SlideShare una empresa de Scribd logo
1 de 6
Sustainable Architecture
Rammed
Earth
By :- Huzefa Malik
INTRODUCTION
A Little History
El Badi palace Marrakech,
Morocco
Watch tower with mafraj in Wadi
Dhahr
-YEMEN
Chinese watch tower Han dynasty
Rammed earth structures can
therefore be loadbearing. The earth
is filled into a form and compressed
in layers similar to conventional in-
situ concrete. Alternatively large
rammed earth blocks can be pre-
cast in molds and then assembled
on site much like brickwork on a
larger scale.
Making Process
Advantages of Rammed Earth
• Earth can be recycled is easy and agreeable to work.
• Has good insulating properties if built with high thermal mass especially for hot climate.
• Known fact earth gives off no harmful emissions.
• Good for noise reduction and insulation.
• Earth doesn’t burn, so rammed earth walls are fire proof.
• Load bearing, which reduces the need for structural supports, therefore reducing building costs. Standard
400mm thick rammed earth walls can be used as load bearing in constructions up to four stories high.
Disadvantages of Rammed Earth
• It is labor-intensive to build, which makes them
relatively expensive.
• The ramming itself is relatively time consuming and
hard physical work.

Más contenido relacionado

La actualidad más candente

Literature case study - Druk White Lotus School
Literature case study - Druk White Lotus SchoolLiterature case study - Druk White Lotus School
Literature case study - Druk White Lotus Schoolnainadesh
 
Low cost construction
Low cost constructionLow cost construction
Low cost constructionAnuj Singhal
 
Wattle & Daub
Wattle & DaubWattle & Daub
Wattle & DaubKyle Lima
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise BuildingsPrasad Thanthratey
 
Earthquake resistant buildings in india
Earthquake resistant buildings in indiaEarthquake resistant buildings in india
Earthquake resistant buildings in indiaViva Bella Interiors
 
Architectural Case Study on Druk White Lotus School
Architectural Case Study on Druk White Lotus SchoolArchitectural Case Study on Druk White Lotus School
Architectural Case Study on Druk White Lotus SchoolRashmi Gautam
 
Bamboo construction, Ferrocement, Wattle & Daub technique
Bamboo construction, Ferrocement, Wattle & Daub techniqueBamboo construction, Ferrocement, Wattle & Daub technique
Bamboo construction, Ferrocement, Wattle & Daub techniqueAzleen Kazi
 
dome and vault
dome and vaultdome and vault
dome and vaultkaiwan1996
 
Cold and Cloudy climatic region
Cold and Cloudy climatic regionCold and Cloudy climatic region
Cold and Cloudy climatic regionM.I.T.,AURANGABAD
 
Low cost building materials and construction techniques
Low cost building materials and construction techniquesLow cost building materials and construction techniques
Low cost building materials and construction techniquesYash Kotgirwar
 

La actualidad más candente (20)

Literature case study - Druk White Lotus School
Literature case study - Druk White Lotus SchoolLiterature case study - Druk White Lotus School
Literature case study - Druk White Lotus School
 
Low cost construction
Low cost constructionLow cost construction
Low cost construction
 
Adobe construction
Adobe constructionAdobe construction
Adobe construction
 
Reinforced brickwork
Reinforced brickworkReinforced brickwork
Reinforced brickwork
 
Wattle & Daub
Wattle & DaubWattle & Daub
Wattle & Daub
 
Mud house
Mud houseMud house
Mud house
 
Dhajji wall
Dhajji wallDhajji wall
Dhajji wall
 
Types of Cladding
Types of CladdingTypes of Cladding
Types of Cladding
 
Case Study: High Rise Buildings
Case Study: High Rise BuildingsCase Study: High Rise Buildings
Case Study: High Rise Buildings
 
Earthquake resistant buildings in india
Earthquake resistant buildings in indiaEarthquake resistant buildings in india
Earthquake resistant buildings in india
 
Architectural Case Study on Druk White Lotus School
Architectural Case Study on Druk White Lotus SchoolArchitectural Case Study on Druk White Lotus School
Architectural Case Study on Druk White Lotus School
 
