SlideShare una empresa de Scribd logo
1 de 48
Supplementary Training Modules on
         Good Manufacturing Practice




                                               Validation



                                                            WHO Technical Report Series,
                                                              No. 937, 2006. Annex 4.


Validation   |   Slide 1 of 48   August 2006
Validation

        Part 1. General overview on qualification and validation

        Part 2. Qualification of HVAC and water systems

        Part 3. Cleaning validation

        Part 4. Analytical method validation

        Part 5. Computerized system validation

        Part 6. Qualification of systems and equipment

        Part 7. Non sterile product process validation


Validation   |   Slide 2 of 48   August 2006
Supplementary Training Modules on
            Good Manufacturing Practice



                                 Qualification of HVAC
                                  and water systems

                                                 Part 2
                                                     WHO Technical Report Series, No. 937,
                                                       2006. Annex 4. Appendix 1 and 2


Validation   |   Slide 3 of 48     August 2006
HVAC

                                                  Objectives

       To understand key issues in
          – commissioning,
          – qualification and
          – maintenance of

                                 HVAC and Water systems
                                                               8.



Validation   |   Slide 4 of 48      August 2006
HVAC
  Documentation requirements to assist in commissioning,
   qualification and maintenance
                 Description of design, installation and functions
                 Specifications, requirements
                 Manuals
                 Operating procedures
                 Instructions for performance control, monitoring and records
                 Maintenance instructions and records
                 Training of personnel
                  ―     programme and records

Validation   |     Slide 5 of 48   August 2006
HVAC

                                          Commissioning
        Precursor to qualification

        Includes setting up, balancing, adjustment and testing of entire
         HVAC system to ensure it meets requirements in URS and
         capacity

        Acceptable tolerances for parameters

        Training of personnel


                                                            8.1.1, 8.1.4, 8.1.5


Validation   |   Slide 6 of 48   August 2006
HVAC

                                      Commissioning (2)
       Records and data maintained include:

        Installation records – documented evidence of measure
         capacities of the system

        Data: design and measurement for, e.g. air flow, system
         pressures

        O&M manuals, schematic drawings, protocols, reports

                                                          8.1.2, 8.1.3, 8.1.6


Validation   |   Slide 7 of 48   August 2006
HVAC

                                               Qualification
        Validation is an extensive exercise

        Qualification of the HVAC system is one component in the
         overall approach that covers premises, systems/utilities,
         equipment, processes, etc.

        See also full guidelines on "Validation" in WHO TRS, No. 937,
         2005, Annex 4

        Risk based approach for HVAC qualification
                                                               8.2.1


Validation   |   Slide 8 of 48   August 2006
HVAC

                                          Qualification (2)

        Described in a Validation Master Plan (VMP)

        VMP to include the nature and extent of tests, and protocols

        DQ, IQ, OQ, and PQ

        Risk analysis to determine critical and non-critical parameters,
         components, subsystems and controls


                                                               8.2.2 – 8.2.5


Validation   |   Slide 9 of 48   August 2006
HVAC

                                          Qualification (3)
        Direct impact components and critical parameters should be
         included

        Non-critical systems and components are subjected to Good
         Engineering Practices (GEP)

        Acceptance criteria and limits defined in design stage

        Design conditions, normal operating ranges, operating
         ranges, alert and action limits
                                                              8.2.5 – 8.2.11

Validation   |   Slide 10 of 48   August 2006
HVAC
 Design                           A C T IO N L IM IT                                                                                                                        A C T IO N L IM IT
  conditions                                            A L E R T L IM IT                                                                                A L E R T L IM IT
  and normal
  operating
  ranges set to
  achievable
  limits

 OOS results                                                                                          D e s ig n C o n d itio n

  recorded
                                                                                                N o r m a l O p e r a tin g R a n g e


                                                                            O p e r a tin g R a n g e - V a lid a te d A c c e p ta n c e C r ite r ia
   8.2.12 – 8.2.15


 Validation   |   Slide 11 of 48         August 2006
HVAC
       Qualification – examples of aspects to consider
        DQ – Design of the system, URS

                 – (e.g. components, type of air treatment needed, materials
                   of construction)
        IQ – Verify installation
                 – E.g. relevant components, ducting, filters, controls,
                   monitors, sensors, etc.
                 – Includes calibration where relevant



Validation   |   Slide 12 of 48   August 2006
HVAC

                                          Qualification (4)
       Typical parameters to be included in qualification (based on risk
         assessment):
        Temperature
        Relative humidity
        Supply, return and exhaust air quantities
        Room air change rates
        Room pressures (pressure differentials)
                                                                 8.2.17

Validation   |   Slide 13 of 48   August 2006
HVAC

                                          Qualification (5)
       Typical parameters to be included in qualification (based on risk
         assessment) (2):
        Room clean-up rate
        Particulate matter, microbial matter (viable and non-viable)
        HEPA filter penetration tests
        Containment system velocity
        Warning/alarm systems
                                                                   8.2.17

Validation   |   Slide 14 of 48   August 2006
HVAC

                                          Qualification (6)
       Conduct of the tests:
        Time intervals and procedure to be defined by the manufacturer

        Influenced by the type of facility and level of protection

        See also ISO 14644 for methods of testing

        Requalification, and change control


                                                              8.2.18 – 8.2.20, 8.2.9



Validation   |   Slide 15 of 48   August 2006
HVAC

                                        Qualification (7)

        Tests performed according to protocols and procedures for
         the tests

        Results recorded and presented in report (source data kept)

        Traceability, e.g. devices and standards used, calibration
         records; and conditions specified




Validation   |   Slide 16 of 48   August 2006
HVAC
        Schedule of tests to demonstrate continuing compliance
Test Parameter                    Objective              Maximum time          Test procedure*
                                                         interval              and key aspects
Particle count test               Verifies cleanliness   6 months or 12        Particle counter.
                                                         months depending on   Readings and
                                                         Class                 positions
Air pressure                      Absence of cross-      12 months             Measure pressure
difference                        contamination                                difference
Airflow volume                    Verify air change      12 months             Measure supply and
                                  rates                                        return air, calculate
                                                                               air change rate
Airflow velocity                  Verify unidirectional 12 months              Velocity
                                  airflow and or                               measurement
                                  containment condition
                                                                                        8. Table 3
        *Test procedure as per ISO 14644
Validation   |   Slide 17 of 48       August 2006
HVAC
        Recommended optional strategic tests
Test Parameter                    Objective                 Maximum time   Test procedure*
                                                            interval       and key aspects
Filter leakage                    Verify filter integrity   12 months      Filter media and filter
                                                                           seal integrity
Containment leakage               Verify absence of         12 months      Airflow direction and
                                  cross-contamination                      pressure differential
Recovery (time)                   Verify clean-up time      12 months      Time taken maximum
                                                                           15 minutes

Airflow visualization             Verify required airflow 12 months        Airflow direction,
                                  patterns                                 documented evidence


        *Test procedure as per ISO 14644
                                                                                     8. Table 3

Validation   |   Slide 18 of 48       August 2006
HVAC
    Cleanroom monitoring programme (1)
       Routine monitoring programme as part of quality assurance
       Additional monitoring and triggers, e.g.
                 1. Shutdown
                 2. Replacement of filter elements
                 3. Maintenance of air-handling systems
                 4. Exceeding of established limits




Validation   |    Slide 19 of 48   August 2006
HVAC
   Cleanroom monitoring programme (2)
      Particles and Microbiological
      contaminants
             Number of points/locations for monitoring determined,
             specified, documented in procedure and or protocol
             Sufficient time for exposure, and suitable sample size
             Identification and marking of sampling points
             Definition of transport, storage, and incubation conditions
             Results to reflect the procedure/protocol followed
             Define alert and action limits as a function of cleanliness
             zone/class                                        See also ISO 14644


Validation   |   Slide 20 of 48   August 2006
HVAC

Cleanroom monitoring programme (3)
 Cleanrooms should be monitored for microorganisms and
 particles
                                                            air




                              Example of a sampling point

Validation   |   Slide 21 of 48        August 2006
HVAC

                                  Definition of Conditions

             as built                            at rest     in operation
                  air                              air            air




Validation   |   Slide 22 of 48    August 2006
HVAC
       Qualification – examples of aspects to consider in
                     qualification (OQ, PQ)
                                           Uni-directional   Turbulent / mixed
Test                                                                                                Description
                                            airflow / LAF        airflow


Differential pressure on filters       2                     2

Room differential pressure             N/A                   2, 3                1 := As built (ideally used to perform IQ)
                                                                                 2 = At rest (ideally used to perform OQ)
Airflow velocity / uniformity          2, 3                  Optional
                                                                                 3 = Operational (ideally used to perform PQ)
Airflow volume / rate                  2                     2

