in the Cost Management Plan. Documentation Cost Calculations - Costs are more practical to calculate at one level higher (Control Account) than work package level Cost Questions What is life cycle costing? Concept of including acquisition, operating, maintenance, and disposal costs; total cost of ownership Which of the following includes an audit; Administrative Closure or Contract Closure? Contract Closure includes an audit. What is "chart of accounts"? Coding structure used to report financial information in general ledger. Code of accounts is numbering of WBS elements What are cost accounts? They represent the basic level at which project performance is measured and reported.