Space frames
Space framesSpace frames
Space frames
 
Bamboo construction, Ferrocement, Wattle & Daub technique
Bamboo construction, Ferrocement, Wattle & Daub techniqueBamboo construction, Ferrocement, Wattle & Daub technique
Bamboo construction, Ferrocement, Wattle & Daub technique
 
Evolution of the arch
Evolution of the archEvolution of the arch
Evolution of the arch
 
Shell structure
Shell structureShell structure
Shell structure
 
dome and vault
dome and vaultdome and vault
dome and vault
 
Cold and Cloudy climatic region
Cold and Cloudy climatic regionCold and Cloudy climatic region
Cold and Cloudy climatic region
 
Vernacular Architecture
Vernacular ArchitectureVernacular Architecture
Vernacular Architecture
 
Cseb
CsebCseb
Cseb
 
Low cost building materials and construction techniques
Low cost building materials and construction techniquesLow cost building materials and construction techniques
Low cost building materials and construction techniques
 

Similar a Rammed earth as Building material

CHAPTER 01 lecture 1.pptx
CHAPTER 01 lecture 1.pptxCHAPTER 01 lecture 1.pptx
CHAPTER 01 lecture 1.pptxYohannes345717
 
alternate wall technologies.pdf
alternate wall technologies.pdfalternate wall technologies.pdf
alternate wall technologies.pdfNithyashree594058
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSjagrutib22
 
Fly ash stablization ppt
Fly ash stablization pptFly ash stablization ppt
Fly ash stablization pptVikrant Sharma
 
Construction technology (process)
Construction technology (process)Construction technology (process)
Construction technology (process)Ain Ridzuan
 
MAXRaft Brochure
MAXRaft Brochure MAXRaft Brochure
MAXRaft Brochure Henry Edney
 
Pre fabricated home corona ridden.
Pre fabricated home  corona ridden.Pre fabricated home  corona ridden.
Pre fabricated home corona ridden.SumitKumawat15
 
high rise building (BURJ KHALIFA)
high rise building (BURJ KHALIFA)high rise building (BURJ KHALIFA)
high rise building (BURJ KHALIFA)suraj kumar
 
Shipping Container Architecture Research
Shipping Container Architecture ResearchShipping Container Architecture Research
Shipping Container Architecture ResearchPB4000XL
 
Iron making refractories
Iron making refractoriesIron making refractories
Iron making refractoriesN.Prakasan
 
Construction repair and maintenance of steep roof
Construction repair and maintenance of steep roofConstruction repair and maintenance of steep roof
Construction repair and maintenance of steep roofSaaranshChawla
 
Specifications of excavation and foundation
Specifications of excavation and foundationSpecifications of excavation and foundation
Specifications of excavation and foundationPrabhat chhirolya
 
Temeltas Bored Piling 25.06
Temeltas Bored Piling 25.06Temeltas Bored Piling 25.06
Temeltas Bored Piling 25.06Can Cihan Cankat
 

Similar a Rammed earth as Building material (20)

CHAPTER 01 lecture 1.pptx
CHAPTER 01 lecture 1.pptxCHAPTER 01 lecture 1.pptx
CHAPTER 01 lecture 1.pptx
 
alternate wall technologies.pdf
alternate wall technologies.pdfalternate wall technologies.pdf
alternate wall technologies.pdf
 
PRECAST.pdf
PRECAST.pdfPRECAST.pdf
PRECAST.pdf
 
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODSFERROCRETE - MATERIAL AND CONSTRUCTION METHODS
FERROCRETE - MATERIAL AND CONSTRUCTION METHODS
 
PRECAST.pptx
PRECAST.pptxPRECAST.pptx
PRECAST.pptx
 
Foam Concrete.ppt
Foam Concrete.pptFoam Concrete.ppt
Foam Concrete.ppt
 
Fly ash stablization ppt
Fly ash stablization pptFly ash stablization ppt
Fly ash stablization ppt
 
BURJ AL ARAB
BURJ AL ARABBURJ AL ARAB
BURJ AL ARAB
 
Podium
PodiumPodium
Podium
 
High rise construction
High rise constructionHigh rise construction
High rise construction
 