Parallelism                            2                     N/A

Airflow pattern                        2                     3




   Validation     |   Slide 23 of 48   August 2006
HVAC

    Qualification – examples of aspects to consider in
                  qualification (OQ, PQ)


                                                 Uni-directional        Turbulent /
 Test                                                                                                    Description
                                                  airflow / LAF        mixed airflow
 Recovery time                               N/A                   2                   1 := As built (ideally used to perform IQ)
 Room classification (airborne particle)     2                     2,3                 2 = At rest (ideally used to perform OQ)

 Temperature, humidity                       N/A                   2,3                 3 = Operational (ideally used to perform PQ)




Validation   |   Slide 24 of 48            August 2006
HVAC

       Maintenance
        Procedure, programme and records for planned, preventative
         maintenance
           – e.g. Cleaning of filters, calibration of devices

        Appropriate training for personnel

        Change of HEPA filters by suitably trained persons

        Impact of maintenance on:
           – Product quality
                                                              8.3.1 – 8.3.5
           – Qualification

Validation   |   Slide 25 of 48   August 2006
HVAC
       Inspecting the air-handling system
                 Verification of design documentation, including
                       description of installation and functions
                       specification of the requirements
                 Operating procedures
                 Maintenance instructions
                 Maintenance records
                 Training logs
                 Environmental records
                 Discussion on actions if OOS values
                 On site verification (walking around the site)
Validation   |     Slide 26 of 48   August 2006
HVAC

                                                  Conclusion

             Air-handling systems:
                  Play a major role in the quality of pharmaceuticals
                  Should be designed properly, by professionals
                  Should be treated as a critical system




Validation    |    Slide 27 of 48   August 2006
HVAC

                  Further proceedings

     This series of explanations will now be followed by:

             Group discussion, with a simple exercise
             Short test




Validation    |    Slide 28 of 48   August 2006
HVAC
                                                                                                         Group Session
                                                             S a m p lin g
                                                                Rooom                                                                                    S e rv i c e C o rrid o r
                                                                                                                                     ( c o n t a in s V a c u u m & R O w a t e r s u p p ly )
                              A ir S h o w e r



                                  W a re h o u se
                                                                     A ir L o c k 2               W e ig h in g                        T a b le t 1                                    T a b le t 2             L iq u id s M ix         S o ftg e l C a p su le
                                                                                                                                                                                                                                               P a c kin g
             A / Lock 1




                                                                                                                  C le a n C o rrid o r
                                                                                                                                                                                                                                                               E m ergenc y
                                                                                                                                                                                                                                                                              E x it



                                                                                                                                                M a le                                            F e m a le
                                                                                                                     2 S ta g e               Change 2                                           Change 2
                                                                                      S te ril e e y e d ro p s    p e rso n n e l                                                                                                 P ri m a ry & S e c o n d a ry
                                                                                          d isp e n sin g            e n try fo r                                                                                P a c ke d
                                                                                                                                                                                                                                             P a c kin g
                                                                                       & a c e p tic fillin g       e y e d ro p s                                                                                G oods
                                                    A ir L o c k 3
                                                                                                                                                                                                               Q u a ra n tin e

                                                                                                                                                M a le                                            F e m a le
                                                                                                                                              Change 1                                           Change 1
                  E q u ip m e n t W a sh                                                                                                                                                                       A ir L o c k 4
                                                                                                                                                                                                                                    S e rv ic e R o o m




Validation                |      Slide 29 of 48                                       August 2006
HVAC
                                                                           Group Session – modified layout
                                                       20P a           S a m p lin g
                                                                          Rooom                                       0P a                                          S e rv ic e C o rrid o r
                                                                             30P a                                                              ( c o n t a in s V a c u u m & R O w a t e r s u p p ly )
                              A ir S h o w e r
                                                                             20P a                                                                                                                                                                                           30P a
                                          10P a
                                                                                          W e ig h                    P o st
                                                                                           B o o th                 S ta g in g                                                                                                                                     S o ftg e l C a p su le
                                     W a re h o u se
                                                                                            20P a                     30P a                       T a b le t 1                                       T a b le t 2            L iq u id s M ix                             P a c kin g
                                                                              M AL 2                                                                    15P a                                          15P a                      30P a
             0P a
                                                                                                                                                                                                                                                                              A ir L o c k
              M A L1




                                                                                                                                                                                                                                                                                                       15P a


                                                                                                                                      30P a

                                                                                                                              C l e a n C o rri d o r
                                                                                                                                                                                                                                                                                              E m ergenc y
                                                                                                                                                                                                                                                                                                             E x it

                                                                                                                                                                20P a                                           20P a
                                                                                                                                  PAL
                                                                                                                                        40P a              M a le                                            F e m a le          10P a
                                                               M AL 3                                                                                    Change 2                                           Change 2                             S e c o n d a ry                    P rim a ry
                                                                                        S te ril e e y e d ro p s                                                                                                                                  P a c kin g                       P a c kin g
                                                               40P a                        d isp e n sin g                                                                                                                   P a c ke d
                                                                                        & a sc e p tic fillin g                                                                                                                G oods
                                                                                                                                                                                                                            Q u a ra n ti n e         20P a                           30P a
                                                                                                                                                        10P a                                                       10P a
                                                                                                    60P a
                                                                                                                                  Change                   M a le                                            F e m a le
                             15P a                             M AL 4
                                                                                                                                    50P a                Change 1                                           Change 1
                    E q u ip m e n t W a sh                    50P a                                                                                                                                                         A ir L o c k 4
                                                                                                                                                                                                                                                              S e rv ic e R o o m               0P a
                                                                                                                                                                                                                                          0P a


                                                                                                                                                                                              0P a
         MAL = Material Air Lock
         PAL = Personnel Air Lock
Validation             |             Slide 30 of 48                                    August 2006
Supplementary Training Modules on
                Good Manufacturing Practice
                                                 Commissioning,
                                                 Qualification and
                                                validation of Water
                                                     systems




                                                    WHO Technical Report Series
                                                      No 929, 2005. Annex 3


Validation   |   Slide 31 of 48   August 2006
HVAC

                                                Objectives

        To understand key issues in
           – commissioning,
           – qualification and
           – maintenance of

                              HVAC and Water systems
                                                             7.



Validation   |   Slide 32 of 48   August 2006
Water for Pharmaceutical Use

                                                Objectives
        To discuss the operational considerations of water systems
          including:

             Start up, commissioning and qualification

             Monitoring

             Maintenance

             System reviews
                                                             7.


Validation   |   Slide 33 of 48   August 2006
Water for Pharmaceutical Use

      Start up and commissioning

       Precursor to qualification and validation
       Should be planned, well defined, well documented
       Includes setting to work
       Includes system set-up
       Includes recording of system performance parameters
       Controls loop tuning
                                                              7.1


Validation   |   Slide 34 of 48   August 2006
Water for Pharmaceutical Use

      Qualification
       WPU systems are "direct impact systems"

       Therefore stages to be considered in qualification should
        include DQ, IQ, OQ, PQ

       DQ: Design review influenced by source water and required
        water quality

       IQ: Installation verification of the system

                                                                    7.2


Validation   |   Slide 35 of 48   August 2006
Water for Pharmaceutical Use

      Qualification

       OQ: operational qualification

       Presentation focusing on PQ

       PQ demonstrates consistent and reliable performance of the
        system

       Three phase approach recommended over extended period –
        proves reliability and robustness
                                                              7.2


Validation   |   Slide 36 of 48   August 2006
Water for Pharmaceutical Use

      Phase 1 (1)
       A test period of 2–4 weeks - monitoring the system intensively

       System to operate continuously without failure or performance
        deviation

      The following should be included in the testing approach:

       Undertake chemical and microbiological testing in accordance
        with a defined plan

                                                                   7.2


Validation   |   Slide 37 of 48   August 2006
Water for Pharmaceutical Use

      Phase 1 (2)
       Sample daily:
          – incoming feed-water
          – after each step in the purification process
          – each point of use and at other defined sample points

       Develop:
          – appropriate operating ranges
          – and finalize operating, cleaning, sanitizing and maintenance
            procedures
                                                                   7.2


Validation   |   Slide 38 of 48   August 2006
Water for Pharmaceutical Use

      Phase 1 (3)
       Demonstrate production and delivery of product water of the
        required quality and quantity

       Use and refine the standard operating procedures (SOPs) for
        operation, maintenance, sanitization and troubleshooting

       Verify provisional alert and action levels

       Develop and refine test-failure procedure


                                                                 7.2

Validation   |   Slide 39 of 48   August 2006
Water for Pharmaceutical Use

      Phase 2 (1)
       A further test period of 2–4 weeks – further intensive monitoring
        the system

       Deploying all the refined SOPs after the satisfactory completion
        of phase 1

       Sampling scheme generally the same as in phase 1

       Water can be used for manufacturing purposes during this phase

                                                                   7.2


Validation   |   Slide 40 of 48   August 2006
Water for Pharmaceutical Use

      Phase 2 (2)

      Demonstrate:
       Consistent operation within established ranges

       Consistent production and delivery of water of the required
        quantity and quality when the system is operated in accordance
        with the SOPs.



                                                                 7.2


Validation   |   Slide 41 of 48   August 2006
Water for Pharmaceutical Use

    Phase 3
     Over one year after the satisfactory completion of phase 2

     Water can be used for manufacturing purposes during this phase

    Demonstrate:
       – extended reliable performance
       – that seasonal variations are evaluated

     Sample locations, sampling frequencies and tests should be
      reduced to the normal routine pattern based on established
      procedures proven during phases 1 and 2                   7.2

Validation   |   Slide 42 of 48   August 2006
Water for Pharmaceutical Use

      Ongoing system monitoring
       After Phase 3 – system review needed

       Based on review including results, establish a routine monitoring
        plan

       Monitoring to include a combination of on-line monitoring and off-
        line sample testing

       Data analysed for trends

                                                                   7.3


Validation   |   Slide 43 of 48   August 2006
Water for Pharmaceutical Use

      Ongoing system monitoring (2)

       Monitoring parameters to include:
         – flow, pressure, temperature, conductivity, TOC

       Samples taken:
         – From points of use, and specific sample points
         – In a similar way how water is used in service

       Tests to include physical, chemical and microbial attributes

                                                                   7.3

Validation   |   Slide 44 of 48   August 2006
Water for Pharmaceutical Use

     Maintenance

     A controlled, documented maintenance programme
       covering:
      Defined frequency with plan and instructions

      Calibration programme

      SOPs for tasks

      Control of approved spares
                                                               7.4
      Record and review of problems and faults during maintenance
Validation   |   Slide 45 of 48   August 2006
Water for Pharmaceutical Use

      System review

       WPU (PW, HPW and WFI) systems to be reviewed at
        appropriate regular intervals
       Review team includes engineering, QA, operations and
        maintenance




                                                          7.5


Validation   |   Slide 46 of 48   August 2006
Water for Pharmaceutical Use
      System review (2)
       The review to cover, e.g.
         – changes made since the last review;
         – system performance;
         – reliability;
         – quality trends;
         – failure events;
         – investigations;
         – out-of-specifications results from monitoring;
         – changes to the installation;
         – updated installation documentation;
         – log books; and
         – the status of the current SOP lists              7.5

Validation   |   Slide 47 of 48   August 2006
Validation


              Group session




Validation    |   Slide 48 of 48   August 2006

Más contenido relacionado

La actualidad más candente

Auditing of sterile poduction
Auditing of sterile poductionAuditing of sterile poduction
Auditing of sterile poductionprakhar rai pk
 
QUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSQUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSANKUSH JADHAV
 
Auditing of Granulation Operation in Dry Production Area
Auditing of Granulation Operation in Dry Production AreaAuditing of Granulation Operation in Dry Production Area
Auditing of Granulation Operation in Dry Production AreaPritam Kolge
 
Six system inspection model
Six system inspection modelSix system inspection model
Six system inspection modelVaishali Dandge
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production departmentArpitSuralkar
 
Revised Process Validation
Revised  Process ValidationRevised  Process Validation
Revised Process Validationpharmaakd
 
Statistical process control
Statistical process controlStatistical process control
Statistical process controlsandesh shah
 
Qualification of Dry Heat Sterilizer or Tunnel.pptx
Qualification of Dry Heat Sterilizer or Tunnel.pptxQualification of Dry Heat Sterilizer or Tunnel.pptx
Qualification of Dry Heat Sterilizer or Tunnel.pptxDhruvi50
 
Process valiadtion
Process valiadtionProcess valiadtion
Process valiadtionSagar Savale
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production departmentPRANJAY PATIL
 
Advance non – sterile solid product manufacturing technology
Advance non – sterile solid product manufacturing technologyAdvance non – sterile solid product manufacturing technology
Advance non – sterile solid product manufacturing technologyAbhishekJadhav189260
 
Auditing of microbiological lab
Auditing of microbiological lab Auditing of microbiological lab
Auditing of microbiological lab KhushbooKunkulol
 
Role of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceuticalRole of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceuticalganpat420
 
Audit of vendors and Production department
Audit of vendors and Production department Audit of vendors and Production department
Audit of vendors and Production department PUNEET NIRMAL
 

La actualidad más candente (20)

Auditing of sterile poduction
Auditing of sterile poductionAuditing of sterile poduction
Auditing of sterile poduction
 
QUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTSQUALIFICATION OF MANUFACTURING EQUIPMENTS
QUALIFICATION OF MANUFACTURING EQUIPMENTS
 
Auditing of Granulation Operation in Dry Production Area
Auditing of Granulation Operation in Dry Production AreaAuditing of Granulation Operation in Dry Production Area
Auditing of Granulation Operation in Dry Production Area
 
Vendor qualification
Vendor qualification Vendor qualification
Vendor qualification
 
Six system inspection model
Six system inspection modelSix system inspection model
Six system inspection model
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production department
 
Revised Process Validation
Revised  Process ValidationRevised  Process Validation
Revised Process Validation
 
Statistical process control
Statistical process controlStatistical process control
Statistical process control
 
Pharmaceutical validation of water system
Pharmaceutical validation of  water system Pharmaceutical validation of  water system
Pharmaceutical validation of water system
 
Qualification of Dry Heat Sterilizer or Tunnel.pptx
Qualification of Dry Heat Sterilizer or Tunnel.pptxQualification of Dry Heat Sterilizer or Tunnel.pptx
Qualification of Dry Heat Sterilizer or Tunnel.pptx
 
Ipqc presentation
Ipqc presentationIpqc presentation
Ipqc presentation
 
Qualification of Weights and Measures
Qualification of Weights and MeasuresQualification of Weights and Measures
Qualification of Weights and Measures
 
Process valiadtion
Process valiadtionProcess valiadtion
Process valiadtion
 
Auditing of vendors and production department
Auditing of vendors and production departmentAuditing of vendors and production department
Auditing of vendors and production department
 
Advance non – sterile solid product manufacturing technology
Advance non – sterile solid product manufacturing technologyAdvance non – sterile solid product manufacturing technology
Advance non – sterile solid product manufacturing technology
 
Auditing of microbiological lab
Auditing of microbiological lab Auditing of microbiological lab
Auditing of microbiological lab
 
Role of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceuticalRole of quality system and audits in pharmamaceutical
Role of quality system and audits in pharmamaceutical
 
Audit of vendors and Production department
Audit of vendors and Production department Audit of vendors and Production department
Audit of vendors and Production department
 
Process Validation for Beginners - FDA - EMA Approach
Process Validation for Beginners - FDA - EMA ApproachProcess Validation for Beginners - FDA - EMA Approach
Process Validation for Beginners - FDA - EMA Approach
 
calulation of yields, production record review,change control
calulation of yields, production record review,change control calulation of yields, production record review,change control
calulation of yields, production record review,change control
 

Destacado

Process Validation Master Planning DMAIC Fusion
Process Validation Master Planning DMAIC FusionProcess Validation Master Planning DMAIC Fusion
Process Validation Master Planning DMAIC FusionGENEO
 
Validation of water
Validation of waterValidation of water
Validation of wateranilak123
 
Equipment validation of fbd
Equipment validation of fbdEquipment validation of fbd
Equipment validation of fbdpriyanka odela
 
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...Palash Das
 
Validation of solid oral dosage form, tablet 1
Validation of solid oral dosage form, tablet 1Validation of solid oral dosage form, tablet 1
Validation of solid oral dosage form, tablet 1Jamia Hamdard
 
Validation of Heat ventilation air conditioning
Validation of Heat ventilation air conditioningValidation of Heat ventilation air conditioning
Validation of Heat ventilation air conditioningPrashant Tomar
 
Assessment of Student Learning 2: Rubrics
Assessment of Student Learning 2: RubricsAssessment of Student Learning 2: Rubrics
Assessment of Student Learning 2: RubricsAlyssa Denise Valino
 
Concept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQConcept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQdhavalrock24
 
Validation of hvac
Validation of hvacValidation of hvac
Validation of hvacK Manivannan
 
Hvac presentation for beginers
Hvac presentation for beginersHvac presentation for beginers
Hvac presentation for beginersguestf11b52
 

Destacado (20)