Construction technology (process)
Construction technology (process)Construction technology (process)
Construction technology (process)
 
MAXRaft Brochure
MAXRaft Brochure MAXRaft Brochure
MAXRaft Brochure
 
Pre fabricated home corona ridden.
Pre fabricated home  corona ridden.Pre fabricated home  corona ridden.
Pre fabricated home corona ridden.
 
high rise building (BURJ KHALIFA)
high rise building (BURJ KHALIFA)high rise building (BURJ KHALIFA)
high rise building (BURJ KHALIFA)
 
Shipping Container Architecture Research
Shipping Container Architecture ResearchShipping Container Architecture Research
Shipping Container Architecture Research
 
burj khalifa
burj khalifaburj khalifa
burj khalifa
 
Iron making refractories
Iron making refractoriesIron making refractories
Iron making refractories
 
Construction repair and maintenance of steep roof
Construction repair and maintenance of steep roofConstruction repair and maintenance of steep roof
Construction repair and maintenance of steep roof
 
Specifications of excavation and foundation
Specifications of excavation and foundationSpecifications of excavation and foundation
Specifications of excavation and foundation
 
Temeltas Bored Piling 25.06
Temeltas Bored Piling 25.06Temeltas Bored Piling 25.06
Temeltas Bored Piling 25.06
 

Último

Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Developmentchesterberbo7
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesVijayaLaxmi84
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptxmary850239
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQuiz Club NITW
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdfMr Bounab Samir
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...DhatriParmar
 
CHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxCHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxAneriPatwari
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxlancelewisportillo
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Association for Project Management
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptxmary850239
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1GloryAnnCastre1
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 

Último (20)

Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their uses
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx4.11.24 Mass Incarceration and the New Jim Crow.pptx
4.11.24 Mass Incarceration and the New Jim Crow.pptx
 
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITWQ-Factor General Quiz-7th April 2024, Quiz Club NITW
Q-Factor General Quiz-7th April 2024, Quiz Club NITW
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
MS4 level being good citizen -imperative- (1) (1).pdf
MS4 level   being good citizen -imperative- (1) (1).pdfMS4 level   being good citizen -imperative- (1) (1).pdf
MS4 level being good citizen -imperative- (1) (1).pdf
 
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
Beauty Amidst the Bytes_ Unearthing Unexpected Advantages of the Digital Wast...
 
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptxINCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
INCLUSIVE EDUCATION PRACTICES FOR TEACHERS AND TRAINERS.pptx
 
CHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxCHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptx
 
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptxQ4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
Q4-PPT-Music9_Lesson-1-Romantic-Opera.pptx
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
Team Lead Succeed – Helping you and your team achieve high-performance teamwo...
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx4.9.24 School Desegregation in Boston.pptx
4.9.24 School Desegregation in Boston.pptx
 
Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1Reading and Writing Skills 11 quarter 4 melc 1
Reading and Writing Skills 11 quarter 4 melc 1
 
Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"Mattingly "AI & Prompt Design: Large Language Models"
Mattingly "AI & Prompt Design: Large Language Models"
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 

Rammed earth as Building material

  • 4. El Badi palace Marrakech, Morocco Watch tower with mafraj in Wadi Dhahr -YEMEN Chinese watch tower Han dynasty
  • 5. Rammed earth structures can therefore be loadbearing. The earth is filled into a form and compressed in layers similar to conventional in- situ concrete. Alternatively large rammed earth blocks can be pre- cast in molds and then assembled on site much like brickwork on a larger scale. Making Process
  • 6. Advantages of Rammed Earth • Earth can be recycled is easy and agreeable to work. • Has good insulating properties if built with high thermal mass especially for hot climate. • Known fact earth gives off no harmful emissions. • Good for noise reduction and insulation. • Earth doesn’t burn, so rammed earth walls are fire proof. • Load bearing, which reduces the need for structural supports, therefore reducing building costs. Standard 400mm thick rammed earth walls can be used as load bearing in constructions up to four stories high. Disadvantages of Rammed Earth • It is labor-intensive to build, which makes them relatively expensive. • The ramming itself is relatively time consuming and hard physical work.