Validation Part3
Validation Part3Validation Part3
Validation Part3
 
PROCESS VALIDATION
PROCESS VALIDATIONPROCESS VALIDATION
PROCESS VALIDATION
 
Process Validation Master Planning DMAIC Fusion
Process Validation Master Planning DMAIC FusionProcess Validation Master Planning DMAIC Fusion
Process Validation Master Planning DMAIC Fusion
 
Hvac part 3
Hvac part 3Hvac part 3
Hvac part 3
 
Validation of water
Validation of waterValidation of water
Validation of water
 
Water for Pharmaceutical Purposes - New USP Requriements
Water for Pharmaceutical Purposes - New USP  RequriementsWater for Pharmaceutical Purposes - New USP  Requriements
Water for Pharmaceutical Purposes - New USP Requriements
 
Hvac manpreet singh naroo
Hvac  manpreet singh narooHvac  manpreet singh naroo
Hvac manpreet singh naroo
 
Tài liệu (Phần 3) | Hệ thống HVAC
Tài liệu (Phần 3) | Hệ thống HVAC Tài liệu (Phần 3) | Hệ thống HVAC
Tài liệu (Phần 3) | Hệ thống HVAC
 
Equipment validation of fbd
Equipment validation of fbdEquipment validation of fbd
Equipment validation of fbd
 
WHO Guidance on HVAC Systems for Non Sterile Pharmaceuticals
WHO Guidance on HVAC  Systems for Non Sterile PharmaceuticalsWHO Guidance on HVAC  Systems for Non Sterile Pharmaceuticals
WHO Guidance on HVAC Systems for Non Sterile Pharmaceuticals
 
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
Pharmaceutical HVAC (Heating, ventilating, and air conditioning; also heating...
 
Validation of solid oral dosage form, tablet 1
Validation of solid oral dosage form, tablet 1Validation of solid oral dosage form, tablet 1
Validation of solid oral dosage form, tablet 1
 
Pharmaceutical Process validation
Pharmaceutical Process validationPharmaceutical Process validation
Pharmaceutical Process validation
 
Validation of Heat ventilation air conditioning
Validation of Heat ventilation air conditioningValidation of Heat ventilation air conditioning
Validation of Heat ventilation air conditioning
 
Assessment of Student Learning 2: Rubrics
Assessment of Student Learning 2: RubricsAssessment of Student Learning 2: Rubrics
Assessment of Student Learning 2: Rubrics
 
K to 12 Mechanical Drafting Learning Module
K to 12 Mechanical Drafting Learning ModuleK to 12 Mechanical Drafting Learning Module
K to 12 Mechanical Drafting Learning Module
 
Rubrics ppt
Rubrics pptRubrics ppt
Rubrics ppt
 
Concept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQConcept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQ
 
Validation of hvac
Validation of hvacValidation of hvac
Validation of hvac
 
Hvac presentation for beginers
Hvac presentation for beginersHvac presentation for beginers
Hvac presentation for beginers
 

Similar a GMP Training Modules HVAC Systems

Heating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC QualificationHeating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC QualificationMayur Unde
 
HVAC qualification .ppt
HVAC qualification .pptHVAC qualification .ppt
HVAC qualification .pptEesha Bhatty
 
Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Apoorva Bauskar
 
Equipment Qualification.pptx
Equipment Qualification.pptxEquipment Qualification.pptx
Equipment Qualification.pptxNeeraj Kumar Rai
 
WHO guideline on Validation .pdf
WHO guideline on Validation .pdfWHO guideline on Validation .pdf
WHO guideline on Validation .pdfHassanHani5
 
PIC/S Guide to GMP PE009-13 - Key changes to Annex 15 - Qualification and val...
PIC/S Guide to GMP PE009-13 - Key changes to Annex 15 - Qualification and val...PIC/S Guide to GMP PE009-13 - Key changes to Annex 15 - Qualification and val...
PIC/S Guide to GMP PE009-13 - Key changes to Annex 15 - Qualification and val...TGA Australia
 
Principle of Validation and Qualification
Principle of Validation and QualificationPrinciple of Validation and Qualification
Principle of Validation and QualificationPharmaguideline
 
validationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfvalidationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfabdo badr
 
Validation master plan
Validation master planValidation master plan
Validation master planDr. Amsavel A
 
ICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptx
ICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptxICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptx
ICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptxABG
 
Cleanroom Qualification
Cleanroom QualificationCleanroom Qualification
Cleanroom QualificationAnwar Munjewar
 
Phụ lục 5. Hướng dẫn chuẩn bị hệ thống HVAC cho các sản phẩm thuộc dạng bào c...
Phụ lục 5. Hướng dẫn chuẩn bị hệ thống HVAC cho các sản phẩm thuộc dạng bào c...Phụ lục 5. Hướng dẫn chuẩn bị hệ thống HVAC cho các sản phẩm thuộc dạng bào c...
Phụ lục 5. Hướng dẫn chuẩn bị hệ thống HVAC cho các sản phẩm thuộc dạng bào c...Công ty Cổ phần Tư vấn Thiết kế GMP EU
 
Calibration of MMDs to meet QMS
Calibration of MMDs to meet QMSCalibration of MMDs to meet QMS
Calibration of MMDs to meet QMSAmsavel Vel
 

Similar a GMP Training Modules HVAC Systems (20)

Validation Part6
Validation Part6Validation Part6
Validation Part6
 
Heating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC QualificationHeating Ventilation and Air Conditioner HVAC Qualification
Heating Ventilation and Air Conditioner HVAC Qualification
 
HVAC qualification .ppt
HVAC qualification .pptHVAC qualification .ppt
HVAC qualification .ppt
 
Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects Facility Qualification & Consideration of Validation Aspects
Facility Qualification & Consideration of Validation Aspects
 
Equipment Qualification.pptx
Equipment Qualification.pptxEquipment Qualification.pptx
Equipment Qualification.pptx
 
WHO guideline on Validation .pdf
WHO guideline on Validation .pdfWHO guideline on Validation .pdf
WHO guideline on Validation .pdf
 
Validation Part5
Validation Part5Validation Part5
Validation Part5
 
PIC/S Guide to GMP PE009-13 - Key changes to Annex 15 - Qualification and val...
PIC/S Guide to GMP PE009-13 - Key changes to Annex 15 - Qualification and val...PIC/S Guide to GMP PE009-13 - Key changes to Annex 15 - Qualification and val...
PIC/S Guide to GMP PE009-13 - Key changes to Annex 15 - Qualification and val...
 
Equipment qualification
Equipment qualificationEquipment qualification
Equipment qualification
 
Tiêu chuẩn GMP WHO trong kiểm nghiệm, đánh giá
Tiêu chuẩn GMP WHO trong kiểm nghiệm, đánh giáTiêu chuẩn GMP WHO trong kiểm nghiệm, đánh giá
Tiêu chuẩn GMP WHO trong kiểm nghiệm, đánh giá
 
Principle of Validation and Qualification
Principle of Validation and QualificationPrinciple of Validation and Qualification
Principle of Validation and Qualification
 
validationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdfvalidationmasterplan-180918073044 (3).pdf
validationmasterplan-180918073044 (3).pdf
 
Validation master plan
Validation master planValidation master plan
Validation master plan
 
ICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptx
ICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptxICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptx
ICH AND WHO GUIDELINES FOR VALIDATION OF EQUIPMENTS.pptx
 
Cleanroom Qualification
Cleanroom QualificationCleanroom Qualification
Cleanroom Qualification
 
Validation ksd
Validation ksdValidation ksd
Validation ksd
 
Phụ lục 5. Hướng dẫn chuẩn bị hệ thống HVAC cho các sản phẩm thuộc dạng bào c...
Phụ lục 5. Hướng dẫn chuẩn bị hệ thống HVAC cho các sản phẩm thuộc dạng bào c...Phụ lục 5. Hướng dẫn chuẩn bị hệ thống HVAC cho các sản phẩm thuộc dạng bào c...
Phụ lục 5. Hướng dẫn chuẩn bị hệ thống HVAC cho các sản phẩm thuộc dạng bào c...
 
Calibration of MMDs to meet QMS
Calibration of MMDs to meet QMSCalibration of MMDs to meet QMS
Calibration of MMDs to meet QMS
 
Validation qualification
Validation qualificationValidation qualification
Validation qualification
 
Validation boot camp 4
Validation boot camp 4Validation boot camp 4
Validation boot camp 4
 

GMP Training Modules HVAC Systems

  • 1. Supplementary Training Modules on Good Manufacturing Practice Validation WHO Technical Report Series, No. 937, 2006. Annex 4. Validation | Slide 1 of 48 August 2006
  • 2. Validation  Part 1. General overview on qualification and validation  Part 2. Qualification of HVAC and water systems  Part 3. Cleaning validation  Part 4. Analytical method validation  Part 5. Computerized system validation  Part 6. Qualification of systems and equipment  Part 7. Non sterile product process validation Validation | Slide 2 of 48 August 2006
  • 3. Supplementary Training Modules on Good Manufacturing Practice Qualification of HVAC and water systems Part 2 WHO Technical Report Series, No. 937, 2006. Annex 4. Appendix 1 and 2 Validation | Slide 3 of 48 August 2006
  • 4. HVAC Objectives To understand key issues in – commissioning, – qualification and – maintenance of HVAC and Water systems 8. Validation | Slide 4 of 48 August 2006
  • 5. HVAC Documentation requirements to assist in commissioning, qualification and maintenance Description of design, installation and functions Specifications, requirements Manuals Operating procedures Instructions for performance control, monitoring and records Maintenance instructions and records Training of personnel ― programme and records Validation | Slide 5 of 48 August 2006
  • 6. HVAC Commissioning  Precursor to qualification  Includes setting up, balancing, adjustment and testing of entire HVAC system to ensure it meets requirements in URS and capacity  Acceptable tolerances for parameters  Training of personnel 8.1.1, 8.1.4, 8.1.5 Validation | Slide 6 of 48 August 2006
  • 7. HVAC Commissioning (2) Records and data maintained include:  Installation records – documented evidence of measure capacities of the system  Data: design and measurement for, e.g. air flow, system pressures  O&M manuals, schematic drawings, protocols, reports 8.1.2, 8.1.3, 8.1.6 Validation | Slide 7 of 48 August 2006
  • 8. HVAC Qualification  Validation is an extensive exercise  Qualification of the HVAC system is one component in the overall approach that covers premises, systems/utilities, equipment, processes, etc.  See also full guidelines on "Validation" in WHO TRS, No. 937, 2005, Annex 4  Risk based approach for HVAC qualification 8.2.1 Validation | Slide 8 of 48 August 2006
  • 9. HVAC Qualification (2)  Described in a Validation Master Plan (VMP)  VMP to include the nature and extent of tests, and protocols  DQ, IQ, OQ, and PQ  Risk analysis to determine critical and non-critical parameters, components, subsystems and controls 8.2.2 – 8.2.5 Validation | Slide 9 of 48 August 2006
  • 10. HVAC Qualification (3)  Direct impact components and critical parameters should be included  Non-critical systems and components are subjected to Good Engineering Practices (GEP)  Acceptance criteria and limits defined in design stage  Design conditions, normal operating ranges, operating ranges, alert and action limits 8.2.5 – 8.2.11 Validation | Slide 10 of 48 August 2006
  • 11. HVAC  Design A C T IO N L IM IT A C T IO N L IM IT conditions A L E R T L IM IT A L E R T L IM IT and normal operating ranges set to achievable limits  OOS results D e s ig n C o n d itio n recorded N o r m a l O p e r a tin g R a n g e O p e r a tin g R a n g e - V a lid a te d A c c e p ta n c e C r ite r ia 8.2.12 – 8.2.15 Validation | Slide 11 of 48 August 2006
  • 12. HVAC Qualification – examples of aspects to consider  DQ – Design of the system, URS – (e.g. components, type of air treatment needed, materials of construction)  IQ – Verify installation – E.g. relevant components, ducting, filters, controls, monitors, sensors, etc. – Includes calibration where relevant Validation | Slide 12 of 48 August 2006
  • 13. HVAC Qualification (4) Typical parameters to be included in qualification (based on risk assessment):  Temperature  Relative humidity  Supply, return and exhaust air quantities  Room air change rates  Room pressures (pressure differentials) 8.2.17 Validation | Slide 13 of 48 August 2006
  • 14. HVAC Qualification (5) Typical parameters to be included in qualification (based on risk assessment) (2):  Room clean-up rate  Particulate matter, microbial matter (viable and non-viable)  HEPA filter penetration tests  Containment system velocity  Warning/alarm systems 8.2.17 Validation | Slide 14 of 48 August 2006
  • 15. HVAC Qualification (6) Conduct of the tests:  Time intervals and procedure to be defined by the manufacturer  Influenced by the type of facility and level of protection  See also ISO 14644 for methods of testing  Requalification, and change control 8.2.18 – 8.2.20, 8.2.9 Validation | Slide 15 of 48 August 2006
  • 16. HVAC Qualification (7)  Tests performed according to protocols and procedures for the tests  Results recorded and presented in report (source data kept)  Traceability, e.g. devices and standards used, calibration records; and conditions specified Validation | Slide 16 of 48 August 2006
  • 17. HVAC Schedule of tests to demonstrate continuing compliance Test Parameter Objective Maximum time Test procedure* interval and key aspects Particle count test Verifies cleanliness 6 months or 12 Particle counter. months depending on Readings and Class positions Air pressure Absence of cross- 12 months Measure pressure difference contamination difference Airflow volume Verify air change 12 months Measure supply and rates return air, calculate air change rate Airflow velocity Verify unidirectional 12 months Velocity airflow and or measurement containment condition 8. Table 3 *Test procedure as per ISO 14644 Validation | Slide 17 of 48 August 2006
  • 18. HVAC Recommended optional strategic tests Test Parameter Objective Maximum time Test procedure* interval and key aspects Filter leakage Verify filter integrity 12 months Filter media and filter seal integrity Containment leakage Verify absence of 12 months Airflow direction and cross-contamination pressure differential Recovery (time) Verify clean-up time 12 months Time taken maximum 15 minutes Airflow visualization Verify required airflow 12 months Airflow direction, patterns documented evidence *Test procedure as per ISO 14644 8. Table 3 Validation | Slide 18 of 48 August 2006
  • 19. HVAC Cleanroom monitoring programme (1)  Routine monitoring programme as part of quality assurance  Additional monitoring and triggers, e.g. 1. Shutdown 2. Replacement of filter elements 3. Maintenance of air-handling systems 4. Exceeding of established limits Validation | Slide 19 of 48 August 2006
  • 20. HVAC Cleanroom monitoring programme (2) Particles and Microbiological contaminants Number of points/locations for monitoring determined, specified, documented in procedure and or protocol Sufficient time for exposure, and suitable sample size Identification and marking of sampling points Definition of transport, storage, and incubation conditions Results to reflect the procedure/protocol followed Define alert and action limits as a function of cleanliness zone/class See also ISO 14644 Validation | Slide 20 of 48 August 2006
  • 21. HVAC Cleanroom monitoring programme (3) Cleanrooms should be monitored for microorganisms and particles air Example of a sampling point Validation | Slide 21 of 48 August 2006
  • 22. HVAC Definition of Conditions as built at rest in operation air air air Validation | Slide 22 of 48 August 2006
  • 23. HVAC Qualification – examples of aspects to consider in qualification (OQ, PQ) Uni-directional Turbulent / mixed Test Description airflow / LAF airflow Differential pressure on filters 2 2 Room differential pressure N/A 2, 3 1 := As built (ideally used to perform IQ) 2 = At rest (ideally used to perform OQ) Airflow velocity / uniformity 2, 3 Optional 3 = Operational (ideally used to perform PQ) Airflow volume / rate 2 2 Parallelism 2 N/A Airflow pattern 2 3 Validation | Slide 23 of 48 August 2006
  • 24. HVAC Qualification – examples of aspects to consider in qualification (OQ, PQ) Uni-directional Turbulent / Test Description airflow / LAF mixed airflow Recovery time N/A 2 1 := As built (ideally used to perform IQ) Room classification (airborne particle) 2 2,3 2 = At rest (ideally used to perform OQ) Temperature, humidity N/A 2,3 3 = Operational (ideally used to perform PQ) Validation | Slide 24 of 48 August 2006
  • 25. HVAC Maintenance  Procedure, programme and records for planned, preventative maintenance – e.g. Cleaning of filters, calibration of devices  Appropriate training for personnel  Change of HEPA filters by suitably trained persons  Impact of maintenance on: – Product quality 8.3.1 – 8.3.5 – Qualification Validation | Slide 25 of 48 August 2006
  • 26. HVAC Inspecting the air-handling system Verification of design documentation, including description of installation and functions specification of the requirements Operating procedures Maintenance instructions Maintenance records Training logs Environmental records Discussion on actions if OOS values On site verification (walking around the site) Validation | Slide 26 of 48 August 2006
  • 27. HVAC Conclusion Air-handling systems: Play a major role in the quality of pharmaceuticals Should be designed properly, by professionals Should be treated as a critical system Validation | Slide 27 of 48 August 2006
  • 28. HVAC Further proceedings This series of explanations will now be followed by: Group discussion, with a simple exercise Short test Validation | Slide 28 of 48 August 2006
  • 29. HVAC Group Session S a m p lin g Rooom S e rv i c e C o rrid o r ( c o n t a in s V a c u u m & R O w a t e r s u p p ly ) A ir S h o w e r W a re h o u se A ir L o c k 2 W e ig h in g T a b le t 1 T a b le t 2 L iq u id s M ix S o ftg e l C a p su le P a c kin g A / Lock 1 C le a n C o rrid o r E m ergenc y E x it M a le F e m a le 2 S ta g e Change 2 Change 2 S te ril e e y e d ro p s p e rso n n e l P ri m a ry & S e c o n d a ry d isp e n sin g e n try fo r P a c ke d P a c kin g & a c e p tic fillin g e y e d ro p s G oods A ir L o c k 3 Q u a ra n tin e M a le F e m a le Change 1 Change 1 E q u ip m e n t W a sh A ir L o c k 4 S e rv ic e R o o m Validation | Slide 29 of 48 August 2006
  • 30. HVAC Group Session – modified layout 20P a S a m p lin g Rooom 0P a S e rv ic e C o rrid o r 30P a ( c o n t a in s V a c u u m & R O w a t e r s u p p ly ) A ir S h o w e r 20P a 30P a 10P a W e ig h P o st B o o th S ta g in g S o ftg e l C a p su le W a re h o u se 20P a 30P a T a b le t 1 T a b le t 2 L iq u id s M ix P a c kin g M AL 2 15P a 15P a 30P a 0P a A ir L o c k M A L1 15P a 30P a C l e a n C o rri d o r E m ergenc y E x it 20P a 20P a PAL 40P a M a le F e m a le 10P a M AL 3 Change 2 Change 2 S e c o n d a ry P rim a ry S te ril e e y e d ro p s P a c kin g P a c kin g 40P a d isp e n sin g P a c ke d & a sc e p tic fillin g G oods Q u a ra n ti n e 20P a 30P a 10P a 10P a 60P a Change M a le F e m a le 15P a M AL 4 50P a Change 1 Change 1 E q u ip m e n t W a sh 50P a A ir L o c k 4 S e rv ic e R o o m 0P a 0P a 0P a MAL = Material Air Lock PAL = Personnel Air Lock Validation | Slide 30 of 48 August 2006
  • 31. Supplementary Training Modules on Good Manufacturing Practice Commissioning, Qualification and validation of Water systems WHO Technical Report Series No 929, 2005. Annex 3 Validation | Slide 31 of 48 August 2006
  • 32. HVAC Objectives  To understand key issues in – commissioning, – qualification and – maintenance of HVAC and Water systems 7. Validation | Slide 32 of 48 August 2006
  • 33. Water for Pharmaceutical Use Objectives To discuss the operational considerations of water systems including: Start up, commissioning and qualification Monitoring Maintenance System reviews 7. Validation | Slide 33 of 48 August 2006
  • 34. Water for Pharmaceutical Use Start up and commissioning  Precursor to qualification and validation  Should be planned, well defined, well documented  Includes setting to work  Includes system set-up  Includes recording of system performance parameters  Controls loop tuning 7.1 Validation | Slide 34 of 48 August 2006
  • 35. Water for Pharmaceutical Use Qualification  WPU systems are "direct impact systems"  Therefore stages to be considered in qualification should include DQ, IQ, OQ, PQ  DQ: Design review influenced by source water and required water quality  IQ: Installation verification of the system 7.2 Validation | Slide 35 of 48 August 2006
  • 36. Water for Pharmaceutical Use Qualification  OQ: operational qualification  Presentation focusing on PQ  PQ demonstrates consistent and reliable performance of the system  Three phase approach recommended over extended period – proves reliability and robustness 7.2 Validation | Slide 36 of 48 August 2006
  • 37. Water for Pharmaceutical Use Phase 1 (1)  A test period of 2–4 weeks - monitoring the system intensively  System to operate continuously without failure or performance deviation The following should be included in the testing approach:  Undertake chemical and microbiological testing in accordance with a defined plan 7.2 Validation | Slide 37 of 48 August 2006
  • 38. Water for Pharmaceutical Use Phase 1 (2)  Sample daily: – incoming feed-water – after each step in the purification process – each point of use and at other defined sample points  Develop: – appropriate operating ranges – and finalize operating, cleaning, sanitizing and maintenance procedures 7.2 Validation | Slide 38 of 48 August 2006
  • 39. Water for Pharmaceutical Use Phase 1 (3)  Demonstrate production and delivery of product water of the required quality and quantity  Use and refine the standard operating procedures (SOPs) for operation, maintenance, sanitization and troubleshooting  Verify provisional alert and action levels  Develop and refine test-failure procedure 7.2 Validation | Slide 39 of 48 August 2006
  • 40. Water for Pharmaceutical Use Phase 2 (1)  A further test period of 2–4 weeks – further intensive monitoring the system  Deploying all the refined SOPs after the satisfactory completion of phase 1  Sampling scheme generally the same as in phase 1  Water can be used for manufacturing purposes during this phase 7.2 Validation | Slide 40 of 48 August 2006
  • 41. Water for Pharmaceutical Use Phase 2 (2) Demonstrate:  Consistent operation within established ranges  Consistent production and delivery of water of the required quantity and quality when the system is operated in accordance with the SOPs. 7.2 Validation | Slide 41 of 48 August 2006
  • 42. Water for Pharmaceutical Use Phase 3  Over one year after the satisfactory completion of phase 2  Water can be used for manufacturing purposes during this phase Demonstrate: – extended reliable performance – that seasonal variations are evaluated  Sample locations, sampling frequencies and tests should be reduced to the normal routine pattern based on established procedures proven during phases 1 and 2 7.2 Validation | Slide 42 of 48 August 2006
  • 43. Water for Pharmaceutical Use Ongoing system monitoring  After Phase 3 – system review needed  Based on review including results, establish a routine monitoring plan  Monitoring to include a combination of on-line monitoring and off- line sample testing  Data analysed for trends 7.3 Validation | Slide 43 of 48 August 2006
  • 44. Water for Pharmaceutical Use Ongoing system monitoring (2)  Monitoring parameters to include: – flow, pressure, temperature, conductivity, TOC  Samples taken: – From points of use, and specific sample points – In a similar way how water is used in service  Tests to include physical, chemical and microbial attributes 7.3 Validation | Slide 44 of 48 August 2006
  • 45. Water for Pharmaceutical Use Maintenance A controlled, documented maintenance programme covering:  Defined frequency with plan and instructions  Calibration programme  SOPs for tasks  Control of approved spares 7.4  Record and review of problems and faults during maintenance Validation | Slide 45 of 48 August 2006
  • 46. Water for Pharmaceutical Use System review  WPU (PW, HPW and WFI) systems to be reviewed at appropriate regular intervals  Review team includes engineering, QA, operations and maintenance 7.5 Validation | Slide 46 of 48 August 2006
  • 47. Water for Pharmaceutical Use System review (2)  The review to cover, e.g. – changes made since the last review; – system performance; – reliability; – quality trends; – failure events; – investigations; – out-of-specifications results from monitoring; – changes to the installation; – updated installation documentation; – log books; and – the status of the current SOP lists 7.5 Validation | Slide 47 of 48 August 2006
  • 48. Validation  Group session Validation | Slide 48 of 48 August 2006

Notas del editor

  1. दिसंबर 4, 2012 In this supplementary training module, we will be looking at the recommendations by WHO, on Validation and qualification. The module consists of 7 parts: Part 1. General overview on qualification and validation Part 2. Qualification of HVAC and water systems Part 3. Cleaning validation Part 4. Analytical method validation Part 5. Computerized system validation Part 6. Qualification of systems and equipment Part 7. Non sterile product process validation Each part deals with a specific topic, and each part can be presented in about one to one and a half hours time. Presenters should know the topics and add practical examples to the texts taken from the WHO guideline.
  2. दिसंबर 4, 2012
  3. दिसंबर 4, 2012
  4. दिसंबर 4, 2012 First number of slides dealing with HVAC, followed by water systems
  5. दिसंबर 4, 2012
  6. दिसंबर 4, 2012 8 . Commissioning, qualification and maintenance 8.1 Commissioning 8.1.1 Commissioning should include the setting up, balancing, adjustment and testing of the entire HVAC system, to ensure that it meets all the requirements, as specifi ed in the user requirement specifi cation (URS), and capacities as specifi ed by the designer or developer . 8.1.2 The installation records of the system should provide documented evidence of all measured capacities of the system . 8.1.3 The data should include items such as the design and measurement fi gures for airfl ows, water fl ows, system pressures and electrical amperages . These should be contained in the operating and maintenance manuals ( O & M manuals ). 8.1.4 Acceptable tolerances for all system parameters should be specifi ed prior to commencing the physical installation . 8.1.5 Training should be provided to personnel after installation of the system, and should include operation and maintenance .
  7. दिसंबर 4, 2012 8.1.3 The data should include items such as the design and measurement fi gures for airfl ows, water fl ows, system pressures and electrical amperages . These should be contained in the operating and maintenance manuals ( O & M manuals ). 8.1.4 Acceptable tolerances for all system parameters should be specifi ed prior to commencing the physical installation . 8.1.5 Training should be provided to personnel after installation of the system, and should include operation and maintenance . 8.1.6 O & M manuals, schematic drawings, protocols and reports should be maintained as reference documents for any future changes and upgrades to the system .
  8. दिसंबर 4, 2012 8.2 Qualifi cation 8.2.1 Validation is a many-faceted and extensive activity and is beyond the scope of these guidelines. Qualifi cation and validation guidelines are included in: Expert Committee on Specifi cations for Pharmaceutical Preparations . Fortieth report . Geneva, World Health Organization, 2005 (WHO Technical Report Series, No. 937), Annex 4 (see also Fig. 28 ).
  9. दिसंबर 4, 2012 8.2.2 The qualifi cation of the HVAC system should be described in a validation master plan (VMP ). 8.2.3 It should defi ne the nature and extent of testing and the test procedures and protocols to be followed . 8.2.4 Stages of the qualifi cation of the HVAC system should include DQ , IQ, OQ and PQ . 8.2.5 Critical and non-critical parameters should be determined by means of a risk analysis for all HVAC installation components, subsystems and controls .
  10. दिसंबर 4, 2012 8.2.5 Critical and non-critical parameters should be determined by means of a risk analysis for all HVAC installation components, subsystems and controls . 8.2.6 Any parameter that may affect the quality of the pharmaceutical product, or a direct impact component, should be considered a critical parameter . 8.2.7 All critical parameters should be included in the qualifi cation process . Note: A realistic approach to differentiating between critical and noncritical parameters is required, to avoid making the validation process unnecessarily complex . Example : • The humidity of the room where the product is exposed should be considered a critical parameter when a humidity-sensitive product is being manufactured. The humidity sensors and the humidity monitoring system should, therefore, be qualifi ed. The heat transfer system, chemical drier or steam humidifi er, which is producing the humidity controlled air, is further removed from the product and may not require operational qualifi cation . Figure 28 Qualifi cation is a part of validation Equip 1 Equip 2 Equip 3 Equip 4 Equip 5 Equip 6 QUALIFICATION VALIDATION Equip 7 System 2 System 1 Process Equip, equipment . 80 Figure 29 System operating ranges • A room cleanliness classifi cation is a critical parameter and, therefore , the room air change rates and HEPA fi lters should be critical parameters and require qualifi cation. Items such as the fan generating the airfl ow and the primary and secondary fi lters are non-critical parameters, and may not require operational qualifi cation . 8.2.8 Non-critical systems and components should be subject to GEP and may not necessarily require qualifi cation . 8.2.9 A change control procedure should be followed when changes are planned to the direct impact HVAC system, its components and controls that may affect critical parameters . 8.2.10 Acceptance criteria and limits should be defi ned during the design stage . 8.2.11 The manufacturer should defi ne design conditions, normal operating ranges, operating ranges, and alert and action limits .
  11. दिसंबर 4, 2012
  12. दिसंबर 4, 2012 8.2.17 For a pharmaceutical facility, based on a risk assessment, some of the typical HVAC system parameters that should be qualifi ed may include : — temperature — relative humidity — supply air quantities for all diffusers — return air or exhaust air quantities — room air change rates — room pressures (pressure differentials ) — room airfl ow patterns — unidirectional fl ow velocities — containment system velocities — HEPA fi lter penetration tests — room particle counts — room clean-up rates — microbiological air and surface counts where appropriate — operation of de-dusting — warning/alarm systems where applicable .
  13. दिसंबर 4, 2012
  14. दिसंबर 4, 2012 8.2.18 The maximum time interval between tests should be defi ned by the manufacturer. The type of facility under test and the product level of protection should be considered . Note: Table 3 gives intervals for reference purposes only. The actual test periods may be more frequent or less frequent, depending on the product and process . 8.2.19 Periodic requalifi cation of parameters should be done at regular intervals, e.g. annually . 8.2.20 Requalifi cation should also be done when any change, which could affect system performance, takes place .
  15. दिसंबर 4, 2012
  16. दिसंबर 4, 2012
  17. दिसंबर 4, 2012
  18. दिसंबर 4, 2012
  19. दिसंबर 4, 2012
  20. दिसंबर 4, 2012
  21. दिसंबर 4, 2012
  22. दिसंबर 4, 2012 This slide shows a series of tests to be carried out during qualification. There are different tests for the turbulent and for the uni-directional air flows. The differential pressure on filters is an indication of the clogging of the filters: with the charging of dust on the filters, the differential pressure will increase. In order to keep the volume of air constant, the fan speed may increase, with the following consequences: Damage to filters, and passage of unfiltered air Particles and micro-organismes will be “pushed” through the filter units. (Inspectors should check whether pressure differential manometers are installed on the AHUs. Without this means of monitoring the filters, the system could go out of control causing contamination problems.) Airflow patterns are interesting to visualize (smoke tests), as zones without proper flushing can be easily identified. It is also important to monitor air flow velocities for each HEPA filter according to a program of established intervals because significant reductions in velocity can increase the possibility of contamination, and changes in velocity can affect the laminarity of the airflow. Airflow patterns should be tested for turbulence, as these can interfere with the flushing action of the air.
  23. दिसंबर 4, 2012 The recovery time (clean-up time) is also an important parameter to be determined . O nce doors have been opened and people have been entering a room, the original conditions have been disturbed and, for a short while, before recovering, the room does not always correspond to the laid down parameters. It is important to know how long this period is. There are no regulations laid down as to how long this clean-up time should be. However, the generally accepted time to clean-up from one cleanroom classification to the next higher classification, should be less than 15 minutes. It should also be remembered that a room is to be qualified “in operation” when it ha s a certain number of people in it. A fter qualification, the number of people in that room, as challenged during qualification, cannot be exceeded. Temperature and humidity can also be important (comfort in clean areas, stability of effervescent products, etc.)
  24. दिसंबर 4, 2012 8.3 Maintenance 8.3.1 There should be a planned preventive maintenance programme , procedures and records for the HVAC system. Records should be kept . 8.3.2 Maintenance personnel should receive appropriate training . 82 8.3.3 HEPA fi lters should be changed either by a specialist or a trained person . 8.3.4 Any maintenance activity should be assessed critically to determine any impact on product quality including possible contamination . 8.3.5 Maintenance activities should normally be scheduled to take place outside production hours, and any system stoppage should be assessed with a view to the possible need for requalifi cation of an area as a result of an interruption of the service .
  25. दिसंबर 4, 2012
  26. दिसंबर 4, 2012
  27. दिसंबर 4, 2012
  28. दिसंबर 4, 2012 The diagram, which is given in handout 3-3-26 , shows a layout of a small pharmaceutical plant for non-sterile tablets, liquids and soft-gel capsules, as well as aseptically filled eye-drops. The group session participants should indicate on the diagram the required cleanroom classes, room pressures (in Pa), as well as any architectural changes which they think necessary. (This layout is not ideal, but as many different types of operations have been incorporated in the facility as possible, so that different concepts can be addressed.) (Note to trainer: The next handout, 3-3-27, giving suggested modifications, should not be distributed until after the group discussion has taken place.)
  29. दिसंबर 4, 2012 This slide indicates the proposed additions, and can be displayed after the group session discussions have taken place. See handout 3-3-27.
  30. दिसंबर 4, 2012
  31. दिसंबर 4, 2012 First 30 odd slides dealing with HVAC, followed by water systems
  32. दिसंबर 4, 2012
  33. दिसंबर 4, 2012 7 . Operational considerations 7.1 Start-up and commissioning of water systems Planned, well-de.ned, successful and well-documented commissioning is an essential precursor to successful validation of water systems . The commissioning work should include setting to work, system setup, controls loop tuning and recording of all system performance parameters. If it is intended to use or refer to commissioning data within the validation work then the quality of the commissioning work and associated data and documentation must be commensurate with the validation plan requirements .
  34. दिसंबर 4, 2012 7.2 Qualification WPU, PW, HPW and WFI systems are all considered to be direct impact, quality critical systems that should be quali.ed. The quali.cation should follow the validation convention of design review or design quali.cation (DQ), installation quali.cation (IQ), operational quali.cation (OQ) and performance quali.cation (PQ ). This guidance does not de.ne the standard requirements for the conventional validation stages DQ, IQ and OQ, but concentrates on the particular PQ approach that should be used for WPU systems to demonstrate their consistent and reliable performance. A three-phase approach should be used to satisfy the objective of proving the reliability and robustness of the system in service over an extended period . Phase 1 . A test period of 2–4 weeks should be spent monitoring the system intensively. During this period the system should operate continuously without failure or performance deviation. The following should be included in the testing approach . • Undertake chemical and microbiological testing in accordance with a de.ned plan . • Sample the incoming feed-water daily to verify its quality . • Sample after each step in the puri.cation process daily . • Sample at each point of use and at other de.ned sample points daily . • Develop appropriate operating ranges . • Develop and .nalize operating, cleaning, sanitizing and maintenance procedures . • Demonstrate production and delivery of product water of the required quality and quantity . • Use and re.ne the standard operating procedures (SOPs) for operation, maintenance, sanitization and troubleshooting . • Verify provisional alert and action levels . • Develop and re.ne test-failure procedure . Phase 2. A further test period of 2–4 weeks should be spent carrying out further intensive monitoring while deploying all the re.ned SOPs after the satisfactory completion of phase 1. The sampling scheme should be generally the same as in phase 1. Water can be used for manufacturing purposes during this phase. The approach should also : — demonstrate consistent operation within established ranges; and — demonstrate consistent production and delivery of water of the required quantity and quality when the system is operated in accordance with the SOPs . Phase 3 . Phase 3 typically runs for 1 year after the satisfactory completion of phase 2. Water can be used for manufacturing purposes during this phase which has the following objectives and features . • Demonstrate extended reliable performance . • Ensure that seasonal variations are evaluated . • The sample locations, sampling frequencies and tests should be reduced to the normal routine pattern based on established procedures proven during phases 1 and 2 .
  35. दिसंबर 4, 2012 7.2 Qualification WPU, PW, HPW and WFI systems are all considered to be direct impact, quality critical systems that should be quali.ed. The quali.cation should follow the validation convention of design review or design quali.cation (DQ), installation quali.cation (IQ), operational quali.cation (OQ) and performance quali.cation (PQ ). This guidance does not de.ne the standard requirements for the conventional validation stages DQ, IQ and OQ, but concentrates on the particular PQ approach that should be used for WPU systems to demonstrate their consistent and reliable performance. A three-phase approach should be used to satisfy the objective of proving the reliability and robustness of the system in service over an extended period . Phase 1 . A test period of 2–4 weeks should be spent monitoring the system intensively. During this period the system should operate continuously without failure or performance deviation. The following should be included in the testing approach . • Undertake chemical and microbiological testing in accordance with a de.ned plan . • Sample the incoming feed-water daily to verify its quality . • Sample after each step in the puri.cation process daily . • Sample at each point of use and at other de.ned sample points daily . • Develop appropriate operating ranges . • Develop and .nalize operating, cleaning, sanitizing and maintenance procedures . • Demonstrate production and delivery of product water of the required quality and quantity . • Use and re.ne the standard operating procedures (SOPs) for operation, maintenance, sanitization and troubleshooting . • Verify provisional alert and action levels . • Develop and re.ne test-failure procedure . Phase 2. A further test period of 2–4 weeks should be spent carrying out further intensive monitoring while deploying all the re.ned SOPs after the satisfactory completion of phase 1. The sampling scheme should be generally the same as in phase 1. Water can be used for manufacturing purposes during this phase. The approach should also : — demonstrate consistent operation within established ranges; and — demonstrate consistent production and delivery of water of the required quantity and quality when the system is operated in accordance with the SOPs . Phase 3 . Phase 3 typically runs for 1 year after the satisfactory completion of phase 2. Water can be used for manufacturing purposes during this phase which has the following objectives and features . • Demonstrate extended reliable performance . • Ensure that seasonal variations are evaluated . • The sample locations, sampling frequencies and tests should be reduced to the normal routine pattern based on established procedures proven during phases 1 and 2 .
  36. दिसंबर 4, 2012 7.2 Qualification WPU, PW, HPW and WFI systems are all considered to be direct impact, quality critical systems that should be quali.ed. The quali.cation should follow the validation convention of design review or design quali.cation (DQ), installation quali.cation (IQ), operational quali.cation (OQ) and performance quali.cation (PQ ). This guidance does not de.ne the standard requirements for the conventional validation stages DQ, IQ and OQ, but concentrates on the particular PQ approach that should be used for WPU systems to demonstrate their consistent and reliable performance. A three-phase approach should be used to satisfy the objective of proving the reliability and robustness of the system in service over an extended period . Phase 1 . A test period of 2–4 weeks should be spent monitoring the system intensively. During this period the system should operate continuously without failure or performance deviation. The following should be included in the testing approach . • Undertake chemical and microbiological testing in accordance with a de.ned plan . • Sample the incoming feed-water daily to verify its quality . • Sample after each step in the puri.cation process daily . • Sample at each point of use and at other de.ned sample points daily . • Develop appropriate operating ranges . • Develop and .nalize operating, cleaning, sanitizing and maintenance procedures . • Demonstrate production and delivery of product water of the required quality and quantity . • Use and re.ne the standard operating procedures (SOPs) for operation, maintenance, sanitization and troubleshooting . • Verify provisional alert and action levels . • Develop and re.ne test-failure procedure .
  37. दिसंबर 4, 2012 Phase 1 . A test period of 2–4 weeks should be spent monitoring the system intensively. During this period the system should operate continuously without failure or performance deviation. The following should be included in the testing approach . • Undertake chemical and microbiological testing in accordance with a de.ned plan . • Sample the incoming feed-water daily to verify its quality . • Sample after each step in the puri.cation process daily . • Sample at each point of use and at other de.ned sample points daily . • Develop appropriate operating ranges . • Develop and .nalize operating, cleaning, sanitizing and maintenance procedures . • Demonstrate production and delivery of product water of the required quality and quantity . • Use and re.ne the standard operating procedures (SOPs) for operation, maintenance, sanitization and troubleshooting . • Verify provisional alert and action levels. • Develop and re.ne test-failure procedure .
  38. दिसंबर 4, 2012
  39. दिसंबर 4, 2012 Phase 2. A further test period of 2–4 weeks should be spent carrying out further intensive monitoring while deploying all the re.ned SOPs after the satisfactory completion of phase 1. The sampling scheme should be generally the same as in phase 1. Water can be used for manufacturing purposes during this phase. The approach should also : — demonstrate consistent operation within established ranges; and — demonstrate consistent production and delivery of water of the required quantity and quality when the system is operated in accordance with the SOPs .
  40. दिसंबर 4, 2012
  41. दिसंबर 4, 2012 Phase 3 . Phase 3 typically runs for 1 year after the satisfactory completion of phase 2. Water can be used for manufacturing purposes during this phase which has the following objectives and features . • Demonstrate extended reliable performance . • Ensure that seasonal variations are evaluated . • The sample locations, sampling frequencies and tests should be reduced to the normal routine pattern based on established procedures proven during phases 1 and 2 .
  42. दिसंबर 4, 2012 7.3 Continuous system monitoring After completion of phase 3 of the quali.cation programme for the WPU system, a system review should be undertaken. Following this review, a routine monitoring plan should be established based on the results of phase 3 . Monitoring should include a combination of online instrument monitoring of parameters such as .ow, pressure, temperature, conductivity and total organic carbon, and of.ine sample testing for physical, chemical and microbiological attributes. Of.ine samples should be taken from points of use and speci.c sample points. Samples from points of use should be taken in a similar way to that adopted when the water is being used in service . Tests should be carried out to ensure that the selected pharmacopoeia speci.cation has been satis.ed, and should include, as appropriate, determination of conductivity, pH, heavy metals, nitrates, total organic carbon, total viable count, presence of speci.c pathogens and endotoxins. Monitoring data should be subject to trend analysis .
  43. दिसंबर 4, 2012
  44. दिसंबर 4, 2012 7.4 Maintenance of water systems WPU systems should be maintained in accordance with a controlled, documented maintenance programme that takes into account the following : — de.ned frequency for system elements ; — the calibration programme ; — SOPs for speci.c tasks ; — control of approved spares ; — issue of clear maintenance plan and instructions ; — review and approval of systems for use upon completion of work; and — record and review of problems and faults during maintenance .
  45. दिसंबर 4, 2012 7.5 System reviews WPU (PW, HPW and WFI) systems should be reviewed at appropriate regular intervals. The review team should comprise representatives from engineering, QA, operations and maintenance. The review should consider matters such as : — changes made since the last review ; — system performance ; — reliability ; — quality trends ; — failure events ; — investigations ; — out-of-speci.cations results from monitoring ; — changes to the installation ; — updated installation documentation ; — log books; and — the status of the current SOP list .
  46. दिसंबर 4, 2012
  47. दिसंबर 4, 2012 The trainer should give the participants a case study, based on experience